HomeMy WebLinkAboutSDP200500094 Review Comments 2005-09-28U I i gh-aik Fr; r IRGtN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:SDP 2005 -094, University Village Phase III, Final Site Plan Plan preparer:Mr. Eric Woolley, PE, The Cox Company fax 434.295.7540) Owner or rep.:Mr. David Turner, MD Development, LLC fax 434.972.7769) Date received:19 September 2005 (plan date 12 September 2005) Date of Comment: 28 September 2005 Lead Engineer:Allan Schuck, Engineer The final site plan for University Village Phase III, received on 19 September 2005, has been reviewed. The engineering review for current development will recommend approval of the final site plan when the following items are adequately addressed: A. Final site plan comments: (Allan Schuck) 1. Please provide a signed and dated professional seal on the computations. [18- 32.6.1] 2. Please revise Note J on Sheet C -1.0. The pavement width is not specified in typical section. 3. There are two Sheets numbered C -5.0. Please revise these sheets with the next submittal. 4. Please show and label all applicable traffic control signage. [18- 4.12.15f] 5. The invert elevations at STR -5 on the profiles do not match the elevations on plan sheet C -4.0. 6. Please show the outfall elevations for STR -1 outfall on plan sheet C -4.0. [18- 32.6.6d3] 7. The outfall area at Point 1 cannot be approved as shown. The water velocity exceeds 10 ft /sec and comes out of the pipe onto a 2:1 riprap slope. The designer will provide the type of velocity dissipation appropriate for velocity, pipe size, and discharge and site conditions. [DM505E7 &8] 8. Please show the entire pipe drainage system and computations for the eastern reach. The system needs to handle the 10 -year storm and address MS -19 concerns. [18- 32.6.6d1, 32- 6.6d3] 9. The drainage computations for the eastern reach do not have correlating drainage areas shown on the plans. [DM909.1 A(1)] The computations were not reviewed for the eastern reach pipes. 10. Structure #8 needs to provide 100% capture to eliminate drainage getting to Crestwood Drive or provide additional information on downstream structures. [DM505G4] 11. Please show the pipe and structure on the plan sheets that correlate to Pipe 1 on Page 1 of the eastern reach computations. 12. Please show inlet shaping for most of the structures because the flow drop exceeds 4 feet. Please refer to VDOT standard, IS -1, Road & Bridge Standards, Volume 1. [DM505E9] 13. The pavement detail, shown on Sheet C -7.0, needs to be referenced on Sheets C -4.0, C -5.0, C -6.0. 14. Additional comments and /or conditions may be forthcoming, on the review of future submittals, due to the changes required for this plan submittal. B. Stormwater management plan comments: (Allan Schuck) Reviewed under WPO- 2005 -00074 15. The SWM plan for this project has been submitted by the applicant. It is under review. C. Erosion and sediment control plan comments: (Allan Schuck) Reviewed under WPO- 2005 -00074 16. The E &SC plan for this project has been submitted by the applicant. It is under review. Items B and C need to be completed before a grading permit can be issued for this project. Copy: SDP -2003 -00086 (Eng. File 2526) Preliminary site plan file File: EI_fsp_ ADS 05-094 University Village Phase I11 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: c litho DATE: Qct. Le S,.2.40S PROJECT NAME: Chive. s: j 0 (l - 3e gaffe F..lA( SI P Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number Copies Erosion & Sediment Control Plan (E &S) Mitigation Plan (MP) Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP)SDP oS- o9y Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) Other: Please explain Non Cwlr A rtSPo / re.les'f.. SDI' G 09`(y / 3 For staff use only) Submittal Code Copies Distribute To:Submittal Code Copies Distribute To: r s ,JclIKc1c. FSP O ffer S+erAe, WA fie, ES P ! o t.e.6-A r7 W Ike rs WD 3 6A,- wLeL.K. G /Sias University Village Phase III 5fi July 15, 2005 Page 2 A.Curre t Development planning review approval to include: 1.32.6.6(/)] Provide a description and photograph or diagram and show the location of each type of outdoor luminaire that emits 3,000 or more initial lumens on the site plan. Please be aware that installation of such luminaires in the future that are not shown on this plan shall require an amendment to this plan. i 2.32.6.6(1)] [4.17.4(h)] Povide a photometric plan on the site plan demonstrating that all parking area luminaires are in compliance with 4.17.4 b. 3.32.7.9] Approval of a final landscape plan depicting the species types, number and location of all proposed planting materials. Please note that this requirement must include the fie.,,,;provision of a landscaped area providing canopy coverage equal to at least ten (10) percent of the total site. 4.32.7.9.7(h)] Interior landscaping equal to five (5) percent of the paved parking and New . Nis ,,. circulation area shall be provided. Please note that this shall be a calculation of the totalk s 3 ground area dedicated to those interior plantings and not the sum of the canopy to be provided no 7U „dp by those items at ten (10) years maturity. 5.32.7.9.4h] A conservation plan checklist must be completed and incorporated into the site plan with notes to show how any individual trees and groups of trees designated to remain will be protected during the construction of this project. The locations of any tree protection fencing and other methods of protection must be shown on the plan for clear identification during field inspections. 6.32.5.6(0J Approval and recordation of a plat showing the proposed relocation of the northern boundary line to allow compliance with the height- related setbacks for the Phase II building addition. 7.Architectural Review Board approval and issuance of a Certificate of Appropriateness. B. Current Development engineering approval to include: 1.Submittal of a tentative final site plan that complies with all applicable items as specified in the Design Standards Manual, section 902. C.Albemarle County Service Authority approval to include: 1.Final approval will not be granted until final approval of water line relocation plan. This plan must be submitted directly to the Service Authority. Please contact me at your earliest convenience if you have any questions or require additional information. Sincerely, C.r,1 crf b.;,C sia. ,,,, Stephen B. Waller, AICP es,4 Senior Planner Current Development Division stii'aller ujulhenrur le.org Attachments: Final Site Plan Checklist Copy: MD Development LLC, C/O Mike Matthews File SDP 03 -086 llt :1I.H County of Albemarle Department of Community Development Memorandum To:Eric Woolley From:Stephen B. Waller AICP, Senior Planner Division:Current Development Planner Date:October 5, 2005 Subject:SDP 05 -094 University Village Phase III Final Site Plan The Albemarle County Department of Community Development Current Development Division will not grant final tentative approval of the above - mentioned site plan for planning and zoning review until the following comments have been addressed satisfactorily. Please note that the following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on the submittal of additional information for review. [Where appropriate, continents are preceded by the applicable reference.]: 1.32.5.6(a)] Approval and recordation of a plat showing the proposed relocation of the northern boundary line to allow compliance with the height - related setbacks for the Phase II building addition. 2.Show and label the location of the timber bridge that is detailed on Sheet 11 of 16 on the site plan. 3.32.7.9.4(a)] Provide the caliper for all deciduous trees and any screening shrubs, and the height at planting for all evergreen trees in the planting schedule. 4.32.6.60] Please be sure that the locations of all wall - mounted lighting fixtures (if any) must be shown on the site plan and with diagrams or photos with descriptions demonstrating compliance with the requirements set forth in Section 4.17.4 b. 5.32.7.9.4(b)] Show the limits of clearing related to the treeline and wooded area surrounding the stormwater management facility. Please also provide and show the tree protection fencing location corresponding with those limits on the plan. 6.32.7.9.7(b)] Provide a notation of the amount of interior landscaping that is being provided on this site to meet the minimum requirement of five (5) percent of the paved parking and circulation. Please be aware that this shall be a calculation of the total ground area dedicated to those interior plantings and not the sum of the canopy to be provided by those items at ten (10) years maturity. 7.32.7.9.90)(44 Tree canopy equal to twenty (20) percent of the total site are is required for all residentially zoned properties developed at a gross density of 10 acres or less. Provide itemized notations of the canopy being provided by each proposed tree species and a calculation of the total area of the canopy being provided. This includes any bonuses for areas where existing trees will be maintained. University Village III Final October 5, 2005 Page 2 8.At least four (4) of the Pyr Calleryana trees are being proposed within the gas and water line easements. No plantings other that shallow rooted shrubs can be approved in utility easements without the written consent of the agencies that are responsible for maintaining those utility lines. 9.Please revise the signature panel on the cover sheet with approval lines for the following reviewers and agencies: CURRENT DEVELOPMENT PLANNER/ZONING CURRENT DEVELOPMENT ENGINEER INSPECTIONS DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION Please contact me at your earliest convenience if you have any questions or require further assistance. Copy: File SDP 05 -094 of Ar.R q X F n A 7Rc.i COUNTY OF ALBEMARLE The following facsimile message is being sent from: Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone: (434) 296 -5832 Fax: (434) 972 -4126 Date: October 5, 2005 Number of Pages (including cover): Sent To: Eric Wooley Fax: 434)295 -7540 David Turner 434) 295 -3203 Sender: Stephen B. Waller AICP, Senior Planner Division: Current Development RE: SDP 05 -094 University Village Phase 111 Final Site Plan Message: Hello Eric: Please find all of the comments received to this date for the above - mentioned final site plan attached with this transmittal (Fire /Rescue comments or approvals have not been receive yet). Please revise the plan to address the attached comments and submit the number of revised plan copies as specified on the attached sheet entitled "Revised Application Submittal" along with any additional information such as cover letters or written responses to the Department of Community Development at your earliest convenience. The site plan will not be accepted for signatures until all departments and reviewers have granted final tentative approval. In accordance with Section 32.6.1, two (2) mylar copies and one (1) paper copy of the final site plan must be sealed, signed and dated by an architect, professional engineer, land surveyor, or certified landscape architect and accompanied with the $410 final site development plan fee when submitted for final approval. Please contact me at your earliest convenience if you have any questions or require further assistance. Sincerely, Stephen B. Waller, AICP Senior Planner Current Development Attachments: Revised Application Submittal fonn Copy: File SDP 05 -094 40Pki , OY AI,44., Very County of Albemarle Department of Community Development Memorandum To:Eric Woolley From:Stephen B. Waller AICP, Senior Planner Division:Current Development Planner Date:October 5, 2005 Subject:SDP 05 -094 University Village Phase I1I Final Site Plan The Albemarle County Department of Community Development Current Development Division will not grant final tentative approval of the above- mentioned site plan for planning and zoning review until the following comments have been addressed satisfactorily. Please note that the following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on the submittal of additional information for review. [Where appropriate, comments are preceded by the applicable reference.]: 1.32.5.6(a)] Approval and recordation of a plat showing the proposed relocation of the northern boundary line to allow compliance with the height- related setbacks for the Phase I1 building addition. 2.Show and label the location of the timber bridge that is detailed on Sheet 11 of 16 on the site plan. 3.32.7.9.4(a)] Provide the caliper for all deciduous trees and any screening shrubs, and the height at planting for all evergreen trees in the planting schedule. 4.32.6.6(j)J Please be sure that the locations of all wall- mounted lighting fixtures (if any) must be shown on the site plan and with diagrams or photos with descriptions demonstrating compliance with the requirements set forth in Section 4.17.4 b. 5.32.7.9.4(b)] Show the limits of clearing related to the treeline and wooded area surrounding the stormwater management facility. Please also provide and show the tree protection fencing location corresponding with those limits on the plan. 6.32.7.9.7(b)] Provide a notation of the amount of interior landscaping that is being provided on this site to meet the minimum requirement of five (5) percent of the paved parking and circulation. Please be aware that this shall be a calculation of the total ground area dedicated to those interior plantings and not the sum of the canopy to be provided by those items at ten (10) years maturity. 7.32.7.9.9(b)(4)] Tree canopy equal to twenty (20) percent of the total site are is required for all residentially zoned properties developed at a gross density of 10 acres or less. Provide itemized notations of the canopy being provided by each proposed tree species and a calculation of the total area of the canopy being provided. This includes any bonuses for areas where existing trees will be maintained. University Village III Final October 5, 2005 Page 2 8.At least four (4) of the Pyr Calleryana trees are being proposed within the gas and water line easements. No plantings other that shallow rooted shrubs can be approved in utility easements without the written consent of the agencies that are responsible for maintaining those utility lines. 9.Please revise the signature panel on the cover sheet with approval lines for the following reviewers and agencies: CURRENT DEVELOPMENT PLANNERIZONING CURRENT DEVELOPMENT ENGINEER INSPECTIONS DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION Please contact me at your earliest convenience if you have any questions or require further assistance. Copy: File SDP 05 -094 Review Comments Project Name:University Village Phase 3 Final — Residential — Commission Date Completed:Wednesday, October 05, 2005 Reviewer:Jay Schlothauer Department/Division /Agency: Inspections Reviews Comments Based on plans dated September 12, 2005. No comments or conditions. Review Status:Administrative Approval Page: 1.00 County of Albemarle Printed 0 Wednesday, October 05, is 6F ALgEt — l II r. 1 -- RGI COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 - 4126 Project:University Village, Phase III Plan preparer:Mr. Eric Woolley, PE, The Cox Company fax 434.295.7540) Owner or rep.:Mr. David Turner, MD Development, LLC fax 434.972.7769) Date received:19 Sep 2005 (fsp), 20 Sep (ecp), 14 Sep (swm) Rev.1: 7 Feb 2006 (fsp,ecp,swm) Date of Comment: 28 Sep 2005 (fsp), 30 Sep (ecp), 6 Oct (swm) Rev.1: 16 Mar 2006 Lead Engineer:Allan Schuck, Rev.1: Glenn Brooks A. Final site plan comments: (SDP200500094) 1. Please provide a signed and dated professional seal on the computations. [18- 32.6.1] Rev.1: comment addressed. 2. Please revise Note J on Sheet C -1.0. The pavement width is not specified m typical section. Rev.1: comment addressed. 3. There are two Sheets numbered C -5.0. Please revise these sheets with the next submittal. Rev.1: comment addressed. 4. Please show and label all applicable traffic control signage. [18-4.12.15f] Rev.1: comment addressed. 5. The invert elevations at STR -5 on the profiles do not match the elevations on plan sheet C -4.0. Rev.1: comment addressed. 6. Please show the outfall elevations for STR -1 outfall on plan sheet C -4.0. [18- 32.6.6d3] Rev.1: comment not adequately addressed. Not found. 7. The outfall area at Point 1 cannot be approved as shown. The water velocity exceeds 10 ft /sec and comes out of the pipe onto a 2:1 riprap slope. The designer will provide the type of velocity dissipation appropriate for velocity, pipe size, and discharge and site conditions. [DM505E7 &8] Rev.1: comment not adequately addressed. The velocity could not be found in the lengthy computer printouts submitted as computations. I computed 6cfs at 9fps. Using plate 3.18 -3 from the Erosion Control Handbook, 9 feet of class Al rip -rip is acceptable. 8. Please show the entire pipe drainage system and computations for the eastern reach. The system needs to handle the 10 -year storm and address MS -19 concerns. [18- 32.6.6d1, 32- 6.6d3] Rev.1: comment not adequately addressed. Existing inlet 3 appears not to be considered on sheet 7 or in the computations. The outlet pipe appears to he in a different location in the field. It is completely blocked, and without a receiving channel. MS -19 considerations are not addressed. The drainage area labeled "Ex. DI 11 (not to be confused with VDOT DI designations) could not he found in the computations. This drainage area looks incorrect in the field. 9. The drainage computations for the eastern reach do not have correlating drainage areas shown on the plans. [DM909.1 A(1)] The computations were not reviewed for the eastern reach pipes. Rev.1: comment not adequately addressed. See comment 8. 10. Structure #8 needs to provide 100% capture to eliminate drainage getting to Crestwood Drive or Albemarle County Community Development Engineering review comments Page 2 of 4 provide additional information on downstream structures. [DM505G4] Rev.1: comment not adequately addressed. The plans now indicate curb inlet 8 is to be replaced by a manhole, which appears incorrect. 11. Please show the pipe and structure on the plan sheets that correlate to Pipe 1 on Page 1 of the eastern reach computations. Rev.1: comment addressed. However, see continent 8. 12. Please show inlet shaping for most of the structures because the flow drop exceeds 4 feet. Please refer to VDOT standard, IS -1, Road & Bridge Standards, Volume 1. [DM505E9] Rev.1: continent addressed. 13. The pavement detail, shown on Sheet C -7.0, needs to be referenced on Sheets C -4.0, C -5.0, C -6.0. Rev.1: comment addressed. 14. Additional comments and /or conditions may be forthcoming, on the review of future submittals, due to the changes required for this plan submittal. Rev.1: see comment 15. 15. Rev.1: It is recommended that the summary tables provided in the Design Manual WR -18 to WR -22, and in the VDOT Drainage Manual, for pipe and inlet computations be used. While the computer printouts are impressively weighty, they are difficult to decipher, the review takes much longer, and information cannot always be found. A bond anount will be computed when plans are approved. B. Stormwater management plan comments: (WPO200500074) 1. The SWM plan showing the filterras needs to be reviewed by Americast. Rev.1: comment addressed. 2. Please provide 2 copies of the signed, dated, and sealed computations. [18-32.6.1] Rev.1: comment addressed. 3. Please provide the computations and drainage areas used to determine flows from the pre - developed areas to the biofilter. [17 -314E] Rev.]: continent not adequately addressed. No drainage area maps were found for pre - development areas. No comparison ofpre- and post- devlepment flows was found. 4. The surface area of the biofilter at elevation 641.50 needs to be at least 5.0% of the total impervious area draining to the biofilter. Currently, with 250 SF, the biofilter's surface area is too small. [DM 503.1F, VSMH Section 3.11] Rev.1: comment addressed. 5. The design of the biofilter needs to allow a maximum water depth of one foot above the surface of the biofilter. [DM 503.1 F - 1 &4] Rev.l: con not adequately addressed. The biofilter appears to be 2 feet deep at the beret, and the spillway is shown 3' deep, without rip -rap sized, or a fabric liner. It is unlikely rip -rap can he used effectively in this case, as the vertical allowances do not leave room for the stone size. 6. Please provide the following notes on the biofilter plan sheet: [DM 503.1F-10&1 1] i. Biofilters must not be installed until the site is determined to be adequately stabilized by the erosion control and water resources inspectors. ii. Contractor shall contact the water resources inspector 24 hours prior to backfilling the biofilter and request an inspection and approval of the under -drain installation and the soil mix. Rev.1: comment not adequately addressed. These notes were not found on the .stormwater management plan. 7. Please label the 6" outlet pipe of the biofilter and describe layout of rock outfall in this area. Rev.1: con not adequately addressed. Not found on plans. 8. Please provide a detail of the filterras, along with showing the size of the filterras on Sheet 5.0. Rev.]: comment not adequately addressed. Not found on stormwater management plan sheet. Albemarle County Community Development Engineering review comments Page 3 of 4 9. Please provide information that shows the eastern section is capable of handling the 2 & 10 year storms. [17 -314 A &B] Rev.1: comment not adequately addressed. Nothing tivas found in the package veri/j ing detention or adequate channels for the eastern side. See also comment A8. A field inspection revealed that the basin at the entrance to the development is in need of cleaning and erosion repair. 10. The applicant needs to submit a completed stormwater management facilities maintenance agreement and fee to the County for review. [17 -323] Rev.1: con not adequately addressed. Our tracking system does not indicate we have received an agreement. 11. Please show a graded SWM maintenance road along with easement on SWM plans. [503.1D] Rev.1: con addressed. 12. Additional comments and /or conditions may be forthcoming due to the changes required. The SWM bond amount has not been computed at this time. Rev.1: See comment 13 -1 below. 13. Rev.1: The biofilter section and planting plan are incorrect. The areas do not agree with the computation package, and the grades on the section do not match the plan. 14. Rev.1: The drainage areas used in the computations package could not be found on the drainage maps. There appear to be errors and omissions. 15. Rev.1: The outlet structure used in the routing model could not be found in the computer printouts. Please provide this information and ensure it matches the plans. 16. Rev.1: It does not appear that the modified rational method has been completed. A peak intensity storm should be run, and the storm with the controlling duration which results in the maximum storage volume. 17. Rev.1: The requirements of 17 -314 must be met. Please provide a computation summary which demonstrates that the requirements of 17 -314 have been met. This information could not be gleaned from the computer printouts provided. C. Erosion and sediment control plan comments: (WPO200500074) Narrative: 1. Please add the following verbiage under the Maintenance section of the E &SC narrative: a. Sediment basins and /or traps will be cleaned and maintained in accordance with the Virginia Erosion & Sediment Control Handbook. b. All gravel outlets will be checked regularly for sediment buildup that will prevent proper drainage. If the gravel is clogged by sediment, the gravel will be removed and cleaned, or it will be replaced. Rev.1: comment addressed. Plans: 2. On the next submittal, please provide only the sheets associated with the E &SC plans. Rev.1: comment addressed. 3. Please show the limits of clearing and grading on the E &SC plan, Sheet C -9.1. Rev.1: comment addressed. 4. The entire area of the sediment trap is wooded; please clearly define the TP limits. Please show the existing tree lines on Sheet C -9.1. Please coordinate the limits of clearing with the proposed Tree Protection measures. The TP limits need to be shown outside of the drip lines of the trees. Rev. 1: comment addressed. 5. On the E &SC plan sheet, please show and label the dividing lines and the direction of flow for the different drainage areas (including the areas for each inlet, ST, and E &SC measure). Rev.1: comment addressed. 6. The eastern section of E &SC plan needs a trapping measure. The proposed SF has more than 100' of Albemarle County Community Development Engineering review comments Page 4 of 4 slope length to it and the SF cannot be used as a diversion. [VESCH 3.05] Rev.1: comment not adequately addressed. The trap is short in day volume, and silt fence needs to be placed below the berm. 7. Please include the following note on the E &SC plan sheets: "The developer shall reserve the right to install, maintain, remove and /or convert to permanent stormwater management facilities (where applicable) all erosion control measures required by this plan regardless of the sale of any lot." Rev. I: comment addressed. 8. Please extend the diversion dikes (DD) towards STR -3 & 4 to encompass the disturbed area. Rev.1: comment addressed. 9. The CE detail on Sheet 9 -0 needs to be labeled as a paved CE not a stone CE. Rev. 1: continent addressed. 10. Please provide the following note for the CE on the E &SC plans: "A minimum water tap of 1 inch must be installed with a minimum 1 inch ballcock shutoff valve supplying a wash hose with a diameter of 1.5 inches for adequate constant pressure. Wash water must be carried away from the entrance to an approved settling area to remove sediment. All sediment shall be prevented from entering storm drains, ditches or water courses." Rev.1: comment addressed. 11. Please show an area for soil stockpiling on the E &SC plan. Show SF around stockpile [MS -2] Rev.1: comment addressed. 12. Please provide required computations for sediment trap and show drainage area to the sediment trap on the E &SC plan sheet. [MS -6] Rev. l: continent addressed. 13. Please show and label the required weir length, minimum bottom, dimensions, slopes noted on plans per computations for volume. Label detail with elevations, slopes, weir length, etc... Rev. 1: comment addressed. 14. Please label the bottom elevations of the sediment traps on the E &SC plan sheet. Rev.1: comment addressed. 15. Additional comments and/or conditions may be forthcoming due to the changes required. The E &SC bond amount has not been computed at this time. It shall become a part of the whole Water Protection bond amount. Rev. l: See con 16. The bond amount for erosion control is $19, 000. 16. Rev.1: The safety fence around the western trap must encircle the facility, and silt fence needs to he placed below the berm. F ii1Illl _: IRctN1 ? County of Albemarle Department of Community Development Memorandum A 4, ' i\ To:Eric Woolley From:David Pennock, Principal Planner t' t l r I r Division:Current Development Planning r .1 V Date:May 10, 2006 V'' v 1 Y ).- t C SubjecSDP05 -094 University Village Phase III Final Site Plan L - r „ t t: 1 1 Via, t, i' , The Albemarle County Department of Community Development Current Development Division will not grant final tentative approval of the above - mentioned site plan for planning and zoning review until the k following comments have been addressed satisfactorily. Please note that the following conditions are those )' that have been identified at this time. Additional conditions may be added or eliminated based on the r ' - submittal of additional information for review. [Where appropriate, comments are preceded by the r,V applicable reference":r` 1.32. ?.9. -l(h)] As a follow up to one of Stephen Waller's previous comments, the limits of clearing related to the treeline and wooded area surrounding the stormwater management facility have now been shown. However, it doesn't appear that the tree protection fencing location corresponding with those limits has been shown on the plan. 2.The subdivision plat that was submitted has also been reviewed — however, it is unclear what the intent of the building restriction area is. The original comment seemed to indicate that it should be ar boundary line adjustment of some sort. Is that what is proposed? r r r Please contact me at your earliest convenience if you have any questions or require further assistanc . Copy: File SDP 05 -094 n ti U t;t t. C t,v a iit Y i\ 1! -4 y t;' i k,1 t i J` 01' , 17.I : / Iaci County of Albemarle Department of Community Development Memorandum To:Eric Woolley From:David Pennock, Principal Planner Division:Current Development Planning Date:May 10, 2006 Subject:SDP 05 -094 University Village Phase 11I Final Site Plan The Albemarle County Department of Community Development Current Development Division will not grant final tentative approval of the above - mentioned site plan for planning and zoning review until the following comments have been addressed satisfactorily. Please note that the following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on the submittal of additional information for review. [Where appropriate, comments are preceded by the applicable reference.]: 1.32.7.9.4(b)] As a follow up to one of Stephen Waller's previous comments, the limits of clearing related to the treeline and wooded area surrounding the stormwater management facility have now been shown. However, it doesn't appear that the tree protection fencing location corresponding with those limits has been shown on the plan. 2.The subdivision plat that was submitted has also been reviewed however, it is unclear what the intent of the building restriction area is. The original comment seemed to indicate that it should be a boundary line adjustment of some sort. Is that what is proposed? Please contact me at your earliest convenience if you have any questions or require further assistance. Copy: File SDP 05 -094 a AL m IRGOs" COUNTY OF ALBEMARLE The following facsimile message is being sent from: Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 l J Phone: (434) 296 -5832 Fax: (434) 972 -4035 Date: May 12, 2006 Number of Pages (including cover): Sent To: Eric Wooley Fax: (434) 295.7540 Phone: Sender: David Pennock RE: University Village — Phase III Division: Current Development Message: Comments Attached — As ACSA plans were submitted directly to them, comments from them will likewise be sent directly to you. Thanks, David Service Authr August 21, 2006 Mr. Frank D. Cox, Jr., P.E. The Cox Company 220 E. High Street Charlottesville, Virginia 22902 Re: University Village Phase III Dear Mr. Cox: The plan, entitled "University Village Phase III" dated September 12, 2005, last revised July 20, 2006, is hereby approved for construction. One set of the approved plan is enclosed for your records. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority and does not relieve the contractor from responsibility for his work as it relates to the plan and specifications. The Albemarle County Service Authority requires that a copy of the approved construction plan be on the job site. It is the contractor's responsibility to mark up a copy of the approved construction plan showing as -built information and provide this data to your client at the completion of utility installation. The final as -built plan shall be submitted in a digital format. A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project, materials, test methods and schedule, in order to expedite construction. Please have the proper party call me at 977 -4511 to schedule the meeting. This approval is valid for a period 6f eighteen (18) months from this date. If construction is not in progress at the end of this time period, the approval shall be void. The pressure for water may be Tess than 30 psi at some meter locations). If you have any questions or if we can be of assistance, please advise us. Sine ely, Peter C. Gorham, P.E. PCG:dmg Senior Civil Engineer cc: Davi Turner anning Dept. Bldg. Codes & Zoning Services Soil Erosion Inspector David Hensley, ACSA Inspector 168 Spotnap Road • Charlottesville, VA 22911 Tel (434) 977-4511 Fax (434) 979 -0698 www.serviceauthority.org