Loading...
HomeMy WebLinkAboutSDP201600008 Review Comments Initial Site Plan 2016-03-24Maude Ginty Service Auth6rity TO: Ellie Ray FROM: Alexander J. Morrison, P.E., Civil Engineer DATE: March 24, 2016 RE: Site Plan Technical Review for: SDP201600008: Mill Creek Industrial Park Lot 11 — Initial Site Plan The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 10 inch water line is located approximately 30' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately on site distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may/may not be signed. 12. RWSA approval for water and/or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: Correctly show existing ACSA water and sewer utilities. Label existing ACSA utilities by size and material. ACSA cannot locate existing meter setters on site. Propose a new water service connection. Call -out meter "to be sized by ACSA." 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698 www.serviceauthority.org