HomeMy WebLinkAboutSDP200500018 Review Comments 2005-05-23Lj< . '
i
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:23 May 2005
RE:Hollymead Town Center — Area C, Block 5, Preliminary Site Plan,
SDP 2005 -00018
The Preliminary Site Plan for Hollymead Town Center Area C, Block 5 has been reviewed. Engineering
recommend approval of the Preliminary Site Plan.
The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control and stormwater management. [17- 203, 17-
303]
2. An erosion control plan, narrative and computations.[14-311, 17 -203]
3. All roads needed for access to this site must be built or bonded before final site plan approval
can be granted. Plantings in sight distance easements will need final approval.
4. A stormwater management plan and computations. Computations must include water routings
for the 2yr and l0yr storms for adequate channels(and pipes, drop inlets, etc.). Best
Management practices shall be designed and sited to capture runoff from the entire land
development project area and, in particular, areas of impervious cover (including roofs) within
the land development, yo the maximum extent practicable. The site plan cannot be approved if
the building roofs do not drain to the stormwater management facility. Please supply
calculations to show the roofs will adequately drain to the stormwater management facility. [17-
304. specifically 17 -315A]
5. A completed stormwater management facilities maintenance agreement and fee. [17 -304]
6. VDOT comments must be addressed before final site plan approval. [VDOT]
Please contact me if you have questions or require additional information.
i
J
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:4 April 2005
RE:Hollymead Town Center — Area C, Block 5, Preliminary Site Plan,
SDP 2005 -00018
The Preliminary Site Plan for Hollymead Town Center — Area C, Block 5 has been reviewed. Engineering
has the following comments:
Easements must be provided for off -site work on all adjacent properties where disturbances are
shown. Please list the owner of all adjacent properties. Specifically owners for Block C4, the
stormwater management "Open Space 3" and land shown as "Grand Forks Boulevard. [DM 1 102,
18- 32.5.6a]]
Please clarify grading along the easternmost boundary. Grading is shown over an existing parking
lot. I believe this parking lost is not an existing structure. Please have the plan accurately reflect
existing conditions on sheets 3, 4 and 5. Also sheet 3 shows the proposed roadways as existing.
Please clarify these on sheet 3 as proposed. [18- 32.5.6d]
Please show access easements or right of ways along all travelways. 18- 32.5.6i, k, m]
eeThe connector road along the northern border of this site must be constructed with this site. Please
show the complete road including the intersection with Grand Forks Boulevard.
V Please label roads as private or public. The travelway the proposed residential units appears to be
an alley. Please label the travelway as an alley if this is the intention. Planning Commission
approval of all private roads is required. [18- 32.7.3, 14 -232] It does not appear private road
approval was granted with the rezoning. [ZMA2002 -02]
illPlease show site distance lines for all intersections on the landscaping plan. Sight distance
easements will be required. Structures and vegetation greater than 3 feet tall are not allowed
within the required sight distance. It appears the structures on lot 17 and lot 18 are within the sight
distance for the northernmost intersection. Also many trees appear to hamper sight distance
requirements. [VDOT, DM CD -151
0 Please show all roof drains attaching to the stormwater system.
ft sidewalk is required along the southernmost roadside. This was shown on the approved
application plan. [ZMA2002 -02]
9. Please show all Existing and proposed utility easements. [ 18- 32.5.61, DM 1001 ]
10. Please show existing property lines on the site plan. [18- 32.5.6a]
11. Please show handicap ramps at all street intersections.
12. Please address VDOT comments. VDOT approval is required for the public roads and entrances.
Policy]
The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control and stormwater management. [17- 203, 17-
303]
2. An erosion control plan, narrative and computations.[14 -311, 17 -203]
CApproved road plans for all roads shown is required. It appears the current road plans do not
have final approval. All roads must be built or bonded before final site plan approval can be
granted. For the final site plan/road plan please show CG -8 gutters at intersections that allow
stormwater to drain across the intersection. In lieu of the CG -8 it would be better to place drop
inlets uphill if the intersections to capture stormwater from the gutter pan.
4. A stormwater management plan and computations. Computations must include water routings
for the 2yr and l0yr storms for adequate channels(and pipes, drop inlets, etc.). [17 -304]
5. A completed stormwater management facilities maintenance agreement and fee. [17 -304]
Please contact me if you have questions or require additional information.
1F .1I.N
t Able
COUNTY OF ALBEMARLE
Department of Community Development, Current Development Group
Engineering Plan Review
TO:Francis McCall, Planner
FROM:Steve Snell, Engineer
DATE:4 April 2005
RE:Hollymead Town Center — Area C, Block 5, Preliminary Site Plan,
SDP 2005 -00018
The Preliminary Site Plan for Hollymead Town Center — Area C, Block 5 has been reviewed. Engineering
has the following comments:
1. Easements must be provided for off -site work on all adjacent properties where disturbances are
shown. Also, please list the owners of all adjacent properties. Specifically owners for Block C4,
the stormwater management "Open Space 3" and land shown as "Grand Forks Boulevard.
DM 1102, 18- 32.5.6a]]
2. Please clarify grading along the easternmost boundary. Grading is shown over an "existing
parking lot ". I believe this parking lot is not an existing structure. Please have the plan accurately
reflect existing conditions on sheets 3, 4 and 5. Also sheet 3 shows the proposed roadways as
existing. Please clarify these on sheet 3 as proposed. [18- 32.5.6d]
3. Please show access easements or right of ways along all travelways. 18- 32.5.6i, k, m]
4. The connector road along the northern border of this site must be constructed with this site. Please
show the complete road including the intersection with Grand Forks Boulevard.
5. Please label roads as private or public. The travelway between the proposed residential units
appears to be an alley. Please label the travelway as an alley if this is the intention. Planning
Commission approval of all private roads may be required. [18- 32.7.3, 14 -232] It does not appear
private road approval was granted with the rezoning. [ZMA2002 -02]
6. Please show site distance lines for all intersections on the landscaping plan. Sight distance
easements may be required. Structures and vegetation greater than 3 feet tall are not allowed
within a required sight distance line. It appears the structures on lot 17 and lot 18 are within the
sight distance line for the northernmost intersection. Also many trees appear to hamper sight
distance requirements. [VDOT, DM CD -15]
7. Please show all roof drains attaching to the stormwater system.
8. A sidewalk is required along the southernmost roadside. This is shown on the approved
application plan. [ZMA2002 -02]
9. Please show all existing and proposed utility easements. [18- 32.5.61, DM1001]
10. Please show existing property lines on the site plan. [18- 32.5.6a]
11. Please show handicap ramps at all street intersections. [VODT]
12. Please address VDOT comments. VDOT approval is required for the public roads and entrances.
The following items must be reviewed and approved by the Engineering Department before tentative
approval of the final site plan can be granted.
1. A completed application and fee for erosion control. [17- 203, 17 -303]
2. An erosion control plan, narrative and computations.[14 -311, 17 -203]
3. Approved road plans for all roads are required. It appears the current road plans do not have
final approval. All roads must be built or bonded before final site plan approval can be granted.
For the final site plan /road plan please show CG -8 gutters at intersections that allow stormwater
to drain across the intersection. In lieu of the CG -8 it would be better to place drop inlets uphill
if the intersections to capture stormwater from the gutter pan. This appears to be most prevalent
at the alleyway entrances.
4. A stormwater management plan and computations. Computations must include water routings
for the 2yr and l0yr storms for adequate channels(and pipes, drop inlets, etc.). [17 -304]
5. A completed stonnwater management facilities maintenance agreement and fee. [ 17 -304]
Please contact me if you have questions or require additional information.