Loading...
HomeMy WebLinkAboutSDP201000047 Review Comments 2010-06-15RUG, i il�l. ' . COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 June 15, 2010 Richard E. Carter 414 Park Street Charlottesville, Va 22904 RE: SP200900035 St. Anne's Playing Field Tax Map Parcel 06000000002400 Dear Mr. Carter: On June 9, 2010, the Albemarle County Board of Supervisors took action on SP 200900035 to allow a playing field, spectator area, and overflow parking on 13.5 acres on Tax Map 60 Parcel 24 in the Jack Jouett District. This special use permit was approved subject to the following conditions: Development of the use on TMP 60 -24 shall be in general accord with the Conceptual Plan entitled "UVAF Property /Plan (Leased) Athletic Field /Gravel Parking Area," Revision 1, prepared by Gloeckner Engineering /Surveying, Inc., and dated February 10, 2010 (hereinafter "Conceptual Plan "), as determined by the Director of Planning and the Zoning Administrator. To be in accord with the Conceptual Plan, development shall reflect the following major elements within the development essential to the design of the development: The location of the playing field and overflow parking as shown on the Conceptual Plan, except that the landscaping and fencing may be modified to meet the requirements of the Architectural Review Board (ARB) and the location of the crosswalks on Faulconer Drive may be changed to meet the requirements of the Virginia Dept. of Transportation (VDOT). Minor modifications to the Conceptual Plan, which do not conflict with the elements above, may be made to ensure compliance with the Zoning Ordinance; and 2. The playing field shall not be lit. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN amendment; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." pF A rl�INlP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 _ Fax (434) 972 -4012 August 16, 2008 Gloeckner Engineering /Surveying Inc. c/o Kurt Gloeckner 508 Dale Avenue Suite P Charlottesville Va 22903 RE SP2007 -00053 St:. Anne's - Belfield TAX MAP /PARCEL TM 60, Parcels 57,57A, 576, 57C Dear Mr Gloeckner- On August 13 2008 the F,lbemarle County Board of Supervisors took action on SP #2007 -00053 to increase the number of students from 300 to 550 by adding new buildings and demolishing some existing buildings No residentia units are proposed on TAX MAP /PARCEL. TM 60 Parcels 57 57A, 57B 57C in the Jack Jouett District. This special use permit was approved based on the following conditions 1 The site shall bE? developed in substantial accord with the concept plan entitled St. Anne s- Belfield ProposE!d Lower /Middle School Preliminary Site Plan dated June 6 2008 except that changes may be made provided the Zoning Administrator finds that all other special use conditions are met; 2 The maximum enrollment shall be 550 students 3 Arrival and dismissal times for Lower and Middle school students shall be staggered at a minimum twenty (20)- minute interval so that all students do not arrive at/depart from the campus at the same timE! 4 The Owner shall design and construct all improvements at the Belfield campus to meet the minimum standard:; for LEED certification under the LEED for Schools Rating System and shall seek to obtain such certification at the minimum level or better within two (2) years from the date of the Certificate of Occupancy, 5 Stormwater management shall be provided in the form of biofilters for any new impervious surfaces. In additio-i to the requirements of the County's Water Protection Ordinance, the majority of roof runoff she It be captured in a rainwater collection and reuse system 6 Erosion control shall be provided within the property by the use of sediment trapping measures and diversions Off site easements or work, or variations from the standards shall not be used 7 In order to address off -site transportation impacts caused by this project, the Owner shall contribute cash in the amount of forty -nine thousand two hundred forty six dollars ($49,246 00) to the County for the purpose of funding road safety improvements, traffic signalization improvements, or o':her transportation improvements located within the boundaries of Neighborhoods 6 or 7 as delineated in the County Comprehensive Plan s Land Use Plan adopted June 5 1996 Tne cash contribution shall be made prior to issuance by the County of the first building permit fo• the project; 8 A row of two and one -half inch (2 %') caliper shade trees spaced forty (40) feet on center shall be provided along the East side of the relocated portion of SR 855 9 A minimum of twE nt/ (20) -foot deep landscape buffers shall be provided, free of utilities to screen the parking lot located southeast of the existing football field from the US 29/250 Bypass and 10 Landscaping may be required to be in excess of the minimum requirements of ARB guidelines or the Zoning Orjirance to compensate for the negative visual impact of the playing fields and parking on the Eitrance Corridor Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes • compliance with conditions of the SPECIAL USE PERMIT, • approval of and compliance with a SITE PLAN, and • approval of a .ZONING COMPLIANCE CLEARANCE. In the event that the use structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated The term commenced" means construction of any structure necessary to the use of the permit. If you have questions o comments regarding the above -noted action please do not hesitate to contact Sherri Proctor at 296 -5832 Sincerely V Wayne Cilimberg Director of Planning cc: St.Anne's Belfield School Inc Attn Dr Lewis Stephens 2132 Ivy Rd Charlottesville Va 22903