HomeMy WebLinkAboutSDP201000037 Review Comments 2010-05-04pF AL
1 0/1 U G q#3110
E ®
1 <<
kGtN
County of Albemarle
Department of Community Development
Memorandum
To:Scott Collins, Collins Engineering
From:Elizabeth Marotta- Senior Planner
Division: Zoning & Current Development
Date:May 4, 2010
Subject: SDP 2010 -037 Woodlands Minor Site Plan Amendment to Sherwood Rec
The Planner for the Zoning & Current Development Division of the Albemarle County
Department Community Development will recommend approval of the plan referred to above
when the following items have been satisfactorily addressed. (The following comments are those
that have been identified at this time. Additional comments or conditions may be added or
eliminated based on further review.)
4. Provide zoning for TMP76P -1 -1 under reference with DB 541 -501. UPDATE:
a. R -15 was not added to the cover sheet, and that is the zoning for the Woodlands
property that is being disturbed and subject to this amendment. For all of the
properties being disturbed, be specific (on the cover sheet) what zoning districts
apply.
b. Parcel identification on Sheet 2 is not consistent for each parcel. Each notation
should include the TMP, owner, zoning, use, and instrument reference.
5. Please clarify how "total acreage" of 0.83 was calculated (from Sheet 1, General Notes).
UPDATE: Please break down the total disturbance that will occur on each parcel.
7. Show limits of "reforestation area" so the intent of the note on Sheet 6 requiring
v.\pk replanting cannot be misinterpreted or disputed. UPDATE: Once stormwater issues are
ra'le,resolved, resubmit plans for further review. As these limits may change, I cannotOfO'.determine if as proposed, it is approvable.
8. It appears tress will be disturbed /removed in order to construct the retaining wall. Please
revise E &S plan accordingly. UPDATE: Response noted, however, once stormwater
issues are resolved, resubmit plans for further review. As limits of clearing/ E &S may
change, I cannot determine if as proposed, it is approvable.
9. As drawn, tree protection fencing is shown going thru trees; please revise to located tree
protection fencing to as close to the dripline as possible. UPDATE: Response noted,
however, once stormwater issues are resolved, resubmit plans for further review. As
limits of clearing/ E &S may change, 1 cannot determine if as proposed, it is approvable.
1
10. Please provide a sheet with a revised planting plan and conservation checklist, and note
on that sheet that the landscape plan revisions shown are intended to amend SDP2007 -51,
LOR #1, as approved 3/23/10. UPDATE: Response noted, however, once stormwater
issues are resolved, resubmit plans for further review. As proposed landscaping may
change, I cannot determine if as proposed, it is approvable.
11. Engineering approval is required.
Please contact Elizabeth Marotta at the Department of Community Development 296 -5832 ext.
3432 for further information.
Application #:SDP20100003r Short Review Comments
Project Name: The Woodlands - Minor Minor Amendment
Date Completed:06/16/2010
Reviewer:Elizabeth Marotta CommDev- Current Development
Review Status:Requested Changes
Reviews Comments: Resolve SWM comments with Engineering. Because the site plan will change to accommodate the
SWM requirements, this plan as submitted is not approvable. Formal planning comments are
pending, however, continue to work on resolving Engineering /SWM comments and resubmit site plan
for review. You may resubmit a revised site plan that reflects engineering comments before I have
returned formal planning comments.
Date Completed:04/29/2010
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments: From email: there is no need to review the minor amendment, you have assured me that current
development will do that. also, there is no need for my office to review the construction details for the
retaining wall now. that will be done when they apply for the building permit to construct the wall,
which is a requirement.
Date Completed:05/27/2010
Reviewer:Max Greene CommDev- Current Development
Review Status:Requested Changes
Reviews Comments: recieved 5/26/2010 for review.
Stormwater management plan required. Please submit a SWM application plan, narrative and fee for
review. Please include a Short Version BMP Computations Worksheet.
Page: 1.00 County of Albemarle Printed On: Wednesday, June 16, 2010