HomeMy WebLinkAboutSUB201600042 Review Comments Easement Plat 2016-03-15- o-,* a County cf Albemarle Department of Community Development Memorandum To: David Jordan From: Paty Saternye- Senior Planner Division: Planning Services Date: March 15, 2016 Subject: SUB -2016-42 Old Trail Village Block 15 — Revised Private Storm Drainage Easements The County of Albemarle Planning Division will grant or recommend approval of the Final Plat referenced above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [14-302 (A)(2)] Vicinity map. Show the scale of each of the vicinity maps individually. 2. [14-302 (A)(3)] Existing or platted streets. Show the far side of the public street easements when they are within the drawing area of Sheet 2 of 2. 3. [14-302 (A)(4)] Private easements. The revised private storm drainage easements shown on this plan do not all match those shown in the approved 'Old Trail Village Block 15 Storm Sewer Field Revisions" SUB201400196. County engineering will contact you about updating SUB20140196 to match this revision submission. 4. [14-302 (A)(5)] Public easements. It is recommend that the easement labels be consistent with the previous submissions. STE1 X VAR was labeled as STE3-X VAR and STE-X VAR was labeled as STE1-X VAR in SUB2014000161. Changing labels between submissions, unless necessary, can cause confusion for future use and review. 5. [14-302 (13)(5)] Zoning. The note on "Zoning" on Sheet 1 of 2 should be update to include the recently approved ZMA2015-00001. 6. [14-302 (B)(9)] Flood plain. Note number 2 on Sheet 1 of 2 conflicts with the statement under Flood Hazard Overlay District". It appears that this portion of Old Trail Village is not within the 100 year flood plain. Please confirm and update notes as appropriate. 7. [14-303 (H) & (1)] Monuments; Bearing and distance ties. There seem to be no permanent monuments shown in this plan and there are also no coordinate locations as were shown in SUB20140161 on Sheet 2 of 6. The bearing and distance ties need to be referenced from some known location. 8. [Comment] Note number 6 on Sheet 1 of 2, what was updated in response to the 11 round of comment from engineering should be updated to include the correct plan date and the correct approval date. The plan was dated February 17, 2016 and was approved on February 25, 2016. 9. [Note] After updating the plan based upon these comments please resubmit for a second round of review. oth planning an engineering will be reviewing the plan at that time. s Please contact Pq a erny at the Department of Community Development 296-5832 ext. 3250 for further i forma ion. CC: March Mountain Properties, LLC 2