Loading...
HomeMy WebLinkAboutSDP201000083 Approval - County 2010-10-06`•w t � i "lxct�T� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 6, 2010 Mr. Craig Kotarski Timmons Group 919 Second Street SE Charlottesville, Virginia 22902 RE: SDP - 2010 -063- National College- Preliminary Site Plan Mr. Kotarski: The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on October 6th, 2011. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division/agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: �- Inc �vre. py4x( ? ZoninL, & Current Developm t approval to include: S,, e f ^ 0 ❑ Meet all the requirements in Chapter 18 Section 32 for ffinna 1 sitCe_,pllans, including landscape plans, and lighting plans. ❑ Architectural Review Board approval. Please contact Megan Yaniglos at 296 -5832 if you have questions or require additional information. Engineerine approval to include: ❑ Adequate sight distance triangles are shown on the plans. Refer to Design Manual. ❑ Provide a revised Simple Method Spreadsheet. ❑ The plan must meet all engineering requirements of the Water Protection, Subdivision, and Zoning Ordinances in addition to all engineering standards detailed in the County's Design Manual. Please contact Phil Custer at 296 -5832 if you have questions or require additional information. VDOT approval to include: ❑ Final site plans will need to include detailed constructions plans for proposed improvements to the extended turn lane on Route 29 and the proposed entrance. Please contact Joel DeNunzio at 589 -5871 if you have questions or require additional information. Fire & Rescue approval to include: ❑ Must comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to field inspection and verification. Please contact James Barber at 296 -5833 if you have questions or require additional information. Inspections approval to include: ❑ Provide curb cuts at the heads of the barrier -free parking spaces' access aisles. Pedestrians should not have to traverse a vehicle travelway in order to reach the sidewalk. Please contact Jay Schlothauer at 296 -5832 if you have questions or require additional information. Sincerely, Megan Yaniglos Senior Planner Zoning & Current Development File: SDP - 2010 -063 National College- Preliminary Site Plan Cc: Owner: Corolla Management Corporation 1813 East Main Street Salem, Virginia 24153 2