Loading...
HomeMy WebLinkAboutSDP201000035 Study 2010-07-19RENAISSANCE PLANNING GROUP Technical Memorandum TRAFFIC IMPACT STUDY West Village Crozet, VA Prepared for: Mr. Keith Whipple WaterStreet Studio By: Bill Wuensch, P.E., PTOE RENAISSANCE PLANNING GROUP 455 2nd St. SE Charlottesville, Virginia 22902 July 19, 2010 I.Introduction and Summary I1.Background Information: Proposed Development III. Analysis of Existing Conditions IV. Analysis of Future Conditions Without Development V. Trip Generation VI. Site Traffic Distribution and Assignment VII. Analysis of Future Conditions With Development VIII. Recommended Improvements IX. Conclusions LIST OF FIGURES Figure 1 Vicinity Map Figure 2 County GIS Map of the Site Location Figure 3 Year 2010 Existing Volumes Figure 4 Year 2020 No Build Volumes Figure 5 Site Trip Distribution Percentages Figure 6 Site Related Peak Hour Volumes Figure 7 Year 2020 Build Volumes Figure 8 County GIS Map of Nearby Parcels LIST OF TABLES Table 1 LOS & Delay for Existing Conditions Table 2 LOS and Delay for Year 2020 No Build Conditions Table 3 Trip Generation for Proposed Development Table 4 LOS & Delay for Year 2020 Build Conditions Table 5 Vacant Parcels Adjacent to the New Connector Road TECHNICAL APPENDICES Appendix A Site Master Plan Appendix B Traffic Count Data Appendix C HCS Worksheets - Existing Conditions Appendix D HCS Worksheets - Year 2020 No Build Conditions Appendix E HCS Worksheets - Year 2020 Build Conditions Appendix F Turn Lane Worksheets - Blue Ridge Avenue Entrance I. Introduction and Summary Purpose of report and study objectives The purpose of this document is to provide a traffic analysis study consistent with the Virginia Department of Transportation (VDOT) Chapter 527 requirements. The flow of the report is modeled after the '`Organization of a Traffic Impact Analysis Report" as summarized in the Chapter 527 Administrative Guidelines. The objective of the study is to report the existing traffic volumes in the study area, calculate new trips associated with the proposed development, and identify related traffic impacts and recommendations to mitigate the impacts. Specifically, this study evaluates traffic operations at one study intersection - Jarmans Gap Road and Blue Ridge Avenue. In addition, discussion is provided regarding future traffic volume projections for the proposed development's new road that provides a new connection in the study area. Executive Summary Site location and study area - The proposed site is located in Albemarle County, in Crozet. The property is located just west of the downtown area, west of Crozet Avenue and north of Jarmans Gap Road. Figure I provides an illustration of the site location. The study area includes the adjacent off -site intersection of Jarmans Gap Road and Blue Ridge Avenue. Description of the proposed development - The proposed neighborhood contains a mix of dwelling types. Five single family detached homes are proposed along with a mixture of 59 townhome / condominium / duplex type dwelling units. In all, the site covers 9.916 acres, of which 8.01 acres is proposed as open / green space. The proposed development build out year is 2020. The residential subdivision has one proposed entrance on Blue Ridge Avenue, approximately 300 feet from Jarmans Gap Road. Note that it is anticipated that the development spine road will connect to a future link to Cling Road pending future development of the abutting parcels. Principal findings - The analysis indicates that the proposed development will have only limited impact to traffic operations at the study intersection and therefore, no improvements are required. In addition, the proposed entrance along Blue Ridge Avenue does not satisfy the turn lane warrants and therefore, no turn lanes are required. 2 II. Background Information: Proposed Development (Site and Nearby) A. List of all non - existent transportation improvements assumed in the analysis None. B. Description of on -site development i) Map ofparcel. See Figure 1 for an illustration of the site location. Description of the parcel The subject parcel consists of approximately 9.916 acres of undeveloped land generally located north of Jarmans Gap Road and west of Blue Ridge Avenue. iii) General terrain, features The topography is generally described as level to rolling in this area. iv) Location within the jurisdiction and region See Figure 1 as well as the applicant's site plan information located in Appendix A for greater detail about vicinity. v) Comprehensive Plan recommendations Ibr the .subject property This proposed development is consistent with the Crozet Master Plan. vi) Current or proposed zoning of the .subject property The subject property is currently zoned R -6 residential. C. Description of geographic scope and limits of study area The study area includes one adjacent offsite intersection — Jarmans Gap Road and Blue Ridge Avenue. D. Plan at an engineering scale of the existing and proposed site uses The applicant's site plan information is provided in Appendix A. 3 a WEST VILLAGE TRAFFIC IMPACT STUDY Panorama Trails*White Hall. , _.. 00th R Q- Dooms gen. RC rQ R • A U G U S T A iii 4 re' arm O O w Or% 90Q rozet 240._._T ' P Greenbrier lF,Z 20Q Ot V I R G I N I A "250 s Pte. 5 oe E E MAR l E 250 s+ CHARLOTTESVILLE Afton Z50 29 Rockfish 99°m J , B.s Charlottesville. South) Entrance Station Ri 29 edc 101 X x st j N E L S O N pe it h se 1a'a Rd G t F 0 5` 0 creek R0 Lake Park F- a CIhg D< c oC}d eo e Ny\•;c6(20.,,UarmanS Gap Rd roz 240 ®ee Notched Rd ke west Dr parYc To'n Ivy Rd yc.rg Qad7wn 250 CI"tP 0 0 Brownsville Rockfish Gap Tpke a cad P s o. Ct LON Q 07 D dt0i...Cr 107 O 250 M O — .._.hS Midway 0 j Rd A Midway Rd yyyanl pi°K ° 0 f1 all I N Figure 1D' ei ortak Vicinity Map E. Description and map or diagram of nearby uses, including parcel zoning Figure 2 below illustrates the current zoning in the study area per the County's online GIS system. The light pink represents urban general (CT 4), pink represents urban general (CT 5), red represents urban core (CT 6) and yellow represents urban edge (CT 3). S4 4.166114L55-46 1.45 IA \ , , 55-1''`i j O y f 6 A 0 st Village C e i 40c, .ners, Ares 4 IIIO ; ssC_a4 -s0 `!8-4;'"i 0 per• 7 1 d i_ 5.. r 541 C.. ___ a 1 t fi i t • f 1 . 2 3.htiL r A Ai c o k iru 1.a 3 . 1 "t Tlfi 1 G I”- 7 -6 c-0 1- G 44 s s 5E'O • 5611 56 i , _ Al !.LZf T' 54" - 07 -0C -1 q-01 -1 A 4 . ,, f/ r , , ry '207 1 r # h i -0C•17 1.- 5 ;. \ V SE+P1.J. a...i C lWWW111 41,„5650 4— sEiAir, 41"--Z 4 a c ss T 4Af yI y r 33^ -'. - . E 1 lrc . K , Put- .L4 t Wf 6f.pm' N Figure 2 — County GIS Map of Current Zoning F. Description and map or diagram of existing roadways See Figure 1 for an illustration of the adjacent roadway network. Jarmans Gap Road is a two lane, east / west collector road that connects the western part of Crozet to Crozet Avenue and downtown. The pavement width is 20 feet and there are no paved shoulders. The VDOT ADT database indicates that the year 2008 traffic volume was 2,800 vpd. Blue Ridge Avenue is a two lane residential street that provides access to several residences in the area. The pavement width is 15 feet and there are no paved shoulders. The year 2008 ADT is 380 vpd. The speed limit is 25 mph for both roadways, there are no turn lanes along either roadway in the study area, and the sight distances are satisfactory. 5 G. Description and map or diagram of programmed improvements to roadways, intersections, and other transportation facilities within the study area Jarmans Gap Road is programmed to be improved next year. The road will remain a two lane roadway. but will be improved to current geometric standards, including a sidewalk. III. Analysis of Existing Conditions A. Collected daily and peak hour of the generator traffic volumes, tabulated and presented on diagrams with counts provided in an appendix Peak hour turning movement counts were conducted at the study intersection on Tuesday, June 8, 2010. See Figure 3 for an illustration of the existing traffic count data. The traffic count worksheets are provided in Appendix B. B. Analyses for intersections and roadways identified by VDOT Highway Capacity Software (HCS +) was utilized to analyze traffic operations at the study intersection. Table 1 provides a summary of the existing level of service and delay, by movement. The intersection operates satisfactorily with all individual movements operating at LOS B or better. The HCS worksheets are provided in Appendix C. TABLE 1 Existing Capacity Analysis Delay (sec /veh) and LOS Intersection and Delay Movement LOS AM PM Jarmans Gap & Blue Ridge Jarmans Gap 7.4 7.7 EB All A A Blue Ridge 9.6 11.5 SB All A B 6 WEST VILLAGE TRAFFIC IMPACT STUDY bn Site 0) (6) 3 3 3 (7) Jarmans Gap Rd L 89 (208) 5) 3 136) 145 —* N Figure 3 Existing (Year 2010)xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes C. When the type of development proposed would indicate significant potential for walking, bike or transit trips either on- or off -site, analyses of pedestrian and bicycle facilities, and bus route(s) and segment(s), tabulated and presented on diagrams, if facilities or routes exist Not applicable. D. Speed Study (if requested by VDOT) — N/A E. Crash history near site (if requested by VDOT) — Crash data was provided by VDOT for the Blue Ridge Avenue intersection with Jarmans Gap Road. There were no reported accidents in the previous three years. F. Sight distance (if requested by VDOT) — N/A A sight distance analysis was not specifically requested; however, when the new site entrance is constructed, the design shall provide for sight distances in compliance with the VDOT requirements. IV. Analysis of Future Conditions Without Development A. Description of and the justification for the method and assumptions used to forecast future traffic volumes Per the VDOT database, the traffic volume on Jarmans Gap Road has only modestly increased in the last several years, from 2,600 vpd in 2005 to 2,800 vpd in 2008. This represents an increase of less than two percent. To be conservative, a two percent per year background growth rate was used to increase the background traffic volume to the build year 2020. See Figure 4 for the No Build year 2020 traffic volumes. B. Analyses for intersections and roadways as identified by VDOT 1. Delay and Level of Service (LOS) are tabulated and LOS is presented on diagrams for each lane group. Table 2 provides a summary of the capacity analysis by movement for the year 2020 no -build condition. There is very little change from existing conditions, with all individual movements still operating at LOS B or better. The HCS worksheets are provided in Appendix D. TABLE 2 No Build Year 2020 Capacity Analysis Delay (sec /veh) and LOS Intersection and Delay Movement LOS AM — 1 PM Jarmans Gap & Blue Ridge Jarmans Gap 7.5 7.8 EB All A A Blue Ridge 9.7 11.8 SB All A B 8 WEST VILLAGE TRAFFIC IMPACT STUDY bn Site 0) (7) 4 4 4 (9) Jarmans Gap Rd L 4-- 108 (254) 6) 4 166) 177 — N Figure 4 2020 No Build xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes C. When the type of development proposed would indicate significant potential for walking, bike or transit trips either on- or off -site, analyses of pedestrian and bicycle facilities, and bus route(s) and segment(s) tabulated and presented on diagrams, if facilities or routes exist or are planned The development will have sidewalks. Considering the proximity of the development to the Crozet CBD, and connection via future sidewalk to Old Trail, it is expected that the site will generate and accommodate bike /walk trips. Note that the site trip generation was not reduced for these trips. V. Trip Generation A. Site trip generation, with tabulated data, broken out by analysis year for multi- phase developments, and including justification for deviations from ITE rates, if appropriate The trip generation for the proposed development is summarized in Table 3. The equations from the ITE Trip Generation Manual Edition 8 were utilized. Table 3 - Trip Generation AM PM Land Use Qty Units ADT in out in out Single Family Dwelling LU 210)5 Units 66 3 10 4 3 Condo /Townhome Dwelling LU 230)59 Units 406 6 28 26 13 Total 472 9 38 30 16 Source: 1TE Trip Generation 8` Edition B. Description and justification of internal capture reductions for mixed use developments and pass -by trip reductions, if appropriate, including table of calculations used No trip reductions were taken, though due to proximity to the Crozet CBD and future facilities in Old Trail it could be expected that some percentage of trips, especially the non -work trips, might be made via biking or walking. VI. Site Traffic Distribution and Assignment 1. Description of methodology used to distribute trips, with supporting data 2. Description of the direction of approach for site generated traffic and diagrams showing the traffic assignment to the road network serving the site for the appropriate time periods 10 The site trip distribution percentages are illustrated in Figure 5. The site trips are distributed based on the general traffic distribution currently in the study area. The distribution differs by peak hour to account for the directional change associated with the morning and evening commutes. The resulting peak hour site related trips are illustrated in Figure 6. VII. Analysis of Future Conditions With Development A. Forecast daily and peak hour of the generator traffic volumes on the highway network in the study area, site entrances and internal roadways, tabulated and presented on diagrams Figure 7 illustrates the total year 2020 build peak hour traffic volumes. B. Analyses for intersections and roadways identified by VDOT (Blue Ridge Avenue at Jarmans Gap Road) 1. Delay and Level of Service (LOS) are tabulated and LOS is presented on diagrams for each lane group. The Year 2020 Total Build level of service is summarized in Table 4. Very little change is projected with all individual movements still operating at LOS B or better. The HCS worksheets are provided in Appendix E. TABLE 4 Build Year 2020 Capacity Analysis Delay (sec /veh) and LOS Intersection and Delay Movement LOS AM PM Jarmans Gap & Blue Ridge Jarmans Gap 7.5 7.9 EB All A A Blue Ridge 10.2 11.5 SB All B B Entrance and Turn Lane Analyses In addition to the study intersection that was evaluated. turn lane analyses were conducted for the proposed Blue Ridge Avenue entrance. Given the relatively low volumes expected on Blue Ridge Avenue, turn lanes are not warranted at this location. In addition, one egress lane is sufficient for traffic exiting the development onto Blue Ridge Avenue. The turn lane worksheets (per the VDOT Road Design Manual) are provided in Appendix F. 11 WEST VILLAGE TRAFFIC IMPACT STUDY 5 %) 5% aby Site Jarmans Gap Rd 55 %)40 %) 40%55% N Figure 5 Site Trip xxx = Peak Hour Distribution Percentages Distribution Percentages WEST VILLAGE TRAFFIC IMPACT STUDY i) 1 Site 2 15) 36 4' 41 8 28) 9) (6) 15 21 t 4 (12) Jarmans Gap Rd 16) 4 N Figure 6 Site Trip xxx(xxx) = am(pm) Peak Hour Volumes Peak Hour Volumes WEST VILLAGE TRAFFIC IMPACT STUDY Site 9) (13) 19 25 1 8 (21) Jarmans Gap Rd L 4-- 108 (254) 22) 8 166) 177 — N I Figure 7 Year 2020 xxx(xxx) = am(pm) Peak Hour Volumes Total Build Peak Hour Volumes C. When the type of development proposed would indicate significant potential for walking, bike or transit trips either on- or off -site, analyses of pedestrian and bicycle facilities, and bus route(s) and segment(s) tabulated and presented on diagrams, if facilities exist or are planned As previously discussed, sidewalks are planned to connect all areas of the proposed site. No sidewalks currently exist along Blue Ridge Avenue. Additional Discussion - Future Roadway Connection Although not part of the capacity analysis requirements, it was requested that discussion be provided regarding traffic volume projections for a potential new street connection. It is anticipated that the West Village development spine road will connect to a future link to Cling Road, thus providing a future connection for the parcels in the immediate surrounding area. With the exception of the residences on Cling Road, most of the adjacent parcels that would utilize this new roadway connection are not yet developed. The ADT projection for the new roadway connection was calculated based on three components: 1. Proposed West Village Subdivision 472 vpd (see Table 3) 2. Cling Lane 479 vpd (currently 50 residences times 9.57 trips per house) 3. Vacant Parcels in the Area There are several vacant parcels in the immediate area that would have access to the new connector road — the parcels are highlighted in orange in Figure 8. These parcels are identified in Table 5, along with the total acreage and the developable acreage (as scaled from the County GIS map) Table 5 — Vacant Parcels Adjacent to the New Connector Road Vacant Parcel Total Area Developable Area acres)acres) 55C -03 -B 4.2 0 55C -03 -A 25.5 12.5 56A1-01-31 0.7 0.6 56A1-01-30A 2.6 2.2 56A1-01-30 2.3 1.8 56A1-01-26B 1.9 1.6 56A1-01-26 4.4 4 56A1-01-25 4.6 4 56A 1 -0 I -26A 0.9 0.9 Total 47.1 27.6 15 The 27.6 acres of developable area is then converted to dwelling units based on six dwelling units per acre (per the proposed revisions to the Crozet Master Plan pending adoption this fall), resulting in 166 dwelling units. Utilizing the ITE Trip Generation Manual for Lane Use Code 230 (condos / townhomes), this equates to 973 vpd. The summation of these three components results in an ADT of 1,924 vpd for the new roadway connection. Note that if the current density of 12 dwelling units per acre were retained, the anticipated ADT for the new connector road would increase to 2,897 vpd. West Villa, - Surroundin• Parcels 5-41 6:1 3.1 1 sNe A *. / 5 4' siar y ' Set 09SC,2.56-1 e "4' ltAt3 r r+ QFFq.1 ` .. S • . .a1 sf4F 16,6461 S6 SS 4611 . k-r6-.,./111,101W A„.. A ,..•6A4.p1N1, % . Q56I t/114„1 . Yl1 a : S-: ' A ^ 3 JS . J24LWi .t. s66 .91. 565•= , s lie. 6t 43-erp ' 4, 1 * . 1* i 1104:11 Y 1, ' s 4 6 rrylPT e y.11, 1x11 . ` '°b,„,rP 1 .! .. Z i A ot_7zs i c CrEecf ' eaC, .'a=rr ` +, F , C4 kA 7,_ a1 'i1 s-fps ar r y4 ^5..L rfj S I *' ' i1 1 SS 6A 557. fci , c ',q ' ih. ,,,1 i ss7,i s77 _ ,,i - sstA ,. , ``; C , y S1A1,6ili12 a +.iratsi a j Ass.7e 11+s i, liter s. r s"'; ..1 so a rr7 , jy !iI/ j ,+.4 'S€A7m_"9 » ` pQicr_ 6 r s.i6a fi 114 ' 6's6A 6: : L3.716 se- },E 1.iz'76 zfi- 6 Ci6'4' ;7 ts [o'-e kL si 1 i s6At z-mr , 2 s VI, :+. is.1 552.0h6 e - W 1 56-11 56A 6 .a isi !od,t 5;7995 1 5061 , 7 "1 C i t 56- P 5W1 * i - .ysPks61, 1_ S5[ -5T, 1iD14 r , .t Set -t SS-1 9D R 1 4 f A 13. ,1j ' 4 11 '21*- " fir-11 Figure 8 — GIS Map of Vacant Parcels in the Immediate Study Area Note that the volume projection methodology was conservative (i.e., resulting in the highest forecasted volume) and assumed: the maximum allowable densities will be achieved; no reduction for bike / walk trips even though the development is in close proximity to mixed uses; and all trips in the immediate area will utilize the new roadway connection, although some trips will be destined for points west and / or McComb Street (to cross the railroad tracks). 16 VIII. Recommended Improvements A. Description and diagram of the location, nature, and extent of the proposed improvements, with preliminary cost estimates as available from VDOT Based on the traffic operations analysis of the study intersection and proposed entrance, no turn lane improvements are required. B. If travel demand management (TDM) measures are proposed, description of methodology used to calculate the effects of TDM measures with supporting data No TDM measures have been examined or considered as part of this analysis. C. Analyses for all proposed and modified intersections in the study area under the forecast and site traffic Not applicable. IX. Conclusions A. Clear, concise description of the study findings Findings The analysis indicates that the proposed development will have only limited impact to traffic operations at the study intersection and therefore, no improvements are required. Information Per the VDOT Secondary Street Acceptance Requirements (SSAR), the proposed West Village subdivision's spine road will be constructed to allow for a potential connection to a future development, and ultimately, to Cling Road. Assuming a density of six dwelling units per acre, the new connector road is likely to experience daily traffic volumes just below 2,000 vpd. Otherwise, if the density is higher, the ADT on the new connector road will very likely be over 2,000 vpd. While the proposed West Village subdivision includes sidewalks, the existing Blue Ridge Avenue cross section does not include sidewalks. Also, the Blue Ridge Avenue pavement width does not meet VDOT standards. As development / redevelopment occurs in the area, right -of -way dedication should be provided as necessary to allow for Blue Ridge Avenue to be improved, especially if/ when a new roadway connection to Cling Road is constructed. 17 Appendix A Site Plan 01./97/9 mew, L3ZOJO 3€JY1- 1111S1M SJOISIA3H O n l ,NVld 1N31A1dO1AA34 111S A VNIWI1321d S31ON GN`d 133HS 2:13AO3 1= a_ w.i a m w O WI z Z J i '-'0 Q w Z w x I 0 J w 1 6'„, E W oQ7 Z O 6 J W d p At e `• H t.P > 1,;S 1 t. r M m9t4VINIO211A13Z02030V11IA1S3MSNOISIA321 r pr NV1d1N31A1dO13A3031ISAHVNIIN1132dA ' NVOW2a'2SNOIIIGNOOONIISIX3V EilI I IEl1 D I010 LI 31V3nrnNlmeandM3,0laante 2 1 1 _ 1IT P1F -1 11q1 5 77i I 7/ Il's is, Ca 01192 4 VINIO IA 13ZO7:10 - 30V11IA 1,SJM SNOISInaa r NVld 1N31AldO13Aa0 31IS MzIVNI1A11132Jd Cr)NV1d 3.IS 12JVNIWI132Id R..a, 1 3/!V3RIIla 3 3 /V3E0183me Lsfu4 U - k 11lip Y p] j - H —_1.— 1 I 4 ' - - 1, L t_ -1 _I j 4 M II ; 1/1 1 I 1 i ` II I I CI11 I'j, r I 1 1 .11 II 1 Y_1 II Y - ` - - i3O r 1 ate YJ 1 a 1I irrUIf p IU E.. j, i 1 J i 4 ej /o y 1-1-1 -4 s / Vii- tic , Appendix B Count Data Data Collection gutty Laura Smith DataCollectionGroup(a,- hotmaiLcom File Name : westVillageCounty6 -8 -10 Site Code 00000000 Start Date : 6/8/2010 Page No 1 Trucks only Groups Printed- Unshifted - Bank 1 Blue Ridge Jarmins from Crozet Jarmins towards Crozet From North From East From South From West Start Time Left Thru Right Peds App ma Left Thru Right Peds App Total Left Thru Right Peds App Total Left Thru Right Peds APP Total It Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1 0 1.0 07:00 AM 0 0 2 0 2 0 6 1 0 7 0 0 0 0 0 0 14 0 0 14 23 0715 AM 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 23 0 0 23 31 07:30 AM 1 0 0 0 1 0 13 0 0 13 0 0 0 0 0 1 40 0 0 41 55 07 45 AM 2 0 1 0 3 0 22 2 0 24 0 0 0 0 0 0 37 0 0 37 64 Total 3 0 3 0 6 0 49 3 0 52 0 0 0 0 0 1 114 0 0 115 173 08:00 AM 0 0 1 0 1 0 23 1 0 24 0 0 0 0 0 2 36 0 0 38 63 08:15 AM 1 0 1 0 2 0 17 0 0 17 0 0 0 0 0 0 32 0 0 32 51 0830 AM 0 0 0 0 0 0 27 0 0 27 0 0 0 0 0 1 40 0 0 41 68 08:45 AM 2 0 0 0 2 0 21 0 0 21 0 0 0 0 0 1 30 0 0 31 54 Total 3 0 2 0 5 0 88 1 0 89 0 0 0 0 0 4 138 0 0 142 236 BREAK "' 04:00 PM 1 0 3 0 4 0 36 1 0 37 0 0 0 0 0 2 47 0 0 49 90 04:15 PM 1 0 0 0 1 0 32 0 0 32 0 0 0 0 0 1 36 0 0 37 70 04:30 PM 1 0 1 0 2 0 44 1 0 45 0 0 0 0 0 0 36 0 0 36 83 04:45 PM 1 0 0 0 1 0 37 0 0 37 0 0 0 0 0 0 19 0 0 19 57 Total 4 0 4 0 8 0 149 2 0 151 0 0 0 0 0 3 138 0 0 141 300 05:00 PM 4 0 0 0 4 0 43 2 0 45 0 0 0 0 0 0 32 0 0 32 81 05:15 PM 1 0 0 0 1 0 57 1 0 58 0 0 0 0 0 1 27 0 0 28 87 05:30 PM 1 0 0 0 1 0 63 1 0 64 0 0 0 0 0 0 46 0 0 46 111 05:45 PM 0 0 0 0 0 0 45 3 0 48 0 0 0 0 0 4 31 0 0 35 83 Total 6 0 0 0 6 0 208 7 0 215 0 0 0 0 0 5 136 0 0 141 362 Grand Total 16 0 9 0 25 0 494 13 0 507 0 0 0 0 0 13 526 0 0 539 1071 Apprch % 64 0 36 0 0 97.4 2.6 0 0 0 0 0 2.4 97 6 0 0 Total % 1.5 0 0.8 0 2.3 0 46 1 1.2 0 47 3 0 0 0 0 0 1 2 49 1 0 0 50.3 Unshifted 15 0 8 0 23 0 487 13 0 500 0 0 0 0 0 10 522 0 0 532 1055 Unshifted 93.8 0 88.9 0 92 0 98.6 100 0 98 6 0 0 0 0 0 76.9 99.2 0 0 98.7 98.5 Bank 1 1 0 1 0 2 0 7 0 0 7 0 0 0 0 0 3 4 0 0 7 16 Bank 1 6.2 0 11 1 0 8 0 1 4 0 0 1.4 0 0 0 0 0 23 1 0.8 0 0 1 3 1.5 Data eattection, quay Laura Smith DataCollectionCroup (wiiotmail.com File Name : westVillageCounty6 -8 -10 Site Code 00000000 Start Date : 6/8/2010 Page No 2 Blue Ridge Jarmins from Crozet Jarmins towards Crozet From North From East From South From West Start Time Left Thru Right Peds App Total Left Thru Right Peds App Total Left Thru Right Peds App Total Left Thru Right Peds App Total Int Total Peak Hour Analysis From 0700 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 0745 AM 2 0 1 0 3 0 22 2 0 24 0 0 0 0 0 0 37 0 0 37 64 08 00 AM 0 0 1 0 1 0 23 1 0 24 0 0 0 0 0 2 36 0 0 38 63 08:15 AM 1 0 1 0 2 0 17 0 0 17 0 0 0 0 0 0 32 0 0 32 51 08:30 AM 0 0 0 0 0 0 27 0 0 27 0 0 0 0 0 1 40 0 0 41 68 Total volume 3 0 3 0 6 0 89 3 0 92 0 0 0 0 0 3 145 0 0 148 246 App Total 50 0 50 0 0 96 7 3 3 0 0 0 0 0 2 98 0 0 PHF 375 000 750 000 500 000 824 375 000 852 000 000 000 000 000 375 906 000 000 902 904 Blue Ridge Out In Total 6 6 12 3 0 3 0 Right Thru Left Peds Peak Hour Data sa A Q N a,0 0 J D 2 ~CO A N o v North CO 3 N C — 1--C to M o—Peak Hour Begins at 0745 AM m53osrnJ3 ca to o c N Unshifted w a E - 0 ) Bank 1 1 coo 0 o o A pO,,. ia)a o—a m ° 4 Left Thru Right Peds 0 0 0 0 0 0 0 Out In Total Data Laura Smith DataCoi[ectionGroup@hotmaii.com File Name : westVillageCounty6 -8 -10 Site Code 00000000 Start Date : 6/8/2010 Page No 3 Blue Ridge Jarmins from Crozet Jarmins towards Crozet From North From East From South From West Thr Rig Ped Thr Rig Ped Thr Start Time Left u ht s Left u ht s M ^ Le u Right Peds App ro,ai Left u Right Peds App rota, Int Total Peak Hour Analysis From 12 00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 4 0 0 0 4 0 43 2 0 45 0 0 0 0 0 0 32 0 0 32 81 05:15 PM 1 0 0 0 1 0 57 1 0 58 0 0 0 0 0 1 27 0 0 28 87 05:30 PM 1 0 0 0 1 0 63 1 0 64 0 0 0 0 0 0 46 0 0 46 111 05:45 PM 0 0 0 0 0 0 45 3 0 48 0 0 0 0 0 4 31 0 0 35 83 Total volume 6 0 0 0 6 0 208 7 0 215 0 0 0 0 0 5 136 0 0 141 362 App Total 100 0 0 0 0 96 7 3 -3 0 0 0 0 0 3 5 96 5 0 0 PHF 375 000 000 000 375 000 825 583 000 840 000 000 000 000 000 313 739 000 000 766 815 Blue Ridge Out In Total 12 6 18 0 0 6 0 Right Thru Left Peds Peak Hour Data A sM 4 o N t--J J A.=+ o 2 North 3 rt 4 /Ro Pa.sB _ o — Peak Hour Begins at 0500 PM B1, 5 r to CDm m CL Unshfted 0 3 t O o o a Bank 1 7) u( m N 0 o-o 4 Left Thru Right Peds 0 0 0 0 0 0 0 Out In Total Appendix C Capacity Analysis Worksheets — Existing HCS +: Unsignali>ed Inter-secti-or,s Release 5.3 TWO -WAY STOP CONTROL SUMMARY Analyst:CTS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: AM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:Existing Project ID: West Village East/West Street:Jarmans Gap Rd North /South Street: Blue Ridge Ave Intersection Orientation: EW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R I L T R Volume 3 145 09 3 Peak -Hour Factor, PHF 0.90 0.90 0.85 0.85 Hourly Flow Rate, HFR 3 161 104 3 Percent Heavy Vehicles 1 Median Type /Storage Undivided RT Channeli:ed? Lanes 0 1 1 0 Configuration LT TR Upstream Signal?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L 7'R L T R Volume 3 3 Peak Hour Factor, PHF 0.50 0.50 Hourly Flow Rate, HFR 6 6 Percent Heavy Vehicles 8 8 Percent Grade 0 0 Flared Approach: Exists? /Storage No Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EH MB Northbound Southbound Movement 1 4 I 7 8 9 10 11 12 Lane Config Li I I LR v vph)3 12 C(m) vph)1490 801 v/c 0.00 0.01 95' queue length 0.01 0.05 Control Delay 7.4 9.6 LOS A A Approach Delay 9 Approach LOS A Appendix D Capacity Analysis Worksheets — No Build Year 2020 HCS +: Unsignalized Intersections Release 5.3 TWO -WAY STOP CONTROL SUMMARY Analyst:CTS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: PM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:Existing Project ID: West Village East /West Street:Jarmans Gap Rd North /South Street: Intersection Orientation: EW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 14 5 6 L T 0 I L T R Volume 5 136 208 7 Peak -Hour Factor, PHF 0.82 0.82 0.84 0.84 Hourly Flow Rate, HFR 6 165 247 8 Percent Heavy Vehicles 1 Median Type /Storage Undivided RT Channelized? Lanes 0 1 0 Configuration LT TR Upstream Signal?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L T R I L T R Volume 6 0 Peak Hour Factor, PHF 0.38 0.38 Hourly Flow Rate, HFR 15 0 Percent Heavy Vehicles 8 8 Percent Grade O 0 0 Flared Approach: Exists? /Storage No Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 9 17 8 9 I 10 11 12 Lane Config LT I 1 LR v vph)6 15 C(m) vph)1316 569 v/c 0.00 0.03 95 queue length 0.01 0.08 Control Delay 7.7 11.5 LOS A B Approach Delay 11.5 Approach LOS B HCS +: Unsignalized Intersections Release 5.3 TWO -WAY STOP CONTROL SUMMARY Analyst:CTS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: AM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:2020 NO Build Project ID: West Village East /West Street:Jarmans Gap Rd North /South Street: Blue Ridge Ave Intersection Orientation: EW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 14 5 6 L T R L T R Volume 4 177 108 4 Peak -Hour Factor, PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 4 192 117 4 Percent Heavy Vehicles 1 Median Type /Storage Undivided RT Channelized? Lanes 0 1 1 0 Configuration LT TR Upstream Signal?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 I 10 11 12 L 1 R I L T R Volume 4 4 Peak Hour Factor, PHF 0.92 0.92 Hourly Flow Rate, HFR 4 4 Percent Heavy Vehicles 8 8 Percent Grade 0 0 Flared Approach: Exists? /Storage No Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 17 8 7 10 11 12 Lane Config LT I LR v vph)4 8 C(m) vph)1473 768 v/c 0.00 0.01 957 queue length 0.01 0.03 Control Delay 7.5 9.7 LOS A A Approach Delay 9.7 Approach LOS A HCS +: Unsignalized Iritersectiorns Release 5.3 TWO -WAY STOP CONTROL SUMMARY Analyst:CTS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: AM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:2020 NO Build Project ID: West Village East /West Street:Jarmans Gap Rd North /South Street: Blue Ridge Ave Intersection Orientation: FW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1.2 3 1 4 5 6 L T R 1 L T R Volume 4 177 108 4 Peak -Hour Factor, PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 4 192 117 4 Percent Heavy Vehicles 1 Median Type /Storage Undivided RT Channelized? Lanes 0 1 1 0 Configuration LT TR Upstream Signal.?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R 1 L T R Volume 4 4 Peak Hour Factor, PHE 0.92 0.92 Hourly Flow Rate, HFR 4 4 Percent Heavy Vehicles 8 8 Percent Grade 0 0 Flared Approach: Exists? /Storage No Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 17 8 5 10 11 12 Lane Confiq LT 1 LR v P C(m) vph)1473 768 v/c 0.00 0.01 95- queue length 0.01 0.03 Control Delay 7.5 q.7 LOS A A Approach Delay 9,7 Approach LOS A Appendix E Capacity Analysis Worksheets — Build Year 2020 HCS +: Unsignalized Intersections Release 5.3 TWO -WAY STC)P CONTROL SUMMARY Analyst:CTS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: PM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:2020 Build Project ID: West Village East /West Street:Jarmans Gap Rd North /South Street: Intersection Orientation: EW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 1 4 5 6 L T R 1 L T R Volume 22 166 254 21 Peak -Hour Factor, PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 23 180 276 22 Percent Heavy Vehicles 1 Median Type /Storage Undivided RT Channelized? Lanes 0 1 1 0 Configuration LT TR Upstream Signal?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 1 10 11 12 L T R 1 L T R Volume 13 9 Peak Hour Factor, PHF 0.92 0.92 Hourly Flow Rate, HFR 14 9 Percent Heavy Vehicles 8 8 Percent Grade 2)0 0 Flared Approach: Exists? /Storage No Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 1 10 11 12 Lane Config LT 1 1 LR v vph)23 23 C(m) vph)1269 574 v/c 0.02 0.04 95, queue length 0.06 0.13 Control Delay 7.9 11.5 LOS A B Approach Delay 11.5 Approach LOS B HCS +: Unsignalized Intersections Release 5.3 TWO -WAY STOP CONTROL SUMMARY Analyst:CPS Agency /Co.:RPG Date Performed:7/14/2010 Analysis Time Period: AM Intersection: Jurisdiction: Units: U. S. Customary Analysis Year:2020 Build Project ID: West Village East /West Street:Jarmans Gap Rd North /South Street: Blue Ridge Ave Intersection Orientation: EW Study period hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement 1 2 3 4 5 6 L T R I L T R Volume 8 177 108 8 Peak -Hour Factor, PHF 0.92 0.92 0.92 0.92 Hourly Flow Rate, HFR 8 192 117 8 Percent Heavy Vehicles 1 Median Type /Storage Undivided R1' Channel i zed? Lanes 0 1 7 0 Configuration LT TR Upstream Signal?No No Minor Street: Approach Northbound Southbound Movement 7 8 9 10 11 12 I;T R L T R Volume 25 19 Peak Hour Factor-, PHF 0.92 0.92 Hourly Flow Rate, HFR 27 20 Percent Heavy Vehicles 8 8 Percent Grade 0 0 Flared Approach: Exists ? /Storage No Lanes 0 0 Configuration LP Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement 1 4 1 7 8 9 10 11 12 Lane Config L5 I I LR v vph)8 47 C(m) vph)1468 740 v/c 0.01 0.06 95 queue length 0.02 0.20 Control Delay 7.5 10.2 LOS A B Approach Delay 10.2 Approach LOS B Appendix F VDOT Turn Lane Worksheets Entrance - Left Turn Warrant Evaluation 43 WARRANT FOR LEFT -TURN STORAGE LANES ON TWO -LANE HIGHWAYS 80.IU *a0a11 a a s a 011 a ! SanE aaaaaa At- Grade, Unsignalized Intersectionssaaaaal!aa111VC1 \!!L = % Left Turns in VAre7aa MMISEOERa 7 0 011 a .11 111111:!aM1N MNIN S = Storage Length Required n-Iaaa a;1 a Ia 1\aa=1. !11 al V = 40 mph (Design Speed)ls 1 1131 M \I11M\\ 11OI L = 30%SORMaaa!!!.\!ESa!a! M w 6001! a 01171. a!! aaa! .OSONSO!!!!!aa a 1 1 a! 1 .1S1aM aaa EN ISM aa!\ MOOM \EEMW>tala! ! IMON D no must 1 ..R a Oaa ! ! 500 ISSSOMISSI 000110 ! \3 . ! .a p Is aURR , SMOSOESUSSOMMIK •!! \ ! \ !!!! lr 11 . aaa1\aa.7 SMOS!E M rtaa 111 • aaOa. ! !OE O 400 rc aaaaaat ' a\ al..!!>tMOSIOS \Ra! It!!a I 11$ art a a \a a\• Z IEa11a S asa !!\1!lRIlCa!Va\! a imsa t1 a aa \ a .a\. \ aa 11\`1 / O a 300 m aaaa i7 a !laa.VaaV0.\aa /!!a\!! aa a 1L11 1111! a11 SSMOSE. a \ E te . a nitl.!aa!lil!!/!\ /lanvlaVa.a! S. o eft -Turn .. a a1aAa 1. t a ? O 200 N L 1111! NN ! /sue J' laii aa! \ s o Lane Required t•••• p ••••1 f ? 11 I0111 i 0,0 • ` . 010,It16 1111 a r 10 011 1a a!! !aa C11n Ma \ MOO S• b OSSEEMEOSEMESSOMMEMISSEMOMENISMSMOSSIMMOSIONMOSS 0 i.ummamita . ° ° n. . . . . ii • .miaiau = 0 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3 -8 800 na1a m mummummilaummm zed IntersectionsnaliUAtGrade, UnsignalizedA = % Left ns gns in VAi 11 1 N Z i 11 / ara NIIMSI .1 r/ S = Storage Length Requiredn- 700 iaat a 7 1'am1 V = 40 mph (Design Speed)i 117 /!!.OlOSMOMaVO\!.!1 11 I a SMSOM Oa ' MOSESM = 1 L = 40 /o OMMISMUIMMEMOSSNEMESEUROMMOSE 600 11!! 1 1aa1anMS7OEM MMON . a !!>t 1.0N finMUNIM a1Vi7/AISO OMM=a / IMM n 0011 aa1' n I a./aimaa J a.1 a1in - m. /al. ummummumi. ! a O 500 1 ./1 • ES a 1a MVaD0aaa! 11 aY1!t V1..OCOSSIMUOM !!.!!OSMOSES - 11111111 ummueammomm101111.1 1 a a Eaa O1 ESSM!Uo4000 ii a /ME ISMONO a \ Z atIMMIS a!! a =!a =WEI\a1S a. 11a a E SSEISSIMMINNaa \aaa.1O7!!aaaCaROMEE. EMMISE =SOM• a!0 300 .1aai 1111 .a\ =a\ \laO 1 N 1111! 1USSMOMMON/ 1111 \ 1111 M E \a a Sa!d SSME .aS • • a. :..1111. O `: 0 1...1-1-0- 1 a.. NM •1111 a Ili ° . 2 0 0 N o Left - Turn mow J , C S 31. S. o Lane r k'Sr. • 1aO!!a O f is S NI 1.11 Requ .1ia! O, a s ,_ O. 0,111.O O ' MEL1001! NEa MB iONEMa1!!!!111110111 =MMM ONNUMENUMMEN MN MUMMOMMUMMMENNEMENuu ias 0 0%111!a IMO 0 200 400 600 8 1000 VA ADVANCING VOLUME (VPH) FIGURE 3 -9 Both AM & PM data plots are in this general area: AM - Advancing volume = 16, Opposing volume = 9 PM - Advancing volume = 43, Opposing volume = 9 55Entrance -Right Turn Warrant Evaluation rte. .,.. y :s:... ..iii' /rxi'a SC '" h6U'::' ? R iii 120;y °z'o:.r;b:,-: z ,^ax rte.' . r >!`Y+£xi"3 %.: ter .. 3 >: xx',,.E, , t ' ,i. ;. / 1.. z ', ' • : i irk". > : :;. 3':5.e'a :• >.ai?, %fir: c.:.. Gc. .a,..:,,.wr,c ;'''1, I?,: : ::,::',: r :.ss:> 100 FULL —WI TURN LANE AND TAPER REQUIREDceY.fi 0 g W es co Lii 0 t ftws.; 60 TAPER REQUIRED F F- z cr 40 t z re NO TURN LANES 20 OR TAPERS REQUIRED i 100 200 300 400 500 600 700 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropri a Radius required at all Intersections and Entrances (Commercia or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Right Turns For posted speeds at or under 45 mph, PHV right turn > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K =the percent of AADT occurring in the peak hour D =the percent of traffic in the peak direction of fl wo Note: An average of 11 % for K x D will suffice. FIGURE 3 -23 GUIDELINES FO RIGHT TURN TREATMENT (2 -LANE HIGHWAY) Both AM & P data points are in this area: AM - Approach total = 9, right turns = 1 PM - Approa total = 9, right turns = 2