Loading...
HomeMy WebLinkAboutSUB201500100 Bond Estimates 2016-03-16Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O15OO1OO Item Free State Road station 10+30 to 15+00 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi. survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) road length 1 470.0 ft n d 470.0 ft L 7.0 ft W 470.OftLftW in d 470.OftLftW in d 470.0 ft L 20.0 ft W Each ES @ 3000 17in d 1 ES -1,2 EC -1 0.0 in d 0 ES -1,2 EC -1 0.0 in dES-1,2 EC -1 0.0 in d ES -1,2 EC -1 2.0 ft d ft ftW ft ftW ft ftW 470.0 ft L 0.08902 mi. 470.0 ft L 0.08902 mi. 470.0 ft L 0.94 inc of 500' 470.0 ft L 0.94 inc of 500' 470.0 ft L 0.94 inc of 500' 470.0 ft L 0.94 inc of 500' 470.0 ft L 0.94 inc of 500' 470.0 ft L 0.08902 mi. 470.0 ft L 0.08902 mi. 470.0 ft L 0.08902 mi. No. Unit Unit Cost Cost installed % compete cost remaining 329.0 ton $35.00 $11,515.00 0% $11,515.00 0.0 sy $10.00 $0.00 0% $0.00 143.9 tons $100.00 $14,393.75 0% $14,393.75 86.4 tons $120.00 $10,363.50 0% $10,363.50 -ft $13.00 $0.00 0% $0.00 940.0 ft $15.00 $14,100.00 0% $14,100.00 45.0 ft $17.00 $765.00 0% $765.00 0 ft $350.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 2 each $200.00 $400.00 0% $400.00 17 each $150.00 $2,550.00 0% $2,550.00 ft $17.00 $0.00 0% $0.00 each $3,500.00 $3,500.00 0% $3,500.00 each $500.00 $0.00 0% $0.00 ft $450.00 $900.00 0% $900.00 321 ft $35.00 $1,620.00 0% $1,620.00 0.0 ft $0.00 $0.00 0% $0.00 0.0 ft $0.00 $0.00 0% $0.00 0.0 -ft $0.00 $0.00 0% $0.00 7.2 ton $60.00 $432.00 0% $432.00 0.0 sy $2.00 $0.00 0% $0.00 0.0 acre $24,000.00 $0.00 0% $0.00 y ZY $4.00 $800.00 0% $800.00 $9.00 $1,800.00 0% $1,800.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $500.00 $500.00 0% $500.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 2 each $200.00 $400.00 0% $400.00 OF 44ft $1.00 $32.00 0% $32.00 2 Lanes $2,000.00 $3,560.61 0% $3,560.61 Lanes $150.00 $267.05 0% $267.05 2 Lanes $100.00 $428.03 0% $428.03 $75,926.93 $75,926.93 cost sum contingency $7,592.69 $7,592.69 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500100 Item Free State Road No. Unit Unit Cost Cost installed % compete cost remaining Total $83,520 $83,520 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O15OO1OO Item Free State Road station 15+00 to 17+00 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi. survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) road length 1 200.0 ft in d 200.0 ft L. ft W 200.0ftL 0.0ftW in d 200.0ftL 25.0 ftW in d 200.0ftL 5.0 ftW Each ES @ 3000 15.0in d 1 ES -1,2 EC -1 24.0 in d OE ES -1,2 EC -1 18.0 in dES-1,2 EC -1 18.0 in d ES -1,2 EC -1 LMft d ftftW ftL.OftW ftLLF.0 30.OftW 200.0 ft L 0.03788 mi. 200.0 ft L 0.03788 mi. 200.0 ft L 0.4 inc of 500' 200.0 ft L 0.4 inc of 500' 200.0 ft L 0.4 inc of 500' 200.0 ft L 0.4 inc of 500' 200.0 ft L 0.4 inc of 500' 200.0 ft L 0.03788 mi. 200.0 ft L 0.03788 mi. 200.0 ft L 0.03788 mi. No. Unit Unit Cost Cost installed % compete cost remaining 175.0 ton $35.00 $6,125.00 0% $6,125.00 0.0 sy $10.00 $0.00 0% $0.00 76.6 tons $100.00 $7,656.25 0% $7,656.25 45.9 tons $120.00 $5,512.50 0% $5,512.50 qft $13.00 $0.00 0% $0.00 400.0 ft $15.00 $6,000.00 0% $6,000.00 200.0 ft $17.00 $3,400.00 0% $3,400.00 0 ft $350.00 $0.00 0% $0.00 each $200.00 $0.00 0% $0.00 each $200.00 $0.00 0% $0.00 10 each $150.00 $1,500.00 0% $1,500.00 $17.00 $0.00 0% $0.00 each M1ft $3,500.00 $7,000.00 0% $7,000.00 each $500.00 $500.00 0% $500.00 ft $450.00 $8,550.00 0% $8,550.00 160.0 ft $35.00 $6,100.00 0% $6,100.00 ft $50.00 $0.00 0% $0.00 01 ft $40.00 $0.00 0% $0.00 0.0 ft $40.00 $0.00 0% $0.00 4.8 ton $60.00 $288.00 0% $288.00 0.0 sy $2.00 $0.00 0% $0.00 0.1 acre $24,000.00 $2,314.05 0% $2,314.05 Klcyy $4.00 $2,800.00 0% $2,800.00 $9.00 $2,070.00 0% $2,070.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $500.00 $0.00 0% $0.00 1 each $200.00 $280.00 0% $280.00 1 each $200.00 $280.00 0% $280.00 1 each $200.00 $280.00 0% $280.00 1 each $200.00 $280.00 0% $280.00 1 each $200.00 $280.00 0% $280.00 �ft $1.00 $160.00 0% $160.00 2 Lanes $2,000.00 $1,515.15 0% $1,515.15 Lanes $150.00 $113.64 0% $113.64 2 Lanes $100.00 $325.76 0% $325.76 $69,330.35 $69,330.35 cost sum contingency $6,933.03 $6,933.03 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500100 Item Free State Road No. Unit Unit Cost Cost installed % compete cost remaining Total $76,270 $76,270 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O15OO1OO Item Free State Road station 17+00 to 18+50 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi. survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining road length 1 150.0 ft in d 150.0 ft LF20.00 ft W 105.0 ton $35.00 $3,675.00 0% $3,675.00 150.0 t L ft W 0.0 sy $10.00 $0.00 0% $0.00 in d 150.0 ft L ft W 45.9 tons $100.00 $4,593.75 0% $4,593.75 lin d 150.0 ft L ft W 27.6 tons $120.00 $3,307.50 0% $3,307.50 qWft $13.00 $0.00 0% $0.00 300.0 ft $15.00 $4,500.00 0% $4,500.00 100.0 ft $17.00 $1,700.00 0% $1,700.00 0 ft $350.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 3 each $200.00 $600.00 0% $600.00 .Each 5 each $150.00 $750.00 0% $750.00 ES @ 3000 ft $17.00 $0.00 0% $0.00 each $3,500.00 $7,000.00 0% $7,000.00 each $500.00 $1,000.00 0% $1,000.00 ft $450.00 $8,550.00 0% $8,550.00 15.0 in d0 ES -1,2 jr EC -1 47. ft $35.00 $1,645.00 0% $1,645.00 30.0 in d 0 ES -1,2 EC -1 270.0 ft $65.00 $17,550.00 0% $17,550.00 18.0 in d ES -1,2 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d ES -1,2 EC -1 0.0 ft $40.00 $0.00 0% $0.00 Loft d ft L.0 ft W 64.8 ton $60.00 $3,888.00 0% $3,888.00 ft L 4.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 ft L 30.0 ft W 0.1 acre $24,000.00 $3,305.79 0% $3,305.79 M cy $4.00 $400.00 0% $400.00 cy $9.00 $2,700.00 0% $2,700.00 150.0 ft L 0.02841 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 150.0 ft L 0.02841 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $500.00 $0.00 0% $0.00 150.0 ft L 0.3 inc of 500' 1 each $200.00 $260.00 0% $260.00 150.0 ft L 0.3 inc of 500' 1 each $200.00 $260.00 0% $260.00 150.0 ft L 0.3 inc of 500' 1 each $200.00 $260.00 0% $260.00 150.0 ft L 0.3 inc of 500' 1 each $200.00 $260.00 0% $260.00 150.0 ft L 0.3 inc of 500' 1 each $200.00 $260.00 0% $260.00 �ft $1.00 $245.00 0% $245.00 150.0 ft L 0.02841 mi. 2 Lanes $2,000.00 $1,136.36 0% $1,136.36 150.0 ft L 0.02841 mi. Lanes $150.00 $85.23 0% $85.23 150.0 ft L 0.02841 mi. 2 Lanes $100.00 $306.82 0% $306.82 cost sum $74,238.44 $74,238.44 contingency $7,423.84 $7,423.84 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500100 Item Free State Road No. Unit Unit Cost Cost installed % compete cost remaining Total $81,670 $81,670 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O15OO1OO Item Free State Drive station 10+10 to 17+25 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (60 to 108") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi. survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining road length 1 715.0 ft in d 715.0 ft Ll ft W 417.1 ton $35.00 $14,597.92 0% $14,597.92 715.0 ft LF2"5 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 in d 715.0 ft L.0ftW 273.7 tons $100.00 $27,371.09 0% $27,371.09 in d 715.0 ft L25.0 ft W 164.2 tons $120.00 $19,707.19 0% $19,707.19 ft $13.00 $0.00 0% $0.00 143 ft $15.00 $21,450.00 0% $21,450.00 111 ft $17.00 $18,955.00 0% $18,955.00 ft $350.00 $1,400.00 0% $1,400.00 each $200.00 $200.00 0% $200.00 each $200.00 $1,400.00 0% $1,400.00 .Each 20 each $150.00 $3,000.00 0% $3,000.00 ES @ 3000 ft $17.00 $0.00 0% $0.00 each $3,500.00 $31,500.00 0% $31,500.00 6 each $500.00 $3,000.00 0% $3,000.00 72 ft $450.00 $32,400.00 0% $32,400.00 15.0 in d 21 ES -1,2 EC -1 813.0 ft $35.00 $29,455.00 0% $29,455.00 24.0 in d 0 ES -1,2 EC -1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 EC -1 0.0 ft $40.00 $0.00 0% $0.00 I96.0 in d 0 ES -1,2 EC -1 �ft $320.00 $70,400.00 0% $70,400.00 2.0 ft d 23.0 ft L ft W 13.8 ton $60.00 $828.00 0% $828.00 8.0 ft L 5.0 ft W 4.4 sy $2.00 $8.89 0% $8.89 715.0 ft L ii ft W 1.0 acre $24,000.00 $23,636.36 0% $23,636.36 5000.0 cy $4.00 $20,000.00 0% $20,000.00 &L1800jdcy $9.00 $16,200.00 0% $16,200.00 715.0 ft L 0.13542 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 715.0 ft L 0.13542 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 -Isum $500.00 $500.00 0% $500.00 715.0 ft L 1.43 inc of 500' 3 each $200.00 $500.00 0% $500.00 715.0 ft L 1.43 inc of 500' 3 each $200.00 $500.00 0% $500.00 715.0 ft L 1.43 inc of 500' 3 each $200.00 $500.00 0% $500.00 715.0 ft L 1.43 inc of 500' 3 each $200.00 $500.00 0% $500.00 715.0 ft L 1.43 inc of 500' 3 each $200.00 $500.00 0% $500.00 ft $1.00 $0.00 0% $0.00 715.0 ft L 0.13542 mi.0 Lanes $2,000.00 $0.00 0% $0.00 715.0 ft L 0.13542 mi. Lanes $150.00 $0.00 0% $0.00 715.0 ft L 0.13542 mi. Lanes $100.00 $0.00 0% $0.00 cost sum $348,509.45 $348,509.45 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500100 Item Free State Drive No. Unit Unit Cost Cost installed % compete cost remaining contingency $34,850.95 $34,850.95 Total $383,370 $383,370 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O15OO1OO Item Farrow Hill Court station 10+12 to 12+12 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") pipe, rcp, cmp (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi. survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) No. Unit Unit Cost Cost installed % compete cost remaining road length t 200.0 ft in d 200.0 ft L. ft W 116.7 ton $35.00 $4,083.33 0% $4,083.33 200.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 in d 200.0 ft L 25.0 ft W 76.6 tons $100.00 $7,656.25 0% $7,656.25 in d 200.0 ft L 5.0 ft W 45.9 tons $120.00 $5,512.50 0% $5,512.50 III ft $13.00 $0.00 0% $0.00 420.0 ft $15.00 $6,300.00 0% $6,300.00 420.0 ft $17.00 $7,140.00 0% $7,140.00 2 ft $350.00 $700.00 0% $700.00 1 each $200.00 $200.00 0% $200.00 4 each $200.00 $800.00 0% $800.00 .Each 9 each $150.00 $1,350.00 0% $1,350.00 ES @ 3000 ft $17.00 $0.00 0% $0.00 each $3,500.00 $3,500.00 0% $3,500.00 each $500.00 $500.00 0% $500.00 ft $450.00 $2,250.00 0% $2,250.00 15.0 in d1 ES -1,2 jr EC -1 ft $35.00 $2,040.00 0% $2,040.00 24.0 in d 0 ES -1,2 EC -1 ft $50.00 $0.00 0% $0.00 18.0 in d ES -1,2 EC -1 ft $40.00 $0.00 0% $0.00 18.0 in d ES -1,2 EC -1 ft $40.00 $0.00 0% $0.00 LMR d ftL0 ft W 3.0 ton $60.00 $180.00 0% $180.00 ft L 4.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 ft L 60.0 ft W 0.3 acre $24,000.00 $6,942.15 0% $6,942.15 Mcy $4.00 $0.00 0% $0.00 cy $9.00 $13,500.00 0% $13,500.00 200.0 ft L 0.03788 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 200.0 ft L 0.03788 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 -Isum $500.00 $500.00 0% $500.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 ft $1.00 $44.00 0% $44.00 200.0 ft L 0.03788 mi. Lanes $2,000.00 $0.00 0% $0.00 200.0 ft L 0.03788 mi.0 Lanes $150.00 $0.00 0% $0.00 200.0 ft L 0.03788 mi. Lanes $100.00 $0.00 0% $0.00 cost sum $70,598.23 $70,598.23 contingency $7,059.82 $7,059.82 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016 Free State Run Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500100 Item Farrow Hill Court No. Unit Unit Cost Cost installed % compete cost remaining Total $77,660 $77,660 sers\mwentland\Documents\Free State Run RP bond estimate 3-11-16.xls 3/16/2016