Loading...
HomeMy WebLinkAboutSDP201000025 Review Comments 2010-06-02Application #: SDP2010OMa.. Short Review Con nents Project Name:IFree Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Bridge Office - Final I Final — Non - residential — Administrative 04/12/2010 Andrew Slack E911 No Objection qO OBJECTION. 04/06/2010 Brent Nelson ARB Pending Fhe applicant has submitted an ARB application for this proposal. The application will be schedule for he May 3, 2010 ARB meeting if it is determined that a full review by the ARB is required. 05/07/2010 Brent Nelson ARB Requested Changes fhe applicant has made an ARB submission for this proposal. Review of the proposal is being candled administratively. Do to the extremely limited, if any, visibility of this proposal, we are only 'eviewing /approving the proposed roof material /color. The applicant is currently trying to locate an ?xisting building that uses the proposed English Gray Slate shingle. 06/02/2010 Elizabeth Marotta CommDev- Current Development Requested Changes 1.) Shared parking and access agreement required prior to final site plan approval. ?.) Engineering and ACSA approval is still outstanding; must be obtained prior to me requesting entative approval sets. 05/14/2010 Elizabeth Marotta CommDev- Current Development Requested Changes 04/07/2010 James Barber Fire Rescue No Objection Oust comply with the Virginia Statewide Fire Prevention Code. No hydrants indicated on plan -- please insure the building is within 400 feet of a fire hydrant by way of a prepared travel way. Final approval s subject to field inspection and verification. 04/05/2010 Jay Schlothauer Inspections No Objection Based on plans dated March 8, 2010. Vo comments or conditions. Page: 1.00 County of Albemarle Printed On: Wednesday, June 02, 2010 v4wr �'IRGIN1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Date received: Date of Comment: Engineer: SDP - 2010 - 00025, Free Bridge Office - Final Justin Shimp Oshimp @ddrva.com) Hurt Investment Company Inc. 16 March 2010 26 March 2010 John Diez The Final Site Plan for Free Bridge Office, received on 16 March 2010 has been reviewed. The plan cannot be approved as submitted and will require the following corrections before approval can be granted: A. General Review Comments 1. Please submit a WPO application and fee for review and approval of an Erosion and Sediment Control Plan. 2. All proposed slopes must be 2:1 (horizontal: vertical) or flatter. 3. Proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. 4. VDOT approval must be obtained for any plans affecting public right -of -way. 5. All parking areas must not exceed 5% grade anywhere, in any direction. 6. Please provide all utility crossings on the drainage profiles. 7. Please provide throat lengths for each drop inlet. 8. Please provide concrete inlet shaping (IS -1) to storm STR. #7. 9. Please provide traffic generation and distribution summary (ADT's). 10. Pipe slopes must be at 0.5% min. to 16% max. (per VDOT standards for anchors over 16 %). 11. Outlet velocities for any pipe cannot exceed 15 fps. B. Stormwater Management Comments 12. Please submit a 'APO application and fee for review and approval of an Erosion and Sediment Control Plan. 13. Please provide a copy of an agreement between Free Bridge and the owner of parcel 78F -A for use and maintenance of the stormwater management pond on this parcel. 14. Please provide a copy of the calculations, details and plan showing that the stormwater pond design accounted for the water quality and quantity requirements of the Free Bridge site. B. Erosion and Sediment Control Comments 15. Please provide an Erosion and Sediment Control Narrative 16. Please provide dust control (DC). 17. Please provide a stockpile location. 18. Please provide a staging and parking area. NMW ..r 19. Please include the proposed pipe connecting to STR. #EX57 in your limits of disturbance. 20. Is the silt fence on the northeast side of the site part of the construction? If so, please include it in your limits of disturbance. 21. Please provide silt fence along the northeast side of the site between both proposed inlet protections. 22. Please provide a letter of intent from the owner of TMP 78F -A with permission to use the pond as an E &S and SWM measure. Vc s�kuk 3111) ];� €)2'` Ir , ... . ..... Megan Yaniglos From: Alex Morrison [ amorrison @serviceauthority.org] Sent: Wednesday, October 31, 2012 4:03 PM To: Megan Yaniglos Subject: SDP2010025: Free Bridge Office - Final Follow Up Flag: Follow up Flag Status: Flagged COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Dear Megan : The Albemarle County Service Authority (ACSA) has received and reviewed the plan /document /project described above. All ACSA comments have been addressed by the applicant. The ACSA hereby approves the plan /document /project described above. Please feel free to contact me at the number below with any comments or questions you may have. Thank you. NOTE TO ENGINEER /DEVELOPER: No sewer connection will be permitted by the ACSA until the Kia Dealership infrastructure has been dedicated. Alexander J. Morrison, EIT Civil Engineer hvr. k Ccanly Service Authority 168 Spotnap Road Charlottesville, VA 22911 Office: (434)977-4511 EXT: 116 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s). i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Review coordinator: Free Bridge Office Dominion Engineering Hurt Investment Company 16 October 2012 16 October 2012 Michael Koslow Megan Yaniglos SDP201000025 [tel 434- 979 -1681] The final site plan submittal (SDP201000025) submitted 5 September 2012 has received Engineering Review and does not appear to meet Albemarle County minimum checklist items for approval. This review does not include a review of Erosion & Sediment Control (ESC) or Stormwater Management (SWM). Please adequately address the following comments for final site plan approval: Proposed Plan View Information 1) Please introduce curb drains near the entrance to ensure site runoff does not drain to Olympia Drive. Drainage Profiles 1) Please indicate inlet shaping (IS -1) for all structures with a 4' or greater drop on sheet C9. Community Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow @albemarle.org to schedule an appointment. `J I1 pJ11 �11'] �J, r, �) ifilly Service Authority TO: (No Reviewer Assigned at This Time) FROM: Alexander J. Morrison, EIT, Civil Engineer DATE: December 30, 2011 RE: Site Plan Technical Review for: SDP201000025: Free Bridge Offices Final TM P# 78 -11 Lot A The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 8 inch water line is located approximately 20' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 250' distant (Sewer will be closer once Kia Auto Dealership sewer is constructed and dedicated). 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. ✓ 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Kia Auto Dealership Dedication is required for sewer prior to approval. • Whitehouse Commercial Dedication is required for water prior to approval. • Add note to water meter, "Water Meter to be sized by ACSA." (Applicant has addressed comment). • Add not to domestic waterline, "Backflow Prevention will be installed on domestic side of water meter." (Applicant has addressed comment). 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 October 26, 2010 Neal Wright Dominion Engineering & Design LLC 172 South Pantops Drive Charlottesville, VA 22911 RE: ARB2010 -28, Free Bridge Office Tax Map 78, Parcel 11 Dear Mr. Wright: I have reviewed your revised submittal for the above - referenced project which consisted of the Certainteed, Landmark, "Heather Blend" roof sample proposed for this development. This latest submission addresses all outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Hurt Investment Company 195 Riverbend Drive Charlottesville, VA 22911 Elizabeth Marotta (via email) Senior Planner Albemarle County ARB File Elizabeth Marotta From: Elizabeth Marotta Sent: Wednesday, June 02, 2010 11:29 AM To: 'nwright @ddrva.com' Subject: Free Bridge office SDP2010 -25 Neal, I have reviewed Free Bridge Office Final, resubmitted 5/26/10. 1 do not have any additional comments, however the parking /access agreement and ARB, ACSA and Engineering approval are still required before I will request tentative approval sets. Please be aware that any changes generated to accommodate ARB /ACSA /Engineering comments may cause additional Planning comments. Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 (434) 296 -5832 Ext. 3432 ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2010 -00025 / WPO- 2010 - 00031, Free Bridge Office - Final Plan preparer: Justin Shimp Oshimp @ddrva.com) Owner or rep.: Hurt Investment Company Inc. Date received: 16 March 2010 Rev. 1: 4 May 2010 Date of Comment: 26 March 2010 Rev. 1: 18 May 2010 Engineer: John Diez The Final Site Plan for Free Bridge Office, received on 4 May 2010 has been reviewed. The plan cannot be approved as submitted and will require the following corrections before approval can be granted: A. General Review Comments 1. Please submit a WPO application and fee for review and approval of an Erosion and Sediment Control Plan. (Rev. 1) Comment has been addressed. 2. All proposed slopes must be 2:1 (horizontal: vertical) or flatter. (Rev. 1) Comment has not been addressed. Please see contours 54 through 60 (behind the dumpster and to the left of the proposed pipe) 3. Proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. (Rev. 1) Comment has been addressed. 4. VDOT approval must be obtained for any plans affecting public right -of -way. (Rev. 1) Comment has been acknowledged. 5. All parking areas must not exceed 5% grade anywhere, in any direction. (Rev. 1) Please disregard comment. However, some grading in the travelway exceeds the 10% maximum slope. Please see contours 50 through 62. 6. Please provide all utility crossings on the drainage profiles. (Rev. 1) Comment has been addressed. 7. Please provide throat lengths for each drop inlet. (Rev. 1) Comment has been addressed. 8. Please provide concrete inlet shaping (IS -1) to storm STR. #7. (Rev. 1) Comment has been addressed. 9. Please provide traffic generation and distribution summary (ADT's). (Rev. 1) Comment has been addressed. 10. Pipe slopes must be at 0.5% min. to 16% max. (per VDOT standards for anchors over 16 %). (Rev. 1) Comment has been addressed. 11. Outlet velocities for any pipe cannot exceed 15 fps. (Rev. 1) Comment has not been addressed. The anchored pipe must be an RCP, not HDPE. Please revise. B. Stormwater Management Comments 12. Please submit a WPO appncation and fee for review and approval of an Erosion and Sediment Control Plan. (Rev. 1) Comment has been addressed. 13. Please provide a copy of an agreement between Free Bridge and the owner of parcel 78F -A for use and maintenance of the stormwater management pond on this parcel. (Rev. 1) Comment has been addressed. 14. Please provide a copy of the calculations, details and plan showing that the stormwater pond design accounted for the water quality and quantity requirements of the Free Bridge site. (Rev. 1) Comment has been addressed. B. Erosion and Sediment Control Comments 15. Please provide an Erosion and Sediment Control Narrative (Rev. 1) Comment has been addressed. 16. Please provide dust control (DC). (Rev. 1) Comment has been addressed. 17. Please provide a stockpile location. (Rev. 1) Comment has not been addressed. If the stockpile location is to be used on the adjacent site (Whitehouse Commercial), the limits of disturbance must be shown, along with the approved WPO plans and grading permit from Whitehouse. 18. Please provide a staging and parking area. (Rev. 1) Comment has not been addressed. If the staging and parking area is to be located on the adjacent site (Whitehouse Commercial), the limits of disturbance must be shown, along with the approved WPO plans. 19. Please include the proposed pipe connecting to STR. #EX57 in your limits of disturbance. (Rev. 1) Comment has been addressed. 20. Is the silt fence on the northeast side of the site part of the construction? If so, please include it in your limits of disturbance. (Rev. 1) Comment has been addressed. 21. Please provide silt fence along the northeast side of the site between both proposed inlet protections. (Rev. 1) Comment has not been addressed. The silt fence must be provided along the proposed curb of the northeast side of the parking lot. I've entailed you a pdf showing the specific location. 22. Please provide a letter of intent from the owner of TMP 78F -A with permission to use the pond as an E &S and SWM measure. (Rev. 1) Comment has been addressed. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000025 Free Bridge Office- Final\E2_fsp_esc_swm_JPD_10 -025 - Free Bridge Office.doc Elizabeth Marotta From: Elizabeth Marotta Sent: Monday, May 17, 2010 11:40 AM To: 'nwright @ddrva.com' Subject: airport office final- comments 5 -17 -10 Neal, Per our telephone conversation today, my only (Planning) outstanding comments for the Final site plan for Airport Office (SDP10 -25) are: 1.) Parking and access agreement must be provided [per Condition #1 of preliminary site plan approval; Sec. 32.5.6.i] 2.) With regards to VDOT and plantings in the street distance triangle- please add the following note (can add to landscape plan) " Street trees and plantings within required sight distance triangle shall be maintained to the requirements set forth by VDOT in the Streetscape requirements for Street Trees." 3.) Engineering, ARB, ACSA approvals required (pending). Feel free to contact me if you have any questions. Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 (434) 296 -5832 Ext. 3432 Elizabeth Marotta From: Gary Whelan [gwhelan @serviceauthority.org] Sent: Wednesday, May 05, 2010 5:16 PM To: Elizabeth Marotta Subject: RE: Free Bridge Office I am in touch with Justin Shimp about the Town and Country and Kia dedications. From: Elizabeth Marotta [mailto:emarotta @albemarle.org] Sent: Wednesday, May 05, 2010 3:51 PM To: Gary Whelan Subject: Free Bridge Office Gary, What is the status of your review of SDP2010 -25, Free Bridge Office Final Site Plan? I see in CV that your comments from the first submittal (4/2/10) are still "pending ", and today I received a revised plan. Are you working with them directly, or shall I send you a copy of the revised plan? Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 (434) 296 -5832 Ext. 3432 Elizabeth Marotta From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Tuesday, May 04, 2010 2:04 PM To: Elizabeth Marotta Cc: Amy Pflaum Subject: Free Bridge Office SDP - 2010 -00025 Free Bridge Office SDP - 2010 -00025 Elizabeth, I have reviewed the above site plan and have no comments. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio@vdot.virginia.gov County of Albemarle Department of Community Development Memorandum To: Hurt Investment Company Plan reparer: Justin Shimp From: abeth M. Marotta, Senior Planner Division: Zoning & Current Development Date: April 15, 2010 Subject: SDP 2010 -25 Free Bridge Office -Final The Planner/Engineer for the Zoning & Current Development Division of the Albemarle County Department Community Development will approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] 1. Condition of Preliminary Approval, #1; [32.5.6.i] : Shared parking and access agreement must be submitted and reviewed against the plan. Please note that this agreement must provide for access thru each site to allow access from Olympia Drive to Richmond Road and visa versa. To that end, please remove any easement limits from the plan, as are currently drawn on Sheet C5. 2. [32.5.6.a] COMYMNT: Parcel Map on Sheet Cl:. a. Parcel Map appears to be the only plan that provides site /parcel dimensions and mets and bounds. Please be sure that all necessary dimensions are provided for both parcels that are the subject of this site plan and be sure that frontage along Olympia Drive can be determined from looking at the parcel map. Currently, curve data is not provided for "C3" reference and without a scale it is difficult to discern what the frontage is. b. [32.6.6.i] Provide frontage length on landscape plan, since it is needed to calculate required street trees. c. Be sure that abbreviations used on the Parcel Map are defined in the Legend. For example, BSL and PSL are not defined. Alternatively, spell them out on the parcel map. 3. CONIlVIENT: While not required for approval, please make an effort not to staple the plan set through required information such as site data, landscaping schedules, and plan views. 4. [32.6.6.i]-CONIMENT: Coordinate parking data used in landscape plan calcs with the other sheets. Landscape plan uses 48 parking spaces to determine Interior Landscaping requirements, however 53 spaces are being provided. Please revise. [32.6.6.i] Landscape Plan CONEWENTS: a. Why did you divide the frontage by 35'? Our ordinance requires 1 large tree every 50' or 1 medium every 40'. After you confirm the frontage length (per comment #2 above) is correct, please address this calculation. b. Please provide the sight distance triangle on the landscape plan, as VDOT will need to approve any plantings within the required sight distance. 6. [32.6.6 j]Lighting Plan CON BENTS: a. Provide footcandle distributions at the property line to show less than 0.5fc will be provided at the property line, especially along the public street. b. "Description" in Luminaire Schedule does not appear to match the fixture options on the cut sheet. Make sure staff can confirm the fixtures specified are represented by the cut sheets on the plan. 7. [32.5.6.d] [32.6.6- Condition # 3 of Preliminary Site Plan approval] COMMENT: List critical slopes waiver and associated condition, preferably under Site Data. This was SDP200900062, to allow 0.41 acres of critical slopes disturbance per Preliminary Site Plan conditionally approved 1/12/2010. The one condition reads: None of the fill taken from the construction site shall be taken through the front entrance of Fontana Subdivision for depositing on another development site. I know in your response you stated this information will be on the E &S sheet, however like any zoning condition it should be provided in clear view on the site plan. 8. [32.5.6.b] COAEVIENT: This project is being built on one parcel and a portion of another parcel that has already been developed. It is important to be able to calculate and track how much development is happening where. Therefore: a. Under Land ,Schedule on Sheet C2, please define what " %" means; for example, does this mean "% of total project area" or does this mean "% of TMP78 -11" ? Define what constitutes the total project area (the acreage of TMP78 -11 plus a portion of 78 -57B ?) Related to this, please make sure to break down pre- and post - development square footages by parcel- meaning please state how many SF of pavement /open space is being provided on each parcel... a chart may help. If you have questions, please let me know. b. Provide site acreages for each of the parcels that are the subject of this site plan, and in the case of TMP78 -57B, identify how much acreage falls under the scope of this site plan. I see that the acreage for TNT 78 -11 is provided on the Parcel Map, but please also provide this information under Site Data. c. Provide maximum paved and circulation area. I see that you have "paved" area calculated on Sheet C2, but this area (21,748sf) does not match the 14, 744sf used to determine landscape plan calculations (Sheet C6). Please make sure Land Schedule data matches the data that is used on the landscape plan, and that in order to meet landscape requirements "parking and vehicular circulation area" is properly called out (may be different than "paved" area). d. Explicitly state maximum building square footage and building footprint. I see that within the footprint of the building it says it will be 12, 000 sf, but please list maximum building square footage under Site Data. e. The Land Schedule (sheet C2) claims .5,978 sf for the building, while the plan views state 6,000 sf. I know these numbers are close, but please coordinate so they are the same. f. Sheet C2 states total site area is 45,302 sf, while the landscape plan uses 45, 395 sf to calculate required canopy. Related to comment (a) above, please address what the total site area includes. If you want to use portions of TNT 78 -57B for planting to count towards the required canopy, then the portion of that parcel being developed with this plan must be counted towards calculating the required canopy, and you must show that the area you are claiming was not previously claimed with the development of TMP.11- 57B. Please contact Elizabeth M. Marotta at the Department of Community Development 296-5 83 2 ext. 3432 for further information. P) ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Date received: Date of Comment: Engineer: SDP - 2010 - 00025, Free Bridge Office - Final Justin Shimp Oshimp @ddrva.com) Hurt Investment Company Inc. 16 March 2010 26 March 2010 John Diez The Final Site Plan for Free Bridge Office, received on 16 March 2010 has been reviewed. The plan cannot be approved as submitted and will require the following corrections before approval can be granted: A. General Review Comments 1. Please submit a WPO application and fee for review and approval of an Erosion and Sediment Control Plan. 2. All proposed slopes must be 2:1 (horizontal: vertical) or flatter. 3. Proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. 4. VDOT approval must be obtained for any plans affecting public right -of -way. 5. All parking areas must not exceed 5% grade anywhere, in any direction. 6. Please provide all utility crossings on the drainage profiles. 7. Please provide throat lengths for each drop inlet. 8. Please provide concrete inlet shaping (IS -1) to storm STR. #7. 9. Please provide traffic generation and distribution summary (ADT's). 10. Pipe slopes must be at 0.5% min. to 16% max. (per VDOT standards for anchors over 16 %). 11. Outlet velocities for any pipe cannot exceed 15 fps. B. Stormwater Management Comments 12. Please submit a WPO application and fee for review and approval of an Erosion and Sediment Control Plan. 13. Please provide a copy of an agreement between Free Bridge and the owner of parcel 78F -A for use and maintenance of the stormwater management pond on this parcel. 14. Please provide a copy of the calculations, details and plan showing that the stormwater pond design accounted for the water quality and quantity requirements of the Free Bridge site. B. Erosion and Sediment Control Comments 15. Please provide an Erosion and Sediment Control Narrative 16. Please provide dust control (DC). 17. Please provide a stockpile location. 18. Please provide a staging and parking area. 19. Please include the proposed pipe connecting to STR. #EX57 in your limits of disturbance. 20. Is the silt fence on the northeast side of the site part of the construction? If so, please include it in your limits of disturbance. 21. Please provide silt fence along the northeast side of the site between both proposed inlet protections. 22. Please provide a letter of intent from the owner of TMP 7817-A with permission to use the pond as an E &S and SWM measure. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP202000025 Free Bridge Office - Fina1\E1_fsp_esc_swm_JPD_10 -025 - Free Bridge Office.doc