Loading...
HomeMy WebLinkAboutSDP200400023 Approval - County 2003-09-30COUNTY OF ALBEMARLE Departmertt of Planning & Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902 -4596 434) 296 - 5523 Fax (434) 972 - 4012 September 30, 2003 Brent Nelson Roudabush. Gale & Associates 914 Monticello Road Charlottesville, VA 22902 RE: SDP -02 -128 Faulconer Construction Office & Shop Preliminary Site Plan Tax Map 58, Parcel 37 Dear Mr, Nelson: The Albemarle County Planning Commission, at its meeting on September 23, 2003, by a vote of 3:2, took the following actions regarding the above -noted plan: Critical Slopes Waiver- Approved pursuant to Section 4.2.5.b, subject to the following conditions: 1. The 30 -foot buffer, which runs along the western /northern side of the property, shall be increased to a 50 -foot buffer. The same activities that are prohibited in the existing 30 -foot buffer are prohibited in the additional 20 -foot buffer. 2. The grading for the roadway to access the site shall be minimized as much as feasible with guidance from the Engineering staff. 3. The applicant to ensure that no additional critical slopes are disturbed by the reconfiguration of the site plan, which includes protecting the stream buffers. 4. This waiver is limited to the critical slope disturbance shown on the September 3, 2003 Preliminary Site Plan. Preliminary Site Plan — Approved subject to the following conditions: The Planning Department shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: The outfall from the proposed oil /water separator will require a permit through the Department of Environmental Quality (DEQ). An alternate would be a zero discharge system that would require period transport of wastewater to a treatment plant. The DEQ permit or a new zero discharge system will be required for final site plan approval. 18- 32.7.4.3, 17 -203] An erosion control plan, narrative, computations, application and fee. 17 -203, 17 -3031 A stormwater management plan, computations, application, fee, and maintenance agreement. 17 -322] A stream buffer mitigation plan. 18 -4 14] A certified engineers report. 18- 32.5.6(n)] Show the location of all outdoor lighting on the plan. September 30, 2003 Page 2 T [18- 32.6.60)] Provide a description and photograph or diagram and show the location of each type of outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such luminaires in the future that are not shown on this plan shall require an amendment to this plan. B. [18- 32.6.60)] [4.17.4(b)] Include a photometric plan on the site plan demonstrating that parking area luminaires are in compliance with 4.17.4 b. 9. [18- 4.15.13] Be aware that all signs will require separate permits under 4.15 of the zoning ordinance. 10. [18- 32.6.6 (i)] Submittal and approval of a Landscape Plan in conformance with Section 32.7.9 of the Zoning Ordinance. The Landscape Plan shall include a tree conservation plan. 11. [18- 32.7.5.3] Health Department approval of all well and drainfield locations. 12. [18- 32.7.3.3] S;:bmittal and approval of a plat dedicating r -o -w of Morgantown Road. 13. [18- 32.5.6(i) The proposed road servicing the development must have an approved road name labeled on the final site plan. 14. The 30 -foot buffer, which runs along the western /northern side of the property, shall be increased to a 50 -foot buffer. The same activities that are prohibited in the existing 30 -foot buffer are prohibited in the additional 20 -foot buffer. 15. The grading for the roadway to access the site shall be minimized as much as feasible with guidance from the Engineering staff. 16. The applicant to ensure that no additional critical slopes are disturbed by the reconfiguration of the site plan, which includes protecting the stream buffers, 17. This waiver is limited to the critical slope disturbance shown on the September 3, 2003 Preliminary Site Plan. 18. The final site plan to be reviewed by the Planning Commission. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me (434) 296 -5821 Sinceely, Yeila Planner YA/jcf cc: Ella Carey Amelia McCulley Jack Kelsey Steve Allshouse r OF AI BEl v 9trrJ IRGINI COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 13, 2004 Brent Nelson 914 Monticello Road Charlottesville, VA 22902 RE: SDP -04 -023 Faulconer Construction Final Site Plan; Tax Map 58, Parcel 37 Dear Mr. Nelson: The Albemarle County Planning Commission, at its meeting on September 7, 2004, denied approval of the above -noted petition for the following reasons, which must be addressed before approval: 1. Submission of a revised Certified Engineers Report as required by Section 32.7.4.2, to address each provision of Section 4.14, explaining methodology and including measurements of actual equipment where appropriate. 2. Submission of as -built plans and structural analysis to verify adequacy of pavement width and strength of Dettor Road from Morgantown Road to the Faulconer entrance as provided by Section 26.12.1. 3. Provision of street trees across Morgantown Road frontage as required by Section 32.7.9.6. 4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or bayberry, planted 15 feet on center adjacent to Rural Area property to provide screening as required by Section 32.7.9.8.c.2 5. The lighting plan shall be revised to comply with Section 4.17.4. 6. Sidewalk notes and dimensions must be corrected. 7. Revise all buffer notes to indicate a 50 foot buffer. 8. Vehicles coming to the site shall be verified to be of a scale that may be safely accommodated by Morgantown Road as provided by Section 26.12.1. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me (434) 296 -5823. in erely, adira Amarante Senior Planner Cc: Ella Carey Amelia McCulley Jack Kelsey Steve Allshouse pF AL 0 9 r IRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 13, 2004 Faulconer Construction Company Inc. 2496 Old Ivy Road Charlottesville, VA 22901 RE: SDP -04 -023 Faulconer Construction Final Site Plan; Tax Map 58, Parcel 37 To Whom It May Concern: The Albemarle County Planning Commission, at its meeting on September 7, 2004, denied approval of the above -noted petition for the following reasons, which must be addressed before approval: 1. Submission of a revised Certified Engineers Report as required by Section 32.7.4.2, to address each provision of Section 4.14, explaining methodology and including measurements of actual equipment where appropriate. 2. Submission of as -built plans and structural analysis to verify adequacy of pavement width and strength of Dettor Road from Morgantown Road to the Faulconer entrance as provided by Section 26.12.1. 3. Provision of street trees across Morgantown Road frontage as required by Section 32.7.9.6. 4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or bayberry, planted 15 feet on center adjacent to Rural Area property to provide screening as required by Section 32.7.9.8.c.2 5. The lighting plan shall be revised to comply with Section 4.17.4. 6. Sidewalk notes and dimensions must be corrected. 7. Revise all buffer notes to indicate a 50 foot buffer. 8. Vehicles coming to the site shall be verified to be of a scale that may be safely accommodated by Morgantown Road as provided by Section 26.12.1. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me (434) 296 -5823. S" r ly, dir mar me Senior Planner Cc: Ella Carey Amelia McCulley Jack Kelsey Steve Allshouse 9 J r , r "IRGtrtt COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5823 Fax (434) 972 -4126 November 3, 2004 Faulconer Construction Company, Inc. 2496 Old Ivy Road Charlottesville, VA 22901 RE: SDP - 2004 -023 Faulconer Construction Office and Shop Final Site Plan; Tax Map 58, Parcel 37 To Whom It May Concern: On October 27, 2004, the Albemarle County Board of Supervisors denied item SDP - 2004 -023 by a vote of 6:0, with the inadequacies and requirements set forth in the Planning Commission's actions dated September 13, 2004, conditions #1 through #7, with condition #8 as modified at the Board meeting. These conditions are: 1. Submission of a revised Certified Engineers Report as required by Section 32.7.4.2, to address each provision of Section 4.14, explaining methodology and including measurements of actual equipment where appropriate. 2. Submission of as -built plans and structural analysis to verify adequacy of pavement width and strength of Dettor Road from Morgantown Road to the Faulconer entrance as provided by Section 26.12.1. 3. Provision of street trees across Morgantown Road frontage as required by Section 32.7.9.6. 4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or bayberry, planted 15 feet on center adjacent to Rural Area property to provide screening as required by Section 32.7.9.8.c.2. 5. The lighting plan shall be revised to comply with Section 4.17.4. 6. Sidewalk notes and dimensions must be corrected. 7. Revise all buffer notes to indicate a 50 foot buffer. 8. Pavement widths and strengths of both internal and external roads shall be adequate to accommodate projected traffic generated from the site as provided by Section 26.12.1 of the Albemarle County Code. If you have questions or comments regarding the above -noted action, please do not hesitate to contact Keith Lancaster at 296 -5832. Sincerely, / n CA4meliaMcCulley Director of Zoning and Current Development Cc Bill Fritz Tex Weaver Chuck Proctor Keith Lancaster lti OY .AL,LJ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5823 Fax (434) 972 -4126 December 1, 2004 Faulconer Construction Company, Inc. 2496 Old Ivy Road Charlottesville, VA 22901 RE: SDP - 2004 -023 Faulconer Construction Office and Shop Final Site Plan; Tax Map 58, Parcel 37 To Whom It May Concern: On October 27, 2004, the Albemarle County Board of Supervisors denied item SDP - 2004 -023 by a vote of 6:0, with the inadequacies and requirements set forth in the Planning Commission's actions dated September 13, 2004, conditions #1 through #7, with condition #8 as modified at the Board meeting. These conditions are: Submission of a revised Certified Engineers Report as required by Section 32.7.4.2, to address each provision of Section 4.14, explaining methodology and including measurements of actual equipment where appropriate. 2. Submission of as -built plans and structural analysis to verify adequacy of pavement width and strength of Dettor Road from Morgantown Road to the Faulconer entrance as provided by Section 26.12.1. 3. Provision of street trees across Morgantown Road frontage as required by Section 32.7.9.6. 4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or bayberry, planted 15 feet on center adjacent to Rural Area property to provide screening as required by Section 32.7.9.8.c.2. 5. The lighting plan shall be revised to comply with Section 4.17.4. 6. Sidewalk notes and dimensions must be corrected. 7. Revise all buffer notes to indicate a 50 foot buffer. 8. Pavement widths and strengths of both internal and external roads shall be adequate to accommodate projected traffic generated from the site as provided by Section 26.12.1 of the Albemarle County Code. Re: SDP - 2004 -00023 Faulconer Construction Office and Shop Final Site Plan December 1, 2004 If you have questions or comments regarding the above -noted action, please do not hesitate to contact Keith Lancaster at 296 -5832. Sincerely, r A Amelia McCulley Director of Zoning and Current Development C: Rick Carter Cc: Bill Fritz Tex Weaver Chuck Proctor Keith Lancaster oe% fiI 9 Eli COUNTA' OF ALBEMARLE Department of Communit Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 March 16, 2006 Richard Carter Taylor, Zunka, Milnor & Carter, Ltd. P.O. Box 1567 Charlottesville, VA 22902 RE: SDP - 2004 -023 Faulconer Construction Company Final Site Plan Tax Map 58, Parcel 37 Dear Mr. Carter: Fax (434) 972 -4012 On February 8, 2006, the Albemarle County Board of Supervisors took action on SDP - 2004 -023 Faulconer Construction Company Final Site Plan. This Final Site Plan was approved based on the following conditions: Submission of a revised Certified Engineer's Report as required by Section 32.7.4.2, to address each provision of Section 4.14, explaining methodology and including measurements of actual equipment where appropriate. 2. Submission of as -built plans and structural analysis to verify adequacy of pavement width and strength of Dettor Road from Morgantown Road to the Faulconer entrance as provided by Section 26.12.1. Provision of street trees across Morgantown Road frontage as required by Section 32.7.9.6. 4. Provision of a double staggered row of shade tolerant evergreen screening trees such as holly or bayberry, planted fifteen (15) feet on center adjacent to Rural Area property to provide screening as required by Section 32.7.9.8.c.2. 5. The lighting plan shall be revised to comply with Section 4.17.4. 6. Sidewalk notes and dimensions must be corrected. 7. Revise all buffer notes to indicate a fifty (50) foot buffer. SDP -2004 -023 Faulconer Construction Final Site Plan Pane 2 oi' 2 March 16, 2006 8. Pavement widths and strengths of internal roads shall be adequate to accommodate projected traffic generated from the site as provided by Section 26.12.1 of the Albemarle County Code. The approval of the final site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the final approval shall expire on February 8, 2007. If the final site plan approval expires, a new application must be filed and processed. If you have questions or comments regarding the above -noted action, please do not hesitate to contact Gerald Gatobu or Louise Wyatt at 296 -5832. Sincerely, 1 William D. Fritz, AICP Chief of Current Development Zoning & Current Development Division WDF /aer Cc: Faulconer Construction Company Inc. 2496 Old Ivy Road Charlottesville, VA 22901 Amelia McCulley Tex Weaver Chuck Proctor Gerald Gatobu Louise Wyatt