Loading...
HomeMy WebLinkAboutSDP200500011 Approval - County 2005-05-25r i i7iii, 9,P o . f IRGIs1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 May 25, 2005 Katurah Roell Virginia Land Company 195 Riverbend Drive Charlottesville VA 22911 RE: SDP - 2005 -0011 Hollymead Town Center Area C Block 5 Preliminary Site Plan Dear Sir: The Dept lnient of Community Development hereby grants administrative approval to the above - referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the preliminary approval shall expire May 25, 2006. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Depai tiuent of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed with the Depattinent of Community Development at a later date. After the initial tentative plan submittal, each depai tment/agency will contact you to discuss any remaining conditions. After all aforementioned depat tment/agencies have granted a tentative approval, you may submit the final mylars (2 sets), two paper copies, final site plan application, final site plan fee, and a copyofallwrittententativeapprovalstotheDepaltutentofCommunityDevelopment. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), inadditiontothefollowingconditions. 1.The Zoning & Current Development Division shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: A.Planner approval to include: 1.32.6.3] Approval of a landscape plan in compliance with Section 32.7.9. The plan should be overlaid with the utilities plan to show all landscaping to belocatedoutofanyutilityeasement. and, 2.32.6.60)] Submittal of a description and photograph or diagram show thelocationofeachtypeofoutdoorIuminairethatemits3,000 or more initiallumens.Please be aware that installation of such luminaires in the future that are notshownonthisplanshallrequireanamendmenttothisplan. and,3. 32.6.60)] [4.1 7.4(b)] Submittal of a photometric plan on the site plandemonstratingthatparkingarealuminairesareincompliancewith4.17.4 b and,4. 32.6.4.1] The final plan approval is subject to the issuance ofa Certificate ofAppropriatenessfromtheArchitecturalReviewBoardand,3 . Approval and recordation of all plats of easements for access. B.Engineer approval to include:1. A completed application and fee for erosion control and stormwater management.17- 203, 17 -303] and,2.An erosion control plan, narrative and computations.[14 -311, 17 -203]3 . All roads needed for access to this site must be built or bonded before final siteplanapprovalcanbegranted. Plantings in sight distance easements will needfinalapprovaland,4.A stormwater management plan and computations. Computations must includewaterroutingsforthe2yrand10yrstormsforadequatechannels (and pipes, dropinlets, etc.). Best Management practices shall be designed and sited to capturerunofffromtheentirelanddevelopmentprojectareaand, in particular, areas ofimpervious cover (including roofs) within the land development, to the maximumextentpracticable. The site plan cannot be approved if the building roofs do notdraintothestormwatermanagementfacility. Please supply calculations to showtheroofswilladequatelydraintothestormwatermanagementfacility. [17 -304.specifically 17 -315A] and,5. A completed stormwater management facilities maintenance agreement and fee.17 -304] and, 6. VDOT comments must be addressed before final site plan approval. [VDOT] C. Albemarle County Service Authority approval to include:1. The dedication and approved easement plat for the Joseph Wright sewer extensi onhasnotbeencompleted. Approval will not be granted until this is done.D.Virginia Department of Transportation approval to include:1. The centerline of Timberwood Blvd needs to align with the approach sectionconstructedwiththeAirportRoadproject. The transition through the intersectionhingesonthatalignment (i.e. no more than 6 feet of transition through theintersection). The current design show about 10 feet of transition, which is notacceptable. The developer has stated they will add a 4' transition and pull the curbinonthecornerofblock. and,2. The radii at the connection opposite Grand Forks and the radii at the corner ofTimberwoodandPublicRoadwillneedtobeupgradedtoincludeCG -12's. Please contact me at your earliest convenience if you have any questions or require additional information.Sincerel q Francis H. MacCall Senior Planner Zoning & Current Development fmaccall@albemarle.orgFile: SDP -2005 -0014