Loading...
HomeMy WebLinkAboutSDP200500019 Calculations 2005-07-26PAVEMENT CACLULATIONS FOR ABBINGTON PLACE AT HOLLYMEAD TOWNCENTER July 26 2005. LOCATION: Tax Map 32 Parcel 46 Rivanna District, Albemarle County, Virginia DEVELOPER Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 434.984.1599 F) 434.984.8863 JUL 2 6 2005 Cr• Flexible Pavement Design County: Albemarle Date: 09- Feb -04 Site: Hollymead Town Center Street Name: Gathering Place Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 2600 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 2600.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 17.75 Course Material Depth Equivalency D(p) Surface SM -9.5A 2 2.25 4.5 Intermediate BM -25.0 4 2.15 8.6 Base 21A 8 0.6 4.8 Total Depth 14 Total D(p)17.9 D(p) -D(r) =0.15 D(p) >D(r) Therefore: ADEQUATE Flexible Pavement Design County: Albemarle Date: 26-Jul-05 Site: Hollymead Town Center Street Name: Deerwood Drive Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix!SSV 5.00 Soil Support Value Current ADT 500 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 500.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement /stone thickness for a road.D(r)= 12.01 Course Material Depth Equivalency D(p)Surface SM -9.5A 1.5 2.25 3.375 Intermediate BM -25.0 3 2.15 6.45Base21A60.6 3.6 Total Depth 10.5 Total D(p)13.425 D(p) =1.41 D(p) >D(r) Therefore: ADEQUATE 1350 Stony Point Road Rivanna Engineering 434.984.1599 Charlottesville, VA 22911 Surveying, PLC F) 434.984.8863 Memorandum To:Glenn Brooks From:Justin Shimp CC: Date:7 -15 -2005 Re:Abington Place SWM Plan. Dear Glenn, Attached to this memo are two copies of the SWM plan for Abington place and the BMP calculation sheets. Please note that level spreaders have been provided at the outfall of the BMP facilities to take advantage of the 50' stream buffer. The BMP sizing has been calculated as follows: Basin #1 Total Impervious: 173,487 SF. Required BMP area: 4,337 SF.* Provided BMP area: 4,750 SF. Basin #2 Total Impervious: 58,430 SF. Required BMP area: 1,460 SF.* Provided BMP area: 1,550 SF. Basin sizing requirement based on the less than 50% RR requirement of 2.5 %. The stream buffer provides the additional water quality required for basin #1. Detention for this site has been provided by stormwater basin #2 at Hollymead. If you have any questions or would like to meet and discuss the plan please give me a call. Page 1 Short Version BMP Computations ,-or Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan: Abington Place at Hollymead Water Resources Area: Preparer JMS Date:15- Jul -05 Project Drainage Area Designation Bio- Filter #1 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.0090) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A C project area in acres in subject drainage area,A =8.40 pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) IImpervious Cover Computation (values in feet & square feet) Item pre - development Area post development Area Roads Length Width subtotal Length Width subtotal 0 0 0 750 32 24000 0 0 0 770 18 13860 0 1220 14 17080 0 0 0 54940 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 1 0 14 16 88 19712 0,0 0 3485 5 1 17425 0 0 0 37137 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 Gravel areas Area Area x0.70=0?x0.70=0 Structures Area no.subtotal Area no.subtotal 0 0 0 870 63 54810 0 0 0 350 76 26600 0 0 0 0 0 81410 Actively- grazed pasture & Area Area yards and cultivated turf 0 x 0.08 =0 117597 x 0.08 =9407.76 Active crop land Area Area x 0.25 =0 x 0.25 =0 Other Impervious Areas 0 0 Impervious Cover 0%50% I(pre)post) Rv(post) V 0.50 282.2 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 1.00 20% 0.23 11.86 25.78 13.92 54% Development Area 0.35 1.00 0% 0.05 1.29 12.89 11.60 90% Drinking Water Watersheds 0.40 1.00 1% 0.06 1.74 14.73 12.99 88% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.23 11.86 25.78 15.10 59% Development Area 0.35 0.85 0% 0.05 1.29 12.89 11.79 91% Drinking Water Watersheds 0.40 0.85 1% 0.06 1.74 14.73 13.25 90% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Short Version BMP Computations r or Worksheets 2 - 6 ir, Albemarle County Water Protection Ordinance: Modified Simple Method Plan: Abington Place Water Resources Area:Development Preparer JMS Date:15- Jul -05 Project Drainage Area Designation Bio- Filter #2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ]Rv mean runoff coefficient, Rv = 0.05 + 0.009(1)Pj small storm correction factor, 0.9 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =4.00Cpollutantconcentration, mg /l or ppm target phosphorusffactorappliedtoRR required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27RRrequiredremoval , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet)Item pre - development Area post- development AreaRoadsLengthWidthsubtotalLengthWidthsubtotal0004501463000007501813500 0 0 .0 0 0 Driveways Length Width no.subtotal Length Width no.subtotal 0 19800 and walks 0 0 1 0 5 1 550000001616358960 Parking Lots ..__..__..._ -..1 2 3 0 0 1 .2 3 ..,....._.._ 14460 4 0 0 0 0GravelareasAreaArea x070 0 x0.70=Structures Area no.subtotal Area no .subtotal000s4301981700001000161600000 m .Actively - grazed pasture & Area 0 0 0` 24170 Areayardsandcultivatedturf0x0.08 =0 30500 x 0.08 =Active crop land Area 2440 Area x0.25=0 x025 0OtherImperviousAreas 0 0ImperviousCover 0% l(pre) 35% Rv(post) V post) 0.36 93.9 New Development (For Development Areas, existing impervious cover <= 20 %)C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type0.70 1.00 20% 0.23 5.65 8.95 3.30 37% Development Area0.35 1.00 0% 0.05 0.61 4.47 3.86 86% Drinking Water Watersheds0.40 1.00 1% 0.06 0.83 5.11 4.29 84% Other Rural Landmin. values Redevelopment (For Development Areas, existing impervious cover > 20 %)C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type0.70 0.90 20% 0.23 5.65 8.95 3.87 43% Development Area0.35 0.85 0% 0.05 0.61 4.47 3.95 88% Drinking Water Watersheds0.40 0.85 1% 0.06 0.83 5.11 4.41 86% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB STORM SEWER CALCULATIONS FOR ABINGTON PLACE SITE PLAN March 14, 2005 LOCATION: Tax Map 32 Parcel 46 Albemarle County, Virginia Y e_ % J PREPARED BY: Rivanna Engineering & Surveying, PLC P.O. Box 7603 Charlottesville, VA 22906 P: 434.984.1599 F: 434.984.8863 1) 0 ( n 0( 0( 0( 1) 1) 01( 1) 0)0) 0) 01(1) 1 ) 1) 010) 01( 0( 11( 1)0) 0010) 01 M M 1) 010) OM I l-- i 1 - 1 - 1 - 1 1 - 1 - 1 - 1 - 1 1 - 1-1 1 1- 1-1 I - I - I -/ - 1 1 - 1 - i I - 1 I - I - 1 0 . 3 N N N 0 woo 0). J0)0) 4 N W 59 m - mm m V m ( 0 0 ( 0 ( 0 ( 0 ( 0 0-, N D OJ 0 0 -+ N W A D m c o o m O n0) n( n(n0) n( n( n( n(n n0) 0) n 00)( n n( n( nW( n OMMM o H-- 1 IH 1- - 1-- 1- 1 - 4- 1 I H- 1- I 171717171 c- 1- 1- 1 c o -1 oH- 1 o m 0 ( O 0 6- m J m 1 A g -' N W m m V m 0 ( 0 ( O ( 0 ( 0 0 0 -' D m 0- N W N N P) N 0 nwoo w D 0 0 P1 C) 0 0 0 0000 00000 999 0 coo 00000 0000 0 0 000 w O 66 W 0) N N 01 N O A W 0 ( 1) 7)) O N O W W A o A m W4, N J 0) A 00 M- 0) 01 01 ( 0 O O W W W 0) 01 N 1( 0 O_ A m N ( 0 ( 0 W WV 0 01 ( 0 C) 7J 0 c CD A 0 O 00 0000 0 0 0 0 0 000 0 000 0 0 0 0 0 0000 0 0 000 0 4 : - . 1 . - 4 M -- J 0 1 ( 0 ( 0 - 4 0) MOW O 666 J0101( 0 O - - , , , . . V m 00) 01 O OO 00101 0 00000 0001 O 000 10000 0_ 001m 010 0010 0 0 1 O O O 0000 00000 000 O coo 00000 0000 O O 0 0 0 O 1 7') 7') 7') 7)) 7)) 7)) 0 0) 7') 0 7)) 7') O 7)) 0 7') N W O W O) j (. 1 W W N N 7)). 0 m A N 01 01 W O W 00 01 A A O 0) O W 01 V ( 0 0. 0 0 01 m A J N 0 . P m ( 0 01 00c1c m 3 O OO 0000 moo O coo O 00 00 O J W 00). 0 N W m 01 N A A N O 0) 0) N 00) O O m L m N W O 01 O 01 10) 0) 7) 10) 0) 01.0 0) 0)0 O 0) 10 10) 0)01 00) 107') W A 0. 001 30o r v J v N V m mmmm m m 01 m mm J mm mmmm mmm m mm N N Wm 666- 00) U1 A m J m m W N A m 0-. 1 W N m V O) -' m N m 0 . 0 m W O »m 0 m mm mmmm mmmmm mmm m mmm mmmmm mmmm mm mmm 3 N V m W W A 01 m m 0) J m 010) 0) N 6:-. 46D m m J V m O) O) V m J m 0) 0) m 0 W 0 ) . ( " 4 0 - ' 0) 01-' 0 -, -' 0-' 0)0)--' LAM- M- MO-. 1 ? 7 O Q1 3 O M N 01. 00)7') 7) 101.00)-' WW-' A A N 0 0 4 0 ) 4 N ) W.- co-- 4w 0 O 7) 1.0 0. 0-'O 0 0 1 7) 1 ( 0 0 ) W N O A 4N) 0--'4 0 ) ( 0 4 7) ) M M WOW N N 40) 0( 0.0 - 1 m m m J W A m O c0- 4N j - J -' N V 0 m A W W mow m c 3 m m m 0101 m m m m m m 01 010101 m 01 m m 01010101 m 0101 m m M M m m m W W W A A A 01 01 m m 01 m 0) 0)0) Vl M-. 4-...1 m m m J V W W 01 m W A N N N o 0 A M M N A V - L V W W A A N W A V N 009) N A 0( 000 A A 3 W A MOW iv oA 001 M 01 0) 0(0 0101 -+ 636 mom MN Omm m 4 0 0 W 01 O m A m 0 0 0 ( 0 N 00 O 03,- 0 0 0 0_ , O m 0 0 0 C m o Al W WW W A A A 01 m 01 m 01 01 m m 01 MM- 4 m 01 m m V W W A m WW N N N j 110 0 M M 00) 010) 0) o') 0) 0).0 O N W m 4M0- 4W 0 ( 0 -+ 0 AM 07) 17)) 3 o O W 0017) 10) O6663- O W 01 O 0 ( 0 7) ) 00101010 00) 017)) 63:- 4 0 0 1 N O 0000 O m m A m 000 0 JUDO N N O O m 0000 O m 000 V b A W W O W A N O V m ( 0 - N W m 1 A N ( O W y W O m A N ( O N ( O A l ( 0 P) A 01N 00M -- J 0- O W A W 0) 0)01 0N0NA mm mm 0)( 0 AMA 0 a 0) 0 cN O O O O m.- ANN 0 N m N O O m 01 N N N O ( '' 1 N O WW O m m 01 010000 07) 10 m 0010 m m W m N 0 7' ) - J 0) bin iv O 0) J 10) 00 001 O o o W 0 00N( 0N 01ONm m V 0) 0101 0 - 17 m A N N ----------- 7') ..... L _ L _. N _, L _. _. _. j _. _. A mm A A m m 01( 0010101 01 01 U7 A 01 01 m A m m M 01 m m m m 01 m m 01 m 0 b b ry j 01 N 4. y y j m m ( 0 A N V O m m m V 001( 0 J m AA 0 ( 0 A -' O O 0) J MOM W 66 A-' i ( O O m m m 01 J'- J-' 01 WW- 01 1 N J m m m N -_ in 00) 0 CD 0 O 0 W M- 01 01 0 0 ) A W W-. MW- m MN-. W 01 A N A 0. 0(0-' M M 00) Z' J W ( 0 0) 0 0 N m I . 0 N W 0 0 1)) y 01 N -+ A N W O W N 66 N W J N m m m A m m A W m A m 4- 4m 0 0 j W 001 m m m O -' W J W N N m m 3 m F) 0 V O 0 0 0000 90000 000 O 000 0000 0000 O O 000 3 O W W . - , , 6 3 . 4 , NW'- m V 64= , 0)-' A -+ N 001 N 64,, O Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan:Abington Place at Hollymead Water Resources Area: Preparer: JDB Date: 14- Oct -05 Project Drainage Area Designation Bio Filter #1 Js L storm pollutant export in pounds, L = [P(Pj)Rv /12 1 [ C(A)2.72 j Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =6.40 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 0 0 0 750 32 24000 0 0 0 770 18 13860 0 1220 14 17080 O 0'0 54940 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 1 0 14 ... ,.. 16 88 ._..._ 19712 ,. 0 0 0 0 3485;5 1 17425: 0 0:0 37137 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 Gravel areas Area Area x0.70=0?x0.70=0. Structures Area no.subtotal Area no.subtotal 0 0 0 870 ........ 63 54810 0 0 0 350 .,,.,.... r 76 26600 0 0 0 0 0 81410 Actively - grazed pasture &Area Area yards and cultivated turf 0 x 0.08 =0 105297 x 0.08 =8423.76 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 0%85 % I(pfe)l(post) Rv(post) V 0.64 280.7 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type .. _.._._. _ ..... ............................... 0.70 1.00 20% 0.23 9.04 25.04 16.00 64% Development Area 0.35 1.00 0% 0.05 0.98 12.52 11.54 92% Drinking Water Watersheds 0,40 1.00 1% 0.06 1.32 14.31 12.98 91% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover> 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.23 9.04 25.04 16.90 68% Development Area 0.35 0.85 0% 0.05 0.98 12.52 11.68 93% Drinking Water Watersheds 0.40 0.85 1% 0.06 1.32 14.31 13.18 92% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan:Abington Place Water Resources Area:Development Preparer: JDB Date: 14- Oct -05 Project Drainage Area Designation Bio- Filter #2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =2.37 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 0 0 0 450 14 6300 0 0 0 750 18 13500 0 0 0 0 0 0 0 19800 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 1 0 1100 5 1 5500 0 0 0 0 16 16 35 8960 0 0 0 14460 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 0 Gravel areas Area Area x0.70=0 x0.70=0 Structures Area no.subtotal Area no.subtotal 0 0 0 430 19 8170 0 0 0 1000 16 16000 0 0 0 0 0 24170 Actively - grazed pasture &Area Area yards and cultivated turf 0 x 0.08 =0 44807 x 0.08 =3584.56 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 0%60% l(pre)post) Rv(post) V 0.59 95.7 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 1.00 20% 0.23 3.35 8.59 5.25 61% Development Area 0.35 1.00 0% 0.05 0.36 4.30 3.93 92% Drinking Water Watersheds 0.40 1.00 1% 0.06 0.49 4.91 4.42 90% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover> 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.23 3.35 8.59 5.58 65% Development Area 0.35 0.85 0% 0.05 0.36 4.30 3.99 93% Drinking Water Watersheds 0.40 0.85 1% 0.06 0.49 4.91 4.49 92% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB ft./ FHWA Urban Drainage Design Program, HY -22 HYDRAULIC PARAMETERS OF OPEN CHANNELS Trapezoidal, Rectangular, or Triangular X- Section Date: 10/13/2005 Project No. 4110 Project Name.:Abington Place Computed by Rivanna Engineering Project Description Concrete V -Ditch Ditch A INPUT PARAMETERS 1. Channel Slope ft /ft)0.0200 2. Channel Bottom Width ft)0.00 3. Left Side Slope Horizontal to 1)12.00 4. Right Side Slope Horizontal to 1)12.00 5. Manning's Coefficient 0.013 6. Discharge cfs)0.99 7. Depth of Flow ft)0.16 OUTPUT RESULTS Cross Section Area Sqft)0.31 Average Velocity ft /sec)3.21 Top Width ft)3.84 Hydraulic Radius ft)0.08 Froude Number 16.51 FHWA Urban Drainage Design Program, HY -22 HYDRAULIC PARAMETERS OF OPEN CHANNELS Trapezoidal, Rectangular, or Triangular X- Section Date: 10/13/2005 Project No. 4110 Project Name.:Abington Place Computed by Rivanna Engineering Project Description Concrete V -Ditch Ditch B INPUT PARAMETERS 1. Channel Slope ft /ft)0.0240 2. Channel Bottom Width ft)0.00 3. Left Side Slope Horizontal to 1)12.00 4. Right Side Slope Horizontal to 1)12.00 5. Manning's Coefficient 0.013 6. Discharge cfs)0.90 7. Depth of Flow ft)0.15 OUTPUT RESULTS Cross Section Area Sqft)0.27 Average Velocity ft /sec)3.32 Top Width ft)3.60 Hydraulic Radius ft)0.07 Froude Number 17.65 awr ave FHWA Urban Drainage Design Program, HY -22 HYDRAULIC PARAMETERS OF OPEN CHANNELS Trapezoidal, Rectangular, or Triangular X- Section Date: 10/13/2005 Project No. 4110 Project Name.:Abington Place Computed by Rivanna Engineering Project Description Concrete V -Ditch Ditch C INPUT PARAMETERS 1. Channel Slope ft /ft)0.0300-- 2. Channel Bottom Width ft)0.00 3. Left Side Slope Horizontal to 1)12.00 4. Right Side Slope Horizontal to 1)12.00 1'dF 5. Manning's Coefficient 0.013 r 6. Discharge cfs)1.35 9'r 7. Depth of Flow ft)0.17 Id LIT 1,6 OUTPUT RESULTS Cross Section Area Sqft)0.35 Average Velocity ft /sec)3.89 Top Width ft)4.08 Hydraulic Radius ft)0.08 Froude Number 19.44 Nur Niue FHWA Urban Drainage Design Program, HY -22 HYDRAULIC PARAMETERS OF OPEN CHANNELS Trapezoidal, Rectangular, or Triangular X- Section Date: 10/13/2005 Project No. 4110 Project Name.:Abington Place Computed by Rivanna Engineering Project Description Concrete V -Ditch Ditch D INPUT PARAMETERS 1. Channel Slope ft /ft)0.0200 2. Channel Bottom Width ft)0.00 3. Left Side Slope Horizontal to 1)12.00 4. Right Side Slope Horizontal to 1)12.00 5. Manning's Coefficient 0.013 6. Discharge cfs)0.77 7. Depth of Flow ft)0.14 OUTPUT RESULTS Cross Section Area Sqft)0.24 Average Velocity ft /sec)3.29 Top Width ft)3.36 Hydraulic Radius ft)0.07 Froude Number 18.11 FHWA Urban Drainage Design Program, HY -22 HYDRAULIC PARAMETERS OF OPEN CHANNELS Trapezoidal, Rectangular, or Triangular X- Section Date: 10/13/2005 Project No. 4110 Project Name.:Abington Place Computed by Rivanna Engineering Project Description Concrete V -Ditch Ditch E INPUT PARAMETERS 1. Channel Slope ft /ft)0.0215 2. Channel Bottom Width ft)0.00 3. Left Side Slope Horizontal to 1)12.00 4. Right Side Slope Horizontal to 1)12.00 5. Manning's Coefficient 0.013 6. Discharge cfs)0.85 7. Depth of Flow ft)0.15 OUTPUT RESULTS Cross Section Area Sqft)0.27 Average Velocity ft /sec)3.16 Top Width ft)3.60 Hydraulic Radius ft)0.07 Froude Number 16.80 1 t 1 n f i I i i i i i ---- ----, s‘,, N. It 1 7 - 4-4- - , -: i il 0 ?' / 1 s :: 7- - j i t, il I (,,,,,,...„----„,---,. N 2 1 i .-- \,,,,, _ „-- 2.:_,.- --- 1 1_,..„! i, v0 ,, , I :); i-- K. t,.„.. ' ,...,,,,::)::::- 1 \ 1 ),---------- 72\ \\ \,\, \\ i‘ A,- 7 I i I i I i n..._!!,*', \ %. • l! i t t t - ',. ti l ow.' . • r ! 1 I 1, ) : ) 1 1 k q 2 !! - ' \ ir-- - '' - -. "--(" s_ s 1 I ' s - - t i • A -. s t 1 l t t- -- 1 l% 1 / I .- k-- 5- ' .-!" V ! I ' I 1 I ' ' t! s s, i 4- A , i r- v -- , 4, i- , ----- ) i / ' - ) r I 1. ,,, s ,/_, I 11 / / 1 ). 1 / 1 I \ ill: 1, ...- \- 1-‘: i 1 \ C; ' .. 2' ' o rkf‘ 4)*--; „ A-. h, 1 t \ „ 1" si,„,,..- 4,-/---. ,.„_, 7--...__ • , lk------ Tik::: ..,, - . 1 ..- *----. - i A ! 1 - i '',, c!!! ; 1 .%;. •• I s 2 i -,-- _ 7. 1,, ,,,,..., 4;. „.., - , c, .! , ,,,,. 1 9-- 1 ' f4 .. 09! C I ' , 4 1 1 i ! ? / 74 y / i / 7 1 , \ \ \ \ \, \ v, -: runitipoa ------\\,,,:\: .. ss ‘ ) i ' 4 i 1 , 1 , , . i , i Whim 1;:, V 1 - t i i- • s" miditatittil t, 1 ..,.., 1 1 / I 4- r,' 1 1 1 ) 14 4 ,,, / / , , I _ A ,, ki- ‘ \ k ii- i I 1 L ..„: / „ i I . . 1 , 4,-, ,,, / „ 1 , 1 I i I 7,'''.% 0 i i rie i 1. ; , 11 ss \ \ v tt t i 4, i I / / IA '„, ' ''"..-, `,.\ ic " t !\ 0 4. ! ! s !is \ l !, t ' I ' ' ' i I l tt s tk, r t „'" 1 1 t, t 1 ;! i„ 1 tv.,:_. 7! ' : it' k, A ‘\) - k, i4,-- 1 1 - 4. 04 I 1. 4 V ,-, \ ,,,, ,/ i o,... t i i ! ''-‘ 1 N \ .,,, A i 1 1 s \ 1 41, \ lk,,) \ \\ \-) IVA ,' \ ' i, -- - , 5; k; 4 ' -/' // ---••• 4 4 ' ' 1' • ''/')- 4 1 j' ij ) - = - 1 4 s : \ . k \ \ \ I \ 4. N, \ /, i 1 42) 01:\ 141 ' 1 4 z • 1 i j° 1 1 211 21 4 ::::X'• '' e 1\: i ; -\,: t a- ‘-- \ 7 /- 7- 4 4 /. 1 1 \ 1 m-,..„. 4t, 4 o..,,,-. -- 7 1,,,,, f,,,,-1. 04,, Tict...* i7 1; \ i 7 s' ' N i.. i ' - • • c' / I,' 1 / / 1 I ri, 3' \ ':-.,, , K s ,'';\ , \ \ \ A 4 '" V I 1 1 \ 1, ''', ‘ k, 7- 4 ir2, ,) 1' .- - 11-- \ i, fr% i \' 1 \ i` 4 \ \ ''- i- s ) \ \ si ' i 1 ! • N- ''' ft" ' f' -. , V 7 i N 4 N I 1 M ,," 4--,-- 1 4, 31.0iTia. , ti i ,/ , `, , -.. I let I , I ' ' l ' S : \ \ \ 1 it ','.- T lir - (- t k...4 1„ • s--. s• \ s i f L 0f, ,;' 7r 7.:;: h : 1 ft '-- 1. i,, \ \ \ \ 1 j \ gi- tommunimmiluniii-- \)!' ii , ' .''',''':':' 1' 4:''''' liN4!'!!' ll'''' 1' 11: J r- \ ---- '-'-!----' N'-----‘!- 1:-------------!! = ::'''-!.--- \!‘ \\----- - - I IF. F. T --- 1 - T -. " \ . f ,, ( 4.,. ' • •.. - ___ E ,,,-• !_•,,, ' - , ,' i i ! II ' ‘ '''•,•,- 4‘ 7` j' -'' ''.... r 1 N/ \•„/ I , , \ i 1. r ! ' k:, 7,t, -- - - ; fr r / 1 1 i .,„, ., g- v ) 1 i c1..., 3, 7' 7 1/.. N - \ \ \ i 4. 1 \ I: I i t - : tV. 4, 1 I ''! ji - -- ;.--,-- 41. I 1 i r------, c.-- P:,---- I tit --- k" I i 1 it : Lk* --- 1---- '-'" i ! ip--,, , r, . 1., 1 7,,, I 4 , IF': 1 r f A „ ! k Ai.1 . 1 &! '" ! `::;:;! ! ' i't -, 1 ! it'' t s --- ---.-! , ‘ r \ I il I I l Iti! r / 1- --- --!;. c - t v i i : t \ \ \ o !,= i I t t \ :, , citi- Lt- ,_ t / I i ; : -- - 1...,_ . 7. 4 1 1., _.,---• I,„,--- 1 I : l 1 : 1 1 4 I 1 s , Sk2, 1 I r, 1 i 1 / - -" W--- / 1-) hi I 3 1 1 ' s 1k " „- b,-, te,:• ;),;-; 1 ,), ) , 1,....• / z -/- ,--- ' S• k ' . 1'. - '%/- 14 1 *" 1 .-(, , ; °,,,,),`-'-- r-=:---- - ---- 4 1 1 - 7-- i - -- - -:. 1 ,(..---- 4-.,4 . 2- 7; i--. , , T - t, Q„,, t0 vli,, , 7 f • / / it; I --= 4 c 1. l' 1, . fr.:.,_ i,: ro , 9 - 11; 1 P) - , -- / 1 i 1 1 4 ' 1,_: i.::',',' : S.: iv.\ -,, 1 z. / ! / "=--- D / :.„---: 11 i : ,--',,, ,-,. / i i E. i , J i I,. i„..•---:—...." it 1 \ 1 ,' ;: y.--/ -- ' ... I 1 tv- p---- --,......_. i., 7 t„ i i t , A 1 \ y. 4 1„.„. 1. :,„, „ i,,- r 1 r = I= ,-''' 1 r ui, t "- w--- i i '' r 1 i , 1 ( 3' 9; 1 1 I ! 99 n , 1. 1 / i 9_, h,,...• - ,,,•_- , c.,, , ,-- W \,,... \ ,•. kr ', \-- " T • k)..) I/ .)". 1 zr.-.. i" t' / ' ''''''' I)) 1 y i),,,"' • z---,)),.. ... 7 . Th t I :,.,/, ‘ ) I f f‘ i !! s!!!.. to't V.,.. v4-1 :-. 7, A ,...,,;:„-...,.-.=.--,, , ': ,,, ::-. ,,,,,,,, ,, , ,,-„,„, 0,;-,•.,,, 1 i i i , I- i;. .-,: ii , „ ,„, 1 , ,, 1 , , r," 9,1 / t ,/,./.,- I 1 ''' \ ii, 1_ I 7 ) 1 \--..' !; ' 1 '''',:•.''''':" .-, \ ‘,.- ' • k • ni"- A.;!* 4-,'":;"- 14.: S; \ - \ I \\ -',\ '',;) 4 l'i \ 7 7,-;., 7 --, r7i ,,,, - - 1 '''' ;''' 5'' t ,;/ \: i-;.,;, ' . 1 4„.„,,..,,,.,,, i, , . „.,„=--- A i i t : ,'„i ,./ , 1- 1 ii, v ,,,,,, i 11 0---- xv-\,, 7 i„.„....„.....„,„:.,„.,,.... h,„.,..........._...,,..„.....,_„, N, t",,, 1 - . 114, I < ')',/ U ,:, 0 ) 1 i _ _ c ' tttt ' '' , ri - '-: '' ' '-''' Fki; \- , 1.---', , , p r, I. : 3 i / Ng, 1 , kil, i\ - . ./ , ; vi ; I':'\ ,, - 1 1:::= 1 1 n r'-' 1 ' 1' \ n '\'•,, •. 4 "- k \ ! .., tte I 9 I 1, -• V ''''-,:' '''''' '-' • • '' " ': 1 1 k:' ' I 1 ) ;,,' \- , ii i '... 1 I ,/ s i 45; \,-• , 1 ' )'• )*' 1 . --- ,' 1 P / 4 ..-' - 4, • 9.‘ y,;•/ - 9. •, \'",,-, 1, !!!, , / , / A---/ s ' dik \ . 1 , I Villi 2; , 4' -,-.', - 1 - - 1 - ;' i / ii' l• / iii) •• . 1 , , .. t-' •-- 1 ! z ---- 1/ .. n• • .. e" *,,, / ' \:. 7,!' f"" ' i, : ! 1 15 9. ,' / / ,-. ,,--;-/ t •-,•' Ay / . 1--- l• I n. 1I -' 9 '''''' ' ‘' X • n -`' S- \ n ' C' n, \ , ' • '''! \ I i 1 1, f .-) 9 , , i f ' -, --,/,•• i V' Th! 1 -- I I 41 sio f il. 4. 1 : \,.' ii.. '.. r- - k -,-- i 4 , 4 , , Yis - - i,:: , isT,:s „ ---- :,,: L1 -, . , - , .:' , N'.,:=,, t - , i ; \ -, ,: 3 \-------- i '‘, ') 1 -- * III o - 0 E," J.,,-- E— ' 4.:?) ' 1" j'''‘'k, ,:',-'-----,- i - " I ''''= . ', \ 0 \ 0/ ---- --_,---- a - - ''''''' z t' i-:;:' ( 1 ------ - - Z.- - -- 1v- - --- iii.:•;', 01- 1.;. T:;,r'', ' 1,,: !.: 1 ! . 1-- t-- 1 Onto, /, pi 1 itp . di \ , \ 0 t t. t,,7b..-* s),,% , , ,.,- , ,„,' -.,:.,,- ,, , x,. 77,, , : . i,,.. ,:,:,,,, i -,,,:,. s.,'-=,, ,.\ - , - ,.: 1, [ 1]-- 41 1114 Lii„ ki i / ::: 4 1 t_ 4,:/ k r- \ . ,.'. , : ) '' 4". k,k .-)'*: " ';%; " Al\'' - k - V -,. ', k ) 1,: k . . ' i 1111 NN. k- 1 / 1 [ 2 J' l:./ :"/. , f')/ 4*, 4:- -...- k . N":•'', ' i '', 0,\ ''' \ ' \ \ r 0 *- . L ) '''',' i ,-' 1 / 7 - 4 ix-',' : II P 71, lt, X„ s k, t 0 1. A 1 1- . 7 0 - I ; IP If 1 ' i 9jZ V n •./ 1-•/ - 1 -- - : II ar 1 i.:: \' ' .:-:, I: 11 ' Iv"-, s. ' 9\)ts• !\•\,:". , X. 4. \•,\,! \ ‘ 1 i 1 i. s N, 0',••• z,••---,.:/•_,- 4-- .•:::•.- •-•, I, t , r, 1 V v, ,,--, „ t ' 0 IP . c i k IA 2,-._,,.., ,. / 2 ,----?,-,-, i/ t • f,: tr ' ,,, 1, t/ --,,' t., ,, At' sk t n.-- it V- tk..: ts ' \ 0 c\ o>01-- / /111k/ 70--- I i I 1; it f; i 1 / i t i di , .„, , i : „ / t i* x ! i II f f, ,,.-- / J., I , 110 IP - 1 i i ri- in i 1 1--, Ax v it 1 0 ----- ' ilr i It 1 t , \ i c i c- 1 I 1 \ ID \ 13 A i V, I z s, \\ \ c' OP'; 4 V- i , / 1 , , , A s. I ; z r I I o a 1' l f ! i i s ', \ '' i il g 1 I i, iiii ao , , s, 1 1 I\o- ii 1 I \ t, 1 i i \ I= 1 ') ' ; \ \ I ‘,), t l' , I 1 i 1 •'. 1 I., ss li •;.; II......... s V, , ',,„,) lt` A I ) 4 . • 2',.. r S:: c 1 1:= 1 0 OM Vella \ 0 I 1P; 111111 0 I I 0' 1 0101 11 t _ '. 41110. 1s1N 111 1111111111111111111111 $ 14 E 0 JIMICIVIMIIIMMILMIKOW. at aokar r1= 111. 5,—, 110. 111. 11.:_MliMIIM Drawing Title: CD Project Title: 0 CC?) Drainage Map for POST- DEVELOPMENT RIVANNA ENGINEERING & g5 ' A ( 2: 3 - a lfI V, ' SURVEYING, PLC. Hollymead Towncenter z 1 0 PHONE: ( 434) 984- 1599 2, g ' • N., Albemarle County, Virginia Droning Scale: r - X0 Drawn By AB File Nome: 32- 41D- UP. N n a. 1350 Stony Point Rd. Charlottesville, VA 22911 PAX: ( 434) 984- 8883 Date: 08- 29-03 Checked By . 10E1 Project No.: 3063 J , Chapter 9— Storm Drains Appendix 9C-1 Flow in Triangular Gutter Sections o5E. 1.6 05 7 67 ko T Q "" S X S T.o 7'. -0 n IM.;"-:" GWEN. e,n act 6 , S0 0 7 -0.04 i T6 TT 0 2 1 1N:5'0 6 _:-- 4C Q z? 4 or. = a 038 0 i Ttrr) z u. ,. 3 0 -02 s cr 1..3 60.01 tr:1-- i.... 0.1 6 0.06 - 0.02 c,D1 i 0 - C.00a il (-“ • ' 0,04_ _i,'. a04 I 2 4 0.0S 0.02 4 • 0.0C2 0 . i-3 -138 0.C. 1 - c.g H 2 -0.008 1.__-.0.4 1 Fcr V-S!lApe, use :he romograph ./.111 t --' - It/ .. x:2. 1 f\i S1 Sx - Sy2) r r ri 0.004 2i Ta de'.errn i'.e d scharge in gutter v. 111 0.2 1---- W carrposi1 ups:, s ope... MIL: 0.1- ultic, t T, and S, Then, J se App 9C-8 to C ____.....- ---Fild Eo The Iola, d sciaryew S),0- and C)0-0,. S'S Source:HEC No. 12, FHWA 1 of 1 VDOT Drainage Manual FLEXIBLE PAVEMENT DESIGN FOR ABINGTON PLACE, PHASE 1 PRIVATE ROADS February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 Flexible Pavement Design County: Albemarle Date: 19- Apr -05 Site: Abington Place Street Name: Abington Drive Developer: Southern Development Phone: Station CBR #1 7.50 19 +00 CBR #2 7.50 22 +00 CBR #3 7.50 25 +00 CBR #4 7.50 28 +00 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 350 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 350.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 10.77 Course Material Depth Equivalency D(p) Surface SM -9.5A 2 1.67 3.34 Intermediate BM -25.0 0 2.25 0 Base 21A 8 1 8 Total Depth 10 Total D(p)11.34 D(p) -D(r) =0.57 D(p) >D(r) Therefore: ADEQUATE Flexible Pavement Design County: Albemarle Date: 26-Jul-05 Site: Hollymead Town Center Street Name: Community Street Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 300 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 300.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 10.24 Course Material Depth Equivalency D(p) Surface SM -9.5A 1.5 2.25 3.375 Intermediate BM -25.0 3 2.15 6.45 Base 21A 6 0.6 3.6 Total Depth 10.5 Total D(p)13.425 D(p) -D(r) =3.19 D(p) >D(r) Therefore: ADEQUATE Flexible Pavement Design County: Albemarle Date: 26-Jul-05 Site: Hollymead Town Center Street Name: Aldersgate Way Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 600 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 600.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 12.65 Course Material Depth Equivalency D(p) Surface SM -9.5A 1.5 2.25 3.375 Intermediate BM -25.0 3 2.15 6.45 Base 21A 6 0.6 3.6 Total Depth 10.5 Total D(p)13.425 D(p) -D(r) =0.78 D(p) >D(r) Therefore: ADEQUATE DI -7 PERFORMANCE CURVES FOR ABINGTON PLACE, PHASE 1 February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 Chapter 9— Storm Drams Appendix 9C -14 Performance Curve 01-7 in a Sump 10 • 0Iw IIIINIIIIIIIiIIIIIII IIN IIIMMIII111111111111111111111111111111111111111111110311111111111111111111 al 11.01111111.1.1111111. MEI MOM IMIIIIIIIIMII ra IIIIIIIIIIIIIIIIIIIIMIIIIIIIIMIII MI IIIIIIIIIIIIIIIIIIIIIMIMIIIIIMIIIIIIIIM II MIEHM.1111111111111111111111111111 IIIIIIINIIIIIIIIIMPIIIIIIIIIIIIP r 1a 1111111111111111111illi 1111 I = 111111111111111111111111 Mill eL 1.0 1111111111111111111111111111111111111111111111111111111111111 111111111111111111111111MMIIIIIIIIMPAIIIIIIIIIIIIIIII111111111111 NIHNNN NNNI!NN•N•IIoMMEMMIMMMM• e MP OMMI Si MU1 II r. -u IIII III 0.5 __ C 200U iiaauiu p ,P ri_IIllI I111 111111 D FT` PERIMETER PEN AREA = 1.2 . FT 0 . I 1 5 10 50 100 DISCHARGE CFS) S O 7 A = 0 . o ck c Q = 0. IS((,.s1(v.oi 0,3 c' f Source:VDOT 1 of 1 VDOT Drainage Manual Chapter 9 - Storm Drips Appendix 9C -14 Performance Curve DI -7 in a Sump 10 . 0 momilim .n. mi _umwoo IN11111•1111•1111111111110 1111•11/1111111111111 5.0 1111111111111111111111111111111111111111111111111111111111111111111110111 Miliall111111 1111111M11111511111111 w . 11111111111111111111111111111111111111111111111111111111111111MINIMMINEMINIMIIIIIIIIIIIIIIIMMIM CD MONME.111111111111111111111111111 rlNI 1111 1111.1111111111111111111111111111 Ir 0. 11111111111111111111111 2/ 11/''..d11111111 111111 iHI 111111 Min OPEN AREA = 6.0 FTC 111111PERtMETER 1 10 50 100 DISCHARGE CFS) A= c u55 50 c1vcect 0. I = S, s JJ Source:VDOT 1 of 1 VDOT Drainage Manual YARD DRAIN CALCULATIONS FOR ABINGTON PLACE PHASE 1 February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 wil 1 13 tPrg B E i sfb C i i LIE n zoc,, N N v it O O i 11 o b to b N b b G Q oo Mk la c II o in r o oo a) o i r ij II II 1 i 5 1 11 I igEgi Iv o E - E1 ilitill F.. 7, r si 1 0 s, i il lilt! P li: 114 . .dil 2 I 1 i itV I It' ll 3 o g tt, ii g 8 05 1 vasaf o a h- 3111. E§ s 8 8 8s838F8as 6- 43 aidlag!1 6 6 le 1 b C4 1 o. z c. i.rr: ii s 1 2 kE t• g E P t - - i O Nw O C 6 0 II 6 MI, Al mg O S Li 1. 5 . Q p CO Z v O 0 o II 11 O `- S IglIgi h O g lo s h Ell a 15, E r g 1 IIu 5 P d 2 1 T"! il Z. LIPlis 11 lit 1 BIB i g is 1 1 igit° 1 5 g s i lia- mi1 Yo Z 8 o 81 8 .§ g g g 8F$ S lam poi w o Hill6' 1 le m a 4 .. 5 1. C— c4 ' A S -It U _ N LL c,'" o I II 65- i 1 1- E cn I I 2 -- r in i L 1-- i i g o II , 11 0 ill5iv 2t. s. htt. 1, h 2131 9 ' 5 i' si fij i! Pt y iii 1 ;/ EiSm 1 I g g lV 1 om % i 5 1 to I iiiii E 858585858585$ 58 m raft 1 PP S E 6 1 a. b 6; i 1 m r r r A i 2 O c. 1 4 p.: 0 1g 1 Pt. g I i O O N V it O Ot II O Ma. bbNtrioN 6 cir - , z" i il O. ik- r cr T O • C L g i g i ij 7O 1' O II II >- or S V t o 2- el 8 1 2 M — 11 111141 iki 11 Siit11111 I ffi R P 0112 tki a 1 4/ M 1 g i. E. Z l 1 g 1 I Mill 1 1 1. 111 1 it I A 11. A s pi 5 ghlii 5 vi 52 z h_ 1 I gF , g55555s55 5E S43. pug E EIt l 6 I 1 a 6 az; i I. a 4 ° c3 ? F E Li te a j li 4 1 1 i 1E II b N N 11 i o ii n 1 1 f 11 0 2 §' . s 4 E 110111 co e 5lit" 5 1PillIP 5 1119141 g t,,, Ki us B I Pgl/ h U # jr, i 1 i. 1- 41i i 1 iiiiiIiii P j'c' N W a l' C Cct1; SliW T gpz 1. 48-ol 8 55. 5 55555s 55 wisp WA m WIlag! S 6 1 sfb 61 i i I . d •- c, I p.. Ei IQ s o U NO II O Z3 u i A 60 6o b t1 6 6o r m o O Mk AI mO c0 •,___ I n Ti_ a O 11 3)° a)) II II g i g 1 n O i h o 5 Ili il le54 i i 1 1 5 I M Ifni 1 1 li 1 1 I TIIIII i si ig 1 1 zi 1R- i-ii 5 iiiiii 5 g Fg 8F, gEE ? 8 m i mg' I tog! l e tti a N g il 5 N g N p n O U n i o w II O b b t'- c-' N t o N ca o T 1 1 COCD g i g 1 u n v i 1515g N o 2 Vs si ! 2 i 1 8 Ililliql if . 6 5 PgD lip EZ 1 1 flNi I i Lliiii c 1 Ililiiiii CV flEfl0 i 3 i hill s al g P == iw1 i " t W 1 llit 5 I'' P I 8 E 8 E 8 E 8 E 8 F Ei $ sd' wil le 16 1 b 4- 6 W i n . 1 6 4m4 ii g ERI k g n s_ r- N LL N v O i II o ht- 6 6 b ! N- 1 4a !• N il o _ fa c o 2 E 11 I; o cn co r o 0 o 0 o o II II i 11 h o _ Sts J' i ps . 72 1111441 5 F' pi clisz §ikz c 1 Ili" 5 i 11 h 1igi U i' liiits I 1 Ma 1 I MICZ1q., co k S i 4, 1E2 5 i A - F -1 cuMil 5 I' nil t5 8 5$ 48$ 84844 4 an Vedgo PPtog! le 6 i ci , c, IQ II E o U N I: 6 0 8 II o i aD ti N 6) T O E4il p w II n 0 O a O 11 II g 1 g iI N p tW o C C ii C Psh - c • ii a Aall I P g gi 1 1112 i1/ 4, 5 li 1 glail e 1 gOgoWWWEI U TH R g I R 2 skill 5 tig 5 1IP. 8 m g 8FIgMsLio s wilPr1 6 i iti: s i 05 i o— c.i i g if o U N N w II it O O0 O N t i Mk 11 b ! o b N 42 b N i s >, rn 11 o o H g i o II , II 1 CJ 1 5 1iglgE N o Ili O El a g wi 1 h 5 ggi' ll N R 1 P11 ii g ittg I : g il- [ 41 s 1 II! I a 2 1 i 1 i 5 I lV C C ill . 1 i C C O I ili 111! Z exit g 5s5g! g555 nF. cl o milRi l e I a s,. b Ct. i V4E0N2E1 RI 1 a 1. o e• t4ezig 1( i k 2 1E 11 rz I it zoU N D7 LL N .- a C3 O OLO to to b N ro b N u I Q O OT E C , 6 ii O g i f O Ps O O a P H C3 g I i i l e 5 5 P 4 cletwION I 01 1 P lit I NOV 14 5 Ht e 1 I' I al I I CV c J Jii 3 iC sql1 5 15-" iii 5 141 E g 55. 5555555 5$ s3' m wigilM"tlEA g Ctisi i fS i m Fi N ty CA I. o. c4 4 rz F xi C i g kE ti FE It z)- 6- II r7II o 4 A il m - L)-,- L(] 11 C C .''' r d p CO II J-- N II N O o II II i i 1 i c h 4 g Ili Iliiihil i e" 154 WI ill 1 1 P h I 2 1 C ti 1 i 2 tq I WIWIPq 8 IA oNtiLico i 5 0 mA 858 5 85 g5g555$ Li o mvift FLEXIBLE PAVEMENT DESIGN FOR ABINGTON PLACE, PHASE 1 PUBLIC ROADS February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 Flexible Pavement Design County: Albemarle Date: 26- Jul -05 Site: Hollymead Town Center Street Name: Livingston Drive Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 500 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 500.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 12.01 Course Material Depth Equivalency D(p) Surface SM -9.5A 1.5 2.25 3.375 Intermediate BM -25.0 3 2.15 6.45 Base 21A 6 0.6 3.6 Total Depth 10.5 Total D(p)13.425 D(p) -D(r) =1.41 D(p) >D(r) Therefore: ADEQUATE Flexible Pavement Design County: Albemarle Date: 09- Feb -04 Site: Hollymead Town Center Street Name: Lockwood Drive Developer: Southern Development Phone: Station CBR #1 7.50 All CBR #2 CBR #3 CBR #4 CBR #5 CBR(d)5.00 Average CBR * (2/3) RF 1.00 Resiliency Factor from Appendix I SSV 5.00 Soil Support Value Current ADT 2600 Average Daily Traffic Volume Growth 0 per year Design Year 0 Number of years after construction HCV 5 Heavy Commercial Vehicles Design ADT 2600.00 Average Daily Traffic Volume This equation solves for D(r), which is used to determine pavement/stone thickness for a road. D(r)= 17.75 Course Material Depth Equivalency D(p) Surface SM -9.5A 2 2.25 4.5 Intermediate BM -25.0 4 2.15 8.6 Base 21A 8 0.6 4.8 Total Depth 14 Total D(p)17.9 D(p) -D(r) =0.15 D(p) >D(r) Therefore: ADEQUATE BMP CALCULATIONS FOR ABINGTON PLACE February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 arl Short Version BMP Computations For Worksheets 2 - 6AlbemarleCountyWaterProtectionOrdinance: Modified Simple MethodPlan:Abington Place at Hollymead Water Resources Area:Preparers JDS Date:14- Oct -05 Project Drainage Area Designation Bio- Filter #1L storm pollutant export inRvmeanrunoffcoefficient, R = 0.0 L . [P(Pj)Rv/12 ] [ C(A)2.72 ]Pj small storm correction factor, 0.9 5 + 0.009(1)I percent imperviousnessperviousness annual precipitation, 43" in AlbemarleAprojectareainacresinsubjectdrainage area, 6.40 t A C pollutant conc mg /I or ppm target phosphorus Z r 7 S4-f factor applied to RRV required treatment volume in c ,RR required removal , L(post) 0.5" over imperv. area = A IRRPost) f x L(pre)43560 (0.5/12) /27removalefficiency , RR100 /L post) tj 4. (0C) 4 G' ° , aa 1 Computation (values in feet & square feet) Impervious Cover Item pre- development Off. r 1 $ ( 2 Area i Roads Length Width subtotal Post- development 0 0 0 Length Width Area 0 0 0 750 subtotal 770 32 2400001813860Lengtho1220 and walks g Width 0 14 17080no.subtotal Length Width no. 0 0 1 0 0 54940 Driveways Len 0 0 0 14 16 subtotal Parkin 0 3485 88 19712ParkingLots 1 0 0 5 1 17425234Gravelareas 0 1 2 0 37137Area034 Structures x 0.70 =Area p 0Areano.subtotal 0 x 0.70000Areano.subtotal 0 0 0 0 870 63 54810Actively- grazed pasture &0 0 350Area00 76 26600yardsandcultivatedturf Active crop land 0 x 0.08 =Area 0 81410Area0 105297 x 0.08OtherImperviousAreasx0.25 =Area 8423.760 x 0.25ImperviousCover _-0 q r 0 Drinking 0.64 280.7 l(pre) l(po New Development c42,._C Pment (For Development Areas, existing impervious Q 0.70 f l (Pre) Rv(pre) L(pre) L(post) RR * 9 cover <= 20 %)t ,l, + 10 . 74 1.00 pre)* 0.35 1 0Q 0% 0.23 9.04 25.04 Area Type t i Y0% 0,05 16.00 64% Development Area 1 1 l0.40 1.00 0.98 12.52 11.54 92min. values 1 O 0.06 1.32 14.392% 12'98 91% Other Rural Land atersheds D Redevelopment I''pment (For Development Areas, existing impervious 0.70 f I (pre) Rv {prej L(pre) *re Pervious cover > 20%)0.90 e) *P ) L(post) RR o0.35 0.85 0% 0.23 9.04 25.04 16.90 RR 68% Developmentoppe S.7 C 0.40 0.85 1 % 0.06 1.32 14.31 0.05 0.98 12 52 11 68 68% Development r Watersheds f 93 Drinking 9 13 18 92% Other Rural Land 9 Water Watersheds92 /° Interim Manual, Page 70 1 t rev. 16 Feb 1998 GEB Cid LI" PY Au 4 Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan:Abington Place Water Resources Area:Development Preparer: JDB Date:14- Oct -05 Project Drainage Area Designation Bio- Filter #2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ]Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A 3 2.37Cpollutantconcentration, mg /1 or ppm target phosphorus Z 2 C f factor applied to RR y 1' rrequiredtreatmentvolumeincy, 0.5" over imperv. area = A(I)43560(0.5/12)/27RRrequiredremoval , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet)Item pre - development Area post - development AreaRoadsLengthWidthsubtotalLength, Width subtotal 450 14 63000007501813500 0 0 0 0 0 0 0 19800DrivewaysLengthWidthno.subtotal Length Width no.subtotalandwalks0010110051550000001616358960 0 0 0 14460ParkingLots134123400000GravelareasAreaArea x 0.70 =0 x 0.70 =01StructuresAreano.subtotal Area no.subtotal0004301981700001000161600000000 24170Actively - grazed pasture &Area Areayardsandcultivatedturf0x0.08 =0 44807 x 0.08 =3584.56ActivecroplandAreaArea x0.25=0 x0.25=0OtherImperviousAreas 0 Impervious Cover 0% I q Lif 0%Cf/' v/ Rv(post)V 2 2 r66 P )}I(Po 0 .59 95.7 127 n 5 j (0 2 New Development (For Development Areas,ng ipervious cover <= 20 %)C f I (pre) * Rv(prej L(pre) L(post) RR A c rea Type c t 0.70 1.00 20% 0.23 3.35 8.59 5.25 675 -Development Area O 0.35 1.00 0% 0.05 0.36 4.30 3.93 92% Drinking Water Watersheds0.40 1.00 1% 0.06 0,49 4.91 4.42 90% Other Rural Landmin. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 2-1(60.70 0.90 20% 0.23 3.35 8.59 5.58 65% Development Area0.35 0.85 0% 0.05 0.36 4.30 3.99 93% Drinking Water Watersheds0.40 0.85 1% 0.06 0.49 4.91 4.49 92% Other Rural Land 5 105-911 Interim Manual, Page 70 rev. 16 Feb 1998 GEB i P WO) U) U)0) e7( AU)0) U) U) U) U) 1 1 J 1 0 0 o 0 c coN CD CO C. 0 co N N v o 1 Structure Number rm r0 Woom D0] O 00 0 0 0 0000 0 0 00 6 6 6 666 w w w w 66 66 000 0 0 0 W CO CO CO 0: CO 03 CO N Inlet Type w Curb Opening m m m mmm o o m m mm mm sw . Catchment Area Goo 0 0 0 0 0 0 0 0 0 0 0 sa WW n . A - n ( 0 C) o ( n 1 O 44 WW p00 coo P000 O O O° cn Runoff Coef D CD ( 0 O Co ( 0 07 0D ( D 0) o m m V 000 coo moo ° 0 0 o m 000 0 0 0 0000 O O O O o) CA N 1 1 N O -• N N N 6.) 63 N N 0) 0) O 0) 0) WM4 n m ( D . A PM M M Sum m Intensity 000 000 0000 bb 0o 0 N OA 00 Catchment 000 000 O— O o 1 1-- 6 CO ( n A 0) 1 0 - - 4 ( 0 6; 0 O O O 0 N m co N O) Q) 1 mw 3 a)C7 tD 0 Q carryover 5 6 0 L' Q Total 000 000 0100 4 ) 6 ) 6 CD V CD 4 bb 0 00 O N m o N Q) m mw O n o . o o o n c) 0 o CD 0 ov o Gutter Slope bbb 0 0 0 0 0 0 0 bb 000 000 m m w w bb w w 1') 1') 1') N N N W W ( 0 ( o N N 1 0 0 0 0 0 0 0 0 0 0 00 00 w Pave X - slope bbb O O° O O O O bb bb N N N N N N N N N N N N NN 000 000 0000 00 oo_ pGutterX - slope bbb 0 0 0 0000 bb bb 0) 0)0) comm 0) 0) 0) 0) mm mm 0) 0)C) 0) 0)0) 0) 0) 0) 0) w w c o w Total Gutter 9 w w b Spread 4M N N N W OM V m CO 1 W . A I ( n N in in A O) 9, 1 Depth at Curb 0 0 0 0 0000 0 0 0 0 N N i \) ; \) N N N n a) V V m W W cD cD Efficency 0 0 0 o 0 0 ( 0 0 O O 0 0 0 0 0 0 000) 0 O O o° O 0 0 0 0 0 0 0 0 0 0 0 1 • w Q intercepted 0 o 0 0 0 1 0 0 D ° O iD 0 0 bb co a 3A o vml r 1:- cr) 00 o O 0000 0 0 Q B bb bb 0 0 0 0 0 0 0 0 O O O O o O N 0 O O O O 0 O No Midpoint Depth cn N N W W 2 Curb Height 0 0 in in m in 0 0 N D/ H A A rn rn cn m w Midpoint Spread N N LD -229 Storm Drain Design Computations Route; Abington Place Proj: Hollymead Towncenter County: Albemarle District: Rivanna Description: Pipe Calculations From To Point Catch Runoff Inc Accum Tot Tot Tot Up Dn Pipe Inv Pipe Pipe Velocity Flow time Point A Coef AC AC Tc Int Flow Inv Inv Len S Dim Cap Inc ac)min) in /hr) cfs)El El ft)in)cfs)ft/s)min) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ST -28 ST -27 0.33 0.80 0.26 0.26 5.0 6.81 1.80 564.00 563.43 44.0 1.30 15 7.35 2.95 0.25 ST -27 Outfall 0.33 0.80 0.26 0.53 5.2 6.74 3.56 562.90 560.97 89.0 2.17 15 9.51 7.28 0.20 ST -226 ST -22A 3.07 0.75 2.30 2.30 9 5.83 13.42 572.47 571.66 44.0 1.84 24 30.7 9.48 0.1 ST -22A ST -22 0.44 0.80 0.35 2.65 9.1 5.81 15.41 570.00 567.50 81.6 3.07 24 51.5 14.38 0.1 ST -24 ST -23 0.31 0.80 0.25 0.25 5 6.81 1.69 569.86 566.66 160.0 2.00 15 11.9 3.2 0.8 ST -23 ST -22 0.30 0.80 0.24 0.49 5.4 6.70 3.27 566.47 566.31 8.0 2.00 15 11.9 8.23 0.0 ST -22 ST -21 0.14 0.75 0.11 3.25 9.2 5.79 18.79 560.89 559.83 105.5 1.00 24 29.5 6.86 0.3 ST -21 ST -20A 0.08 0.70 0.06 3.30 9.5 5.73 18.94 559.38 559.22 32.0 0.50 30 37.7 4.78 0.1 ST -20A ST -20 -1 0.09 0.75 0.07 3.37 9.6 5.71 19.25 559.12 558.74 76.0 0.50 30 37.8 5.81 0.2 ST -20 -2 ST -20 -1 0.40 0.68 0.27 0.27 5 6.81 1.85 560.66 560.50 32.0 0.50 15 5.9 4.33 0.1 ST -20 -1 ST -20 0.23 0.72 0.17 3.81 9.8 5.67 21.59 558.64 558.16 97.0 0.50 36 47.1 5.65 0.3 ST -20 ST -19 0.00 0.00 0.00 3.81 10.1 5.61 21.37 559.38 559.22 32.0 0.50 30 37.7 4.78 0.1 ST -19E ST -19D 1.70 0.80 1.36 1.36 5.0 6.81 9.26 581.71 580.83 44.0 2.00 18 14.9 8.97 0.1 ST -19D ST -19CC 0.21 0.90 0.19 1.55 5.1 6.79 10.51 578.83 578.01 41.0 2.00 18 14.9 9.21 0.1 ST -19CC ST -19C 0.00 0.00 0.00 1.55 5.2 6.77 10.48 574.52 572.40 105.8 2.00 18 14.9 6.80 0.3 ST -19C ST -19B 0.35 0.80 0.28 1.83 5.4 6.69 12.24 570.40 569.70 32.0 2.19 18 15.5 9.81 0.1 ST -1913 ST -19A 0.29 0.85 0.25 2.08 5.5 6.68 13.86 567.05 565.00 97.7 2.10 24 32.8 10.11 0.2 ST -19A ST -19 0.45 0.85 0.38 2.46 5.6 6.63 16.31 562.25 562.03 18.0 1.22 24 32.3 10.41 0.0 ST -19 Outfall 0.03 0.90 0.03 6.29 9.9 5.64 35.52 557.28 556.00 256.5 0.50 36 47.1 7.20 0.6 ST -14A ST -14 0.19 0.80 0.15 0.15 5.0 6.81 1.04 546.55 546.25 32.5 0.92 15 8.06 4.58 0.1 ST -14 ST -13A 0.22 0.70 0.15 0.31 5.1 6.78 2.07 544.75 538.43 61.3 10.30 15 26.95 13.23 0.1 ST -13A ST -13 0.25 0.66 0.17 0.47 5.2 6.75 3.18 535.76 534.85 19.9 4.58 15 17.96 11.12 0.0 ST -13 Outfall 0.05 0.901 0.05 0.52 5.2 6.75 3.48 534.60 534.00 15.1 3.96 15 16.71 10.81 0.0 ST -16A Outfall 0.25 0.59 0.15 0.15 5.0 6.81 1.00 540.90 540.00 27.7 3.25 15 15.14 7.1 0.1 ST -18 ST -17 0.35 0.75 0.26 0.26 5.0, 6.81 1.79 550.50 550.20, 13.7 2.19 18 26.11 7.29 0.0 ST -17 ST -16 0.19 0.6 0.11 0.38 5.0 6.80 2.56 546.20 541.65 85.6 5.31 18 31.46 10.78 0.1 ST -16B ST -16 0.42 0.61 0.26 0.26 5.0 6.81 1.74 542.75 541.98 56.0 1.37 15 7.57 3.03 0.3 ST -16 ST -15 0.07 0.81 0.06 0.69 5.3 6.72 4.63 541.55 541.30 25.0 1.00 18 10.5 4.28 0.1 ST -15 Outfall 0.12 0.9 0.11 0.80 5.4 6.70 5.34 541.10 541.00 10.2 0.98 18 10.41 5.97 0.0 ST -11 ST -10 0.60 0.70 0.42 0.42 5.0 6.81 2.86 557.68 557.32 17.9 2.01 15 11.9 8.07,0.0 ST -10 ST -9 0.29 0.69 0.20 0.62 5.0 6.80 4.22 554.49 552.60 54.0 3.50 15 15.7 4.33 0.2 ST -9A ST -9 0.11 0.80 0.09 0.09 5.0 6.81 0.60 552.68 552.50 17.9 1.01 15 6.5 4.09 0.1 ST -9 ST -8 0.04 0.76 0.03 0.74 5.2 6.74 4.98 551.85 551.61 24.1 1.00 15 8.4 5.04 0.1 ST -8 ST -7 0.13 0.81 0.11 0.84 5.3 6.72 5.67 551.26 550.94 32.0 1.00 15 8.4 7.41 0.1 ST -7B ST -7A 0.37 0.62 0.23 0.23 5.0 6.81 1.56 555.56 555.24 32.3 0.99 15 8.4 2.83 0.2 ST -7A ST -7 0.18 0.77 0.14 0.37 5.2 6.76 2.49 555.14 553.90 91.2 1.36 15 9.8 6.75 0.2 ST -7 ST -6 0.12 0.75 0.09 1.30 5.4 6.70 8.72 549.39 549.21 18.0 1.00 18 13.7 8.27 0.0 ST -6 ST -5 0.00 0.00 0.00 1.30 5.4 6.69 8.71 546.80 541.84 90.8 5.46 18 31.9 5.78 0.3 ST -5A ST -5 0.10 0.80 0.08 0.08 5.0 6.81 0.54 542.09 541.91 18.0, 1.00 15 8.4 3.91 0.1 ST -5 ST -4 0.33 0.80 0.26 1.65 5.7 6.62 10.89 539.01 536.34 61.2 4.36 18 28.5 15.20 0.1 ST -4 ST -3 0.08 0.70 0.06 1.70 5.8 6.60 11.23 532.31 531.85 49.3 0.93 24 28.3 8.57 0.1 ST -3 ST -2 0.20 0.80 0.16 1.86 5.9 6.57 12.24 531.25 531.00 25.1 0.99 24 29.4 9.02 0.0 ST -2 ST -1 0.04 0.90 0.04 1.90 5.9 6.56 12.45 526.00 521.50 260.4 1.73 30 70.1 4.19 1.0 ST -1 Outfall 3.35 0.85 2.85 4.75 6.9 6.30 29.87 520.60 520.50 15.6 0.64 30 42.7 9.45 0.0 C W N N N N N N a.) Ey 0. 0 0 0 U U U cC o o w w w w w w N LO C CO N L W O O O O O O r r O V C n 0 NCO O CO C OO O r N M V O CD O 0 r r o N d' 00 O CO vt CO CO N O CP CO h O CD CD CO CO CD O O O CLW0 CO) II C C C C_ 0 J O t` CO N CD CD I CD t` r C•) W O O O O r r O r N 0 V f- 2 O J N V O CO CO CO CL I W N N M N M N O O T T O N C O CD 0C Q 0 0 0 0 O V L CO N O N V W ca TD c > 0 CO CO 0 0 0 0 0 0 U 00000000 N O O O O O O O 0 c O O O O O O O O Cl) O N N V V V V ' 7 7 CCI Q O 0000000 CC d O O CO CO O O O O o O O O O O O O O NCI O CO V N O n r V CO N O D) ct t• r ( O O r N N 0) 0) N N N r r 0 N O CO t` O V CO CO O O V V 4 V V V N O n cY N O) V O ' d' 1— 0 O O CD n CO O) O) aW O N V CCD CO O 0 0 C) U O O O O O O N N 0 Q Q G. 0 0) o) CD Co In 0 a) a Z O r O N. 0 CO 0) 0 O Q C O O O O O O r O 1 Q 7 V V V V Z O O O O O O O O Q U N Q) O CO N CO CO Q CO V O CO N Q O O O O V O 0 r N CO V 0 CO CO 0 0 r N CO C O CO n cn H e 1992 3.14 TEMPORARY SEDIMENT BASIN DESIGN DATA SHEET with or without an emergency spillway) Project AAj, f,c r * ckcs2_ Basin #53 1 Location p 3a -4(p Total area draining to basin: 0, KS acres. Basin Volume Design Wet Storage: 1.Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 10 , ‘s acres = ('O cu. yds. 2.Available basin volume = s cu. yds. at elevation -, 1/.1(6. From storage - elevation curve) 3.Excavate C cu. yds. to obtain required volume *. Elevation corresponding to required volume = invert of the dewatering orifice. 4.Available volume before cleanout required. 33 cu. yds. x yp, 15 acres = 33S cu. yds. 5.Elevation corresponding to cleanout level = X11. C2 - From Storage - Elevation Curve) 6.Distance from invert of the dewatering orifice to cleanout level = x,17 ft. Min. 1.0 ft.) d Dry Storage: 7.Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 10.1 acres = Lo /D cu. yds. II1 - 112 1992 3.14 8.Total available basin volume at crest of riser* cu. yds. at elevation S31.30. (From Storage - Elevation Curve) Minimum 134 cu. yds. /acre of total drainage area. 9.Diameter of dewatering orifice =C in. 10. Diameter of flexible tubing =in. (diameter of dewatering orifice plus 2 inches). Preliminary Design Elevations 11. Crest of Riser = Sa\ . 50 Top of Dam =5 • OD Design High Water =3aa .00 Upstream Toe of Dam =516).5D Basin Shape 12. Length of Flow L gib Effective Width We 37f If 2, baffles are not required 3.2 If < 2, baffles are required Runoff 13. Q cfs From Chapter 5) 14. Q I cfs From Chapter 5) r Principal Spillway Design 15. With emergency spillway, required spillway capacity Q = Q =cfs. riser and barrel) Without emergency spillway, required spillway capacity Q = Q =cfs. riser and barrel) III - 113 1992 3.14 16. With emergency spillway: Assumed available head (h) 0,7 ft. (Using Q h Crest of Emergency Spillway Elevation Crest of Riser Elevation Without emergency spillway: Assumed available head (h) ft. (Using Q25) h Design High Water Elevation - Crest of Riser Elevation 17. Riser diameter (D = 3Co in. Actual head (h) = p.c\ ft. From Plate 3.14 -8.) Note: Avoid orifice flow conditions. 18. Barrel length (1) _ft. Head (H) on barrel through embankment = 10 ft. From Plate 3.14 -7). 19. Barrel diameter =34 in. From Plate 3.14 -B [concrete pipe] or Plate 3.14 -A [corrugated pipe]). 20. Trash rack and anti- vortex device Diameter = sy-inches. Height =j inches. From Table 3.14 -D). Emergency Spillway Design 21. Required spillway capacity Q = Q - Q 11. 1 cfs. 22. Bottom width (b) a. ft.; the slope of the exit channel (s) O.ft. /foot; and the minimum length of the exit channel (x) 40 ft. From Table 3.14 -C). III - 114 1992 3.14 Anti -Seep Collar Design 23. Depth of water at principal spillway crest (Y) _ 1 ft. Slope of upstream face of embankment (Z) _1. Slope of principal spillway barrel (S = 1. a Length of barrel in saturated zone (L = p ft. 24. Number of collars required = g dimensions =3.S from Plate 3.14 -12). Final Design Elevations 25. Top of Dam = Sa3 Design High Water = aa.ab Emergency Spillway Crest =DO Principal Spillway Crest = Sa 1.30 Dewatering Orifice Invert = SI1./d Cleanout Elevation Elevation of Upstream Toe of Dam or Excavated Bottom of "Wet Storage Area" (if excavation was performed) 51 (, III - 115 Y_ co u N N N N N N cC O O W W W W W W d N OD CO n CO N LO O O O O O O r r O CD N O N CO r CO O d' CD r- Q) CO O CO CO O r N N c} Ln ( 0 O Q r r o N d' CO LO c*) d CO CO N O O) CO r- CO ( 5 ( D O O i. 0 Ln LO 0W li c c c 0 O co N a) Q - co N. ( 0 CD r CO W O O O O r r v 0 w ( 0 r N LO I. 4 r- O J N d' O CO CO CD Q_ I W N N 0) N 0) N Q o LO N.. N w+ CD CO Q 0 0 0 0 0 0 0 d- 1() L 0) N V O N N V W c > CO CO LO LO LO LO LO LO O O o 0 0 o O O O O O O O o O o 0 0) 0a LO LO 000000 y 0 - N N 4 4 4 4 4 4 03Q 0 0 0 0 0 0 0 t0 CC Q O O CO O O O O o CO o o O O O O O o CON N N O O) dr r CO O r N N C7 0) N N 1 r r 0 N o co t` ( C) CI' CO CO L n L() d' d' d' d' d' d' UN O N 4 N O) V O d' c-) L OL OO CD LO CV W O N d C I- co CO m C.) U O O o 0 0 0 N U a 0 Q O m CD CO In O O d' co co o 0) 0) o Z O N O CA v- 0 0 0 0 0 0 0 +- O LO LO LO LO LO LO l0 LO d' d- d' V d' d' O O O o O O O O Q U Q r dr CO d or N CO Q 0 0 0 0 0 d' O N co d' LO CO f` CO U0 O r N CO d LO Q 1-Cn SEDIMENT BASIN CALCULATIONS FOR ABINGTON PLACE MASS GRADING PLAN September 23, 2005 LOCATION: Tax Map 32 Parcel 46 Albemarle County, Virginia PREPARED BY: Rivanna Engineering & Surveying, PLC P.O. Box 7603 Charlottesville, VA 22906 P: 434.984.1599 F: 434.984.8863 TEMPORARY SEDIMENT BASIN PROJECT Abington Place PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 9/23/2005 LOCATION BY JMS INPUT DRAINAGE AREA 10.40 ac BASIN VOLUME DESIGN WET STORAGE 1. MINIMUM REQUIRED VOLUME 696.80 cy 2. AVAILABLE BASIN VOLUME AVERAGE END AREA - BASIN VOLUME ESTIMATES ELEVATIOt AREA VOLUME VOLUME TOTAL ft sf cf cy cy 532 3,200.00 8,277.00 306.56 534 5,077.00 306.56 14,433.00 534.56 536 9,356.00 841.11 22,788.00 844.00 538 13,432.00 1,685.11 REQUIRED WET STORAGE VOLUME 696.80 cy APPROX. ELEVATION 535.29 x, 3. EXCAVATE CUBIC YARDS 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 348.40 cy 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 534.30 1 6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL INVERT DEWATERING ORIFICE R'QD 535.29 INVERT DEWATERING ORIFICE USED 535.30 APPROX. VOLUME AT INVERT USED 703.01 cy DISTANCE FROM INVERT TO C/O LEVEL 1.00 ft DISTANCE ACCEPTABLE WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7. MINIMUM REQUIRED VOLUME 696.80 cy 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER 1 537.40 APPROX. AVAILABLE TOTAL VOLUME 1426.75 cy ADEQUATE DRY STORAGE VOLUME f 9. DIAMETER OF DEWATERING ORIFICE q 0.90 cfs d(1 ST ITERATION)5.80 In d(2nd ITERATION)6.19 In d(3rd ITERATION)6.22 In d(4th ITERATION)6.23 in USE d 6 In 10. DIAMETER OF FLEXIBLE TUBING 8 In STANDARD SIZE Page 1 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abington Place PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 9/23/2005 LOCATION BY JMS PRELIMINARY DESIGN 11. PRELIMINARY DESIGN ELEVATIONS: CREST OF RISER 537.40 ft TOP OF DAM 539.40 ft DESIGN HIGH WATER 538.20 ft UPSTREAM TOE OF DAM 529.00 ft BASIN SHAPE 12. LENGTH OF FLOW / EFFECTIVE WIDTH: SURFACE AREA OF NORMAL POOL 9100 sf LENGTH OF FLOW PATH 108 it EFFECTIVE WIDTH 84 ft L/We 1.28 BAFFLES REQUIRED RUNOFF RATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CON STRUCTION AND MINIMUM Tc VALUE 13. FLOW FROM 2 -YEAR STORM C:0.50 Tc:5.0 I:5.5 In /hr Q=28.6 cfs 14. FLOW FROM 25 -YEAR STORM C:0.50 Tc:5.0 I:8.1 In /hr Q=42.1 cis PRINCIPAL SPILLWAY DESIGN 15. REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY? (YIN)Y REQUIRED SPILLWAY CAPACITY:28.6 CFS 16. ASSUMED AVAILABLE HEAD: ELEV. OF CREST OF E.S. IF USED:538.00 ASSUMED AVAILABLE HEAD=0.60 ft 17. RISER DIMENSIONS: I RISER DIAMETER:36.00 In From Plate 3.14 -8 or Calcs) ACTUAL MAX. ELEV.:537.40 tt From Calcs if appropriate) ACTUAL HEAD:0.00 ft From Plate 3.14 -8 or Calcs) 18. BARREL LENGTH: BARREL LENGTH:33.00 ft BARREL INVERT OUT:529.00 ft HEAD H ON BARREL:8.40 it From Plate 3.14 -7) 19. BARREL DIAMETER: BARREL DIAMETER:24 In From Plate 3.14A or 3.14B) 20. TRASH RACK AND ANTI- VORTEX DEVICE: DIAMETER:48 In From Plate 3.14D) HEIGHT:24 in Page 2 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abln •ton Place PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 9/23/2005 LOCATION BY JMS EMERGENCY SPILLWAY DESIGN 21. REQUIRED SPILLWAY CAPACITY: Qe = 0(25 -0. =13.5 CFS 22. DIMENSIONS: BOTTOM WIDTH kb):18.00 ft From Table 3.14-C) - SLOPE OF EXIT CHANNEL s:0.04 ft/ft From Table 3.14-_C) MIN. LENGTH EXIT CHANNEL x:33.00 ft From Table 3.14-C) ANTI-SEEP COLLAR DESIGN 23. DIMENSIONS: DEPTH WATER @ CREST OF P.S. U:8.40 ft SLOPE UPSTREAM FACE DAM 2.00 :1 SLOPE P.S. BARREL (Sb):6.10 % LENGTH BARREL IN SAT. ZONE (Ls 60.00 ft From Plate 3.14-11) 24. NUMBER OF COLLARS: I NUMBER REQUIRED:2 from Plate 3.14-12) DIMENSIONS:5.0 ft"2 jFrom Plate 3.14-12) FINAL DESIGN ELEVATIONS 25. ELEVATIONS: TOP OF DAM:539.40 ft DESIGN HIGH WATER:537.40 ft EMERGENCY SPILLWAY CREST:538.00 ft PRINCIPAL SPILLWAY CREST:537.40 ft DEWATERING ORIFICE INVERT:535.30 ft CLEANOUT ELEVATION:534.30 ft Page 3 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abington Place, EnS PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #2 DATE 9/23/2005 LOCATION BY JMS INPUT DRAINAGE AREA 8.90 ac BASIN VOLUME DESIGN WET STORAGE 1. MINIMUM REQUIRED VOLUME 596.30 cy 2. AVAILABLE BASIN VOLUME AVERAGE END AREA - BASIN VOLUME ESTIMATES ELEVATIOI AREA VOLUME VOLUME TOTAL ft sf cf cy cy 544 2,037.00 7,711.00 285.59 546 5,674.00 285.59 15,224.00 563.85 548 9,550.00 849.44 23,231.00 860.41 550 13,681.00 1,709.85 REQUIRED WET STORAGE VOLUME 596.30 cy APPROX. ELEVATION 547.03 3. EXCAVATE CUBIC YARDS 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 298.15 cy 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 546.20 f I I 1 6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL INVERT DEWATERING ORIFICE R'QD 547.03 INVERT DEWATERING ORIFICE USED 547.20 APPROX. VOLUME AT INVERT USED 663.44 cy DISTANCE FROM INVERT TO C/O LEVEL 1.00 ft DISTANCE NOT ACCEPTABLE -1' R'QD WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7. MINIMUM REQUIRED VOLUME 596.30 cy 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER 1 548 APPROX. AVAILABLE TOTAL VOLUME 1268.75 cy ADEQUATE DRY STORAGE VOLUME 9. DIAMETER OF DEWATERING ORIFICE Q 0.76 cfs d(1ST ITERATION)5.59 In d(2nd ITERATION)6.06 In d(3rd ITERATION)6.11 In d(4th ITERATION)6.11 In USE d 6 in 10. DIAMETER OF FLEXIBLE TUBING 8 In STANDARD SIZE Page 1 Abington - SB.xis TEMPORARY SEDIMENT BASIN PROJECT Abington Place, EnS PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #2 DATE 9/23/2005 LOCATION BY JMS PRELIMINARY DESIGN 11. PRELIMINARY DESIGN ELEVATIONS: CREST OF RISER 548.90 ft TOP OF DAM 550.80 ft 1 DESIGN HIGH WATER 549.30 ft UPSTREAM TOE OF DAM 541.00 ft BASIN SHAPE 12. LENGTH OF FLOW / EFFECTIVE WIDTH: SURFACE AREA OF NORMAL POOL 8500 sf LENGTH OF FLOW PATH 90 ft EFFECTIVE WIDTH 94 ft 1/We 0.95 BAFFLES REQUIRED RUNOFF RATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE 13. FLOW FROM 2-YEAR STORM C:0.50 Tc:5.0 5.5 In/hr 0=24.5 cfs 14. FLOW FROM 25-YEAR STORM C:0.50 Tc:5.0 8.1 in/hr Ct.36.0 cfs PRINCIPAL SPILLWAY DESIGN T 15. REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY? (Y/N) REQUIRED SPILLWAY CAPACITY:24.5 CFS 16. ASSUMED AVAILABLE HEAD: ELEV. OF CREST OF E.S. IF USED:549.30 ASSUMED AVAILABLE HEAD=0.40 ft 17. RISER DIMENSIONS: 1 RISER DIAMETER:36.00 In From Plate 3.14-8 or Calcs) ACTUAL MAX. ELEV.:548.90 ft From Calcs if appropriate) ACTUAL HEAD:0.00 ft From Plate 3.14-8 or Calcs) 18. BARREL LENGTH: 1 BARREL LENGTH:37.00 ft BARREL INVERT OUT:540.30 ft HEAD H ON BARREL:8.60 ft From Plate 3.14-7) 19. BARREL DIAMETER: 1 1 BARREL DIAMETER:24 In From Plate 3.14A or 3.14B) 20. TRASH RACK AND ANTI-VORTEX DEVICE: DIAMETER:48 In From Plate 3.14D) HEIGHT:24 In Page 2 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abington Place, EnS PROJ NO BASIN #TEMPORARY SEDIMENT BASIN #2 DATE 9/23/2005 LOCATION BY JMS EMERGENCY SPILLWAY DESIGN 21. REQUIRED SPILLWAY CAPACITY: Qe = Q(25)-Qp =11.6 CFS 22. DIMENSIONS: BOTTOM WIDTH (b):16.00 ft fFrom Table 3.14-C) SLOPE OF EXIT CHANNEL (s):0.04 fVft From Table 3.14-C) MIN. LENGTH EXIT CHANNEL (x):33.00 It From Table 3.14-C) ANTI-SEEP COLLAR DESIGN 23. DIMENSIONS: DEPTH WATER @ CREST OF P.S. (Y):7.90 ft SLOPE UPSTREAM FACE DAM 174 2.00 :1 SLOPE P.S. BARREL (Sb):7.30 % LENGTH BARREL IN SAT. ZONE (Ls):70.00 ft From Plate 3.14-11) 24. NUMBER OF COLLARS: r NUMBER REQUIRED:2 From Plate 3.14-12) DIMENSIONS:5.3 ft"2 From Plate 3.14-12) FINAL DESIGN ELEVATIONS F 25. ELEVATIONS: TOP OF DAM:550.80 ft DESIGN HIGH WATER:548.90 ft EMERGENCY SPILLWAY CREST:549.30 ft PRINCIPAL SPILLWAY CREST:548.90 ft DEWATERING ORIFICE INVERT:547.20 ft CLEANOUT ELEVATION:546.20 ft Page 3 Abington - SB.xls EROSION AND SEDIMENT CONTROL NARRATIVE FOR ABINGTON PLACE AT HOLLYMEAD TOWNCENTER February 28, 2006 LOCATION: Tax Map 32 Parcel 46 Rivanna District, Albemarle County, Virginia DEVELOPER Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 434.984.1599 F) 434.984.8863 A. MINIMUM STANDARDS (MS): All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. CONCENTRATED RUN -OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 1 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall t e provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected sc that sediment -laden water cannot enter the conveyance system without first being filter ed or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining sh.ill be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structur s s if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in -my six month period, a temporary stream crossing constructed of nonerodible materials shut all be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing lip --•e watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches c. Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adver --- ely affect flowing streams or offsite property. d. Material used for backfilling trenches shall be properly compacted in order to minim – ate ize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 2 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E &S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24 -hour duration. B1. PROJECT DESCRIPTION: The purpose of this project is to build an 88 lot townhouse development. The total area to be disturbed by this project will be 14.1 acres. B2. EXISTING SITE CONDITIONS: The site is currently grassed with mixed deciduous trees. The current vegetation is small trees and brush. The existing topography is rolling terrain with slopes of 10 -20 %. B3. ADJACENT AREAS: The site is bounded to the east, west and south by the Hollymead Towncenter development, which is mixed use. To the north is the existing Deerwood subdivision. B4. SOIL DESCRIPTIONS: According to the Albemarle County Soils Survey conducted by the United States Department of Agriculture Soil Conservation Service, the primary soil types that may be disturbed during this scope of work have been identified as the following: 1. Loisburg sandy loam (47C) — Permeability is rapid, surface runoff is rapid, and the hazard of erosion is severe. Hydrologic group B, K factor .24 2. Wedowee sandy loam (94B) — Permeability is moderate, surface runoff is medium, and the hazard of erosion is moderate. Hydrologic group B, K factor 28 3. Wedowee sandy loam (94C) — Permeability is moderate, surface runoff is rapid, and the hazard of erosion is severe. Hydrologic group B, K factor .28 3 B5. CRITICAL AREAS: The stream along the north property line with Deerwood subdivision is a critical area, and a 50' undisturbed stream buffer must be maintained. B6. EROSION AND SEDIMENT CONTROL MEASURES: Unless otherwise indicated, all erosion and sediment control practices will be constructed and maintained according to the minimum standards and specifications as set forth in the Virginia Erosion and Sediment Control Handbook, latest edition. The minimum standards of the Virginia Erosion and Sediment Control Regulations shall be adhered to unless otherwise waived or approved by variance. SAFETY FENCE (SAF) — 3.01 Safety fence will be installed to prevent access to erosion control measures. Location and details are shown on the plans. TEMPORARY CONSTRUCTION ENTRANCE (CE) — 3.02 An asphalt pad shall be constructed at the entrance of the project site to provide a means of removing sediment from the tires of construction vehicles leaving the work site. The Contractor shall remove any mud from the existing road surface by means of sweeping and shoveling, in the event the asphalt pad is not adequate in sediment removal. SILT FENCE (SF) — 3.05 Silt fencing will be installed as a first step in construction activities. Location and details are shown on the plans. STORM DRAIN INLET PROTECTION (IP) — 3.07 A sediment filter around a storm drain drop inlet or curb inlet used to prevent sediment from entering storm drainage systems prior to permanent stabilization of the disturbed area. Location and details of inlet protection are shown on the plans. CULVERT INLET PROTECTION (CIP) — 3.08 Culvert inlet protection will be installed according to Virginia Erosion and Sediment Control regulations. Location and details are shown on the plans. TEMPORARY DIVERSION DIKE (DD) — 3.09 A temporary diversion dike will be installed before site grading begins, for the purposes of diverting storm and sediment -laden runoff to the appropriate outlet or trapping facility. Location and details are shown on the plans. TEMPORARY RIGHT -OF -WAY DIVERSION (RWD) — 3.11 Temporary right -of -way diversion will be installed to shorten the flow length within a sloping right -of -way, thereby reducing the erosion potential by diverting storm runoff to a stabilized outlet. Location and details for the right -of -way diversion are shown on the plans. TEMPORARY SEDIMENT TRAP (ST) — 3.13 A temporary sediment trap will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment traps are shown on the plans. 4 TEMPORARY SEDIMENT BASIN (SB) — 3.14 A temporary sediment basin will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment basins are shown on the plans. OUTLET PROTECTION (OP) — 3.18 Outlet protection will be installed according to Virginia Erosion and Sediment Control regulations. Location and details are shown on the plans. DUST CONTROL (DC) — 3.39 A variety of methods are available to prevent surface and air movement of dust from exposed soil surfaces and reduce the presence of airborne substances which may present health hazards, traffic safety problems or harm animal or plant life. B7. PERMANENT AND TEMPORARY STABILIZATION: SURFACE ROUGHENING — 3.29 Disturbed areas to be seeded and mulched shall be left in a roughened condition to help decrease runoff velocities and aid in the establishment of vegetation. TOPSOILING — 3.30 Topsoil may be stripped from the area to be graded and stockpiles for later use. All stockpiles which will be left dormant for more than 30 days shall be temporarily seeded. A topsoil stockpile may be selected onsite by the developer and shall be temporarily protected with surrounding silt fencing. TEMPORARY SEEDING — 3.31 Temporary soil stabilization shall be applied within 7 days to denuded areas that may not be at final grade, but will remain dormant (undisturbed) for longer than 30 days and less than 1 year. This includes, but is not limited to areas such as soil stockpiles. Seeded areas shall be limed when necessary at a rate of 2 tons per acre, and fertilized at a rate of 450 lbs. per acre of 10 -20 -20 (10 lbs. per 1,000 square feet) or equivalent. A Temporary Seeding Schedule is attached for proper seed selection. PERMANENT SEEDING —3.32 A perennial vegetative covering shall be established on disturbed areas within 7 days of being brought to final grade on areas not otherwise protected. Selection of the seed mixture shall depend on the time of year it is to be applied according to the Permanent Seed Schedule as shown on the drawing. Seeded areas shall be limed when necessary at a rate of 2 tons per acres, and fertilized at a rate of 1,000 lbs. per acre of 10 -20 -10 (10 lbs. per 1,000 square feet) or equivalent. MULCHING — 3.35 All seeded areas shall be mulched with straw immediately following seeding operations. Straw mulch shall be applied at a rate of two tons per acre. SOIL STABILIZATION BLANKETS AND MATTING — 3.36 Soil stabilization matting shall be applied in the conveyance areas of the designed diversions to help reduce velocities and aid in the establishment of vegetation. A detail showing the proper materials and installation is shown on the plan. 5 B8. SOIL STOCKPILES AND BORROW AREAS Fill material for this project will be obtained from the Hollymead Towncenter -- Area A property. An erosion plan has been approved for that property. B9. STORM WATER MANAGEMENT: Hollymead Towncenter Stormwater Management Facility SWM -2, which is just upstream of the site, provides stormwater detention for this development. B10. MAINTENANCE SCHEDULE: A program of maintenance for the erosion and sediment controls specified in this narrative and shown on the plans are recommended as follows: 1. The Site Superintendent or his representative shall make a visual inspection of all erosion and sediment controls on a daily basis until the site is stabilized and especially after a heavy rainfall to assure that all controls are in place and that none have been damaged. Any damaged control shall be repaired prior to the end of each workday to include re- seeding if necessary. 2. All silt trapping devices shall be cleaned out at 50 percent capacity and sediment shall be disposed of by spreading on site or hauling away if not suitable for fill. 3. Gravel outlets shall be checked regularly for sediment buildup that may prevent drainage. Controls shall be inspected and repaired after each rainfall and cleaned if sediment has accumulated to half of the device's original height. 4. All earthen structures such as diversion dikes and berms shall be checked daily during construction for breaching by equipment. Repairs shall be made immediately. 5. Silt fences shall be checked after each rainstorm to assure they have not fallen or become clogged with silt. All repairs shall be made immediately. 6. All seeded areas shall be inspected regularly to see that good stand is maintained. Areas will be re- fertilized and re- seeded as necessary. 7. After construction operations have ended and disturbed areas have been stabilized, all berms and sediment - trapping devices may be removed after removal, the ground shall be restored to its natural or proposed condition to include establishment of permanent vegetation. Removal of any control is contingent upon approval of the County Inspector. 6 EROSION CALCULATIONS FOR ABINGTON PLACE AT HOLLYMEAD TOWNCENTER March 2, 2006 LOCATION: Tax Map 32 Parcel 46 Rivanna District, Albemarle County, Virginia OWNER: Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC. 1350 Stony Point Rd. Charlottesville, VA 22911 434) 984 -1599 F: (434) 984 -8863 Fl ^M Cr) cn N N N N N N N CC O Q W W W W W W N L COO CO r CO N U O O O O O O r r O C N- N N CD O CO C O r N N V' Ln CD CD 0 r o N 7 co Lf) C) CO CD V N O 0) CO n CD CO CD CO co Ln Ln Ln d OoIIC C_ 0 J 0 N CD 0.. CO N- CO h r N W O O O O r r U 0 Ln N LO O O J N O CO CO CD d C W N N N N C) N O o Ln C- ( n r N CD CO O O O O O O a La U L C) N t t O V W C N N CO CO La Ln La L() La La C U 0 0 0 0 0 0 0 0 r N 0 0 0 0 0 0 0 c LO 0 0 0 0 0 0 O N N V V V V V a> p 0000000 CC n 0 0 CO CO 0 0 0 0 CO V 6 0 0 0 0 0 0 0 O C) V N co N O o r CO O r N N C'') C") N N N r r 0 N O CO In V' CO CO Ln Ln . Y 4 V V V 7 U N N CA 7 0 7 Ln ID CD h.: I CD O) CA U W O N V ( D N- W CO 0 N U U O O O O O O N N U J < <d 0 0 co CD N ) o 0) 0 Z LO CO rI o COC 0) rn 0 o 000000 - 0 1— 1010101010101010 Z v V v v ' 7 7 7 v O 0000000 Q 0 N LO CP N N CO CO Q Q C) Q O N N Q O O O O V O N CO V la CD CO f-CD p00 o r N CO V LO CD L• CD F- aaaa n a n o n a a a n Y F F- F TH F- F F N ui u u) i ai N N N N N N C) C C) C) N M M C C) C) E U U 0 0000000 U U U U U U CE • 0 C) C) W W W W W W W W W W W W W W W W IL co r V' O CO CO CO CO 0 0 0 C O O V O O W O O O r ci T O O r- r 0 0 0 r h o m ,- r co co LO r N N V V' CD CO LO Ln LO 0 CD 0) CO N. CO CD 0 CO LO CO O V LO r co O N v v O N C) r-: C70 — C') CM C) CO h h n 4,- N N N C) 0 O co CO LO CD V' N CO CO CO n N CD 0 CO CO CO CO CD ') N 0 CA CO I"- 10 V' V' CO CO CO CO ( 0 V' N r o O CD CD O O Ln xi 1. 6 cri Ln CO Ln CC) O CO CD O CO CD a co w 0 0 o) i i c c c c 0 3 CO O CO O LO V' V' CO I` n CO r O r N. ( 0 CO a 0 CO 0 r N .- O) O) 0) 0) O 00 O co 00 0 W O,- ,- r r o o 0 0 0 0— ,- O O U 0 co o) O O C) I- O Ln Q) O O C) O CO I- CO J N CO 0 CO LO 0 V' N V' LO CO CO N r CO N W C W N C) C) N N C7 Ln Ln cC) cn n M N V' C) L Cn O p) r co 0 m 0 0 co v V co Co N CD r O 4:. N CO V' V' V' cn CD CO CO CO V' V' d• V' LO O O O O O O O O O O O O O O O O V O co L co N N CO Cti 0 0 N N N 0 w > 0 co co CO LO LO Cn LO LO 10 LO 10 LO Cn LO U) LO LO LO LO U 0000000000000 0 0 0 0 0 0 N O O O O O O O O O O O O O O O O O O O CIO C 0 co co co O 0 O O O O co co cn co O co co co co co O N N N 4 V 4 4 4 4 n n r 4 n n I` V a> COO 0 0 0 Ln co 0 0 LO LO 0 0 0 0 0 0 0 0 0 0 CC a) CO CD N N N 0 0) 0 0 CO N CO 0) N 1 0 0 0 0 0 0 0 0 0 0 ,- 0,- 0 0 0* CO El)O O O O O O O O O O O O O O O O O O O O CON N. V' CO V' O V' O O) O N O O 0 co n N CO J V' N O CO N CO N- CO O O O) CO CO CO CO O r CO O O N N Ln ( D O Cn m O N N N N C) 00 O Cn fA O N r a) 0 COCO N 0 CO n LO d - CO N r 0 0 n) 0) N r 0 O) n CO a LA to d' V' V' d' d' CM C7 Lri Lri V' V' V' m N N 0`C O N. co N 0 V' Cr) LO N h O V r O co co co T 4 IL 0 U Ln Ln 0 CD co CO O 6 O,- r Ln Ln O n LC) n 0) N O) cn r- LO V' V' CO N• Cl V' 0 N CO V- O) co N a3 O V' LO N M O) N CO V' 0) r N CO r N CO C) CO 1- 0 C U O O O — r,- N N N N C) C) C) 0 0 0 0 0 0 Q Q E O 0 O O V' N. N CO CO O) 0 0) N O 0) 0 I- ( 0 LO I` O Q Cr) CO V Ln N CO O V' co O LO LO CO 0 Cr) V' CO .: Q O CO ,- CO r L0 Ln N 0 O O LO ,- ,- O O O O co .,- N c O O O 6 O O O O O O O O O O O O O 6 O N O 111 1 4Ls) co C LO LO LO LO LO LO L LO LO LO LO LO LO LO co L co _ C V' V' V' V' V' V' V' V' V' V' 1" 1' V' CO V' V' d' V' st CO L 0 0 0 6 0 0 0 6 0 0 6 0 O 0 0 d 0 0 0 - j 0 0 c O O 0 N CO I CO t N 0 N CD V' CO CO CO h CO O I . - - o N CO Cr) V N N CD N N N CO N,- N r r 0 r- CO N N O O O r O r 0 0 6 .— 0 0 0 O O O O 6 O U 0 0 OO C OO n CD LO V' CO N 0 n N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C I- ,- C N T + + + + + n 0 U W U — N CO C Ln CD N O 0) CO I-- ( D LO Cr CO N ,- o O N N N T 0 0 0 0 o tL 0 0 0 0 0 O r N CO + LO SEDIMENT BASIN PROJECT Abington Place PROJ NO. BASIN #SEDIMENT BASIN 41 DATE 2/24/2006 LOCATION BY ABB INPUT DRAINAGE AREA 10.15 ac BASIN VOLUME DESIGN WET STORAGE 1. MINIMUM REQUIRED VOLUME 680.05 cy 2. AVAILABLE BASIN VOLUME AVERAGE END AREA - BASIN VOLUME ESTIMATES 1 1 1 516.4 0.00 0.00 346.10 12.82 516.5 6.922,00 12.82 7,239.00 268.11 517.5 7,556.00 280.93 7,876.00 291.70 518.5 8,196.00 1 572.63 17,692.00 655.26 520.5 9,496.00 1,227.89 16,530.00 612.22 522 12.544.00 1,840.11 REQUIRED WET STORAGE VOLUME 680.05 cy APPROX. ELEVATION 518.75 3. EXCAVATE CUBIC YARDS 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 340.03 cy 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 517.62 6. DISTANCE FROM DEWATERING ORIFICE TO CIO LEVEL INVERT DEWATERING ORIFICE R'QD 518.75 INVERT DEWATERING ORIFICE USED 519.00 APPROX. VOLUME AT INVERT USED 754.98 cy DISTANCE FROM INVERT TO C/O LEVEL 1.38 ft DISTANCE ACCEPTABLE WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7. MINIMUM REQUIRED VOLUME 680.05 cy 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER 521.50 APPROX. AVAILABLE TOTAL VOLUME 1505.25,cy ADEQUATE DRY STORAGE VOLUME 9. DIAMETER OF DEWATERING ORIFICE 0 0.94 cfs d(1ST ITERATION)5.65 in d(2nd ITERATION)5.96 in d(3rd ITERATION)5.98 in d(4th ITERATION)5.98 in USE d 6 in 10. DIAMETER OF FLEXIBLE TUBING 8 i STANDARD SIZE Page 1 ABINGTON- REV- SB1.XLS Abington Place Subdivision Sediment Trap Calculations NO. A B C X W WEIR DRAINAGE WET D1 Al Al DRY D2 A2 A2 LENGTH AREA VOL.Req) Prov) VOL.Req) Prov) 1 549 552 554 3 2 9 1.51 2732 3 1071 1133 2732 2 1660 1698 ABINGTON -REV SEDIMENT TRAP.XLS 3/2/2006 I N n i 0 I N gtitn'' s--- " by I Ia ry 1 N O r I fi I 443 § m" I 7111.„ I i 1 e' y: I t trt A c z • c N, i a" F • l i...... L...... r....... t r:: : ' :, I11 ' :,_ ir d lr 9 4 t I 1 II T 1 1 4„,, i . ,. II i A MAN ayvavd o I m il 1f5liytunw. A i .,, el: te• c y x JP n 1o I i• }¢ ar a i c i. I Ii f I I II I Alnd anaui7 OP -- --- w ® 1 . 1 1 1 z i i 1 if e , . 1 4,-. 11-4, a lit i t 1f ; 1 1 1! i I 1 1 iaTle iat i to°- z 5" , r 1 i t a •- i a 1 it'''. i T",. IN... 1 , i T I g o, 1 2 l r 91— j j 1 s 1 Livingston Drive 0 1 t 1 Il 1 0 ' Pub lic R P pp I. w 3 B 1 1 vvti - 3, z,1 1 7 I I Il 1 A v 84' GA 4 .°.'-. 3' a Wit; t i a O u " q• T T R Ssqq)) 1 T m cr, Timberv ao,l Dl 7 1 STORM SEWER CALCULATIONS FOR ABINGTON PLACE SITE PLAN July 29, 2005 LOCATION: Tax Map 32 Parcel 46 Albemarle County, Virginia PREPARED BY: Rivanna Engineering & Surveying, PLC P.O. Box 7603 Charlottesville, VA 22906 P: 434.984.1599 F: 434.984.8863 0) m0) D 1) m0) D 0) 0) n cn 0) mcn0) cnU) 0)(1) U) 0) cn0cn0) i0) m0) mm 0) 0) 0) 0)cncn 7 1-4 H m I 1 i i 1 - 1 1 - 1 1 - i i - I - i H - 1 1 7 1 - i 1- 1 1 N W p 1, 66 V W N N O -• i j j N N N NM MN N N N N D D D C O o 1 N co WW noco 0" N W4 N v, c V m StructureNumber co 0 0 0 z 0 0 0 Z OK 0 0 0000 0 0 K 0 00 0 00000 0 0 00 00 0 0 0 0 636v D 3 Dc)) 63O3 4 W 4 W W 666.) 6 0)( vv C) 636) 00 coca m co m w CO CO CO CO W CO CO CO CO CO CO CO w W W C O C O M M N Inlet Type 7 7 7 w W w a w Curb Opening W N W W NNW W WW W W m A N m m O W W OW 0) m O O m m 0 M M 03 03 03 0 ) Catchment Area coo 0 0 0 0 0 0 000 0000 0 0 0 0 0 0 0 0 000 0 0 0 0 o w o o 9 W 00 MW 0) M N in 0 A 0 A A M M o N M W N M C A M M 44 M m U, ( O m 61 0) N 4 V O O m Ut ( D W N ( O ( O W mm U, 07 ( D 01 - L O N m 4 O - A A 01 0 0) 0) 0 0 00000 0 0 0 00 00 0000 U, Runoff Coef 000 0 000 0 0 0 0 0000 0 0 0 0 00 m 0 0 0 ( D o Dim Co Co o ' co ' co Co 00 m o io ' co ' co ' co 0) 0)o Co Co co 0101000 0100 00 00 00100 o) CA 900 0 coo 0 0 0 0 0 0000 0000 0 0 O 00000 000 0 0 0 0 0000 N A N N Mb A b ( . ) N 1 N --• 0 ) 0) N o M M N -+ tO tO W -+ M M MM h A M M 0) A m N O W 0) O N O D m 0 0t ( D A o- 4 N A 401M04 V m O A 01 Mtn 44M0) V Sum CA o) Intensity A A A P 444 44 A A A A A A A . A A A 44 A 44444 A 4 A 44 44 4444Z% r' 666 O 0 0 0 O 66 O b 0666 O O O O bb O O O O O O 666 0 0 bb 6666 OP 0- _ D Q Catchment O" N O O 0 0 O 0 0— 0 O --• O L O O 00-' 00 O O O G m V N m m ( D 0 co Co O V m A -+ Ut ( D A -' A W iV ( D o ' co0 -" 4(0 O Ut W 0 ( D A J V V O O U1 0) - 0) 0 N N N 0) 0 U1 0) O CO V 0) W OA 0) Op 31 0 V Ut ( D N 0) 0) CO A ( D 0) ( D 1 - 0) 0) 0) 0) 3 o Q carryover 5 0 O o-• N o 0 00 0 00" 0 010 0 o 00' 00 0 00 QTotal C 0) V N m m ( o O Co C o b V m A—' ( 11 ( D A—' A W N ( D D ( D -• V ( D 0010) 4, 47) U1 0) -+ 0) O N N N MO Ut 0) O m V 0) W Oo 0) m MO V U, ( D N 0) 0) D A ( D OW 0) 0) 0) 0) O 7 0000 0 00000 00 00 0000 N Gutter Slope 00 00 0 0 0 0 0 0 0 0 66666 0 0 66 6666 66= 7 66= 7 7 mm 66== 0 7 A 000) 0)0) 7 N M N N W W A - P W W NNW W WW W w U1 U1 N N NNw w NW O D W 0) ( D CD CO CO 0) W co 00 0101- - 000 0 000 0 00 0 0 0000 0 0 0 0 00 0 00000 0 0 0 00 00 0000— Pave X slope 666 0 666 0 bb 0 0 0 0 0 0 6666 0 0 0 66666 0 0 0 bb bb 6666 0( 0(0 N N N N N N N N N N N N N N N N N M N N N N N N N 0 ( 0 ( 0 M N M N 0( 0( 0( 0 000 o 000 o 0 0 0 0 0000 0000 0 0 0 00000 woo O o 0 0 0 0 0 0 Z" Gutter X Slope 666 0 666 0 bb 0 0 6666 0 0 0 0 bb 0 66066 0 0 0 66 bb 6666 m m m m m m m m mm m m m m m m 0) 03 m m mm m m m m m m m m m mm mm m m m m 01 Total Gutter 4 100 7 D7 7 A W V m 4 M 7 7 M7 N Ut N N N w MV= on m U, c o w O Spread Vow w in-. W w wW W W Vv,( a mew w oW D o- v 0) 010) w W bb mrn( D(D 0 0 0 o 00 0 0 0 0 00 o o o o Depth at Curb • MMO N N 9 N N M M N N — ' 0 0 ,' M° O O O O f 7 Mm= 7 Lm== cn 7 V W Q1 m 01( 0 7 M M iV N ( D ( D A 0) 0) w V N w a) A) 0) W CO O) N N. r 0) m m 0) N V V A N V W W NN mm co 0 0 o cO ( D 0 0 0 0 00( 00 0 ( 0 0 0 D o o 0 moo o 0 0 0 0( 000 V% Efficency 400 0 040 0 Om 0 0 O m 0 V 0) - 0 MO 0 m O O m O O ( D ( D 00 00 3101 0 0 0 0 0 0 0 0 0 0 o W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a 0 0 0 0 0-+ N o 0 00 O co- Lo O- 0 -• 0 0000 O oo 0Qintercepted m V N m U1 m m Co O V • m o f Ut ' 0 A " A W o 0 O O" V ( D D A A co Cr) O o" 0) M" N 0) O U7 0) A m W m N W O) m mw V 0)( 0(003 0( 0(0 O M V V O m 000 0 00" 0 0 0 0 0 0000 0 0 0 0 0 0 0 00000 0 0 0 00 00 00 03 Q Bypassed 666 0 6 0 bb 0 0 0 0 0 0 0 0 0 0 bb 0 6 0 0 0 bb bb 66 400 O 4" N O 00 0 0 0040 01 0 0 MO 0 N O O N O NO 00 CO 0000 o Midpoint Depth N Curb Height w n 5 N D/ H 9NNlicipointSpread A. STORM SEWER CALCULATIONS FOR ABINGTON PLACE SITE PLAN July 29, 2005 LOCATION: Tax Map 32 Parcel 46 Albemarle County, Virginia PREPARED BY: Rivanna Engineering & Surveying, PLC P.O. Box 7603 Charlottesville, VA 22906 P: 434.984.1599 F: 434.984.8863 1) 0(n WW(/) n0) 1) 1) CnCnC1) C1) W( n0)U) n0) 1) Cn( n0)( n( n 0) 0)0) n0) n0) 0) Cn(nW TM 1 - I - 1 m 1 - 1 - 1 1 4- i 4 I 4-- 1-- 1-- 4 4- 4- 1- 4 71- 71 1 4-- 4H- 4--- 4 I - 4 - 4 I - I 1-- 1 4-- 4-- 4- 4 o 1 1 1 1 — 1 1 1 1 N W P) A ( J1 6) m 1( 10 60 00 O N N N 6r6 N N N N N N 5 O D D D W 0--. ND cno) Jm wA co 0( 0( 0(( 0(0 0.-. m wA mm ) O 40) 1 co n ( n n n ( n ( n n n ( n n n n ( n ( n ( n p ( n W ( 1) OW 0 n w ( n 0 ( n n ( n ( n n ( n n . p W M c - 1 - 1 H H- 1-4 I I - I I 1 1 - 1 - 1 - 1 c - I H H c - 1 c I - 1 - I - 71 1 - 1 - 1 1- I 4- i cc -- 4 - 1 - 1 0 D-. N W W A ( 11 0) 0) J W CD 60 Cb j N-. --• -. N N N N N N N N N N 0- 01 0) J A W O w o CD ( O coo-. mw mm N ( n 0) J N O D w o U D 5 o v0 w 0- 000 O O O O O O 000 0000 0 0 N N O O O -• 000 00 ow 00) P m W W PP W w N N o O A P A -• A W N O O N W N J W A— W W A o m + - ( O W 0( 71(0 0) O' 1 0) N A Jo D m 71( 0 0( 0(00) Q M J J ( D 01 1 0 N ) ( 0 - 4 ' 0- 71 J 0) 00)0) O M O G D A 0 0 0 0 00000 O O O 00 00 0000 000 O 000 O 0 i 0 0000 0 0 0 0 00 00 m m J 0) 0) m V 0) - J 0 0( 00) 0) C O M M 0) m 0 01 m 0 ( 0 0) 0) 00) 0)0) 0) 01 m 010) 000 0100 00 001 001010 n • o m 000 0 000 O O O O O 0000 0000 O O N N 0 0 0 1 cop O O cm 00) 0)0 N 0) N Mb- ' 0 0) - ' 0) 0) 0) 1 m N N W 0) 0)-' 0) 0) W W 0) r \ ) \ ) 0) 01 N 00) 0) 0 N O D 0) 0 0 1 ( 0 . t O -• A m N N ( n m ( c 0) Imo A O1 m O A W N 0) D D o c m c 4 . 0) 0 ) 0 NN- O 1 O 0 0000 0000 O O N 10) 0) 00 N N 01 4 0) o N 40) 0) N 0) A 1 A J 0) O) N 0- 0) 710) m 0) 0010) 00)( 7 4M 0) W IV m A N O A O N CO CO 01 O A CO O O) m CO Co A CO m 0) A A N N O m W O1 0) O N A D ( n n 0 1 -, Co 0) 3 0 o r 0 J m 0) O) O1 0) 0) ( n n n 01 01 n m 01 ( n n ( n ( n 01 n ( n O 0) Ot ( n ( n u1 O ( D ( c n o D ( D ( O ( n v N A W N O L- O 14. O O 0) 0)-'01 hp O D 0 ) 0) 0) - ' 0 WWI., A O7 w W v O O D 7 O 5- O Z m 0) ) m 0))) m 0) m m m m 0) m m 0 3 ) ) ) mm U1 0) 030) 0) 0) n ( n ( n 0) m men m ( n 01 m m y 3 A A A Co n 01 m CO 0) J Co Co J J J CO J J m CO V m 0) Go J V J CO J V J V CO Cu CO 0) 0) Co Co A m m mm 1 N O 3 1 4 01 - ' 01 J -• 1 J -• A 0) 0) 01( 0-' 0 ) - J ( 0 0-' 0) J0) 0)-' 0 7") 1.1g 0)3 o N N N 1 1 0)-'-'- 0 0) 010) J 01 N OM s W n A A 1 0101 W N W.- A 00) 0) 0( 0 N O M C4- M W V A -+ CD p co ' co 0) A J -• -• W m ( n N N 01 N 0) CO 0 -• CO 0) 01 N W ( D W ( n N A W J N 0) A A J W A Co 1) C O M M J 0) 0)0) CO CO -- 4 m 0) 45. 01(00) 00). W W m 0103. 45. 0) 0) 1001 4M 45) 010( 00 m5 c0 0 01 Cn 01 01 01 T1 O1 Cr 01 01 11 Cn Cn O1 ( n 01 Ol n 01 01 Ol cn n 01 O1 ( n N Ol 1 0) 0)45) 01( 10) 4 01010101 01 m n M4 m MN- 4-.4M 01010) 0) 0) 4- 4 A m 0) 0) O 0 45) 4 0) 0)'-) 01 -• n n 0) 0) 01 A A 0 M W A J 0) 000)0) 0( 00) 0) W ow D -+ N A m O A 9 —' —' 45) 0) n A V O A m 0 A N 0) m O CD 0) O'-' 401 O M 0b10 0) 0)45) O1 A J N 01 0 0) 05. 45. 0) 01 606 P m N 0000) 01 w-..-- 40) O 01 045) 00 m Ob C S m 0) 01 n 01 m 01 n ( n ( n ( n n n n 01 ( n ( n ( n n 01 ( n n ( n n ( n n 01 ( n ( n 01 N N 01 CO W n 01 01 O1 01 ( n co W n 0) 0) J J m n O1 0) 0) 0) 0) J A U7 m 0) j O 1.)— N, m W A 01 m m m N W W A m A A m W M m N O 1 o 4 ( O O m 0) J N m O A W p • MNN N N m A A 0 01 n O1 Co -• A O A J O O m N --• m 0) 0) ( n W 0) 01 1 W O O D O. N En co m 0) 01 W O J O W 01 m A m W V fV W m O J ( D O O W N N O L 0) O 0) O O O O O _ o ( D O N co , • N O O W -• 4C0 01 0) Co - ' 0) 0 ) N ( D NO N O W N A W - 0) M4 0) A N A N W ( n J N O cm A 0) J m A N 01 m m m m O W 01 m 01 m A m 1) t_ n m 0 4 D b m A n S) o N O co o N, A N N NN i- j 1 N O m W 0 N J N O W 09( 71 NN W N N A N N n O O O O O -+ D N in O1 0 0 0 0 o m A J O ( n 0) CO A O CO O 0) ( n W O o 0 A W O N 000 n O W C M n N n O O O O O J 01 4M A 0 - ' 0 01 0 O ( D A 00 M M J m O J A 0) 0)45) 0) - -' - ' AAA Amm mm m 01 0) 010101 01() 0101 mm A A mmmm AA 0101 mm N) N) O v ' O 0) 71.45 m-.— N N L N 45 0) - - ' 0) - - ' N N N 1 w Cn 10( 0-' 31( 0(0 W O 0 00) 0)0) 0) W m 40) 01(0 0) 0) A O M m 0) C1 0 ) 3 . ( 0 A A ( n W ( D 0) J W N n A A A Co ( n A 0) m -' O1 01 O 6 ( n N CO CO N 1 01 ( n W ( O ( O J O n n 000) Irv- W 1 0) J J J m 0010) 10 0) -• W w J J W O m -• m mm O 0) 01(005 0) m En En -• ( O N 0) A 0) W -• J A O) 0) 00 m D W A 4 ( O 01 IV Co 0) A ( D Co O1 Co Co IV 7 0 3 o coop J cop O O O 0 0 O O 9000 0000 O O O 00000 cop O O op O J 1 3 bb- 1 0 N N W_ 0) 0-'--' O -• -• O W 00)-' 0)--' 0) 0 -• O A O 01 A N co Cn C/) U) C/) o (! 1 1) 1) (/) J) n Cn ( n ( n 0) 0) 0) W ( 1) 1) ( 1) 1) W Cn C/) W ( 1) 0) ( n Cn MM W ( n W Cn ( n ( n 1771 71- 1-1 m 1 - 1 - 1 1- 1 1 1 I - i - I 71717171 7171 I 7 1 7 1 71 1 71 1- 1 I H 71. 71- 1- 1 g . o N W w 466 Q) J00 N C 6--- 11 NNN NN NN NNNN 3 D W o-- N ncJm wA o D( O DD o-- N wA NN N nrnJrn -• W ( n ( n n n ( n ( n 1) n ( n n n n ( n W ( n O W W ( n O Cn 0 n ( n ( n ( n ( n W ( n ( n n n ( n O OWWM 1 c - 1 - 1 1 1- 1-1 I 1- 1 I 1 1- 1-171 c H - 1 - 1 71 c 1 H - 1 - 1 1 - I 1- 1 H.-- 1 c- 1- 1- 1 0 N W W A 67 Co Co J OD W Co () 0- W ( n 0) J N (-) w o ( 0 n( D O O N N W N N pl ( O V N 0 132. 0 0 w n w 000 O O O O O O PPP O O O O O O N N 0 0 0: 000 O O OW O W N O 1 O1 W 0 pp) C-) N N O1 1 0 0 4 - . : 4 Who O CD N W N V C- W M 4, 6 O1 -- ( O w 07 m ( O 0) n Q) N A V O co W O W N ( O ( O w woo J V ( O ( J7 — O N OO A 0-- L 4... I J7 O 0) W 0 • c7 O c D 7 A 0 0 0 00000 000 O O 00 0000 000 O 000 O 0 O 0 0000 O O O O 00 47 Cp W W W W CD O) V 00 C) D W J Cp V V W O W 00 O) 00 00 Co in O O cn 00 O 4) Co W Co 0) 0) OO Co W m cn cn O O O 01 O O O O O ( 71 O cn cn O O O O O O O O O O 0 O O O 0 O O O O O O o o O O N N O O O -- O O o O O oh) o N N O 1- L'46 N A A N N N O A O W N W N 01 O1 N N 1 W h) 6)-- N IV W (-) A W N N 0 ) 4 . ( 71 N QC) O N O O 0) O Ol ( O A 0--- 1 N N N U) o O 0) 4C00 A Ol M O A W N 0) n 80 O C A W W O N N 1 O O O 0000 0000 coo N A N -- W w W o c N N cn A N o 3 O Ui N J Co Co N O) A A V m Co N CO J• a C ..) T N n O) O CA Ol Cl) W O N A N 0) Co N Co A N 040 N W W m O 4W O 0) N N W A O) U, 0) A 4N N O 0 ) W O 1 O) O N A O ( 71 M O n --- 00 m 37 , => J 1-0 m ( n of O) 0) O) n O m Ot Ot Ot Ol m n crimp J1 Ol ( n m n cn O n ( n O ( O ( D n D O ( O ( O ( Jt V v N A W N O 1 -- ( 0 O V A O O N N - O1 N)- CC 1 0 O m W N 1 0 W W N A U1 CD V O O W O 74 O 0 0) Q)0) m mmm 0) mm m m 90 ) mm mm0) Q) ma) 01 Ommmm W O1 31 mm 31U1 mcn U70) O) v 3 4A . P A Co 31 01 01 0) 0) V OO W V V J CO V J CO CO V W 0) Co V V V CO V V V V Co bo Co in Cr) Co 0) 0 A_ m W 1 1.) a) N O 01 V 00 -- cn V 1 - V- A W W 01 ( O — 0) V ( O O 1 w V 0) W— 0 Q1 3 . N N N 0) O1 N 1 V O1 N O • ( O W O1 A A -- cn 01 W N W 1 A W N O ( O NN-, 0) W..- 1 W 0- 44.-. N O 0 M W W Q1 A V -- -- W 00 01 I) i 10 O1 N 0) 00 O - s W W Cn I) W W W 01 N A ( O V IV ( n A J J W A ( A A O 00 0) V 0) 0) W co O V m 0) A 0) ( O w s ( O N A W w O1 01 0) A N 0) W O Ol V ( O 1 N O1 O 0) O mac O1 O1 O1 O1 O1 O1 ( n O1 O1 O1 01 O1 O1 O1 O1 V1 01 O1 O1 O1 mm mm 31 ( 31 ( 31 01 — 0 j N N m W W 4m O1 Ol Ol 01 J1 O1 01 r14 m 0) V V J 0O O1 O1 0) 0) 0) vv A m 0) 0) O 0 N A W W V 01 01 W W A M W4 V N O O 0) N 0( 00) M O O W 0-' 3'J4 3 O O A 0 N cn n A V O ' 1 cn O A IV O O) O CO Co -- b1 Co -- A 00 O N CO ( O O1 O W w N O1 A V NM 0 0) O A OO O1 01001 0) O1 N O O O W O1 W—'— J 0) 001 0N) 00 13 m o o n . F•• C 0) M M Ol 31010101 O1 01 0101010101 01 0 1 0 1 M M 0101 01010101 1 0 JINN N 01 W 01010101 010101 O1 W O1 0) 0) V V_ 03 O1 O1 0) 0) 0) 0) V A O1 O1 0) _ n. 0 Ou N N N CO A A 0101 31 6 N 4o A A A A O A J O O CO N -- CO 0) Co 01 W 0) O1 1 Co O O D 3 01 W 0) 0) Cn W 0- 4 O Ol Ot m A 00 6) W 01 O 1( 000w N N O LCD OM 0000 0 NO D W 1 4M w O) 00 1 N W NO NO 01 N ( O W N A 1 W O O M4 0) A N A W 001- J 030 0) A 0) J ( 0 . 3' ) 01010) 0) M W W 010) 010) A 0) 0301 M O L4 04. M4 CT C o ( n 7 p)O W N A N N N N 1 1 3 0 01 0 ) L 0 N J N M W 0 0 71 N N o r N A N N N 666 00-' WI.) b n 6666 O W A V 66 0) 0 . 0 ( 0 0 0) 010) 66 6 GJ O N O O O mow O 0) O1 N m O O O O O V O1 V 00 A 0) --- O OO O O ( 0 A O O O 00 V 0) O V j. 0 - u A 03033') A 00 M 0) - 00 01 M O) O1 O1 O1 OI 0 O1 O1 J1 O1 A W OO ( W A 00 O1 O1 0O 0 A A W O7 N p O N N A D) -- -- NN 1 N N A W -- N --- 03N) 3') W A U1 00D- 01( 0(0 w0 0 0( 0(0 40) 0) W 0 J W ( n w N N A app mm 030)( 0 a A A in 1 Co ( O 6 J Ca N n A A A O) in A 0) Co i n 6 O 01 ( n N 0) Co N n 01 Co CO ( O V r . 0 i O) n m ow 403-' CD-' 0) V 4 O m w O O) -- W C0440) 0 O -- W 0) 0) O 0301( 00) Q) 0) in n -- ( O N ( n A 0) W - V a 0) CD ( n 00 D W i 4 V ( O ( n N Co Cr) A CO CD in Co O) N 3 . 5 ( . ; O c o o p - . 000 000 O O O O coop 0000 pp O 99999 coo O O op b - . 4- 0) IV W NO-- O--- - O 1 W O N-- N1 CnO-- O A 11 Om A N O HYDROLOGIC/HYDRAULIC CALCULATIONS FOR ABINGTON PLACE AT HOLLYMEAD TOWNCENTER BIOFILTER-1 March 2, 2006 LOCATION: Rio District, Albemarle County, Virginia OWNER: Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 INDEX Summary:2 Post-Development: DA-A Hydrographs:3-8 Pond & Outlet Structure:9-13 Routed Hydrographs:14-19 Drainage Area Maps are included attached at the end of this report. feN vL 7 Rivanna Engineering & Surveying, PLC Page 1 434) 984-1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Summary Two bio- filters will provide stormwater management for Abington Place at Hollymead Towncenter. Drainage area DA -A flows into Bio - Filter -1. Rivanna Engineering & Surveying, PLC Page 2 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Post - Development Hydrographs Name:DA- Abington 'A' 2 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)17.86 (cfs) Time to Peak (Tp)12.00 (min) Time of Base (Tb)30.00 (min) Volume 0.37 ac -ft) Time Step 1.00 (min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 (cfs) Maximum Storage 0.37 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 6.47 NA 0.69 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)12.00 (min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 0.79 (in) Return Period 2 (yr) Storm Duration 0.20 (hr) Rivanna Engineering & Surveying, PLC Page 3 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Post - Development Hydrographs DA- Abington 2 Ye Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.07 0.00 1.49 2 2.00 0.07 0.13 1.49 2.98 3 3.00 0.07 0.20 1.49 4.46 4 4.00 0.07 0.26 1.49 5.95 5 5.00 0.07 0.33 1.49 7.44 6 6.00 0.07 0.40 1.49 8.93 7 7.00 0.07 0.46 1.49 10.42 8 8.00 0.07 0.53 1.49 11.91 9 9.00 0.07 0.60 1.49 13.39 10 10.00 0.07 0.66 1.49 14.88 11 11.00 0.07 0.73 1.49k6 ^gym 12 12.00 0.07 0.79 1.4917.86,13 13.00 0.00 0.79 0.99 T 14 14.00 0.00 0.79 0.99 15.87 15 15.00 0.00 0.79 0.99 14.88 16 16.00 0.00 0.79 0.99 13.89 17 17.00 0.00 0.79 0.99 12.90 18 18.00 0.00 0.79 0.99 11.91 19 19.00 0.00 0.79 0.99 10.91 20 20.00 0.00 0.79 0.99 9.92 21 21.00 0.00 0.79 0.99 8.93 22 22.00 0.00 0.79 0.99 7.94 23 23.00 0.00 0.79 0.99 6.95 24 24.00 0.00 0.79 0.99 5.95 25 25.00 0.00 0.79 0.99 4.96 26 26.00 0.00 0.79 0.99 3.97 27 27.00 0.00 0.79 0.99 2.98 28 28.00 0.00 0.79 0.99 1.98 29 29.00 0.00 0.79 0.99 0.99 30 30.00 0.00 0.79 0.99 0.00 Rivanna Engineering & Surveying, PLC Page 4 434) 984 -1599 4 Abington Place at Hollymead Towncenter, Bio- Filter -1 Post - Development Hydrographs Name:DA- Abington 'A' 10 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)24.95 (cfs) Time to Peak (Tp)12.00 (min) Time of Base (Tb)30.00 (min) Volume 0.52 ac -ft) Time Step 1.00 min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 cfs) Maximum Storage 0.52 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 6.47 NA 0.69 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)12.00 min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 1.11 in) Return Period User Defined (yr) Storm Duration 0.20 hr) Rivanna Engineering & Surveying, PLC Page 5 434) 984 -1599 Abington Place at Hoflymead Towncenter, Bio- Filter -1 Post - Development Hydrographs DA- Abington 'A' 10 Year Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.09 0.00 2.08 2 2.00 0.09 0.18 2.08 4.16 3 3.00 0.09 0.28 2.08 6.24 4 4.00 0.09 0.37 2.08 8.32 5 5.00 0.09 0.46 2.08 10.40 6 6.00 0.09 0.55 2.08 12.48 7 7.00 0.09 0.65 2.08 14.56 8 8.00 0.09 0.74 2.08 16.64 9 9.00 0.09 0.83 2.08 18.72 10 10.00 0.09 0.92 2.08 20.80 11 11.00 0.09 1.02 2.08 22.87 12 12.00 0.09 1.11 2.08 24.95 13 13.00 0.00 1.11 1.39 23.57 14 14.00 0.00 1.11 1.39 22.18 15 15.00 0.00 1.11 1.39 20.80 16 16.00 0.00 1.11 1.39 19.41 17 17.00 0.00 1.11 1.39 18.02 18 18.00 0.00 1.11 1.39 16.64 19 19.00 0.00 1.11 1.39 15.25 20 20.00 0.00 1.11 1.39 13.86 21 21.00 0.00 1.11 1.39 12.48 22 22.00 0.00 1.11 1.39 11.09 23 23.00 0.00 1.11 1.39 9.70 24 24.00 0.00 1.11 1.39 8.32 25 25.00 0.00 1.11 1.39 6.93 26 26.00 0.00 1.11 1.39 5.55 27 27.00 0.00 1.11 1.39 4.16 28 28.00 0.00 1.11 1.39 2.77 29 29.00 0.00 1.11 1.39 1.39 30 30.00 0.00 1.11 1.39 0.00 Rivanna Engineering & Surveying, PLC Page 6 434) 984-1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Post - Development Hydrographs Name:DA- Abington 'A' 100 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)35.84 (cfs) Time to Peak (Tp)12.00 (min) Time of Base (Tb)30.00 (min) Volume 0.74 ac -ft) Time Step 1.00 (min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 (cfs) Maximum Storage 0.74 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 6.47 NA 0.69 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)12.00 (min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 1.59 (in) Return Period 100 (yr) Storm Duration 0.20 (hr) Rivanna Engineering & Surveying, PLC Page 7 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Post - Development Hydrographs DA- Abington 'A' 100 Year Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.13 0.00 2.99 2 2.00 0.13 0.27 2.99 5.97 3 3.00 0.13 0.40 2.99 8.96 4 4.00 0.13 0.53 2.99 11.95 5 5.00 0.13 0.66 2.99 14.93 6 6.00 0.13 0.80 2.99 17.92 7 7.00 0.13 0.93 2.99 20.91 8 8.00 0.13 1.06 2.99 23.89 9 9.00 0.13 1.19 2.99 26.88 10 10.00 0.13 1.33 2.99 29.87 11 11.00 0.13 1.46 2.99 32.85 12 12.00 0.13 1.59 2.99 35.84 13 13.00 0.00 1.59 1.99 33.85 14 14.00 0.00 1.59 1.99 31.86 15 15.00 0.00 1.59 1.99 29.87 16 16.00 0.00 1.59 1.99 27.88 17 17.00 0.00 1.59 1.99 25.89 18 18.00 0.00 1.59 1.99 23.89 19 19.00 0.00 1.59 1.99 21.90 20 20.00 0.00 1.59 1.99 19.91 21 21.00 0.00 1.59 1.99 17.92 22 22.00 0.00 1.59 1.99 15.93 23 23.00 0.00 1.59 1.99 13.94 24 24.00 0.00 1.59 1.99 11.95 25 25.00 0.00 1.59 1.99 9.96 26 26.00 0.00 1.59 1.99 7.96 27 27.00 0.00 1.59 1.99 5.97 28 28.00 0.00 1.59 1.99 3.98 29 29.00 0.00 1.59 1.99 1.99 30 30.00 0.00 1.59 1.99 0.00 Rivanna Engineering & Surveying, PLC Page 8 434) 984 -1599 I Abington Place at Hollymead Towncenter, Bio- Filter -1 Pond Report Name: Water Quality Pond RATING CURVE LIMIT] Minimum Elevation 516.50 ft) Maximum Elevation 523.00 ft) Elevation Increment 0.20 ft) STAGE STORAGE INFORMATION] Storage Method: User - Defined Storage Input Method: Area Number Elevation Area Ave Area Volume Cumulative Volume ft)sq ft)sq ft)cu ft)cu ft) 1 516.50 0.00 0.00 0.00 0.00 2 520.20 0.00 0.00 0.00 0.00 3 520.30 9496.00 4748.00 474.80 474.80 4 522.50 13545.00 11520.50 25345.10 25819.90 5 523.00 14592.00 14068.50 7034.25 32854.15 DISCHARGE INFORMATION] Structure Number: 1 Type: Name:Stand Pipe Structure Number: 2 Type:Trapezoidal Weir Name:Bio - Filter #1 Weir RESERVOIR STAGE STORAGE /DISCHARGE] Elevation Stage Area Storage Discharge ft)ft)sq ft)cu ft)cfs) 516.50 0.00 0.00 0.00 0.00 516.70 0.20 0.00 0.00 0.00 516.90 0.40 0.00 0.00 0.00 517.10 0.60 0.00 0.00 0.00 517.30 0.80 0.00 0.00 0.00 517.50 1.00 0.00 0.00 0.00 517.70 1.20 0.00 0.00 0.00 517.90 1.40 0.00 0.00 0.00 518.10 1.60 0.00 0.00 0.00 518.30 1.80 0.00 0.00 0.00 518.50 2.00 0.00 0.00 0.00 518.70 2.20 0.00 0.00 0.00 518.90 2.40 0.00 0.00 0.00 519.10 2.60 0.00 0.00 0.00 519.30 2.80 0.00 0.00 0.00 519.50 3.00 0.00 0.00 0.00 519.70 3.20 0.00 0.00 0.00 519.90 3.40 0.00 0.00 0.00 520.10 3.60 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 9 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Pond Report 520.30 3.80 9496.00 949.60 0.00520.50 4.00 9864.09 2885.61 0.00520.70 4.20 10232.18 4895.24520.90 4.40 0.00 10600.27 6978.48 0.00521.10 4.60 10968.36 9135.35 0.00521.30 4.80 11336.45 11365.83 0.00521.50 5.00 11704.55 521.70 13669.93 3,875.20 12072.64 16047.65 10.95521.90 5.40 12440.73 18498.98 18.62522.10 5.60 12808.82 21023.94 20.30522.30 5.80 13176.91 23622.51 26.06522.50 6.00 13545.00 26294.70 34.17522.70 6.20 13963.80 29045.58 44.09522.90 6.40 14382.60 31880.22 55.59 Maximum Storage 33328.95 cu ft)Maximum Discharge 61.87 cfs) Type Stand Pipe Name Stand Pipe RATING CURVE LIMIT] Minimum Elevation 516.50 ft)Maximum Elevation 523.00 ft)Elevation Increment 0.20 ft) STAND PIPE INFORMATION] ORIFICE INFORMATION] Height 3.50 ft)Width 3.00 ft)Crest Length 13.00 ft)Effective Crest Length 13.00 ft)Orifice Coefficient 0.60 Fractional Open Area 0.60 ORIFICE EQUATION] Q = Co *A((2gh) /k) ^0.5 DEFINITIONS] Co Orifice Coefficient A Wetted Area, sq ft) WEIR INFORMATION] Crest Elevation 521.30 ft)Weir Coefficient 3.33Exponential1.50 WEIR EQUATION] Q = Cw * L * H ^exp Rivanna Engineering & Surveying, PLC Page 10434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Pond Report DEFINITIONS] Cw Weir Coefficient H Headwater depth above inlet control section invert ft L Crest length ft CULVERT INFORMATION] Type Circular Concrete - Square Edge with Headwall OUTLET STRUCTURE INFORMATION] Diameter 18.00 in) Invert Elevation 516.50 ft) OUTLET STRUCTURE REPORT Pipe Length 86.00 ft) Slope 0.03 Manning's n Value 0.01 Orifice Coefficient 0.60 Tailwater Elevation 514.50 ft) Number of Barrels 1 UNSUBMERGED EQUATION] H /Diam = Hc/ Diam +K *(Q /(A *Diam ^0.5)) ^M -0.5 *S Coefficient K 0.01 Coefficient M 2.00 Q Maximum 7.58 SUBMERGED EQUATION] H /Diam = c *(Q /(A *Diam ^0.5)) ^2 +Y -0.5 *S Coefficient c 0.04 Coefficient Y 0.67 Q Minimum 8.66 DEFINITIONS] H Headwater depth above inlet control section invert, ft) Diam Interior height of culvert barrel, ft) He Specific head at critical depth (dc +Vc ^2/2g), ft) Q Discharge, cfs) A Full cross sectional area of culvert barrel, sq ft) S Culvert barrel slope, ft /ft) STAND PIPE STAGE VS. DISCHARGE] Elevation Stage Weirs Orifices Stand Pipe Culvert Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.50 0.00 0.00 0.00 0.00 0.00 0.00 516.70 0.20 0.00 0.00 0.00 0.20 0.00 516.90 0.40 0.00 0.00 0.00 0.70 0.00 517.10 0.60 0.00 0.00 0.00 1.46 0.00 517.30 0.80 0.00 0.00 0.00 2.40 0.00 517.50 1.00 0.00 0.00 0.00 3.46 0.00 517.70 1.20 0.00 0.00 0.00 4.60 0.00 517.90 1.40 0.00 0.00 0.00 5.76 0.00 518.10 1.60 0.00 0.00 0.00 6.91 0.00 Rivanna Engineering & Surveying, PLC Page 11 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Pond Report 518.30 1.80 0.00 0.00 0.00 7.58 0.00 518.50 2.00 0.00 0.00 0.00 8.94 0.00 518.70 2.20 0.00 0.00 0.00 9.78 0.00 518.90 2.40 0.00 0.00 0.00 10.55 0.00 519.10 2.60 0.00 0.00 0.00 11.27 0.00 519.30 2.80 0.00 0.00 0.00 11.94 0.00 519.50 3.00 0.00 0.00 0.00 12.58 0.00 519.70 3.20 0.00 0.00 0.00 13.19 0.00 519.90 3.40 0.00 0.00 0.00 13.77 0.00 520.10 3.60 0.00 0.00 0.00 14.33 0.00 520.30 3.80 0.00 0.00 0.00 14.87 0.00 520.50 4.00 0.00 0.00 0.00 15.39 0.00 520.70 4.20 0.00 0.00 0.00 15.89 0.00 520.90 4.40 0.00 0.00 0.00 16.38 0.00 521.10 4.60 0.00 0.00 0.00 16.85 0.00 521.30 4.80 0.00 0.00 0.00 17.31 0.00 521.50 5.00 0.00 0.00 3.87 17.76 3.87 521.70 5.20 0.00 0.00 10.95 18.19 10.95 521.90 5.40 0.00 0.00 19.48 18.62 18.62 522.10 5.60 0.00 0.00 26.53 19.04 19.04 522.30 5.80 0.00 0.00 30.32 19.44 19.44 522.50 6.00 0.00 0.00 33.22 19.84 19.84 522.70 6.20 0.00 0.00 35.88 20.23 20.23 522.90 6.40 0.00 0.00 38.35 20.62 20.62 523.00 6.50 0.00 0.00 39.54 20.81 20.81 WEIR STAGE VS. DISCHARGE] Elevation Stage Weir 1 Weir 2 Weir 3 Weir 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.50 0.00 0.00 0.00 0.00 0.00 0.00 516.70 0.20 0.00 0.00 0.00 0.00 0.00 516.90 0.40 0.00 0.00 0.00 0.00 0.00 517.10 0.60 0.00 0.00 0.00 0.00 0.00 517.30 0.80 0.00 0.00 0.00 0.00 0.00 517.50 1.00 0.00 0.00 0.00 0.00 0.00 517.70 1.20 0.00 0.00 0.00 0.00 0.00 517.90 1.40 0.00 0.00 0.00 0.00 0.00 518.10 1.60 0.00 0.00 0.00 0.00 0.00 518.30 1.80 0.00 0.00 0.00 0.00 0.00 518.50 2.00 0.00 0.00 0.00 0.00 0.00 518.70 2.20 0.00 0.00 0.00 0.00 0.00 518.90 2.40 0.00 0.00 0.00 0.00 0.00 519.10 2.60 0.00 0.00 0.00 0.00 0.00 519.30 2.80 0.00 0.00 0.00 0.00 0.00 519.50 3.00 0.00 0.00 0.00 0.00 0.00 519.70 3.20 0.00 0.00 0.00 0.00 0.00 519.90 3.40 0.00 0.00 0.00 0.00 0.00 520.10 3.60 0.00 0.00 0.00 0.00 0.00 520.30 3.80 0.00 0.00 0.00 0.00 0.00 520.50 4.00 0.00 0.00 0.00 0.00 0.00 520.70 4.20 0.00 0.00 0.00 0.00 0.00 520.90 4.40 0.00 0.00 0.00 0.00 0.00 521.10 4.60 0.00 0.00 0.00 0.00 0.00 521.30 4.80 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 12 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Pond Report 521.50 5.00 0.00 0.00 0.00 0.00 0.00 521.70 5.20 0.00 0.00 0.00 0.00 0.00 521.90 5.40 0.00 0.00 0.00 0.00 0.00 522.10 5.60 0.00 0.00 0.00 0.00 0.00 522.30 5.80 0.00 0.00 0.00 0.00 0.00 522.50 6.00 0.00 0.00 0.00 0.00 0.00 522.70 6.20 0.00 0.00 0.00 0.00 0.00 522.90 6.40 0.00 0.00 0.00 0.00 0.00 523.00 6.50 0.00 0.00 0.00 0.00 0.00 ORIFICE STAGE VS. DISCHARGE] Elevation Stage Orifice 1 Orifice 2 Orifice 3 Orifice 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.50 0.00 0.00 0.00 0.00 0.00 0.00 516.70 0.20 0.00 0.00 0.00 0.00 0.00 516.90 0.40 0.00 0.00 0.00 0.00 0.00 517.10 0.60 0.00 0.00 0.00 0.00 0.00 517.30 0.80 0.00 0.00 0.00 0.00 0.00 517.50 1.00 0.00 0.00 0.00 0.00 0.00 517.70 1.20 0.00 0.00 0.00 0.00 0.00 517.90 1.40 0.00 0.00 0.00 0.00 0.00 518.10 1.60 0.00 0.00 0.00 0.00 0.00 518.30 1.80 0.00 0.00 0.00 0.00 0.00 518.50 2.00 0.00 0.00 0.00 0.00 0.00 518.70 2.20 0.00 0.00 0.00 0.00 0.00 518.90 2.40 0.00 0.00 0.00 0.00 0.00 519.10 2.60 0.00 0.00 0.00 0.00 0.00 519.30 2.80 0.00 0.00 0.00 0.00 0.00 519.50 3.00 0.00 0.00 0.00 0.00 0.00 519.70 3.20 0.00 0.00 0.00 0.00 0.00 519.90 3.40 0.00 0.00 0.00 0.00 0.00 520.10 3.60 0.00 0.00 0.00 0.00 0.00 520.30 3.80 0.00 0.00 0.00 0.00 0.00 520.50 4.00 0.00 0.00 0.00 0.00 0.00 520.70 4.20 0.00 0.00 0.00 0.00 0.00 520.90 4.40 0.00 0.00 0.00 0.00 0.00 521.10 4.60 0.00 0.00 0.00 0.00 0.00 521.30 4.80 0.00 0.00 0.00 0.00 0.00 521.50 5.00 0.00 0.00 0.00 0.00 0.00 521.70 5.20 0.00 0.00 0.00 0.00 0.00 521.90 5.40 0.00 0.00 0.00 0.00 0.00 522.10 5.60 0.00 0.00 0.00 0.00 0.00 522.30 5.80 0.00 0.00 0.00 0.00 0.00 522.50 6.00 0.00 0.00 0.00 0.00 0.00 522.70 6.20 0.00 0.00 0.00 0.00 0.00 522.90 6.40 0.00 0.00 0.00 0.00 0.00 523.00 6.50 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 13 434) 984-1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Name:Routed 2 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)4.71 (cfs) Time to Peak (Tp)25.00 (min) Time of Base (Tb)224.00 (min) Volume 0.11 (ac -ft) Time Step 1.00 (min) Peak Elevation 521.52 (ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 33328.95 (cu ft) Maximum Discharge 61.87 cfs) INFLOW HYDROGRAPH INFORMATION] Number 1 Name DA- Abington 'A' 2 Year Peak Flow (Qp)17.86 (cfs) Time to Peak (Tp)12.00 (min) Time of Base (Tb)30.00 (min) Volume 0.37 (ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: I1 = Previous inflow I2 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 S1) / dt) - 01 C = (2 (S2) / dt) + 02 Rivanna Engineering & Surveying, PLC Page 14 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Routed 2 Year Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 1.49 1.49 0.00 89.30 0.00 44.65 520.11 2 2.00 2.98 4.46 89.30 357.18 0.00 178.59 520.14 3 3.00 4.46 7.44 357.18 803.66 0.00 401.83 520.18 4 4.00 5.95 10.42 803.66 1428.73 0.00 714.36 520.25 5 5.00 7.44 13.39 1428.73 2232.39 0.00 1116.19 520.32 6 6.00 8.93 16.37 2232.39 3214.64 0.00 1607.32 520.37 7 7.00 10.42 19.35 3214.64 4375.48 0.00 2187.74 520.43 8 8.00 11.91 22.32 4375.48 5714.91 0.00 2857.46 520.50 9 9.00 13.39 25.30 5714.91 7232.93 0.00 3616.47 520.57 10 10.00 14.88 28.28 7232.93 8929.55 0.00 4464.77 520.66 11 11.00 16.37 31.25 8929.55 10804.75 0.00 5402.38 520.75 12 12.00 17.86 34.23 10804.75 12858.55 0.00 6429.27 520.85 13 13.00 16.87 34.73 12858.55 14942.11 0.00 7471.06 520.95 14 14.00 15.87 32.74 14942.11 16906.61 0.00 8453.31 521.04 15 15.00 14.88 30.76 16906.61 18752.05 0.00 9376.03 521.12 16 16.00 13.89 28.77 18752.05 20478.43 0.00 10239.22 521.20 17 17.00 12.90 26.79 20478.43 22085.75 0.00 11042.87 521.27 18 18.00 11.91 24.80 22085.75 23532.91 0.67 11766.79 521.33 19 19.00 10.91 22.82 23532.91 24758.38 1.70 12380.04 521.39 20 20.00 9.92 20.84 24758.38 25752.98 2.54 12877.76 521.43 21 21.00 8.93 18.85 25752.98 26538.85 3.20 13271.02 521.47 22 22.00 7.94 16.87 26538.85 27136.03 3.70 13569.87 521.49 23 23.00 6.95 14.88 27136.03 27554.41 4.20 13779.30 521.51 24 24.00 5.95 12.90 27554.41 27802.06 7 1 3 25 25.00 4.96 10.91 27802.06 27899.9 4.7 13952.34,. 521 52 26 26.00 3.97 8.93 27899.96 27872.68 67 13938.67 52 27 27.00 2.98 6.95 27872.68 27740.73 4.48 13872.60 521.52 28 28.00 1.98 4.96 27740.73 27521.29 4.15 13762.72 521.51 29 29.00 0.99 2.98 27521.29 27224.65 3.78 13614.21 521.50 30 30.00 0.00 0.99 27224.65 26850.00 3.46 13426.73 521.48 31 31.00 0.00 0.00 26850.00 26454.68 3.13 13228.91 521.46 32 32.00 0.00 0.00 26454.68 26097.31 2.83 13050.07 521.45 33 33.00 0.00 0.00 26097.31 25774.25 2.56 12888.40 521.43 34 34.00 0.00 0.00 25774.25 25482.19 2.31 12742.25 521.42 35 35.00 0.00 0.00 25482.19 25218.17 2.09 12610.13 521.41 36 36.00 0.00 0.00 25218.17 24979.49 1.89 12490.69 521.40 37 37.00 0.00 0.00 24979.49 24763.72 1.71 12382.72 521.39 38 38.00 0.00 0.00 24763.72 24568.67 1.54 12285.11 521.38 39 39.00 0.00 0.00 24568.67 24392.33 1.40 12196.86 521.37 40 40.00 0.00 0.00 24392.33 24232.93 1.26 12117.09 521.37 41 41.00 0.00 0.00 24232.93 24088.82 1.14 12044.98 521.36 42 42.00 0.00 0.00 24088.82 23958.55 1.03 11979.79 521.35 43 43.00 0.00 0.00 23958.55 23840.78 0.93 11920.86 521.35 44 44.00 0.00 0.00 23840.78 23734.31 0.84 11867.58 521.34 45 45.00 0.00 0.00 23734.31 23638.07 0.76 11819.42 521.34 46 46.00 0.00 0.00 23638.07 23551.06 0.69 11775.88 521.34 47 47.00 0.00 0.00 23551.06 23472.41 0.62 11736.52 521.33 48 48.00 0.00 0.00 23472.41 23401.31 0.56 11700.93 521.33 Rivanna Engineering & Surveying, PLC Page 15 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Name:Routed 10 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)11.20 (cfs) Time to Peak (Tp)22.00 (min) Time of Base (Tb)228.00 min) Volume 0.25 (ac -ft) Time Step 1.00 (min) Peak Elevation 521.71 ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 33328.95 (cu ft) Maximum Discharge 61.87 cfs) INFLOW HYDROGRAPH INFORMATION] Number 2 Name DA- Abington 'A' 10 Year Peak Flow (Qp)24.95 (cfs) Time to Peak (Tp)12.00 (min) Time of Base (Tb)30.00 (min) Volume 0.52 (ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: I1 = Previous inflow I2 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 (S1) / dt) - 01 C = (2 (S2) / dt) + 02 Rivanna Engineering & Surveying, PLC Page 16 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Routed 10 Year Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 2.08 2.08 0.00 124.77 0.00 62.39 520.11 2 2.00 4.16 6.24 124.77 499.08 0.00 249.54 520.15 3 3.00 6.24 10.40 499.08 1122.94 0.00 561.47 520.22 4 4.00 8.32 14.56 1122.94 1996.33 0.00 998.17 520.31 5 5.00 10.40 18.72 1996.33 3119.27 0.00 1559.63 520.36 6 6.00 12.48 22.87 3119.27 4491.75 0.00 2245.87 520.43 7 7.00 14.56 27.03 4491.75 6113.77 0.00 3056.88 520.52 8 8.00 16.64 31.19 6113.77 7985.33 0.00 3992.67 520.61 9 9.00 18.72 35.35 7985.33 10106.43 0.00 5053.22 520.72 10 10.00 20.80 39.51 10106.43 12477.08 0.00 6238.54 520.83 11 11.00 22.87 43.67 12477.08 15097.27 0.00 7548.63 520.95 12 12.00 24.95 47.83 15097.27 17966.99 0.00 8983.50 521.09 13 13.00 23.57 48.52 17966.99 20878.31 0.00 10439.16 521.22 14 14.00 22.18 45.75 20878.31 23579.76 0.71 11790.24 521.34 15 15.00 20.80 42.98 23579.76 25951.13 2.71 12976.92 521.44 16 16.00 19.41 40.20 25951.13 27914.80 4.73 13959.77 521.52 17 17.00 18.02 37.43 27914.80 29452.61 7.03 14729.82 521.59 18 18.00 16.64 34.66 29452.61 30585.73 8.72 15297.23 521.64 19 19.00 15.25 31.89 30585.73 31380.53 9.90 15695.22 521.67 20 20.00 13.86 29.11 31380.53 31892.49 10.67 15951.58 521.69 21 21.00 12.48 26.34 31892.49 32167.65 11..08._:.: 16089.36 521.70 22 22.00 11.09 23.57 32167.65 32244.52, 11.20 16127.86 521.71 23 23.00 9.70 20.80 32244.52 32156.35' 11.06 16083.71 521.70 24 24.00 8.32 18.02 32156.35 31930.81 10.72 15970.77 521.69 25 25.00 6.93 15.25 31930.81 31590.07 10.21 15800.14 521.68 26 26.00 5.55 12.48 31590.07 31152.71 9.56 15581.14 521.66 27 27.00 4.16 9.70 31152.71 30634.59 8.79 15321.69 521.64 28 28.00 2.77 6.93 30634.59 30048.94 7.92 15028.43 521.61 29 29.00 1.39 4.16 30048.94 29406.85 6.96 14706.91 521.59 30 30.00 0.00 1.39 29406.85 28717.58 5.93 14361.75 521.56 31 31.00 0.00 0.00 28717.58 28065.09 4.96 14035.03 521.53 32 32.00 0.00 0.00 28065.09 27519.62 4.15 13761.88 521.51 33 33.00 0.00 0.00 27519.62 27053.33 3.63 13528.48 521.49 34 34.00 0.00 0.00 27053.33 26638.49 3.29 13320.89 521.47 35 35.00 0.00 0.00 26638.49 26263.48 2.97 13133.22 521.45 36 36.00 0.00 0.00 26263.48 25924.46 2.68 12963.57 521.44 37 37.00 0.00 0.00 25924.46 25617.99 2.43 12810.21 521.43 38 38.00 0.00 0.00 25617.99 25340.93 2.19 12671.56 521.41 39 39.00 0.00 0.00 25340.93 25090.47 1.98 12546.23 521.40 40 40.00 0.00 0.00 25090.47 24864.05 1.79 12432.92 521.39 41 41.00 0.00 0.00 24864.05 24659.36 1.62 12330.49 521.38 42 42.00 0.00 0.00 24659.36 24474.32 1.47 12237.89 521.38 43 43.00 0.00 0.00 24474.32 24307.05 1.32 12154.19 521.37 44 44.00 0.00 0.00 24307.05 24155.83 1.20 12078.51 521.36 45 45.00 0.00 0.00 24155.83 24019.12 1.08 12010.10 521.36 46 46.00 0.00 0.00 24019.12 23895.54 0.98 11948.26 521.35 47 47.00 0.00 0.00 23895.54 23783.82 0.88 11892.35 521.35 48 48.00 0.00 0.00 23783.82 23682.82 0.80 11841.81 521.34 Rivanna Engineering & Surveying, PLC Page 17 434) 984 -1599 4 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Name:Routed 100 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)19.10 (cfs) Time to Peak (Tp)20.00 min) Time of Base (Tb)230.00 min) Volume 0.48 ac -ft) Time Step 1.00 (min) Peak Elevation 521.96 (ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 33328.95 (cu ft) Maximum Discharge 61.87 cfs) INFLOW HYDROGRAPH INFORMATION] Number 3 Name DA- Abington 'A' 100 Year Peak Flow (Qp)35.84 cfs) Time to Peak (Tp)12.00 min) Time of Base (Tb)30.00 (min) Volume 0.74 ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: Il = Previous inflow I2 = Current inflow Si = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A _ (II + 12) B = (2 (S1) dt) - 01 C = (2 (S2) dt) + 02 Rivanna Engineering & Surveying, PLC Page 18 434) 984-1599 Abington Place at Hollymead Towncenter, Bio- Filter -1 Routed Hydrographs Routed 100 Year Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 2.99 2.99 0.00 179.20 0.00 89.60 520.12 2 2.00 5.97 8.96 179.20 716.82 0.00 358.41 520.18 3 3.00 8.96 14.93 716.82 1612.84 0.00 806.42 520.27 4 4.00 11.95 20.91 1612.84 2867.27 0.00 1433.63 520.35 5 5.00 14.93 26.88 2867.27 4480.11 0.00 2240.05 520.43 6 6.00 17.92 32.85 4480.11 6451.35 0.00 3225.68 520.53 7 7.00 20.91 38.83 6451.35 8781.01 0.00 4390.50 520.65 8 8.00 23.89 44.80 8781.01 11469.07 0.00 5734.54 520.78 9 9.00 26.88 50.77 11469.07 14515.54 0.00 7257.77 520.93 10 10.00 29.87 56.75 14515.54 17920.42 0.00 8960.21 521.08 11 11.00 32.85 62.72 17920.42 21683.71 0.00 10841.86 521.25 12 12.00 35.84 68.69 21683.71 25655.43 2.46 12828.94 521.43 13 13.00 33.85 69.69 25655.43 29278.90 6.77 14642.83 521.58 14 14.00 31.86 65.71 29278.90 32147.91 11.05 16079.48 521.70 15 15.00 29.87 61.73 32147.91 34317.98 14.45 17166.21 521.79 16 16.00 27.88 57.74 34317.98 35897.63 16.92 17957.28 521.86 17 17.00 25.89 53.76 35897.63 36988.80 18.62 18503.71 521.90 18 18.00 23.89 49.78 36988.80 37725.88 18.87 18872.38 521.93 19 19.00 21.90 45.80 37725.88 38199.88 19.03 19109.45 521.9 5, 20 20.00 19.91 41.81 38199.88 38421.10 19.10 19220.10 521.96 21 21.00 17.92 37.83 38421.10 38399.48 19.09 19209.28 521.96 22 22.00 15.93 33.85 38399.48 38144.52 19.01 19081.76 521.95 23 23.00 13.94 29.87 38144.52 37665.40 18.85 18842.12 521.93 24 24.00 11.95 25.89 37665.40 36971.47 18.61 18495.04 521.90 25 25.00 9.96 21.90 36971.47 36132.96 17.29 18075.13 521.87 26 26.00 7.96 17.92 36132.96 35220.21 15.86 17618.04 521.83 27 27.00 5.97 13.94 35220.21 34245.96 14.34 17130.15 521.79 28 28.00 3.98 9.96 34245.96 33220.76 12.73 16616.75 521.75 29 29.00 1.99 5.97 33220.76 32153.36 11.06 16082.21 521.70 30 30.00 0.00 1.99 32153.36 31046.64 9.40 15528.02 521.66 31 31.00 0.00 0.00 31046.64 30012.19 7.86 15010.03 521.61 32 32.00 0.00 0.00 30012.19 29147.39 6.57 14576.98 521.58 33 33.00 0.00 0.00 29147.39 28424.42 5.49 14214.96 521.55 34 34.00 0.00 0.00 28424.42 27820.01 4.59 13912.30 521.52 35 35.00 0.00 0.00 27820.01 27313.93 3.85 13658.89 521.50 36 36.00 0.00 0.00 27313.93 26874.08 3.48 13438.78 521.48 37 37.00 0.00 0.00 26874.08 26476.45 3.15 13239.80 521.46 38 38.00 0.00 0.00 26476.45 26116.99 2.85 13059.92 521.45 39 39.00 0.00 0.00 26116.99 25792.04 2.57 12897.30 521.43 40 40.00 0.00 0.00 25792.04 25498.27 2.33 12750.30 521.42 41 41.00 0.00 0.00 25498.27 25232.71 2.10 12617.41 521.41 42 42.00 0.00 0.00 25232.71 24992.63 1.90 12497.27 521.40 43 43.00 0.00 0.00 24992.63 24775.60 1.72 12388.66 521.39 44 44.00 0.00 0.00 24775.60 24579.41 1.55 12290.48 521.38 45 45.00 0.00 0.00 24579.41 24402.04 1.40 12201.72 521.37 46 46.00 0.00 0.00 24402.04 24241.70 1.27 12121.49 521.37 47 47.00 0.00 0.00 24241.70 24096.76 1.15 12048.95 521.36 48 48.00 0.00 0.00 24096.76 23965.72 1.04 11983.38 521.35 I Rivanna Engineering & Surveying, PLC Page 19 1 434) 984 -1599 BMP CALCULATIONS FOR ABINGTON PLACE February 27, 2006 LOCATION: Rio District Albemarle County, Virginia Tax Map 32, Parcel 46 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 CV#0444,4,k Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan:Abington Place at Hollymead Water Resources Area: Preparer: JDB Date:14- Oct -05 Project Drainage Area Designation Bio- Filter #1 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =6.40 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length Width subtotal Length Width subtotal 0 0 0 750 32 24000 0 0 0 770 18 13860 0 1220 14 17080 0 0 0 54940 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 1 0 14 16 88 19712 0 0 0 0 3485 5 1 17425 0 0 0 37137 Parking Lots 1 2 3 4 1 2 3 4 0 0 0 0 Gravel areas Area Area x0.70=0 x0.70=0 Structures Area no.subtotal Area no.subtotal 0 0 0 870 63 54810 0 0 0 350 76 26600 0 0 0 0 0 81410 Actively - grazed pasture &Area Area yards and cultivated turf 0 x 0.08 =0 105297 x 0.08 =8423.76 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 0%65% l(pre)post) Rv(post)V 0.64 280.7 New Development (For Development Areas, existing impervious cover <= 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 1.00 20% 0.23 9.04 25.04 16.00 64% Development Area 0.35 1.00 0% 0.05 0.98 12.52 11.54 92% Drinking Water Watersheds 0.40 1.00 1% 0.06 1.32 14.31 12.98 91% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type 0.70 0.90 20% 0.23 9.04 25.04 16.90 68% Development Area 0.35 0.85 0% 0.05 0.98 12.52 11.68 93% Drinking Water Watersheds 0.40 0.85 1% 0.06 1.32 14.31 13.18 92% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan:Abington Place Water Resources Area:Development Preparer: JDB Date: 14- Oct -05 Project Drainage Area Designation Bio- Filter #2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 j [ C(A)2.72 jRvmeanrunoffcoefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 I percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage area,A =2.37Cpollutantconcentration, mg /I or ppm target phosphorusffactorappliedtoRR required treatment volume in cy, 0.5" over imperv. area = A(I)43560(0.5/12)/27RRrequiredremoval , L(post) - f x L(pre) RR removal efficiency , RR100 /L(post) Impervious Cover Computation (values in feet & square feet)Item pre - development Area post - developmentRoadsLengthWidthsubtotal Area Length Width subtotal0004501463000007501813500 0 0 0 0 0 0 0 19800DrivewaysLengthWidthno.subtotal Length Width no.subtotalandwalks0010110051550000001616358960 0 0 0 14460ParkingLots1234123400000GravelareasAreaArea x 0.70 =0 x 0.70 =0StructuresAreano.subtotal Area no.subtotal0004301981700001000161600000000 24170Actively - grazed pasture &Area Areayardsandcultivatedturf0x0.08 =44807 x 0.08 =0 3584.56ActivecropandAreaArea x0.25=0 x0.25=0OtherImperviousAreas 0 0ImperviousCover0% l(pre) 60% Rv(post)V post) 0.59 95.7 New Development (For Development Areas, existing impervious cover <= 20 %)C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type0.70 1.00 20% 0.23 3.35 8.59 5.25 61% Development Area0.35 1.00 0% 0.05 0.36 4.30 3.93 92% Drinking Water Watersheds0.40 1.00 1% 0.06 0.49 4.91 4.42 90% Other Rural Landmin. values Redevelopment (For Development Areas, existing impervious cover > 20 %)C f I (pre) * Rv(pre) L(pre) L(post) RR RR Area Type0.70 0.90 20% 0.23 3.35 8.59 5.58 65% Development Area0.35 0.85 0% 0.05 0.36 4.30 3.99 93% Drinking Water Watersheds0.40 0.85 1% 0.06 0.49 4.91 4.49 92% Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB HYDROLOGIC /HYDRAULIC CALCULATIONS FOR ABINGTON PLACE AT HOLLYMEAD TOWNCENTER BIOFILTER -2 March 2, 2006 LOCATION: Rio District, Albemarle County, Virginia OWNER: Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 INDEX Summary:2 Post - Development: DA -B Hydrographs:3-8 Pond & Outlet Structure:9 -12 Routed Hydrographs:13 -18 Drainage Area Maps are included attached at the end of this report. Rivanna Engineering & Surveying, PLC Page 1 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Summary Two bio- filters will provide stormwater management for Abington Place at Hollymead Towncenter. Drainage area DA -B flows into Bio - Filter -2. Rivanna Engineering & Surveying, PLC Page 2 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs Name:DA- Abington 'B' 2 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)7.26 (cfs) Time to Peak (Tp)8.00 min) Time of Base (Tb)20.00 (min) Volume 0.10 ac -ft) Time Step 1.00 min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 cfs) Maximum Storage 0.10 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 2.30 A 0.67 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)8.00 min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 0.62 in) Return Period 2 yr) Storm Duration 0.13 (hr) Rivanna Engineering & Surveying, PLC 434) 984 -1599 Page 3 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs DA- Abington 'B' 2 Year Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.08 0.00 0.91 2 2.00 0.08 0.16 0.91 1.82 3 3.00 0.08 0.23 0.91 2.72 4 4.00 0.08 0.31 0.91 3.63 5 5.00 0.08 0.39 0.91 4.54 6 6.00 0.08 0.47 0.91 5.45 7 7.00 0.08 0.55 0.91 6.35 8 8.00 0.08 0.62 0.91 7.26 9 9.00 0.00 0.62 0.60 6.66 10 10.00 0.00 0.62 0.61 6.05 11 11.00 0.00 0.62 0.61 5.45 12 12.00 0.00 0.62 0.61 4.84 13 13.00 0.00 0.62 0.61 4.24 14 14.00 0.00 0.62 0.61 3.63 15 15.00 0.00 0.62 0.61 3.03 16 16.00 0.00 0.62 0.61 2.42 17 17.00 0.00 0.62 0.61 1.82 18 18.00 0.00 0.62 0.61 1.21 19 19.00 0.00 0.62 0.61 0.61 20 20.00 0.00 0.62 0.61 0.00 Rivanna Engineering & Surveying, PLC Page 4 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs Name:DA- Abington 'B' 10 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)9.95 (cfs) Time to Peak (Tp)8.00 (min) Time of Base (Tb)20.00 min) Volume 0.14 ac -ft) Time Step 1.00 min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 cfs) Maximum Storage 0.14 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 2.30 NA 0.67 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)8.00 (min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 0.85 in) Return Period User Defined (yr) Storm Duration 0.13 hr) Rivanna Engineering & Surveying, PLC Page 5 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs DA- Abington 'B' 10 Year Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.11 0.00 1.24 2 2.00 0.11 0.21 1.24 2.49 3 3.00 0.11 0.32 1.24 3.73 4 4.00 0.11 0.43 1.24 4.98 5 5.00 0.11 0.53 1.24 6.22 6 6.00 0.11 0.64 1.24 7.46 7 7.00 0.11 0.75 1.24 8.71 8 8.00 0.11 0.85 1.24 9.95 9 9.00 0.00 0.85 0.83 9.13 10 10.00 0.00 0.85 0.83 8.30 11 11.00 0.00 0.85 0.83 7.47 12 12.00 0.00 0.85 0.83 6.64 13 13.00 0.00 0.85 0.83 5.81 14 14.00 0.00 0.85 0.83 4.98 15 15.00 0.00 0.85 0.83 4.15 16 16.00 0.00 0.85 0.83 3.32 17 17.00 0.00 0.85 0.83 2.49 18 18.00 0.00 0.85 0.83 1.66 19 19.00 0.00 0.85 0.83 0.83 20 20.00 0.00 0.85 0.83 0.00 Rivanna Engineering & Surveying, PLC Page 6 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs Name:DA- Abington 'B' 100 Year Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)14.14 cfs) Time to Peak (Tp)8.00 min) Time of Base (Tb)20.00 min) Volume 0.19 (ac -ft) Time Step 1.00 min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 cfs) Maximum Storage 0.19 (cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 2.30 NA 0.67 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)8.00 min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 1.21 in) Return Period 100 yr) Storm Duration 0.13 hr) Rivanna Engineering & Surveying, PLC Page 7 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Post - Development Hydrographs DA- Abington 'B' 100 Year Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental. Design Irterval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.15 0.00 1.77 2 2.00 0.15 0.30 1.77 3.54 3 3.00 0.15 0.46 1.77 5.30 4 4.00 0.15 0.61 1.77 7.07 5 5.00 0.15 0.76 1.77 8.84 6 6.00 0.15 0.91 1.77 10.61 7 7.00 0.15 1.06 1.77 12.37 8 8.00 0.15 1.21 1.77 14.14 9 9.00 0.00 1.21 1.17 12.97 10 10.00 0.00 1.21 1.18 11.79 11 11.00 0.00 1.21 1.18 10.61 12 12.00 0.00 1.21 1.18 9.43 13 13.00 0.00 1.21 1.18 8.25 14 14.00 0.00 1.21 1.18 7.08 15 15.00 0.00 1.21 1.18 5.90 16 16.00 0.00 1.21 1.18 4.72 17 17.00 0.00 1.21 1.18 3.54 18 18.00 0.00 1.21 1.18 2.36 19 19.00 0.00 1.21 1.18 1.18 20 20.00 0.00 1.21 1.18 0.00 Rivanna Engineering & Surveying, PLC Page 8 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Pond Report Name: Water Quality Pond RATING CURVE LIMIT] Minimum Elevation 530.00 ft) Maximum Elevation 536.50 ft) Elevation Increment 0.20 ft) STAGE STORAGE INFORMATION] Storage Method: User - Defined Storage Input Method: Area Number Elevation Area Ave Area Volume Cumulative Volume ft)sq ft)sq ft)cu ft)cu ft) 1 530.00 0.00 0.00 0.00 0.00 2 533.90 0.00 0.00 0.00 0.00 3 534.00 887.00 443.50 44.35 44.35 4 536.00 3613.00 2250.00 4500.00 4544.35 5 536.50 4153.00 3883.00 1941.50 6485.85 DISCHARGE INFORMATION] Structure Number: 1 Type: Name:Stand Pipe Structure Number: 2 Type:Trapezoidal Weir Name:Bio- Filter #2 Weir RESERVOIR STAGE STORAGE /DISCHARGE] Elevation Stage Area Storage Discharge ft)ft)sq ft)cu ft)cfs) 530.40 0.40 0.00 0.00 0.00 530.80 0.80 0.00 0.00 0.00 531.20 1.20 0.00 0.00 0.00 531.60 1.60 0.00 0.00 0.00 532.00 2.00 0.00 0.00 0.00 532.40 2.40 0.00 0.00 0.00 532.80 2.80 0.00 0.00 0.00 533.20 3.20 0.00 0.00 0.00 533.60 3.60 0.00 0.00 0.00 534.00 4.00 887.00 88.70 0.00 534.40 4.40 1432.20 552.54 0.00 RESERVOIR REPORT 534.80 4.80 1977.40 1234.46 0.00 535.20 5.20 2522.60 2134.46 3.87 535.60 5.60 3067.80 3252.54 14.31 536.00 6.00 3613.00 4588.70 23.63 536.40 6.40 4045.00 6120.30 38.14 Maximum Storage 6530.20 cu ft) Maximum Discharge 42.42 cfs) Rivanna Engineering & Surveying, PLC Page 9 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Pond Report Type Stand Pipe Name Stand Pipe RATING CURVE LIMIT] Minimum Elevation 530.00 ft) Maximum Elevation 536.50 ft) Elevation Increment 0.20 ft) STAND PIPE INFORMATION] ORIFICE INFORMATION] Height 3.50 ft) Width 3.00 ft) Crest Length 13.00 ft) Effective Crest Length 13.00 ft) Orifice Coefficient 0.60 Fractional Open Area 0.60 ORIFICE EQUATION] Q = Co *A((2gh) /k) ^0.5 DEFINITIONS] Co Orifice Coefficient A Wetted Area, sq ft) WEIR INFORMATION] Crest Elevation 535.00 ft) Weir Coefficient 3.33 Exponential 1.50 WEIR EQUATION] Q = Cw * L * H ^exp DEFINITIONS] Cw Weir Coefficient H Headwater depth above inlet control section invert ft L Crest length ft CULVERT INFORMATION] Type Circular Concrete - Square Edge with Headwall OUTLET STRUCTURE INFORMATION] Diameter 15.00 in) Invert Elevation 530.00 ft) OUTLET STRUCTURE REPORT Pipe Length 57.00 ft) Slope 0.04 Manning's n Value 0.01 Orifice Coefficient 0.60 Tailwater Elevation 528.50 ft) Number of Barrels 1 Rivanna Engineering & Surveying, PLC Page 10 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Pond Report UNSUBMERGED EQUATION] H /Diam = Hc/ Diam +K *(Q /(A*Diam ^0.5)) ^ M - 0.5 *S Coefficient K 0.01 Coefficient M 2.00 Q Maximum 4.80 SUBMERGED EQUATION] H /Diam = c'(Q /(A *Diam ^0.5)) ^2 +Y - 0.5 *S Coefficient c 0.04 Coefficient Y 0.67 Q Minimum 5.49 DEFINITIONS] H Headwater depth above inlet control section invert, ft) Diam Interior height of culvert barrel, ft) He Specific head at critical depth (dc +Vc ^2/2g), ft) Q Discharge, cfs) A Full cross sectional area of culvert barrel, sq ft) S Culvert barrel slope, ft /ft) STAND PIPE STAGE VS. DISCHARGE] Elevation Stage Weirs Orifices Stand Pipe Culvert Total ft)ft)cfs)cfs)cfs)cfs)cfs) 530.40 0.40 0.00 0.00 0.00 0.64 0.00 530.80 0.80 0.00 0.00 0.00 2.09 0.00 531.20 1.20 0.00 0.00 0.00 3.84 0.00 531.60 1.60 0.00 0.00 0.00 4.80 0.00 532.00 2.00 0.00 0.00 0.00 6.71 0.00 532.40 2.40 0.00 0.00 0.00 7.76 0.00 532.80 2.80 0.00 0.00 0.00 8.68 0.00 533.20 3.20 0.00 0.00 0.00 9.51 0.00 533.60 3.60 0.00 0.00 0.00 10.27 0.00 534.00 4.00 0.00 0.00 0.00 10.99 0.00 534.40 4.40 0.00 0.00 0.00 11.66 0.00 534.80 4.80 0.00 0.00 0.00 12.29 0.00 535.20 5.20 0.00 0.00 3.87 12.89 3.87 535.60 5.60 0.00 0.00 19.48 13.46 13.46 536.00 6.00 0.00 0.00 30.32 14.01 14.01 536.40 6.40 0.00 0.00 35.88 14.54 14.54 WEIR STAGE VS. DISCHARGE] Elevation Stage Weir 1 Weir 2 Weir 3 Weir 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 530.40 0.40 0.00 0.00 0.00 0.00 0.00 530.80 0.80 0.00 0.00 0.00 0.00 0.00 531.20 1.20 0.00 0.00 0.00 0.00 0.00 531.60 1.60 0.00 0.00 0.00 0.00 0.00 532.00 2.00 0.00 0.00 0.00 0.00 0.00 532.40 2.40 0.00 0.00 0.00 0.00 0.00 532.80 2.80 0.00 0.00 0.00 0.00 0.00 533.20 3.20 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 11 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Pond Report 533.60 3.60 0.00 0.00 0.00 0.00 0.00 534.00 4.00 0.00 0.00 0.00 0.00 0.00 534.40 4.40 0.00 0.00 0.00 0.00 0.00 534.80 4.80 0.00 0.00 0.00 0.00 0.00 535.20 5.20 0.00 0.00 0.00 0.00 0.00 535.60 5.60 0.00 0.00 0.00 0.00 0.00 536.00 6.00 0.00 0.00 0.00 0.00 0.00 536.40 6.40 0.00 0.00 0.00 0.00 0.00 ORIFICE STAGE VS. DISCHARGE] Elevation Stage Orifice 1 Orifice 2 Orifice 3 Orifice 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 530.40 0.40 0.00 0.00 0.00 0.00 0.00 530.80 0.80 0.00 0.00 0.00 0.00 0.00 531.20 1.20 0.00 0.00 0.00 0.00 0.00 531.60 1.60 0.00 0.00 0.00 0.00 0.00 532.00 2.00 0.00 0.00 0.00 0.00 0.00 532.40 2.40 0.00 0.00 0.00 0.00 0.00 532.80 2.80 0.00 0.00 0.00 0.00 0.00 533.20 3.20 0.00 0.00 0.00 0.00 0.00 533.60 3.60 0.00 0.00 0.00 0.00 0.00 534.00 4.00 0.00 0.00 0.00 0.00 0.00 534.40 4.40 0.00 0.00 0.00 0.00 0.00 534.80 4.80 0.00 0.00 0.00 0.00 0.00 535.20 5.20 0.00 0.00 0.00 0.00 0.00 535.60 5.60 0.00 0.00 0.00 0.00 0.00 536.00 6.00 0.00 0.00 0.00 0.00 0.00 536.40 6.40 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 12 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Name:Routed 2 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)5.25 (cfs) Time to Peak (Tp)11.00 min) Time of Base (Tb)57.00 min) Volume 0.06 (ac -ft) Time Step 1.00 min) Peak Elevation 535.24 ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 6530.20 cu ft) Maximum Discharge 42.42 cfs) INFLOW HYDROGRAPH INFORMATION] Number 4 Name DA- Abington 'B' 2 Year Peak Flow (Qp)7.26 (cfs) Time to Peak (Tp)8.00 (min) Time of Base (Tb)20.00 min) Volume 0.10 ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: I1 = Previous inflow I2 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 S1) dt) - 01 C = (2 S2) dt) + 02 Rivanna Engineering & Surveying, PLC Page 13 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Routed 2 Year Computation of Reservoir Ou:flow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 0.91 0.91 0.00 54.46 0.00 27.23 533.86 2 2.00 1.82 2.72 54.46 217.85 0.00 108.93 534.02 3 3.00 2.72 4.54 217.85 490.17 0.00 245.08 534.15 4 4.00 3.63 6.35 490.17 871.41 0.00 435.70 534.31 5 5.00 4.54 8.17 871.41 1361.57 0.00 680.79 534.48 6 6.00 5.45 9.98 1361.57 1960.66 0.00 980.33 534.66 7 7.00 6.35 11.80 1960.66 2668.68 0.00 1334.34 534.8588.00 7.26 13.62 2668.68 3451.55 0.56 1726.05 535.03 9 9.00 6.66 13.92 3451.55 4066.88 3.06 2034.97 535.16 10 10.00 6.05 12.71 4066.88 4369.81 4.57 2187.19 535.22 11 11.00 5.45 11.50 4369.81 4470.09 5.25 2237.67 535.24 12 12.00 4.84 10.29 4470.09 4461.59 5.19 2233.39 535.24 13 13.00 4.24 9.08 4461.59 4406.39 4.82 2205.60 535.23 14 14.00 3.63 7.87 4406.39 4331.15 4.31 2167.73 535.21 15 15.00 3.03 6.66 4331.15 4245.04 3.79 2124.41 535.20 16 16.00 2.42 5.45 4245.04 4142.68 3.37 2073.03 535.17 17 17.00 1.82 4.24 4142.68 4022.23 2.88 2012.56 535.15 18 18.00 1.21 3.03 4022.23 3890.77 2.35 1946.56 535.12 19 19.00 0.61 1.82 3890.77 3752.61 1.78 1877.19 535.09 20 20.00 0.00 0.61 3752.61 3610.37 1.21 1805.79 535.062121.00 0.00 0.00 3610.37 3494.61 0.73 1747.67 535.04 22 22.00 0.00 0.00 3494.61 3424.06 0.45 1712.25 535.02 23 23.00 0.00 0.00 3424.06 3381.13 0.27 1690.70 535.01 24 24.00 0.00 0.00 3381.13 3355.01 0.17 1677.59 535.01 25 25.00 0.00 0.00 3355.01 3339.11 0.10 1669.60 535.01 26 26.00 0.00 0.00 3339.11 3329.44 0.06 1664.75 535.00 27 27.00 0.00 0.00 3329.44 3323.55 0.04 1661.79 535.00 28 28.00 0.00 0.00 3323.55 3319.97 0.02 1660.00 535.002929.00 0.00 0.00 3319.97 3317.79 0.01 1658.90 535.00 30 30.00 0.00 0.00 3317.79 3316.46 0.01 1658.23 535.00 31 31.00 0.00 0.00 3316.46 3315.65 0.01 1657.83 535.00 32 32.00 0.00 0.00 3315.65 3315.16 0.00 1657.58 535.003333.00 0.00 0.00 3315.16 3314.86 0.00 1657.43 535.00 34 34.00 0.00 0.00 3314.86 3314.68 0.00 1657.34 535.003535.00 0.00 0.00 3314.68 3314.57 0.00 1657.29 535.00 36 36.00 0.00 0.00 3314.57 3314.50 0.00 1657.25 535.003737.00 0.00 0.00 3314.50 3314.46 0.00 1657.23 535.003838.00 0.00 0.00 3314.46 3314.44 0.00 1657.22 535.003939.00 0.00 0.00 3314.44 3314.42 0.00 1657.21 535.00 40 40.00 0.00 0.00 3314.42 3314.41 0.00 1657.21 535.00 Rivanna Engineering & Surveying, PLC 434) 984 -1599 Page 14 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Name:Routed 10 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)8.15 (cfs) Time to Peak (Tp)10.00 min) Time of Base (Tb)58.00 min) Volume 0.10 ac -ft) Time Step 1.00 min) Peak Elevation 535.32 ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 6530.20 (cu ft) Maximum Discharge 42.42 cfs) INFLOW HYDROGRAPH INFORMATION] Number 5 Name DA- Abington 'B' 10 Year Peak Flow (Qp)9.95 cfs) Time to Peak (Tp)8.00 min) Time of Base (Tb)20.00 (min) Volume 0.14 ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: I1 = Previous inflow I2 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 (S1) dt) - 01 C = (2 (S2) dt) + 02 Rivanna Engineering & Surveying, PLC Page 15 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Routed 10 Year Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 1.24 1.24 0.00 74.65 0.00 37.32 533.88 2 2.00 2.49 3.73 74.65 298.59 0.00 149.30 534.06 3 3.00 3.73 6.22 298.59 671.84 0.00 335.92 534.23 4 4.00 4.98 8.71 671.84 1194.38 0.00 597.19 534.43 5 5.00 6.22 11.20 1194.38 1866.22 0.00 933.11 534.64 6 6.00 7.46 13.69 1866.22 2687.35 0.00 1343.67 534.85 7 7.00 8.71 16.17 2687.35 3589.45 1.12 1795.2.8 535.06 8 8.00 9.95 18.66 3589.45 4365.73 4.55 2185.14 535.22 9 9.00 9.13 19.08 4365.73 4791.08 7.40 2399.24 535.30 10 10.00 8.30 17.42 4791.08 4903.12 8.15 2455.63 535.32 11 11.00 7.47 15.77 4903.12 4880.56 8.00 2444.2.8 535.32 12 12.00 6.64 14.11 4880.56 4800.22 7.46 2403.84 535.30 13 13.00 5.81 12.45 4800.22 4695.09 6.75 2350.92 535.28 14 14.00 4.98 10.79 4695.09 4579.32 5.98 2292.65 535.26 15 15.00 4.15 9.13 4579.32 4458.98 5.17 2232.07 535.24 16 16.00 3.32 7.47 4458.98 4336.68 4.35 2170.51 535.21 17 17.00 2.49 5.81 4336.68 4206.92 3.64 2105.28 535.19 18 18.00 1.66 4.15 4206.92 4057.13 3.03 2030.08 535.16 19 19.00 0.83 2.49 4057.13 3886.27 2.33 1944.30 535.12 20 20.00 0.00 0.84 3886.27 3702.57 1.58 1852.07 535.08 21 21.00 0.00 0.00 3702.57 3550.76 0.96 1775.86 535.05 22 22.00 0.00 0.00 3550.76 3458.23 0.59 1729.41 535.03 23 23.00 0.00 0.00 3458.23 3401.92 0.36 1701.14 535.02 24 24.00 0.00 0.00 3401.92 3367.66 0.22 1683.94 535.01 25 25.00 0.00 0.00 3367.66 3346.81 0.13 1673.47 535.01 26 26.00 0.00 0.00 3346.81 3334.12 0.08 1667.10 535.00 27 27.00 0.00 0.00 3334.12 3326.40 0.05 1663.22 535.00 28 28.00 0.00 0.00 3326.40 3321.70 0.03 1660.87 535.00 29 29.00 0.00 0.00 3321.70 3318.84 0.02 1659.43 535.00 30 30.00 0.00 0.00 3318.84 3317.10 0.01 1658.56 535.00 31 31.00 0.00 0.00 3317.10 3316.05 0.01 1658.03 535.00 32 32.00 0.00 0.00 3316.05 3315.40 0.00 1657.70 535.00 33 33.00 0.00 0.00 3315.40 3315.01 0.00 1657.51 535.00 34 34.00 0.00 0.00 3315.01 3314.77 0.00 1657.39 535.00 35 35.00 0.00 0.00 3314.77 3314.63 0.00 1657.31 535.00 36 36.00 0.00 0.00 3314.63 3314.54 0.00 1657.27 535.00 37 37.00 0.00 0.00 3314.54 3314.48 0.00 1657.24 535.00 38 38.00 0.00 0.00 3314.48 3314.45 0.00 1657.2.3 535.00 39 39.00 0.00 0.00 3314.45 3314.43 0.00 1657.22 535.00 40 40.00 0.00 0.00 3314.43 3314.42 0.00 1657.21 535.00 Rivanna Engineering & Surveying, PLC Page 16 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Name:Routed 100 Year Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)11.80 (cfs) Time to Peak (Tp)10.00 min) Time of Base (Tb)58.00 min) Volume 0.16 (ac -ft) Time Step 1.00 min) Peak Elevation 535.45 ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 6530.20 cu ft) Maximum Discharge 42.42 cfs) INFLOW HYDROGRAPH INFORMATION] Number 6 Name DA- Abington 'B' 100 Year Peak Flow (Qp)14.14 cfs) Time to Peak (Tp)8.00 min) Time of Base (Tb)20.00 (min) Volume 0.19 (ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: I1 = Previous inflow 12 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 S1) / dt) - 01 C = (2 S2) / dt) + 02 Rivanna Engineering & Surveying, PLC Page 17 434) 984 -1599 Abington Place at Hollymead Towncenter, Bio- Filter -2 Routed Hydrographs Routed 100 Year Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 1.77 1.77 0.00 106.07 0.00 53.03 533.92 2 2.00 3.54 5.30 106.07 424.27 0.00 212.14 534.12 3 3.00 5.30 8.84 424.27 954.61 0.00 477.30 534.34 4 4.00 7.07 12.37 954.61 1697.08 0.00 848.54 534.59 5 5.00 8.84 15.91 1697.08 2651.69 0.00 1325.84 534.84 6 6.00 10.61 19.45 2651.69 3718.13 1.64 1859.89 535.08 7 7.00 12.37 22.98 3718.13 4619.08 6.24 2312.66 535.27 8 8.00 14.14 26.52 4619.08 5216.54 10.25 2613.40 535.38 9 9.00 12.97 27.11 5216.54 5533.40 11.56 2772.48 535.44 10 10.00 11.79 24.76 5533.40 5617.07 11.80 2814.43 535.45 11 11.00 10.61 22.40 5617.07 5555.86 11.62 2783.74 535.44 12 12.00 9.43 20.04 5555.86 5392.25 11.15 2701.70 535.41 13 13.00 8.25 17.69 5392.25 5183.67 10.03 2596.85 535.37 14 14.00 7.08 15.33 5183.67 4982.42 8.68 2495.55 535.34 15 15.00 5.90 12.97 4982.42 4795.66 7.43 2401.54 535.30 16 16.00 4.72 10.62 4795.66 4615.11 6.22 2310.66 535.27 17 17.00 3.54 8.26 4615.11 4437.23 5.03 2221.13 535.23 18 18.00 2.36 5.90 4437.23 4259.92 3.85 2131.88 535.20 19 19.00 1.18 3.55 4259.92 4060.13 3.04 2031.58 535.16 20 20.00 0.00 1.19 4060.13 3825.27 2.08 1913.68 535.11 21 21.00 0.00 0.00 3825.27 3625.50 1.27 1813.38 535.07 22 22.00 0.00 0.00 3625.50 3503.71 0.77 1752.24 535.04 23 23.00 0.00 0.00 3503.71 3429.59 0.47 1715.03 535.02 24 24.00 0.00 0.00 3429.59 3384.50 0.29 1692.39 535.01 25 25.00 0.00 0.00 3384.50 3357.05 0.17 1678.61 535.01 26 26.00 0.00 0.00 3357.05 3340.36 0.11 1670.23 535.01 27 27.00 0.00 0.00 3340.36 3330.19 0.06 1665.13 535.00 28 28.00 0.00 0.00 3330.19 3324.01 0.04 1662.03 535.00 29 29.00 0.00 0.00 3324.01 3320.25 0.02 1660.14 535.00 30 30.00 0.00 0.00 3320.25 3317.96 0.01 1658.99 535.00 31 31.00 0.00 0.00 3317.96 3316.57 0.01 1658.29 535.00 32 32.00 0.00 0.00 3316.57 3315.72 0.01 1657.86 535.00 33 33.00 0.00 0.00 3315.72 3315.20 0.00 1657.60 535.00 34 34.00 0.00 0.00 3315.20 3314.89 0.00 1657.44 535.00 35 35.00 0.00 0.00 3314.89 3314.70 0.00 1657.35 535.00 36 36.00 0.00 0.00 3314.70 3314.58 0.00 1657.29 535.00 37 37.00 0.00 0.00 3314.58 3314.51 0.00 1657.26 535.00 38 38.00 0.00 0.00 3314.51 3314.47 0.00 1657.23 535.00 39 39.00 0.00 0.00 3314.47 3314.44 0.00 1657.22 535.00 40 40.00 0.00 0.00 3314.44 3314.42 0.00 1657.21 535.00 Rivanna Engineering & Surveying, PLC Page 18 434) 984 -1599 EROSION AND SEDIMENT CONTROL NARRATIVE FOR MASS GRADING OF ABBINGTON PLACE AT HOLLYMEAD TOWNCENTER July 20 2005. REV: September 23, 2005. LOCATION: Tax Map 32 Parcel 46 Rivanna District, Albemarle County, Virginia DEVELOPER Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 434.984.1599 F) 434.984.8863 A. MINIMUM STANDARDS (MS): All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. CONCENTRATED RUN -OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 1 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches c. Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 2 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E &S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24 -hour duration. B1. PROJECT DESCRIPTION: The purpose of this project is to mass grade the property. The total area to be disturbed by this project will be 8.8 acres. B2. EXISTING SITE CONDITIONS: The site is currently grassed with mixed deciduous trees. The current vegetation is small trees and brush. The existing topography is rolling terrain with slopes of 10 -20 %. B3. ADJACENT AREAS: The site is bounded to the east, west and south by the Hollymead Towncenter development, which is mixed use. To the north is the existing Deerwood subdivision. B4. SOIL DESCRIPTIONS: According to the Albemarle County Soils Survey conducted by the United States Department of Agriculture Soil Conservation Service, the primary soil types that may be disturbed during this scope of work have been identified as the following: 1. Pacolet Sandy loam (65B) — Permeability is moderate, surface runoff is rapid, and the hazard of erosion is severe. Hydrologic group B, K factor .28 2. Mount Lucas silt loam (57C) — Permeability is slow, surface runoff is medium, and the hazard of erosion is moderate. Hydrologic group C, K factor .28 3. Elioak Loam (27B) — Permeability is moderate, surface runoff is medium, and the hazard of erosion is moderate. Hydrologic group C, K factor .28 3 B5. CRITICAL AREAS: The stream along the north property line between Deerwood subdivision and parcel 46 is a critical area, and a 50' undisturbed stream buffer must be maintained. The designated Critical slope areas shall be protected with safety fence prior to grading. B6. EROSION AND SEDIMENT CONTROL MEASURES: Unless otherwise indicated, all erosion and sediment control practices will be constructed and maintained according to the minimum standards and specifications as set forth in the Virginia Erosion and Sediment Control Handbook, latest edition. The minimum standards of the Virginia Erosion and Sediment Control Regulations shall be adhered to unless otherwise waived or approved by variance. SILT FENCE (SF) — 3.05 Silt fencing will be installed as a first step in construction activities. Location and details are shown on the plans. TEMPORARY DIVERSION DIKE (DD) — 3.09 A temporary diversion dike will be installed before site grading begins, for the purposes of diverting storm and sediment -laden runoff to the appropriate outlet or trapping facility. Location and details are shown on the plans. TEMPORARY SEDIMENT TRAP (ST) — 3.13 A temporary sediment trap will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment traps are shown on the plans. TEMPORARY SEDIMENT BASIN (SB) — 3.14 A temporary sediment basin will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment basins are shown on the plans. DUST CONTROL (DC) — 3.39 A variety of methods are available to prevent surface and air movement of dust from exposed soil surfaces and reduce the presence of airborne substances which may present health hazards, traffic safety problems or harm animal or plant life. B7. PERMANENT AND TEMPORARY STABILIZATION: SURFACE ROUGHENING — 3.29 Disturbed areas to be seeded and mulched shall be left in a roughened condition to help decrease runoff velocities and aid in the establishment of vegetation. TOPSOILING — 3.30 Topsoil may be stripped from the area to be graded and stockpiles for later use. All stockpiles which will be left dormant for more than 30 days shall be temporarily seeded. A topsoil stockpile may be selected onsite by the developer and shall be temporarily protected with surrounding silt fencing. TEMPORARY SEEDING — 3.31 Temporary soil stabilization shall be applied within 7 days to denuded areas that may not be at final grade, but will remain dormant (undisturbed) for longer than 30 days and less 4 than 1 year. This includes, but is not limited to areas such as soil stockpiles. Seeded areas shall be limed when necessary at a rate of 2 tons per acre, and fertilized at a rate of 450 lbs. per acre of 10 -20 -20 (10 lbs. per 1,000 square feet) or equivalent. A Temporary Seeding Schedule is attached for proper seed selection. PERMANENT SEEDING — 3.32 A perennial vegetative covering shall be established on disturbed areas within 7 days of being brought to final grade on areas not otherwise protected. Selection of the seed mixture shall depend on the time of year it is to be applied according to the Permanent Seed Schedule as shown on the drawing. Seeded areas shall be Timed when necessary at a rate of 2 tons per acres, and fertilized at a rate of 1,000 lbs. per acre of 10 -20 -10 (10 lbs. per 1,000 square feet) or equivalent. MULCHING — 3.35 All seeded areas shall be mulched with straw immediately following seeding operations. Straw mulch shall be applied at a rate of two tons per acre. SOIL STABILIZATION BLANKETS AND MATTING — 3.36 Soil stabilization matting shall be applied in the conveyance areas of the designed diversions to help reduce velocities and aid in the establishment of vegetation. A detail showing the proper materials and installation is shown on the plan. B8. SOIL STOCKPILES AND BORROW AREAS No offsite activities are expected for this project. B9. STORM WATER MANAGEMENT: Stormwater management facility #2 at Hollymead, which is just upstream of the site, provides stormwater detention for parcel 46. Stormwater quality shall be provided by onsite facilities to be installed after site stabilization. 5 B10. MAINTENANCE SCHEDULE: A program of maintenance for the erosion and sediment controls specified in this narrative and shown on the plans are recommended as follows: 1. The Site Superintendent or his representative shall make a visual inspection of all erosion and sediment controls on a daily basis until the site is stabilized and especially after a heavy rainfall to assure that all controls are in place and that none have been damaged. Any damaged control shall be repaired prior to the end of each workday to include re- seeding if necessary. 2. All silt trapping devices shall be cleaned out at 50 percent capacity and sediment shall be disposed of by spreading on site or hauling away if not suitable for fill. 3. Gravel outlets shall be checked regularly for sediment buildup that may prevent drainage. Controls shall be inspected and repaired after each rainfall and cleaned if sediment has accumulated to half of the device's original height. 4. All earthen structures such as diversion dikes and berms shall be checked daily during construction for breaching by equipment. Repairs shall be made immediately. 5. Silt fences shall be checked after each rainstorm to assure they have not fallen or become clogged with silt. All repairs shall be made immediately. 6. All seeded areas shall be inspected regularly to see that good stand is maintained. Areas will be re- fertilized and re- seeded as necessary. 7. After construction operations have ended and disturbed areas have been stabilized, all berms and sediment - trapping devices may be removed after removal, the ground shall be restored to its natural or proposed condition to include establishment of permanent vegetation. Removal of any control is contingent upon approval of the County Inspector. 6 EROSION AND SEDIMENT CONTROL NARRATIVE FOR MASS GRADING OF ABBINGTON PLACE AT HOLLYMEAD TOWNCENTER July 20 2005. LOCATION: Tax Map 32 Parcel 46 Rivanna District, Albemarle County, Virginia DEVELOPER Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: JUL 2 2005RivannaEngineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 434.984.1599 F) 434.984.8863 A. MINIMUM STANDARDS (MS): All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. CONCENTRATED RUN -OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 1 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches c. Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 2 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E &S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24 -hour duration. 61. PROJECT DESCRIPTION: The purpose of this project is to mass grade the property. The total area to be disturbed by this project will be 13.8 acres. B2. EXISTING SITE CONDITIONS: The site is currently grassed with mixed deciduous trees. The current vegetation is small trees and brush. The existing topography is rolling terrain with slopes of 10 -20 %. B3. ADJACENT AREAS: The site is bounded to the east, west and south by the Hollymead Towncenter development, which is mixed use. To the north is the existing Deerwood subdivision. B4. SOIL DESCRIPTIONS: According to the Albemarle County Soils Survey conducted by the United States Department of Agriculture Soil Conservation Service, the primary soil types that may be disturbed during this scope of work have been identified as the following: 1. Pacolet Sandy loam (65B) — Permeability is moderate, surface runoff is rapid, and the hazard of erosion is severe. Hydrologic group B, K factor .28 2. Mount Lucas silt loam (57C) — Permeability is slow, surface runoff is medium, and the hazard of erosion is moderate. Hydrologic group C, K factor .28 3. Elioak Loam (27B) — Permeability is moderate, surface runoff is medium, and the hazard of erosion is moderate. Hydrologic group C, K factor .28 B5. CRITICAL AREAS: The stream along the north property line between Deerwood subdivision and parcel 46 is a critical area, and a 50' undisturbed stream buffer must be maintained. 3 B6. EROSION AND SEDIMENT CONTROL MEASURES: Unless otherwise indicated, all erosion and sediment control practices will be constructed and maintained according to the minimum standards and specifications as set forth in the Virginia Erosion and Sediment Control Handbook, latest edition. The minimum standards of the Virginia Erosion and Sediment Control Regulations shall be adhered to unless otherwise waived or approved by variance. SILT FENCE (SF) — 3.05 Silt fencing will be installed as a first step in construction activities. Location and details are shown on the plans. TEMPORARY DIVERSION DIKE (DD) — 3.09 A temporary diversion dike will be installed before site grading begins, for the purposes of diverting storm and sediment -laden runoff to the appropriate outlet or trapping facility. Location and details are shown on the plans. TEMPORARY SEDIMENT TRAP (ST) — 3.13 A temporary sediment trap will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment traps are shown on the plans. TEMPORARY SEDIMENT BASIN (SB) — 3.14 A temporary sediment basin will be installed before site grading begins, for the purpose of detaining sediment -laden runoff from disturbed areas. Location and details of the sediment basins are shown on the plans. DUST CONTROL (DC) — 3.39 A variety of methods are available to prevent surface and air movement of dust from exposed soil surfaces and reduce the presence of airborne substances which may present health hazards, traffic safety problems or harm animal or plant life. B7. PERMANENT AND TEMPORARY STABILIZATION: SURFACE ROUGHENING — 3.29 Disturbed areas to be seeded and mulched shall be left in a roughened condition to help decrease runoff velocities and aid in the establishment of vegetation. TOPSOILING — 3.30 Topsoil may be stripped from the area to be graded and stockpiles for later use. All stockpiles which will be left dormant for more than 30 days shall be temporarily seeded. A topsoil stockpile may be selected onsite by the developer and shall be temporarily protected with surrounding silt fencing. TEMPORARY SEEDING — 3.31 Temporary soil stabilization shall be applied within 7 days to denuded areas that may not be at final grade, but will remain dormant (undisturbed) for longer than 30 days and less than 1 year. This includes, but is not limited to areas such as soil stockpiles. Seeded areas shall be limed when necessary at a rate of 2 tons per acre, and fertilized at a rate of 450 lbs. per acre of 10 -20 -20 (10 lbs. per 1,000 square feet) or equivalent. A Temporary Seeding Schedule is attached for proper seed selection. 4 PERMANENT SEEDING — 3.32 A perennial vegetative covering shall be established on disturbed areas within 7 days of being brought to final grade on areas not otherwise protected. Selection of the seed mixture shall depend on the time of year it is to be applied according to the Permanent Seed Schedule as shown on the drawing. Seeded areas shall be limed when necessary at a rate of 2 tons per acres, and fertilized at a rate of 1,000 lbs. per acre of 10 -20 -10 (10 lbs. per 1,000 square feet) or equivalent. MULCHING — 3.35 All seeded areas shall be mulched with straw immediately following seeding operations. Straw mulch shall be applied at a rate of two tons per acre. SOIL STABILIZATION BLANKETS AND MATTING — 3.36 Soil stabilization matting shall be applied in the conveyance areas of the designed diversions to help reduce velocities and aid in the establishment of vegetation. A detail showing the proper materials and installation is shown on the plan. B8. SOIL STOCKPILES AND BORROW AREAS No offsite activities are expected for this project. B9. STORM WATER MANAGEMENT: Stormwater management facility #2 at Hollymead, which is just upstream of the site, provides stormwater detention for parcel 46. Stormwater quality shall be provided by onsite facilities to be installed after site stabilization. B10. MAINTENANCE SCHEDULE: A program of maintenance for the erosion and sediment controls specified in this narrative and shown on the plans are recommended as follows: 1. The Site Superintendent or his representative shall make a visual inspection of all erosion and sediment controls on a daily basis until the site is stabilized and especially after a heavy rainfall to assure that all controls are in place and that none have been damaged. Any damaged control shall be repaired prior to the end of each workday to include re- seeding if necessary. 2. All silt trapping devices shall be cleaned out at 50 percent capacity and sediment shall be disposed of by spreading on site or hauling away if not suitable for fill. 3. Gravel outlets shall be checked regularly for sediment buildup that may prevent drainage. Controls shall be inspected and repaired after each rainfall and cleaned if sediment has accumulated to half of the device's original height. 4. All earthen structures such as diversion dikes and berms shall be checked daily during construction for breaching by equipment. Repairs shall be made immediately. 5. Silt fences shall be checked after each rainstorm to assure they have not fallen or become clogged with silt. All repairs shall be made immediately. 6. All seeded areas shall be inspected regularly to see that good stand is maintained. Areas will be re- fertilized and re- seeded as necessary. 7. After construction operations have ended and disturbed areas have been stabilized, all berms and sediment - trapping devices may be removed after removal, the ground shall be restored to its natural or proposed condition to include establishment of permanent vegetation. Removal of any control is contingent upon approval of the County Inspector. 5 HYDROLOGIC /HYDRAULIC CALCULATIONS FOR ABINGTON PLACE AT HOLLYMEAD TOWNCENTER SEDIMENT BASIN -1 March 2, 2006 LOCATION: Rio District, Albemarle County, Virginia OWNER: Southern Development South Pantops Drive Charlottesville, VA 22911 PREPARED BY: Rivanna Engineering & Surveying, PLC 1350 Stony Point Rd. Charlottesville, VA 22911 P: 434.984.1599 F: 434.984.8863 INDEX Summary:2 Pre - Development: Flood Hydrographs:3 -4 Pre - Development: Pond & Outlet Structure:4 -8 Routed Hydrographs:9 -10 Drainage Area Maps are included attached at the end of this report. Rivanna Engineering & Surveying, PLC Page 1 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Summary One sediment basin will provide erosion and sediment control for Abington Place at Hollymead Towncenter. Drainage area DA -SB1 flows into SB -1. Rivanna Engineering & Surveying, PLC Page 2 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Pre - Development Hydrographs Name:DA -SB1 25 Yr Type:Modified Rational HYDROGRAPH INFORMATION] Peak Flow (Qp)31.94 (cfs) Time to Peak (Tp)10.00 min) Time of Base (Tb)25.00 min) Volume 0.55 ac -ft) Time Step 1.00 min) Flow Multiplier 1.00 RATIONAL HYDROGRAPH INFORMATION] Flow Multiplier 1.00 Receding Limb Factor 1.50 APPROXIMATE STORAGE] Maximum Outflow 0.00 cfs) Maximum Storage 0.55 cu ft) BASIN INFORMATION] WEIGHTED WATERSHED AREA] Description Area CN Runoff Coef None> Overall Approximation 10.15 NA 0.45 TIME CONCENTRATION -- User Defined] Time of Concentration (Tc)10.00 min) RAINFALL DESCRIPTION] Distribution Type Synthetic Total Precipitation 1.16 in) Return Period 25 yr) Storm Duration 0.17 hr) Rivanna Engineering & Surveying, PLC Page 3 434) 984-1599 Abington Place at Hollymead Towncenter, SB -1 Pre - Development Hydrographs DA -SB1 25 Yr Hydrograph Flow Values: Time vs. Flow Time Time Incremental Cumulative Incremental Design Interval Rainfall Rainfall Outflow Outflow min)in)in)cfs)cfs) 1 1.00 0.00 0.12 0.00 3.19 2 2.00 0.12 0.23 3.19 6.39 3 3.00 0.12 0.35 3.19 9.58 4 4.00 0.12 0.46 3.19 12.78 5 5.00 0.12 0.58 3.19 15.97 6 6.00 0.12 0.69 3.19 19.17 7 7.00 0.12 0.81 3.19 22.36 8 8.00 0.12 0.92 3.19 25.56 9 9.00 0.12 1.04 3.19 28.75 10 10.00 0.12 1.16 3.19 31.94 11 11.00 0.00 1.16 2.13 29.82 12 12.00 0.00 1.16 2.13 27.69 13 13.00 0.00 1.16 2.13 25.56 14 14.00 0.00 1.16 2.13 23.43 15 15.00 0.00 1.16 2.13 21.30 16 16.00 0.00 1.16 2.13 19.17 17 17.00 0.00 1.16 2.13 17.04 18 18.00 0.00 1.16 2.13 14.91 19 19.00 0.00 1.16 2.13 12.78 20 20.00 0.00 1.16 2.13 10.65 21 21.00 0.00 1.16 2.13 8.52 22 22.00 0.00 1.16 2.13 6.39 23 23.00 0.00 1.16 2.13 4.26 24 24.00 0.00 1.16 2.13 2.13 25 25.00 0.00 1.16 2.13 0.00 Rivanna Engineering & Surveying, PLC Page 4 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Pond Report Name: Water Quality Pond RATING CURVE LIMIT] Minimum Elevation 516.40 ft) Maximum Elevation 523.00 ft) Elevation Increment 0.20 ft) STAGE STORAGE INFORMATION] Storage Method: User - Defined Storage Input Method: Area Number Elevation Area Ave Area Volume Cumulative Volume ft)sq ft)sq ft)cu ft)cu ft) 1 516.40 0.00 0.00 0.00 0.00 2 518.90 0.00 0.00 0.00 0.00 3 519.00 8519.00 4259.50 425.95 425.95 4 520.50 9496.00 9007.50 13511.25 13937.20 5 522.50 13545.00 11520.50 23041.00 36978.20 6 523.00 14592.00 14068.50 7034.25 44012.45 DISCHARGE INFORMATION] Structure Number: 1 Type: Name:Stand Pipe Structure Number: 2 Type:Trapezoidal Weir Name:Bio- Filter #1 Weir RESERVOIR STAGE STORAGE /DISCHARGE] Elevation Stage Area Storage Discharge ft)ft)sq ft)cu ft)cfs) 516.80 0.40 0.00 0.00 0.00 517.20 0.80 0.00 0.00 0.00 517.60 1.20 0.00 0.00 0.00 518.00 1.60 0.00 0.00 0.00 518.40 2.00 0.00 0.00 0.00 518.80 2.40 0.00 0.00 0.00 519.20 2.80 8649.27 2568.73 C).00 519.60 3.20 8909.80 6080.54 0.00 520.00 3.60 9170.33 9696.57 0.00 520.40 4.00 9430.87 13416.81 0.00 520.80 4.40 10103.35 17309.92 0.00 521.20 4.80 10913.15 21513.22 0.00 521.60 5.20 11722.95 26040.44 7.11 522.00 5.60 12532.75 30891.58 18.83 522.40 6.00 13342.55 36066.64 29.87 522.80 6.40 14173.20 41569.09 49.65 Maximum Storage 44445.61 cu ft) Maximum Discharge 61.87 cfs) Rivanna Engineering & Surveying, PLC Page 5 434) 984-1599 Abington Place at Hollymead Towncenter, SB -1 Pond Report Type Stand Pipe Name Stand Pipe RATING CURVE LIMIT] Minimum Elevation 516.50 ft) Maximum Elevation 523.00 ft) Elevation Increment 0.20 ft) STAND PIPE INFORMATION] ORIFICE INFORMATION] Height 3.50 ft) Width 3.00 ft) Crest Length 13.00 ft) Effective Crest Length 13.00 ft) Orifice Coefficient 0.60 Fractional Open Area 0.60 ORIFICE EQUATION] Q = Co *A((2gh) /k) ^0.5 DEFINITIONS] Co Orifice Coefficient A Wetted Area, sq ft) WEIR INFORMATION] Crest Elevation 521.30 ft) Weir Coefficient 3.33 Exponential 1.50 WEIR EQUATION] Q = Cw * L * H ^exp DEFINITIONS] Cw Weir Coefficient H Headwater depth above inlet control section invert ft L Crest length ft CULVERT INFORMATION] Type Circular Concrete - Square Edge with Headwall OUTLET STRUCTURE INFORMATION] Diameter 18.00 in) Invert Elevation 516.50 ft) OUTLET STRUCTURE REPORT Pipe Length 86.00 ft) Slope 0.03 Manning's n Value 0.01 Orifice Coefficient 0.60 Tailwater Elevation 514.50 ft) Number of Barrels 1 Rivanna Engineering & Surveying, PLC Page 6 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Pond Report UNSUBMERGED EQUATION] H /Diam = Hc/ Diam +K *(Q /(A *Diam ^0.5)) ^M -0.5 *S Coefficient K 0.01 Coefficient M 2.00 Q Maximum 7.58 SUBMERGED EQUATION] H /Diam = c *(Q /(A *Diam ^0.5)) ^2 +Y -0.5 *S Coefficient c 0.04 Coefficient Y 0.67 Q Minimum 8.66 DEFINITIONS] H Headwater depth above inlet control section invert, ft) Diam Interior height of culvert barrel, ft) He Specific head at critical depth (dc +Vc ^2 /2g), ft) Q Discharge, cfs) A Full cross sectional area of culvert barrel, sq ft) S Culvert barrel slope, ft /ft) STAND PIPE STAGE VS. DISCHARGE] Elevation Stage Weirs Orifices Stand Pipe Culvert Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.90 0.40 0.00 0.00 0.00 0.70 0.00 517.30 0.80 0.00 0.00 0.00 2.40 0.00 517.70 1.20 0.00 0.00 0.00 4.60 0.00 518.10 1.60 0.00 0.00 0.00 6.91 0.00 518.50 2.00 0.00 0.00 0.00 8.94 0.00 518.90 2.40 0.00 0.00 0.00 10.55 0.00 519.30 2.80 0.00 0.00 0.00 11.94 0.00 519.70 3.20 0.00 0.00 0.00 13.19 0.00 520.10 3.60 0.00 0.00 0.00 14.33 0.00 520.50 4.00 0.00 0.00 0.00 15.39 0.00 520.90 4.40 0.00 0.00 0.00 16.38 0.00 521.30 4.80 0.00 0.00 0.00 17.31 0.00 521.70 5.20 0.00 0.00 10.95 18.19 10.95 522.10 5.60 0.00 0.00 26.53 19.04 19.04 522.50 6.00 0.00 0.00 33.22 19.84 19.84 522.90 6.40 0.00 0.00 38.35 20.62 20.62 WEIR STAGE VS. DISCHARGE] Elevation Stage Weir 1 Weir 2 Weir 3 Weir 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.90 0.40 0.00 0.00 0.00 0.00 0.00 517.30 0.80 0.00 0.00 0.00 0.00 0.00 517.70 1.20 0.00 0.00 0.00 0.00 0.00 518.10 1.60 0.00 0.00 0.00 0.00 0.00 518.50 2.00 0.00 0.00 0.00 0.00 0.00 518.90 2.40 0.00 0.00 0.00 0.00 0.00 519.30 2.80 0.00 0.00 0.00 0.00 0.00 519.70 3.20 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 7 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Pond Report 520.10 3.60 0.00 0.00 0.00 0.00 0.00 520.50 4.00 0.00 0.00 0.00 0.00 0.00 520.90 4.40 0.00 0.00 0.00 0.00 0.00 521.30 4.80 0.00 0.00 0.00 0.00 0.00 521.70 5.20 0.00 0.00 0.00 0.00 0.00 522.10 5.60 0.00 0.00 0.00 0.00 0.00 522.50 6.00 0.00 0.00 0.00 0.00 0.00 522.90 6.40 0.00 0.00 0.00 0.00 0.00 ORIFICE STAGE VS. DISCHARGE] Elevation Stage Orifice 1 Orifice 2 Orifice 3 Orifice 4 Total ft)ft)cfs)cfs)cfs)cfs)cfs) 516.90 0.40 0.00 0.00 0.00 0.00 0.00 517.30 0.80 0.00 0.00 0.00 0.00 0.00 517.70 1.20 0.00 0.00 0.00 0.00 0.00 518.10 1.60 0.00 0.00 0.00 0.00 0.00 518.50 2.00 0.00 0.00 0.00 0.00 0.00 518.90 2.40 0.00 0.00 0.00 0.00 0.00 519.30 2.80 0.00 0.00 0.00 0.00 0.00 519.70 3.20 0.00 0.00 0.00 0.00 0.00 520.10 3.60 0.00 0.00 0.00 0.00 0.00 520.50 4.00 0.00 0.00 0.00 0.00 0.00 520.90 4.40 0.00 0.00 0.00 0.00 0.00 521.30 4.80 0.00 0.00 0.00 0.00 0.00 521.70 5.20 0.00 0.00 0.00 0.00 0.00 522.10 5.60 0.00 0.00 0.00 0.00 0.00 522.50 6.00 0.00 0.00 0.00 0.00 0.00 522.90 6.40 0.00 0.00 0.00 0.00 0.00 Rivanna Engineering & Surveying, PLC Page 8 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Routed Hydrographs Name:DA -SB1 25 Rtd Type:Reservoir: Modified Puls HYDROGRAPH INFORMATION] Peak Flow (Qp)1.31 (cfs) Time to Peak (Tp)24.00 min) Time of Base (Tb)530.00 min) Volume 0.06 (ac -ft) Time Step 1.00 min) Peak Elevation 521.39 (ft) Detention Time NA RESERVOIR STRUCTURE INFORMATION] Number 1 Name Water Quality Pond Storage Type User - Defined Area Maximum Storage 44445.61 cu ft) Maximum Discharge 61.87 cfs) INFLOW HYDROGRAPH INFORMATION] Number 1 Name DA -SB1 25 Yr Peak Flow (Qp)31.94 cfs) Time to Peak (Tp)10.00 min) Time of Base (Tb)25.00 (min) Volume 0.55 ac -ft) Flow Multiplier 1.00 EQUATION] I1 +I2) + (2(S1) /dt) -01 = (2(S2) /dt) +02 Where: Il = Previous inflow I2 = Current inflow S1 = Previous storage S2 = Current storage dt = Time increment 01 = Previous outflow 02 = Current outflow A = (I1 + I2) B = (2 S1) dt) - 01 C = (2 (S2) dt) + 02 Rivanna Engineering & Surveying, PLC Page 9 434) 984 -1599 Abington Place at Hollymead Towncenter, SB -1 Routed Hydrographs DA-S81 25 Rtd Computation of Reservoir Outflow Table of Modified Puls Method Intv Time Inflow A B C Outflow Storage Elev min) cfs)cfs)cfs)cfs)cfs)cu ft) ft) 1 1.00 3.19 3.19 0.00 191.66 0.00 95.83 518.82 2 2.00 6.39 9.58 191.66 766.66 0.00 383.33 518.89 3 3.00 9.58 15.97 766.66 1724.98 0.00 862.49 519.00 4 4.00 12.78 22.36 1724.98 3066.62 0.00 1533.31 519.08 5 5.00 15.97 28.75 3066.62 4791.60 0.00 2395.80 519.18 6 6.00 19.17 35.14 4791.60 6899.90 0.00 3449.95 519.30 7 7.00 22.36 41.53 6899.90 9391.54 0.00 4695.77 519.44 8 8.00 25.56 47.92 9391.54 12266.50 0.00 6133.25 519.61 9 9.00 28.75 54.30 12266.50 15524.79 0.00 7762.39 519.79 10 10.00 31.94 60.69 15524.79 19166.40 0.00 9583.20 519.99 11 11.00 29.82 61.76 19166.40 22872.16 0.00 11436.08 520.19 12 12.00 27.69 57.51 22872.16 26322.62 0.00 13161.31 520.37 13 13.00 25.56 53.25 26322.62 29517.54 0.00 14758.77 520.54 14 14.00 23.43 48.99 29517.54 32456.90 0.00 16228.45 520.69 15 15.00 21.30 44.73 32456.90 35140.70 0.00 17570.35 520.83 16 16.00 19.17 40.47 35140.70 37568.96 0.00 18784.48 520.94 17 17.00 17.04 36.21 37568.96 39741.66 0.00 19870.83 521.05 18 18.00 14.91 31.95 39741.66 41658.81 0.00 20829.41 521.14 19 19.00 12.78 27.69 41658.81 43314.99 0.09 21657.54 521.21 20 20.00 10.65 23.43 43314.99 44684.64 0.51 22342.58 521.27 21 21.00 8.52 19.17 44684.64 45753.77 0.84 22877.30 521.32 22 22.00 6.39 14.92 45753.77 46533.27 1.08 23267.17 521.36 23 23.00 4.26 10.66 46533.27 47033.65 1.23 23517.44 521.38 24 24.00 2.13 6.40 47033.65 47265.05 1.31 23633.18 521.39 25 25.00 0.00 2.14 47265.05 47237.21 1.30 23619.25 521.39 26 26.00 0.00 0.00 47237.21 47084.70 1.25 23542.98 521.38 27 27.00 0.00 0.00 47084.70 46937.48 1.20 23469.34 521.38 28 28.00 0.00 0.00 46937.48 46795.60 1.16 23398.38 521.37 29 29.00 0.00 0.00 46795.60 46658.87 1.12 23330.00 521.36 30 30.00 0.00 0.00 46658.87 46527.10 1.08 23264.09 521.36 31 31.00 0.00 0.00 46527.10 46400.11 1.04 23200.57 521.35 32 32.00 0.00 0.00 46400.11 46277.72 1.00 23139.36 521.35 33 33.00 0.00 0.00 46277.72 46159.78 0.97 23080.37 521.34 34 34.00 0.00 0.00 46159.78 46046.11 0.93 23023.52 521.34 35 35.00 0.00 0.00 46046.11 45936.57 0.90 22968.73 521.33 36 36.00 0.00 0.00 45936.57 45831.00 0.86 22915.93 521.33 37 37.00 0.00 0.00 45831.00 45729.26 0.83 22865.04 521.32 38 38.00 0.00 0.00 45729.26 45631.21 0.80 22816.01 521.32 39 39.00 0.00 0.00 45631.21 45536.72 0.77 22768.74 521.31 40 40.00 0.00 0.00 45536.72 45445.65 0.75 22723.20 521.31 Rivanna Engineering & Surveying, PLC Page 10 434) 984 -1599 TEMPORARY SEDIMENT BASIN PROJECT Abington Place f PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 10/25/2005 LOCATION L BY JMS INPUT DRAINAGE AREA 10.40 ac BASIN VOLUME DESIGN WET STORAGE 1. MINIMUM REQUIRED VOLUME i 696.80 cy 2. AVAILABLE BASIN VOLUME AVERAGE END AREA - BASIN VOLUME ESTIMATES 1 ELEVATION AREA VOLUME VOLUME TOTAL sf at cy cy 532 3,338.00 8,415.00 311.67 534 5,077.00 311.67 14,433.0 534.56 536 9,356.00 846.22 I 22,788.00 844.00 538 13,432 00 1,690.22 REQUIRED WET STORAGE VOLUME 696.80 cy APPROX. ELEVATION i --535.28 3. EXCAVATE CUBIC YARDS 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 348.40 cy 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 534.29 6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL INVERT DEWATERING ORIFICE R'QD 535.28 INVERT DEWATERING ORIFICE USED 535.30 APPROX. VOLUME AT INVERT USED 7 cy DISTANCE FROM INVERT TO C/O LEVEL 1.01 ft DISTANCE ACCEPTABLE WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7. MINIMUM REQUIRED VOLUME 696.80 cy 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER 537.40 APPROX. AVAILABLE TOTAL VOLUME 14 1.86 c_y ADEQUATE DRY STORAGE VOLUME 9. DIAMETER OF DEWATERING ORIFICE Q 0.90 cfs d(1ST ITERATION)5.80 in d(2nd ITERATION)6.19 in d(3rd ITERATION)In d(4th ITERATION)6.23 in USE d 6 in 10. DIAMETER OF FLEXIBLE TUBING 8 In STANDARD SIZE Page 1 Abington - SB.xls J TEMPORARY SEDIMENT BASIN PROJECT Abington Place I PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 10/25/2005 LOCATION BY JMS PRELIMINARY DESIGN 11. PRELIMINARY DESIGN ELEVATIONS: CREST OF RISER 537.40 It TOP OF DAM 539.40 tt DESIGN HIGH WATER 538.20,tt UPSTREAM TOE - - i 529.00 tt BASIN SHAPE 12. LENGTH OF FLOW / EFFECTIVE WIDTH SURFACE AREA OF NORMAL POOL 9100 sf LENGTH OF FLOW PATH 108 ft EFFECTIVE WIDTH 84 ft L/We 1.28IBAFFLES REQUIRED RUNOFF RATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE 13. FLOW FROM 2 -YEAR STORM C:0.50 Tc:5.0 I:5.5 in /hr Q=28.6 cfs 14. FLOW FROM 25 -YEAR STORM C:0.50 Tc.5.0 I:8.1 in /hr Q.42.1 cfs PRINCIPAL SPILLWAY DESIGN 15. REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY ?JY /NJ; REQUIRED SPILLWAY CAPACITY:28.6 CFS 16. ASSUMED AVAILABLE HEAD: ELEV. OF CREST OF E.S. IF USED:538.00 ASSUMED AVAILABLE HEAD=0.60 tt 17. RISER DIMENSIONS: I RISER DIAMETER:36.00 In From Plate 3.14 -8 or Calcs) ACTUAL MAX. ELEV.:537.40 It From Calcs if appropriate) ACTUAL HEAD:0.00 ft From Plate 3.14 -8 or Cal) 18. BARREL LENGTH: BARREL LENGTH:I 33.00 ft BARREL INVERT OUT:(529.00 ft HEAD H ON BARREL:I 8.40 ft From Plate 3.14 -77 19. BARREL DIAMETER: 1 BARREL DIAMETER 24 in From Plate 3.14A or 3.148) 20. TRASH RACK AND ANTI - VORTEX DEVICE: DIAMETER:48 in From Plate 3.14D) HEIGHT:24 In Page 2 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT lAbington Place PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #1 DATE 10/25/2005 LOCATION BY JM S 1 I EMERGENCY SPILLWAY DESIGN 21. REQUIRED SPILLWAY CAPACITY: I Qe = Q(25)-Qp =13.5 CFS 22. DIMENSIONS: 1 BOTTOM WIDTH (b):18.00 ft From Table 3.14 -C) SLOPE OF EXIT CHANNEL (s):0.04 tt/tt i (From Table 3.14 -C) MIN. LENGTH EXIT CHANNEL (x):33.00 ft From Table 3.14 -C) I I ANTI -SEEP COLLAR DESIGN I 23. DIMENSIONS: DEPTH WATER @ CREST OF P.S. 8.40 it SLOPE UPSTREAM FACE DAM (Z):2.00 :1 SLOPE P.S. BARREL (Sb):6.10 % LENGTH BARREL IN SAT. ZONE (Ls):60.00 It From Plate 3.14 -11) 24. NUMBER OF COLLARS: NUMBER REQUIRED:2 From Plate 3.14 -12) I DIMENSIONS:5.0 tt "2 From Plate 3.14-12) FINAL DESIGN ELEVATIONS 25. ELEVATIONS: 1 TOP OF DAM 539.40 ft DESIGN HIGH WATER:537.40 ft EMERGENCY SPILLWAY CREST:538.00 ft PRINCIPAL SPILLWAY CREST:537.40 ft DEWATERING ORIFICE INVERT:535.30 ft CLEANOUT ELEVATION:534.29 ft Page 3 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abington Place, EnS PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #2 DATE 10/25/2005 LOCATION BY JMS INPUT f _ DRAINAGE AREA 1 8.90 ac BASIN VOLUME DESIGN WET STORAGE 1. MINIMUM REQUIRED VOLUME 596.30 cy 2. AVAILABLE BASIN VOLUME AVERAGE END AREA - BASIN VOLUME ESTIMATES I ELEVAiic? AREA VOLUME VOLUME TOTAL ft st of cV cy 544 2,037.00 7,711.00 285.59 546 5,674.00 285.59 15,224.00 563.85 548 9,550.00 849.44 23,231.00 860.41 550 13,681.00 1,709.85 REQUIRED WET STORAGE VOLUME 596.30 cy APPROX. ELEVATION 547.03 3. EXCAVATE CUBIC YARDS 4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 298.15jcy 5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 546.20 6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL INVERT DEWATERING ORIFICE R'QD 1 547.03 INVERT DEWATERING ORIFICE USED 547.20 APPROX. VOLUME AT INVERT USED 663.44 cy DISTANCE FROM INVERT TO C/0 LEVEL 1.00 ft DISTANCE NOT ACCEPTABLE- 1' R'QD WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7. MINIMUM REQUIRED VOLUME 596.30 cy 8. TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER 1 548.90 APPROX. AVAILABLE TOTAL VOLUME 1268.75Icy ADEQUATE DRY STORAGE VOLUME 9. DIAMETER OF DEWATERING ORIFICE p 0.76 cfs d(1ST ITERATION)5.59 in d(2nd ITERATION)6.06 in d(3rd ITERATION)6.11 in d(4th ITERATION)6.11 In USE d 7 6 in 10. DIAMETER FLEXIBLE TUBING 8 in 1STANDARD SIZE Page 1 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT Abington Place, EnS PROJ NO. BASIN #TEMPORARY SEDIMENT BASIN #2 DATE 10/25/2005 LOCATION BY JMS PRELIMINARY DESIGN 11. PRELIMINARY DESIGN ELEVATIONS: CREST OF RISERI 548.90 ft TOP OF DAM 550.80 tt I DESIGN HIGH WATER 549.30 tt UPSTREAM TOE OF DAM 541.001tt I BASIN SHAPE 12. LENGTH OF FLOW / EFFECTIVE WIDTH: SURFACE AREA OF NORMAL POOL 8500 sf LENGTH OF FLOW PATH 90 tt EFFECTIVE WIDTH 94 It L/We 0.95 BAFFLES REQUIRED RUNOFF RATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE 13. FLOW FROM 2 -YEAR STORM C:,0.50 Tc:5.0 I:5.5 In /hr 0=24.5 cfs 14. FLOW FROM 25 -YEAR STORM C:f 0.50 Tc:5.0 I:8.1 in /hr Q=36.0 cfs PRINCIPAL SPILLWAY DESIGN 15. REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY? (Y /N)'Y REQUIRED SPILLWAY CAPACITY:24.5 CFS 16. ASSUMED AVAILABLE HEAD: ELEV. OF CREST OF E.S. IF USED:549.30 ASSUMED AVAILABLE HEAD_0.40 ft 17. RISER DIMENSIONS: RISER DIAMETER 36.00 in From Plate 3.14 -8 or Calcs) 548.90 tt From Calcs if appropriate)ACTUAL MAX. ELEV.: A C TUAL HEAD:0.00 ft F_rom Plate 3.14 -8 or Calcs) 18. BARREL LENGTH: 1 BARREL LENGTH:37.00 tt BARREL INVERT OUT:540.30 tt HEAD HON BARREL:8.60 It From Plate 3.14 -71 19. BARREL DIAMETER: BARREL DIAMETER:24 In om P_ late 3.14A or 3 14B) 20. TRASH RACK AND ANTI - VORTEX DEVICE: DIAMETER:48 In From Plate 3.14Dj HEIGHT:24 In Page 2 Abington - SB.xls TEMPORARY SEDIMENT BASIN PROJECT lAbington Place, EnS PROJ NO. BASIN #1TEMPORARY SEDIMENT BASIN #2 1DATE 10/25/2005 LOCATION BY JMS 1 EMERGENCY SPILLWAY DESIGN 21. REQUIRED SPILLWAY CAPACITY: Qe = Q(25) -Qp =1 11.6 CFS 22. DIMENSIONS: 1 BOTTOM WIDTH (b) •16.00 tt j from Table 3.14-CL SLOPE OF EXIT CHANNEL (s):'0.04 ft/ft From Table 3.14 -C) MIN. LENGTH EXIT CHANNEL (x):33.00 ft From Table 3.14 -C) 1 ANTI -SEEP COLLAR DESIGN 23. DIMENSIONS: DEPTH WATER @ CREST OF P.S. (Y):7.90 ft SLOPE UPSTREAM FACE DAM (Z4:2.00 :1 SLOPE P.S. BARREL (Sb):7.30 % LENGTH BARREL IN SAT. ZONE (Ls):70.00 ft From Plate 3 14 -11) 24. NUMBER OF COLLARS: NUMBER REQUIRED:2 From Plate 3.14 -12) DIMENSIONS:5.3 ft"2 From Plate 3.14 -12) FINAL DESIGN ELEVATIONS 1 25. ELEVATIONS: TOP OF DAM:550.80 tt DESIGN HIGH WATER:548.90 ft EMERGENCY SPILLWAY CREST:549.30 ft PRINCIPAL SPILLWAY CREST:548.90 ft DEWATERING ORIFICE INVERT:547.20 ft CLEANOUT ELEVATION:546.20 ft Page 3 Abington - SB.xls b C1) CO N Cn / n to cc C7 C7 0 C7 C7 C7 d CO W co m m co CO CO W O O O r. CI CD V r) CD CD O O LO ( n N LO C7 M r) m r M o co 0 r r m m CO O Cn N. O m m ( D ( D m CA 0 CO Wo IIc c c 0 Ja) aW0 2 O J d c 0co 0 O I I` CO m m c m r r co cj al V W c j r N N N CO CO CO r) CO CO O O O O O O a) 0 0 0 0 0 0 C 0) a n n ( n ( n LO N O N N N N N N T O n LO LO N000000 Q C]. 000000 CO O O O O 0 0 0 N0 o O) ( D 0 L() J PO CD CD CO o N N CV ( D m O N r N Q) I- Cn M C • N o o 0) rn ( o C' cam L. 6 o o r o of C in v CO ( n Co N 0) in ( n r) o r) C U O O O r N N Q Q U 0) CO D) h N O cY O O I CO Cr) TD"C LO In LO u) LO C 7 V v v c o 0 0 o o c) 0 W N a' CD m r) O n N O I y Q O O O r r O d O O O O O O 0 n r O N 0 m ( 0U 0 0 0 0 0 0 J O r N CO 4: 1- Cn