County cf Albemarle
Department of Community Development
Memorandum
To: David Jordan
From: Paty Saternye- Senior Planner
Division: Planning Services
Date: March 15, 2016
Subject: SUB -2016-42 Old Trail Village Block 15 — Revised Private Storm Drainage
Easements
The County of Albemarle Planning Division will grant or recommend approval of the
Final Plat referenced above once the following comments have been addressed: [Each
comment is preceded by the applicable reference, which is to the Subdivision/Zoning
Ordinances unless otherwise specified.]
1. [14-302 (A)(2)] Vicinity map. Show the scale of each of the vicinity maps
individually.
2. [14-302 (A)(3)] Existing or platted streets. Show the far side of the public street
easements when they are within the drawing area of Sheet 2 of 2.
3. [14-302 (A)(4)] Private easements. The revised private storm drainage
easements shown on this plan do not all match those shown in the approved
'Old Trail Village Block 15 Storm Sewer Field Revisions" SUB201400196.
County engineering will contact you about updating SUB20140196 to match this
revision submission.
4. [14-302 (A)(5)] Public easements. It is recommend that the easement labels be
consistent with the previous submissions. STE1 X VAR was labeled as STE3-X
VAR and STE-X VAR was labeled as STE1-X VAR in SUB2014000161.
Changing labels between submissions, unless necessary, can cause confusion
for future use and review.
5. [14-302 (13)(5)] Zoning. The note on "Zoning" on Sheet 1 of 2 should be update
to include the recently approved ZMA2015-00001.
6. [14-302 (B)(9)] Flood plain. Note number 2 on Sheet 1 of 2 conflicts with the
statement under Flood Hazard Overlay District". It appears that this portion
of Old Trail Village is not within the 100 year flood plain. Please confirm and
update notes as appropriate.
7. [14-303 (H) & (1)] Monuments; Bearing and distance ties. There seem to be
no permanent monuments shown in this plan and there are also no
coordinate locations as were shown in SUB20140161 on Sheet 2 of 6. The
bearing and distance ties need to be referenced from some known location.
8. [Comment] Note number 6 on Sheet 1 of 2, what was updated in response to the
11 round of comment from engineering should be updated to include the correct
plan date and the correct approval date. The plan was dated February 17, 2016
and was approved on February 25, 2016.
9. [Note] After updating the plan based upon these comments please resubmit for a
second round of review. oth planning an engineering will be reviewing the plan
at that time.
s
Please contact Pq a erny at the Department of Community Development 296-5832
ext. 3250 for further i forma ion.