Loading...
HomeMy WebLinkAboutSDP200500149 Review Comments 2006-01-06TO:David Pennock, Planner FROM: Gary Whelan, Civil Engineer DATE: January 6, 2006 RE:Site Plan Technical Review for: Hollymead Town Center Area C Block 3 TM 32, Parcel 41D) The below checked items apply to this site. SDP - 2005 -00149 X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located onsite. X 3. Fire flow from nearest public hydrant, located 250' distant from this site plan, is 4006 gpm + at 20 psi residual. X 4. An 8 inch sewer line is located onsite. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. 9. No plans are required. X 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. Comments: Separate metering for commercial and residential. Backflow prevention required. A water connection between Blocks 2 and 3 will be required. The site plan does not show or incorrectly shows: meter locations waterline size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands