HomeMy WebLinkAboutSDP200500011 Review Comments 2005-08-23Aiptift
FA .1^ ,
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:23 August 2005
RE:Hollymead Town Center — Area C, Block 9, Preliminary Site Plan,
SDP 2005 -00011
The Preliminary Site Plan for Hollymead Town Center — Area C, Block 9 has been reviewed. Engineering
recommends approval with the following conditions:
1. Please supply written grading easements for grading on all adjacent parcels that have off -site
grading. [DM 1102]
2. All existing and proposed easements must be shown on the final site plan. Proposed easements
must be recorded before final approval is given. [proffer, 18- 32.5.6i, k, m]
3. About a quarter of the site just north of the proposed buildings does not drain to a drainage
structure. This drainage area must be included in the stormwater management plan. [18- 32.5.6j,k]
4. Please show the complete round about and its intersections on the final site plan so the road
geometry can be verified. [18- 32.5.6m]
5. The westernmost BMP should be redesigned to capture more stormwater runoff and to eliminate
or reduce the retaining wall along the downhill side. [18- 32.5..6.k]
The following items must be reviewed and approved by the Engineering Departrnent before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control and stormwater management. [17- 203, 17-
303]
2. An erosion control plan, narrative and computations.[14 -311, 17 -203]
3. A stormwater management /BMP plan and computations. Computations must include water
quality, and detention routings for the 2yr and l0yr storms. Please include required BMP
removal rate calculations. [17 -304]
4. A completed stormwater management facilities maintenance agreement and fee. [17 -304]
Please contact me if you have questions or require additional information.
n
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:7 March 2005
RE:Hollymead Town Center — Area C, Block 9, Preliminary Site Plan,
SDP 2005 -00011
The Preliminary Site Plan for Hollymead Town Center Area C, Block 9 has been reviewed. Engineering
has the following comments:
1. The entrance road "B" from the roundabout to the adjacent block 7 does not appear to be in
general accord to the approved application plan. The road has several parking spaces on it not
shown on the approved application plan. Parking should be on travelways off of road "B" as
shown on the application plan. Also the egress is askew to the roundabout. The roadway should
be shifted to the northwest to align with the roundabout. Please remove the parking from road "B"
and realign the roadway more in accordance to the application plan. [proffer, 18- 32.5.6i]
Please list the source of topography and survey. [18- 32.5.6a]
3. Please supply written grading easements or letter of intent for grading on all adjacent parcels that
have off -site grading. [DM 1102]
4. Please show access easements along travelwa s to Area X, and Block 7 and 8. [18- 32.5.6i, k, m]4.
The 17 foot retaining wall is located over a eeIine ease . Written approval is required if the
easement is publicly owned. Please label the easement as public (list Authority) or private on the
plan. Also the retaining wall will need a building permit and may need ARB approval.
6. Please address VDOT comments.
The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control and stormwater management. [17- 203, 17-
303]
2. An erosion control plan, narrative and computations.[14 -311, 17 -203]
3. A stormwater management /BMP plan and computations. Computations must include water
quality, and detention routings for the 2yr and 10yr storms. [17 -304]
4. A completed stormwater management facilities maintenance agreement and fee. [17 -304]
Please contact me if you have questions or require additional information.
t v C s TZ= N 1 /° b y 66S/ Cr w D /-4 w Vv
D R.4 1 AtICE-Rj-Pi r 80/ LDf,GS C- A-t iuR.St
S 14ow 0 OvAP -1
5 ito -) A Lc. 64SG meA.)5 S
it i. y
cigrW;,guite
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:7 March 2005
RE:Hollymead Town Center — Area C, Block 9, Preliminary Site Plan,
SDP 2005 -00011
The Preliminary Site Plan for Hollymead Town Center — Area C, Block 9 has been reviewed. Engineering
has the following comments:
1. The entrance road "B" from the roundabout to the adjacent block 7 does not appear to be in
general accord to the approved application plan. The road has several parking spaces on it not
shown on the approved application plan. Parking should be on travelways off of road "B" as
shown on the application plan. Also the egress is askew to the roundabout. The roadway should
be shifted to the northwest to align with the roundabout. Please remove the parking from road "13"
and realign the roadway more in accordance to the application plan. [proffer, 18- 32.5.6i]
2. Please list the source of topography and survey. [18- 32.5.6a]
3. Please supply written grading easements or letter of intent for grading on all adjacent parcels that
have off -site grading. [DM1102]
4. Please show access easements along travelways to Area X, and Block 7 and 8. [18- 32.5.6i, k, m]
5. The 17 foot retaining wall is located over a sewerline easement. Written approval is required if the
easement is publicly owned. Please label the easement as public (list Authority) or private on the
plan. Also the retaining wall will need a building permit and may need ARB approval.
6. Please address VDOT comments.
The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control and stormwater management. [17- 203, 17-
303]
2. An erosion control plan, narrative and computations.[14 -311, 17 -203]
3. A stormwater managementBMP plan and computations. Computations must include water
quality, and detention routings for the 2yr and l0yr storms. [17 -304]
4. A completed stormwater management facilities maintenance agreement and fee. [17 -304]
Please contact me if you have questions or require additional information.