Loading...
HomeMy WebLinkAboutSDP201000091 Review Comments 2011-12-1614ftr Review Comments Project Name: Treesdale Park Site Plan Amendment - Minor Minor Amendment Date Completed: Friday, December 16, 2011 Reviewer: Christopher Perez Department/Division /Agency: CommDev- Current Development Reviews SDP 201000091 has been withdrawn and SDP201100083 has replaced it: the difference between the two site plan amendments is that SDP 201100083 does NOT modify the stormwater management facility (all sheets provided in SDP20100091 that do not apply were omitted from SDP201100083). SDP201100083 added additional modifications to the site plan such as #8 Orientation of dumpster and one space omitted... #9 Playground added #10 added a 4' retaining wall around HVAC #11 Added retaining wall behind building 3 #12 added a 4' retaining wall to north side of building 1 #13 revised location of community ceneter entrance and crosswalk. r%CViCw aiaLub. rending