HomeMy WebLinkAboutSDP200600062 Plan - Approved 2007-04-25o 4 Z E w a a c 0 0 0 Z Albemarle County Engineering General Construction Notes for Site Plans SIA z f o W 1. Prior to any construction within any existing public right -of- -way, including connection to any existing road, a permit shall be obtained from the Virginia Department of F Transportation (VDOT). This plan as drawn may not accurately reflect the requirements o 440ofthepermit. Where any discrepancies occur the requirements of the permit shall govern.Albemarle Count Vir inia2. All paving, drainage related materials and construction methods shall conform to current m m o 1 ° - ° f- QspecificationsandstandardsofVDOTunlessotherwisenoted. I-- _ o Design Narrative: 1. Project Description: o3. Erosion and siltation control measures shall be provided in accordance with the approved 1 / This project proposes improvement of the property such that a new building shall be constructed to house missions m m = Y activities and storage purposes. The project will be adjacent to an existing building and parking lot but shall utilize Z Z ° oerosioncontrolplanandshallbeinstalledpriortoanyclearing, grading or other petted that the occupants project will have significant use of vehicleses Q Z ; Q o Qconstructio 744 during own new typica parking spaces. It is not ex Islchurchactivities, therefore minimal impact to the existing parking facility expected. Q .E w J o w D \ w \ 0 0 (n Z E Z 2. Sitework: 6 6 Grading for the project is designed to be minimal. Paving, curbing, and drainage is designed to minimize the4. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum / impact of sheet flow on the buildings and redirect offsite sheet existing channels. Stormwater from the new allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of \ impervious areas will be directed to the SoakAway swale downhill of the proposed structures. 3:1 or better are to be achieved. 3. Water & Sewer: Water supply for the project shall be from the existing well. No improvements or changes are proposed. o N 5. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the {° The buildings will be designed such that fireflow requirements will be satisfied by building separation ( >20 ft.) only. N No sprinkler systems of fire hydrant provisions are proposed. v Albemarle County Director of Engineering, or the Director's designee, it is deemed o Ln > w o64Sanitarysewagesystemshallbeprovidedbytheexistingdrainfield. No improvements or changes are proposed. w aJ Qnecessaryinordertostabilizeadrainagechannel. / - J o o < V , 4. Utilities: m J - m > Electric and telephone currently access the site and shall be appended to serve the new facility. a o Q) Q 6. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic 2 5 0 s. Landscapin ° wControlDevicesLandscapingshallbedeterminedbytheowneratconstruction. Typically, trees and or shrubbery will be placed -5 while lowbuildings shrubneartheproposedSITEshru will be placed in and around the BMP Swale. 7. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class II1. 6. 6ign: Locations, expected type and dimensions, for the parcel signage shall be determined by the owner. O 6. Stormwater Management and Erosion Control:8. All excavation for underground pipe installation must comply with OSHA Standards for , '' In general, stormwater management will be qualiity control and be accomplished by wide grassed swale BMP the Construction Industry (29 CFR Part 1926).e trenching. Such technique combines infiltration trenches with wide stormwater conveyance channels.e 7. Trash Collection There is no provision for trash collection or storage with this project. ` p O Site Data: Revised 25- Jul -06 ` p •., p Project: Colonial Baptist Church ? (V Missions & Storage Building -2006 r T is VICINITY MAP ( no s c a 1 e Owner: Colonial Baptist Church ' w J `" Attn: Edwin Leake, Jr. 1 3 (V PO Box 6547 Z3 O M X Charlottesville, VA 22902 U_2• 1. The designer has attempted to locate existing subsurface utilities) however, such any exist that are not shown.c: v7 The contractor shall exercise care In this work so as to avoid damage to any utlllties. Any Contact: S. L. Key, Inc.damage shall be the contractor's responsibRity. The contractor shall notify all utility companies as well as CcMissUtlllty' 72 hours prior to construction. Attn: Steve Key, L.S. is2. Any unusual subsurface conditions shall be reported ImmeaN PO Box 1346atetytotheEngineer. 2 ^ M3. The contractor shall obtain all permits required for this work and pay all associated fees. Chariottemille, VA 22902 LL 4. The contractor shall employ erosion control devices and methods as required to meet the Intent of the Local Erosion Control ordWmnce. 5. Contractor to clean up and restore disturbed areas Immediately upon completion of final grading In Tax Map & Parcel: 94 00 the affected area. 2° SM 2A Acreage: 10.39 Acres 6. All grading and Improvements to be confined to the project area unless otherwise Indicated. Owner Deed Book: Na w E shalt obtain any offsite easements required, To Cl< Coa zoning: RA he 7. All fltl material shall be compacted to 95% of theoretical maximum density as determined by A.A.S.H.O. T - 99 Method A, within plus or minus 2 percentage points of optimum moisture for the full Setbacks: Front: 75' width of fill section. 8 „ 21 _ Side: 26S. All site grading and restoration shall be In accordance with these plans unless modified by the project Rear 35 SengineerduetosituationsencounteredInthefield. - 4" 4000 ps ]9. All dimensions, elevations and locations shall be verlfkd In the field by the contractor prior to Magisterial District: Scottsville beginning the work. Re i n farced Conc, Overlay Districts: Entrance Condor nc10. The designer has conducted no studies designed to discover the presence of any hazardous S i de wo 4' w i d substances on this property and assumes no responsibility or liability resulting from the presence on any N 00 , O 0 O 00 O O LO 00 waivers Requested a. Na 6 such substance. 4 # 7 L - ) 0 0 Waivers & Conditions Approved: a. Na 11. Prior to commencement of any construction within any existing publlc right of way, Including c • o . o .. o . n O O O o O 0 OO Reservoir Watershed: No. ° connection to any existing road, a permit for said construction shall be obtained from the Virginia > ° ° C> ° ° D ° ° O U O 0 0 - O 0 _ Where any descrepancles occur, the requirements of the ermit o Benchmark: Doo Datum: AssumedDepartmentofTransportation (hereafter abbreviated VDOT). This plan as drawn may not accurately ° O O O O O O O Oreflecttherequirementsofthepermit, p ° ° o ° y Ex. SW church entrance 500.0 Q `• shall govern. 00 O 0_ . 0 -0 Surrey: S. L. Key, Inc. 12. All materials and constructlon shall conform to curent specifications and standards of VDOT unless O 0 0 0 ` FC o 0 Topographic Ir>xxmation: S.L. Key, Inc. U1 ( °'otherwise noted, o O 0- O 0 0 0 Maximum Structure HeiOOOHeight: 35 ft. -I O Q°13. Erosion and siltation control measures shall be provided In nccodnnce with the approved Erosion o O O0 O Paving Type: Asphalt or Prime/Dble Seal _ z E control plan and shall be Installed prior to any ctearing, grading or other construction. SUBGRADE COMPACTED TD Contents: ~ -14. All slopes and disturbed areas are to be fertilized, seeded and mulched. Maximum allowable fill or Existing Tree Coverage: Sparse Wooded 00 QcutslopeIs2d. Where reasonably obtainable, lesser slopes of 44 or better are to be achieved. 95% MAX DRY DENSITY PER Previous Previous New New Total Total 1. Cover15. All drainage Inlets shall haven 2 In, local depression, A S TM _ D _ 6 98 Proposed Coverages Area s. f. % s. f. % s. f. % 2. Existing Site Survey °16. Paved or rip rap ditch may be required when, M the opinion of the Engineer or his designee, SUBGRADE COMPACTED TOItIsdeemednecessaryInordertostablilzen Buildings /canopy 7400 2/0 4000 1% 11400 3/0drainagechannel' 95% MAX DRY DENSITY PER . o17. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices Parkiny/Drive 27078 6% 10152 2% 37230 8% 3 Site Planlatestedition, and shall be provided by the contractor, AS TM -D -698 OpeNgrass 418066.84 92% Na Na 403914.8 s9% 4. Grading Plan18. Unless otherwise noted, all iep shall be Corrugated Metal pipe 19. All excavatlon for underground pipe Installation must comply with OSHA Standards IF Total 452544.84 100% 100% 452544.8 100% or the Re r -Forcement to be Impervious Coverage: Na rJ. Stormwater Management Plan OConstructionIndustryC29CFRPart1926 >. 6' x6' Welded w ' re A V//n / T r o/ / 6. Erosion Control Plan O Y) or approved equal, / / / ` / 1 V Y) 7 I / / / P "'`' " 6A. Erosion Control Narrative S I LJ W f L K SECTION N, T, S, Employees 2 Total 2 Spaces required N, T. S, Interior Parking and and TY QVeIWQyS 4 Spaces Provided 4 Std (9'x 18' or larger) SHEET N0. 1 of 60Handicap (16'x 19) (Van access) 0 Loading Space (17 x 26) owc. No. 06 -024 19 O Co I rt 0 d O d I I + I \ I I a , cn I I !r I I I I I I I I II I I I I I I I I M I x U, rt , o , CD I r+ I I I I I F-, C X I JI N O I I I I I o I m m X rt ' I o , U)rt I ID rt I I I 0 ly I I I I I I I I I I I I O L7 1 fo l9 f s. -n I s 0 OP 0 / Qo TREELINE Y ! RET. WALL AREA #6 oFfii`Sls EXISTING - - - - - - - - - - - - - - - -o ck Access — — — — — — — 500 • !- / / / O 2bo o o A v F' S s \ ba C C +/ S Io \ o W - s) \ C) 1 4 I v \ \ \I F Sid \ — — . 10 v n i 13I AA ^` a z o F N J E O i m M m gQ U O U LLJJ < + a U -U — D 0 0 0 c o 0 N cv O Q w 9 0 C N rD Q o QzE -D v LLJ CL o o Q Fa 13I AA ^` a z o F N J E O i m M m gQ U O U LLJJ < +O U -U — D 0 0 0 c o 0 zvicv O 13I AA ^` a z o F N J E O I z w JU N L - D C) N N d J Q Cl C X N m 3 m >V) 6 o 0 UQ I L, 1 , 0 -J U II cn E MR M rQ N W W v i m M m 7U O U LLJJ < +O U -U — D 0 o X W o z C a m m O Q 0 Q o QzE -D LLJoonzE z I z w JU N L - D C) N N d J Q Cl C X N m 3 m >V) 6 o 0 UQ I L, 1 , 0 -J U II cn E MR M rQ N W W v V Q 00 M J O N E XOM C LL v >N 02— - ca MLL s CL ITi, 0 o C) CQ a 0 O u SHEET NO. 2 OF 6 DWG. NO. 06 -024 7U U LLJJ < +O X W O V Q 00 M J O N E XOM C LL v >N 02— - ca MLL s CL ITi, 0 o C) CQ a 0 O u SHEET NO. 2 OF 6 DWG. NO. 06 -024 I I I I I I r X I I I I C I I U I li I I I I I 5 O . N 0 0 O X 6 0 0 I I C— x zu r I I I II 6 II I I C C I I I I I I I I I I Lin of o I I I I I I I I I I I I I I I I I I I I I I A I o, F- 01 M 1 I' 1 I I I I I I I I I I I Note; N s tx N0 Cn ruction U0 I 00 O e e Oe e A P O O e 1 A d O e 1 e C A I \ O o - his C I \ A C C1 J C C O © OO C c P A O \ \ y b b 0 Ob ` I Ex. trees within limits of construction may be removed at the discretion of the Cy Cti BMP contract i CYI 0r0 5 , P q'i \ y trofitted 0 3 Pr" p40x8ft. Se iment Tra ° I E BM iEase PLANTING BALLED --& —B URLAPPED Prop. BMP Easement & CONTAINER —GROWN TREES t I Access pt.I 1 I I I I I I I I I I C 1 15I CMP I 5011.f. @ 1.0% - - - - -- I n=i 492.0 I I Purr AT THE SAME DEPTH AS w4EN Out= 491.5 - - Y `. IM POORLY - DRAINED SOILS SPREAD iATEnw+c oEPRE3f INSWE F— _ EXCAVATED 10N AREA t - -I J ` PLANTING soi hM7f>'URE I S I TREE w T A!Q SIRINIG 1E I I GAMEN HOSE STAKES MAY AND *W wWE TO BE CARDEN NO,ANGLED TO AVE111D DAMAGE ORME srAx po TO 1i GALL AT SAME TURNOUCKlE ANGLE 1ASAS or I I RIbCK. EC-? . 44 ii OF ALL ROOT au; Auaws IT r0 X, — SX TREES UNDER 20 TREES OVER 20' PROPOSED PROPOSED Lighting 2) 60W recessed 0 Wall mt. at loading 1i ' T,. Adock and rear door Aruction may \ of the ine R) T RE tMcj construction) to b remo a M Prop. 40x70 ft. BMP - Easement with 15" accessway easmt. between bldgs. Area #1 consisting of: a 3- Betula Nigro "Dura Heat" (Dura Heat River Birch) 8 -10'H b 1 1 - Viburnum Davidii ( Davidii Viburnum) 15 -18" c 13- Potentillc Fruticosa (Gold Drop) 15 -18" Area #2 consisting of: 8d 3 -Ilex Nellie R. Stevens (Nellie Stevens Holly) 8 -10'H 13- Spirarea x bumalda (Magic Carpet) 15 -18" Area #3 consisting of: 8f –5 – Acer ginnala Flame (Flame Amur Maple) 8 10 H 9 20 –Pinus mugo var. pumilio (Mugo Pine) 9 -12" Area #4 consistin of: ousa Dogwood) 8 -10'H i 1 – Crataegus viridis "winter kind" (Winter King Hawthorn) 2.5 -3 "Cal. i 1 -Acer palmatum "West Grove Japanese Maple) 3 -4'H k 25 -Taxus Baccata "Repandens" Spreading English Yew) 12 -15" L 25- Weigela Florida "Tango" (Tango Weigela) 15 -18' Area #5 consisting of: m 1- Cryptomeria japonica (Yoshino) 6 -7'H n 3 -Tsuga Canadensis Canadian Hemlock) 0 1 - Fraxinus Excelsior ' Golden Desert" (Golden Desert Ash) 3 -3.5 "Cal. P 13 -Itea Virginica "Henry's Garnet" (Sweet Spirea) 15 -18" Q 75- Rudbeckia Fulgida Speciosa "goldstrum" (Black Eyed Susan) #1 cont. r 85- Salvia Nemorosa "May Night" (Meadow Sage) #1 cont. Area #6 consisting of: Retaining Wall -45 L x 2'H to ce' Constructed of: Anchor Highland Stone 3" Color: Blue Ridge Range b Area #7 consisting of: 5- Berberis Thunbergii var. atropurpurea "Crimson - Pygmy" Crimson Pygmy Barberry) 12 -15" e 4- Spirea x bumalda (Magic Carpet) 15 -18 Area #8 proposed Dumpster Area with: t12— Syringa Patula "Miss Kim" Lilac 2.5 -3 ft. a rz° QD 0 Q o o E-a U7 z M 00 YO o O o U Q 4 Q j Q p Qzn 0 Q In u) Z E z O O 8 U o U Q z I—I Uj a L m F 8 Q o M N z a rz° QD 0 Q o o E-a U7 z M 00 YO w MMM C) _D m U _D QD 0 Q o C5 U7 z M 5 M W U YO o O 3 U Q 4 Q j Q p Qzn 0 Q In u) Z E z O O N s 0 7 I Q) C11,1 U aQ F fn J CO z w 0 c x U 0 . 0. M - m > O W 0 Q) 0 - o i O Q -C U hom Li Q 0 0 N 0I 0 1 MR M o w o cz 9 w W C N N SM J rn CN X O2•UT c CP_ LC) vaN V_ CIO 10Lm r\ t CL H SHEET NO. 3 OF 6 Dwc. N0. 06 -024 U7 o U J J Q 4 O L L 0 1 U w O O U o U O O I—I SHEET NO. 3 OF 6 Dwc. N0. 06 -024 Proposed Culvert C1 (nts) 50 I.f. - 15" CMP@ 1.0% E I In= 492.0 Out= 491.5 Note;a Tree Protection shall be orange fence E W X placed along limits of construction. No a Construction materials or equipment shall a be permitted beneath the dripline of trees 1-L s I to remain. A J C 00 M M 0 5'CCVV 0 i I 0 0 0 0 N 0 Z 71111,r O O L ran i is of T Z>.o SidePole ? , 25 ConstructionL<<1 N O O 0 • \Note; '0J et Tree Protection shall be grange fence along limits of No 1 placed gonstruction. Construction o r 9 O O p materia s or equipment shall / be permitted bene f the dri line of treep Q Q F a a N s` p 9,p `S remain.J o 1 Cdh ruction c N m I °/o d F w L 00 1110er— PROPOSED /m m 0 s _ B ING I 1 \ °° F ithin limits of struction may \ w Q I oo -be f6mloved at the dis of the e (tyR TREELIKE contractor. 1 o m m Rs 9p L I 1 4• { •This Treeline( within Construction) Q 2 — D 0 — D n Z E Z to remo / C) CA --- I RET. WALL AREA V C EXISTING ODoc = Access / L L o N N o A 500 U r'- Limi sof w a cl J CD Constr ion m E m 0 0 1 Not ; Ex. trues' within limits of constructnm ay s U o be remove' d at the discretion of the 0, 0/ i '' ` l U ' ro contract \ I F7- ]1 0 A 110o- O ao o co I 490\o U- M Vegetated embankments as desired w U- . C 1 15" CMP 4 ft. bottom idWti4 -ti 5011.f. @ 1.0%I T n 492.0 Out= 491 C41 M I y r ' - j X - \ _ — _ _ grasse3Ike 12" Depth _ _ / 7Z c 9 ko z Trench Botto o JC ee'%ne - rh s - ' 'BMP Tench Detail be o 7 Q scarified prior placement of filter \ o fabric or aggregate U I O 9e-1 S IC ) I SHEET N0.4 OF 6 DWIG. N0.06 -024 Bi filter Notes: .o 1. The Biofilter Soil Mix shall b "Luck Stone Bio- filter Mix" . I or a tested equivalent approved by t County Engineer. x 2. Biofilters must not be installed til the sitis .l d termined to be adequately stabilized the eros on control C`0 ' 3 Z I a d water resources inspectors. .LJ 3. The contractor shall contact the wate esour s o inspector 24 hours prior to backfilling the biofi r an request E/ Q a inspection and approval of the underdrain in Ilan n and the soil mix.5 o s AGO 5 for I X,5 m U V F O pO Q s, 2OA10acv ' G • ER °i _ ' S 5 C J F 0 owl NDSCAPING I ° D\ o ° / , ' 7o /ea A Area 2 Qo O n , , oo cry --, O PROPOSED SWAAAAq _BMP a JwCQx — —rop. I s Retrofitte 0 o z ,.. , , — c I — o I IF, s PROPOSED oo P sO I BUILDING I I / Sedime Tra p OPOSED lsSCAPIo I , FF =503.5 IOPOSED I h \m m CD oO A _ O Ar — As ` L \ I \ Oi ou>PSTE II IPROPOSED / TR E y _ K X Y t \ , - LiJ a 0 Y J CJ o Y J U w 0 F- QQ LANDS9 '°O 0S - '• ;" LANDSCAPING X F V N •'' Z o N I Area 8 I w o m m o o P ', ° '7i o c Ar 4 Lid sale -- --- - - - -e a A'' --.- _ — — Widened i ° QZ w 3Qw Q owQ QD Access LANEXISTINGl QOCI Access r''Pro ' Easement Accessbess p I / A PROPOSED PROPOSED \ LANDSCAPING ' Area #5 o < y O + 3 N r- N Area 1 _ ,o ° \ °9sS 017 Zw a C x W Q J o N O O /Q \ \J O C)C ) 3 W p0 O-N 0 P(C".MP ti Rgtrofitted SO Prop. 40x70 ft. BM o ,,Pr op . 4 x0 80 f1k Sedj, ment Trap o Easemerx / with 15 accessv ay O i n BMP- Easeme \easmt. between bldgs. /lco / \ N / `J BfoAl4r Summary / l >I Prop . BMP Easemen BicAfter No.: 1 Drainage Area = 92782.8 s.f. Runoff "c" fafactor- N r I Access pt. ` \ \ 1 0.57 Required WQV (first 1/2')= 2197 c.f. O pp Cn \ Top Dimensions of biolitter material- 47 x 27 - 1269 s.f. Dimensions at Bottom of Weir- 53 x 33 = 1749 s.f. J (h 3 ch Available Volume= 2263.5 c. f. WQV O. K. 0 0 Stormwater Management Narrative: ' i 490___ I Biofitter Top Elev= 484.5 Bottom of weir stone = O (>a' LL 1. Project Description: - Top of ponding berm = 487.0 c N This site was first constructed in the 1980's with the placement of the Colonial Baptist Church. The current project , ' Max Elevation of 2 yr. event= 485.5 OK Max Elevation of 10 yr. event = 485.8 OK 3 0 r proposes placement of a missions building and associated parking area and travelway. The new construction shall ,i -\J Required No. of Plants (10 per 1000 s.f. )= 13 Shrubs Ci d `M predominantly drain across the previously developed portion of the site. The water resources area is described as , \ `3 ti other Rural land ". - - - - - - _ Trees shall be evenly divided among the following species: CJ 2. Drainag Areas9 The has been in two drainage for OUTLET 6" NON- PERFORATED PROTECTION PVC PIPE TO DAYLIGHT PROTECTION Flowering Dogwood (Comus Florida) Black Willow(Salix nigra) Fringe tree (Chionanthus viginicus) Shrubs shall be evenly divided among the following species:site analyzed separate areas the purposes of Stormwater Management. Drainage r _ _ Arrowwood Viburnum (Viburnum dentatum) area 1 (Eastern side toward Rt. 250) is roughly 2.12 ac. while Area 2 (Western side) is roughly 0.8 ac. x STONE WEIR BERM BERM Common Spicebush (Lindera benzoin) Elderberry (Sambucus canadensis) 3. Removal rates -I 3:1 SIDE SLOPESS { ! Note . Trees and shrubs are solocted based on Wrpnis Stonmister manspament Handbook recomrnendedons (Zones 3 or 4) and cross- nAaranced Wth Albemarle County approved pant list 1 s - UX•Required removal rates have been calculated for each drainage area as follows. - - - _ _MAX)rSummBioAlb ary DA 1- 35% - J • - 4 " -6' PERFORATED BlOflttef NO.: 2 Drainage Area= 35283.8 s.f.L w 4. Utilized BMPs: I DA 1- Retrofitted Sediment trap (50 %) - - - - - ' PVC PIPE y"9 sq. e e .. ° (SAM: 0.0 INLET AM PROTECTION/ Runoff "c" factor- 0.40 Required WQV (first 1/2 )= Top Dimensions of biofitter material= 42 588 c.f. x 22 = 924 s.f. Dimensions at Bottom of Weir- x e = 1196 s f Available Volume= 1060 c. f. E N y Co F J 0) Q SedimentDA2RetrofittedSediment trap (50% -o.ea ENERGY s., w •1w,1N° SOMO E iiiX-at WQV O.K.C7 w Q C)4 --)O po I -4. Removal Efficiency DISSIPATER I Flaw STORM ,cam co.c • - IKI teven uT'•0hintr»uATmyr . WATER CHANNEL nom• K d d b o• uW+ PBiofitterTo Elev.= 494.0 Bottom of weir stone= 495.0 Top of rmbe= 498.0 z Q c 7 Q DA 1- BMP provides greater than required removal rates CLEAN-OUT ponding Max Elevation of 2 yr. event= 495.2 OK J 0 DA 2- BMP provides greater than required removal rates ;TOP OF BERM Max Elevation of 10 yr. event= 495.5 OK 3 C (1 -/ /-5. Stormwater Detention (MS - 19) ` ( ( CLEAN -OUT W /WATERTIGHT STONE CAP WEIR 1 -0 Required No of Plants (10 per 1000 s.f.)= 9 Shrubs 7 Trees 2 00 U r-i r-I D 0 U V Exemption from Stormwater detention requirement is requested under County Code section 17- 314(g). Flows __ ° % dt associated with this project are minimal and s would involve disturbance / CprovisionsfordetentionstructureP \ p 1 3 Trees shall be evendividedamongthefollowingspecies Flowerin Do (Comus Florida O O Oo Black Willownexistingvegetatedareasandencroachmentintoexistingdrainagenetworks.Sediment Trap Sahx mgrs) Fringe tree (Chionanthus viginicus) Shrubs shall be evenly divided among the following species: I w I 4 -6" NON- PERF ORATED PVC PIPE ® 1% MIN, LOAM OR GRANULARRetrofit (no scale) SLOPE EARTHFILL Arrowwood Viburnum (Viburnum dentatum) Common Spicebush (Lindera benzoin) Elderberry (Sambucuscanadensis) V I NOTE 4 " -6" PERFORATED PVC SEE DRAWING 5 FOR PIPE o 1% MIN, SLOPE VEGETATIVE COVER OPTIONS.Note: Trees and shrubs are selected b mod onVirprNaStornmetwmarmVernentHandbook SHEET N0.5 OF 6 recorranendasorrs (zones 3 or 4) and cross - referenced Kith Aft er o County approved plantlist 06DWG. NO.024 g I Note; Tree Protection shall be orange fence E 3 Z 0 V) r placed along limits of construction. No W Construction materials or equipment shall be b libeneathpermittednrithedp ne of trees to F rL I remain.J V s J w L ` 010 F-Q CD w000TP 0 I w A / w 0 / f+)IN9 z o I 0 O TP iin its ofSBL r o /o , co e1 E S de vF F e /25 Constructior,BIN \ 0 •Z Note; Tree Protection shall be grange fence PPE placed along limits of gonstrOction. No CIA r O y O I 0Y N D S CAP I N Construction materia s or equipment shall/ be bene h the dripline of tree 4 o Z Q a TP O ea 7 permitted sos # PS \\a W r O l re . /O TP c ' remain. o D PROPOSED E1 .4W n a S z q TP PROPOSED I wool '" — oPOSED 1 NZSCAPiN na B ING DC / \ PS °I f Fr ithin is o struction may \ J J QQ o A O Ar _ 1./ pDr QED TES I yIbemovedatthedis of the ee qty TREE If Y I PR OP O S E D _ contra _ tn9 ye - _ _X /LANDSCAPING — U z ~ m m Q Q Q o Q N o J O.. _ c ° S S R O L N r 1 , x This Treeline( within Construction) to remo ed.I Area #8 :t \ / Q .W J Of W vo z W z r r I =CD u c AreaC d sWA rj \( \ fS o C C eg _ - - - - - - - - - - EXISTING LAN D Widened Dock Access •. // S Dock Access AreO 566 EXISTING Do A — ess /C Z U L O o PROPOSED a \ P I\ O I V .TCJ LANIDSCA I i r1it of p El o, ,l T Y Y V) w a X_ N Q Q Q) w o N LANDSCAPING Area 1 ea Constr i nOp ° Qr9 O ± a s Off, s o m 3 o W m Q c o Note• r°ees limits of construct "i"ay6O,o Ex t ' d50= 6 \ O /y SO S be remov`ed at the discretion of the "-_ Q C a o i ---- / o Q U o C U o o IF- I J '9,0 11 L 5 0lp \ i contract 9 loy0soo o A W - 5' Wlaw= Full vX w \ ` I o V Channel \ , / 5 —Sediment Trap /o Mo C \ ' Length= 5ft. / 43.5BottomofExcaiatedArea = 40x20 a '1 o 0 ITEM KEY SYMBOL Depth of WetStorage= 1.5 ft.cj M\ — — 4 _9 Pe ^^ Wet Cleano t Elev.= 494.1 Ps (Na, Bottom of e i r= 46x26 @ 495.0 o V N r on Depth Dry Storage= 1.5 ft. r ` =1 op of D Storage= 52x32 @ 497.5Dry w 4.0 L M 15' CMP H= 2.5 ft. /rC1 500.f. @1.0% Siiterce sF `\ _ x Ho= 1.5 ft. / W= 2.5 ft. 1n=9 492.0 T --Sediment Trap ST ST1 0 Out= 49 1 .5 Soils: Limits aNasonSiltLoams r - -- _— t „,Na) — •• —••— 7 D I— Z \ Diversion y 7 UI\ Tree Preservation TP (Na) \n i 0 9 ( Sed i m - t \ TrapQ Length- 13 niet c9O r6 `'iP e to _ O J Q CCS I o n o N C) Eft. Bottom of Area= 41 x21 I483.0 \ It Q Depth of Wet Storage= 3 ft., \ \outlef Protection OP = \ C o O o I o Wet_Zaanout -E1ov. 5 Bottom of Weir= 53x33 @ 486.0 \Diversion p w Depth of Dry Storage= 2 ft. \0 0 T -0 of D Sto eTopDry 61x41 a489.ir>tet o or rb H 3 ft. 9 \ S 4 \Ho = 2_ _ \DwtControt 0- 7) 1 W =2.5ft. Temporary 6 6 Seeding s (Ns) \SHEET N0.OF DWIS. N0.06 -024 Set the stakes. Max a Flow 3. Staple filter material to stakes and extend it into the trench. Sheet Flow Installation A Points "A" should be higher than Point "B" Drainageway Installation S* ft Fence nsta anon Rip Rap Headwall 1 ft. Horseshoe Shape 2 ft. Around Culvert 2:1 466 Culvert VDOT #3 Class I RipRap Stone Cuivert net Protection STONE CONSTRUCT ON ENTRANCE 70' MIN. PA EX. GROUND EX. GROUN FILTER CLOTH —/ 6" MIN. ASIDEELEVATION 70' MIN. VDOT #1 B_ COURSE AGGREGATE MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS OPERATION VJI 11 vL of \MIIVMUC TO SEDIMENT TRAPPING DEVICE PLAN VIEW 12' MIN. FILTER CLOTH I SECTION A —A 6' -7" — REINFORCED CONCRETE - M SECTION B —B 4. Backfill and compact the excavated soil. MOUNTABLE BERM OPTIONAL) z O Ex. PAVEMENT, Z " 0 3" MI 3" MIN. DRAIN SPACE 1 ouur' I,L: VA. UJWG PLATE 3.02 -1 Narrat1 *Vk__-1 MANAGEMENT STRATEGIES a Areas which are not to be disturbed shall be clearly Marked by flags, signs, etc,at the owner's discretion 2. The Contractor shall be responsible for the installation and maintenance of all Earthwork summary: PROJECT DESCRIPTION:erosion and sediment control Measures. It is expected that the earthwork on this project will balance on site.The purpose of this project is the construction of Church missions building. Approximately 1.5 acres are scheduled for disturbance. ERSI N AND SEDIMENT CONTROL MEASURES: EXISTING SITE CONDITIONS:Measures shown on the accompanying drawings are to be installed in The topography of the site is relatively flat within all reaches. The area landcover is partly wooded area with an existing Church building, some accordance with the specifications and standards of the Virginia Erosion and Sedimentation Control Handbook, 3rd Edition 1992,existing parking areas and utility structures. ADJACENT AREAS:MAINTENANCE The project area is bounded by rt. 250 to the South and by unimproved or rural properties on all other sides.In general, all Erosion and Sediment control measures will be checked daily and after each significant rainFall. The following items be W will checked in particular: SOILS:a) should sediment basins or traps be required, they will be cleaned and maintained Soils in this area are generally described as Nason Silt loam. Nason are well drained with medium to rapid runoff and moderate permeability.according to the Virginia Erosion and Sediment Control Handbook b) All gravel outlets will be checked regularly for sediment buildup that CRITICAL AREAS:will prevent drainage If the gravel is clogged by sediment, it shall be Critical areas are those (such as creek channels) subject to concentrated stormflows or subsurface springs. In topography such as this,removed and cleaned or replaced c) All silt barriers will be checked regularly for undermining or deteriorationsourcecontrolofsedimentiscriticaltoerosioncontrol. Contractor should use care in scheduling and sequencing to minimize excavation exposure in of the fabric and repaired as required, Sediment shall be removedtheseareas.when the level of sediment deposition reaches half way to the top of the barrier, EROSION AND SEDIMENT CONTROL MEASURES:d) All Seeded areas will be checked regularly to see that a good stand is Measures shown on the accompanying drawings and in this narrative are to be installed in accordance maintained Areas should be fertilized and reseeded as needed, ThewiththespecificationsandstandardsoftheVirginiaErosionandSedimentationControlHandbook, 3rd Edition 1992. e) acceptance of approval implies that the applicant has agreed to use L i the materials as indicated on the Erosion Control Plan, attachment and samples submitted Any change to the approved design or materials will STABILIZATION PACTICES require approval by the Engineer Adapted from State Minimum Standards as effected, 13 SEP95). Standards listed here, are in summary form. In cases of question or controversy,CALCULATI NS the Virginia Regulation VR 625 - 012 -00 shall govern.None MS -1 Permanent or temporary soil stabilization shall be applied to denuded areas within seven m days after final grade is reached on any portion PERM SEEDING SPECIFICATI NS CAI( units in Pounds per acre)of the site. Temporary soil stabilization shall be applied to denuded areas within seven (7) days to Feb. 16 thru April 30: denuded areasthat may not be at final grade, but will remain dormant for longer than 30 days. Permanent stabilization shall be Kentucky 31 Fecue- 128 lbs.; Red Top Grass- 2 lbs,; Annual Rye- 20 Ilas,applied to those areas which will remain dormant for longer than one year.Fertilize at 1,000 tb. per acre or as determined by soil testMS -2 Soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection For Slopes steeper than 3 :1, add 20 l b . C r o w n v e t c handpermanentstabilizationofallsoilstockpilesonsiteaswellassoilintentionallytransportedfromthesite.May I thru August 15 MS-3 A permanent vegetative cover shall be established on denuded areas not otherwise stabilized. Permanent vegetation shall not be considered Kentucky 31 Fecue- 128 l b s ; Red Top Grass- 2 l b s ; F o x t a i l Millet- 20 l b sestablisheduntilagroundcoverisachievedthat, in the opinion of the local program administrator, or his agent, is uniform, mature enough to Fertilize at 1,000 (lo, per acre or as determined b y soil testsurvive, and will inhibit erosion.For Slopes steeper than 31, add 20 lb. Crownvetch MS-4 Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment on -site must be constructed as Aug 16 thru Oct. 31 a first step in grading and be made functional before upslope land disturbance takes place.Kentucky 31 Fecue- 128 tli Red Top Grass- 2 llos,; Annual Rye- 20 lbs.III Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation.Fertilize at 1,000 lb. per acre or as determined by soil testMS -6 Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to, three (3)For Slopes steeper than 3 :1, add 20 (lo, C r o w n v e t c h acres, shall be controlled by a sediment basin. The sediment basin shall be designed and constructed to accommodate the anticipated sediment Nov. 1 thru Felo 15 loading from the land disturbing activity. The outfall device or system design shall take into account the total drainage area flowing through the Kentucky 31 Fecue- 128 lbs ; Red Top Grass- 2 tbs ; Winter Rye- 20 lbs.disturbed area to be served by the basin.Fertilize at 1,000 lb, per acre or as determined by soil testMS -7 Cut and fill slopes shall be constructed in a manner that will minimize erosion. Slopes that are found to be eroding For Slopes steeper than 3 1, add 20 lb. Crownvetch excessively within one year of permanent stabilization, shall be provided with additional slope stabilizing measures until the problem is corrected. MS -8 Concentrated runoff shall not flow down cut or fill slopes unless contained within adequate temporary or permanent channel, flume or slopedrainstructure. MS -9 Whenever water seeps from a slope face, adequate drainage or other protection shall be provided.GENERAL REMARKS; MS -10 All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the 1 Lime shalt be applied at 3 tons per acre unless otherwise noted,conveyance system without first being filtered or otherwise treated to remove sediment.2. Fertilizer shall be Type 10 -20 -10 unless otherwise noted MS -11 Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary orpermanentchannelliningshallbeinstalledinboththeconveyancechannelandreceivingchannel. MS -12 When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport andstabilizetheworkareatothegreatestextentpossibleduringconstruction. Norwodible TEMP SEEDING SPECS, Albemarle Count EnForPlantingDatesyEngineerinmaterialshallbeusedfortheconstructionofCausewaysandofSep. 1 to Feb. 15 cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials.Use a 50/50 Mix of Annual Rye and Winter Rye General Construction Notes for Erosion Control PlansMS -13 When a live watercourse must be crossed by construction vehicles more than twice in any six -month period, a temporary stream crossing at 50 to 100 lb, per acre constructed of nonerodible material shall be provided. z MS -14 All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met.For Planting Dates of Feb. 16 to April 30 MS -15 The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed.MS 16 Underground utility lines shall be installed in accordance with the following standards in Use Annual Ryegrass at 6o to 100 lb per acre ES -1 : Unless otherwise indicated, all vegetative and structural erosion and sediment controladditiontootherapplicablecriteria:For Planting Dates of May 1 to Aug, 31 practices will be constructed and maintained according to minimum Standards anda. No more than linear feet of trench may be opened at one time. III Excavated mat shall be placed on the uphill side of trenches. Use German Millet at 50 lb, per acre.specifications of the Virginia Erosion and Sediment Control Handbook and Virginia c. Effluent from dewatering operations shall be filtered or passed through an Regulations VR 625 Erosion Sediment approved sediment trapping device, or both, and discharged in a manner that 02 -00 and Control Regulations. does not adversely affect Wowing stream Site property, d. Rsstalrlization shall be accomplished inn acc ordance with these regulations.accordance ES -2: The plan approving authority must be notified one week prior to the pre - constructione. Applicable Safety regulations Shall be compli with. MS -17 Where construction vehicle access routes intersect paved public roads, shall be conference, one week prior to the commencement of land disturbing activity, and oneprovisionsmadetominimizethetransportofsedimentbyvehiculartrackingontothepavedsurface. Where sediment is transported onto a public road surface, the road shall be cleaned thoroughly at the end week prior to the final inspection. of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual subdivision lots as well as to larger 3E land disturbing activities.ES -3: All erosion and sediment control measures are to be to or as the first in MS -18 All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary placed prior step clearing.measures are no longer needed, unless otherwise authorized by the local program administrator. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosionandSedimentation. MS -19 Stormwater management plan for the project details the biofilter retrofits of the sediment traps. The ES4: A copy of the approved erosion and sediment control plan shall be maintained on the sitesubsequentroutingshowssubstantialdecreaseinstonnwaterrunoffforthesite.at all times. ES -5: Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. ES -6: The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. ES -7: All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. ES -8: During dewatering operations, water will be pumped into an approved filtering device. ES -9: The contractor shall inspect all erosion control measures periodically and after each runoff- producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. Abutted Edges 4 inches to er ,aru ct rer s ns ruction grMjn9I Fold pled (B /M -1) iked (B /M -2) ownstrearr Sectionerminosurge e to 12 Inches f re am ecti nm inus overlapped Inc es Junction Slot 5' Wooden Stakes TrM inl Fold Soil Stablization Blanket Details Oufiet Protection O E 3 O L 3 L 3 La 0% Filter Cloth Key in 6 -9" recommended for entire perimeter 1. Apron Lining May be Rip Rap, grouted Riprap Gabion Basket, or concrete. 2. La= length of riprap apron as specified. 3. d= 1.5time max stone diameter but not less than 6 in. a 1 1 7 1 I I F i r 0 W 20 ft. 2 ' 1 Dry Storage Wet Storage Dry Storage Excavated VDOT /3 0— 1 RipRap den th 0p O 0 ZD 0 O a 0 VDOT /3 a o0 S e Inn Filter Cloth e n ra CIA ZO r O 11 F aU /7 6 E o y E- 5 m r m CID O W o o 0o f f—Q U U D U 7 6 Z 0 o w J OQs` L i o o Z U m Li Y 0 M U o c F-Z Z o0 C IDaca 0 QZEQwJ QQ m W QD \Jw\ 2 - D c 0 I cn Z Z z 0 Q V) 3E 3+ C3 i ? Q U Q J 5 w Q c o v Z CIA ZO r O 11 F aU /7 6 E o y E- N O rn N N U ' Zt Q 0>Z N L d J X Qj J () O — U m J m > a- ()0 .3 O O o o U _F_ U w p J Q UU n n I• t , o • V 9 W 111 l` W a V 5 m r m CID O W o o 0o f f—Q U U D U 7 6 Z o w J OQs` L i o o Z U m Li Y 0 M U o c F-Z Z o0 C IDaca3 <QZEQwJ QQ m W QD \J w\ 2 - D 0 _D 0 I cn Z Z N O rn N N U ' Zt Q 0>Z N L d J X Qj J () O — U m J m > a- ()0 .3 O O o o U _F_ U w p J Q UU n n I• t , o • V 9 W 111 l` W a V o N Q p M o X0LL. LO N 0 L M n L d RR 0 U o E c Q o a c O U SHEET N0. 6A OF 6 2. EX avate a 4" x 4" trench upsiope along the Ilne of the stakes VICINITY MAP (no scale) 0o r U Z w J OQs` L i o U U c 00 U) 4 -25-01 r-1 6: o N Q p M o X0LL. LO N 0 L M n L d RR 0 U o E c Q o a c O U SHEET N0. 6A OF 6 2. EX avate a 4" x 4" trench upsiope along the Ilne of the stakes VICINITY MAP (no scale)