HomeMy WebLinkAboutSDP200600062 Plan - Other (not approved) 2006-07-278 J Z) O > N :0- C - C N N E o U � > U 8 3 Z a o E v) E v > U �0 w m � 2 _y 7 IC U y Q c CL CD CD 2 W w i _J Q 0 N O O O nj Z Albemarle County Engineering General Construction Notes for Site Plans SIA � `�~ ^ 6 within an existing public right-of-way, including connection to ^ 1. Prior to an construction wit y g p g y� g 4 G EE a N a any existing road, a permit shall be obtained from the Virginia Department of J Transportation (VDOT). This plan as drawn may not accurately reflect the requirements �� W �o��� p ( ) Where an discrepancies occur the requirements of the permit shall of the permit. y p q 0° e govern. Albemarle Count Vir inia >_. 2. All paving, drainage related materials and construction methods shall conform to current ' 0 specifications and standards of VDOT unless otherwise noted. W 0 Y _J Y � y 9 < Q Design Narrative: 1. Project Description: 3. Erosion and siltation control measures shall be provided in accordance with the approved 1 / o ° � Z This project proposes improvement of the property such that a new building shall be constructed to house missions activities and storage purposes. The project will be adjacent to an existing building and parking lot but shall utilize L'J ° m °' 0 erosion control plan and shall be installed prior to any clearing, grading or other 744 �its own new parking spaces. It is not expected that the occupants project will have significant use of vehicles Q ~ Z Z \ / during typical church activities, therefore minimal impact to the existing parking facility is expected. Q • w J w construction. o _D o cn Z Z 2. Sitework: 6 6 Grading for the project is designed to be minimal. Paving, curbing, and drainage is designed to minimize the 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum / impact of sheet flow on the buildings and redirect offsite sheet existing channels. Stormwater from the new allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of impervious areas will be directed to the SoakAway Swale downhill of the proposed structures. 3. Water & Sewer: 3:1 or better are to be achieved. Water supply for the project shall be from the existing well. No improvements or changes are proposed. N 0 0. � 5. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the The buildings will be designed such that fireflow requirements will be satisfied by building separation (>20 ft.) only. U N No sprinkler systems of fire hydrant provisions are proposed. U r Ln > Albemarle County Director of Engineering, or the Director's designee, rt Is deemed 6 4 Sanitary sewage system shall be provided by the existing drainfield. No improvements or changes are proposed.z ° � J o necessary in order to stabilize a drainage channel. / J 0 J X U \ 4. Utilities: m _J m C„ Electric and telephone currently access the site and shall be appended to serve thenew facility, cn Q 6. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic a- a .� 0 250 1 0 Control Devices. Landscaping shall be determined by the owner at construction. Typically, trees anoor shrubbery will be placed o wnear the proposed buildings while low shrubbery will be placed in and around the BMP Swale. U SITE 7. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. 6. signage' Locations, expected type and dimensions, for the parcel signage shall be determined by the owner. 6. Stormwater Management and Erosion Control: 0 8. All excavation for underground pipe installation must comply with OSHA Standards for �� In general, stormwater management will be qualitty control and be accomplished by wide grassed Swale BMP the Construction Industry (29 CFR Part 1926). fie'✓ trenching. Such technique combines infiltration trenches with wide stormwater conveyance channels. \ '' � '� y' 7. Trash Collection: There is no provision for trash collection or storage with this project. ' Site Data Revised 25 -Jul -06 Project: Colonial Baptist Church til Missions & Storage Building -2006 ° N p Q. 00 M VICINITY TVI A P (no scale) ; �wnec Colonial Baptist Church w _J N M Attn: Edwin Leake, Jr. - �O N P Box 6547 __ --_ --- - - --- - Charlottesville, VA 22902 CD L- _ ._ 1. The designer has attempted to locate existing subsurface utilitlesl however, such May exist that are not shown. - - The contractor shall exercise care In this work so as to avoid damage to any utlllties. Any _ _ - - - -- Contact: S.L. Key, Inc. o M damage shall be the contractor's responslblllty. The contractor shall notify all utility companies as well as - 'Miss Utlllty' 72 hours prior tPO Box 1346 o construction. Attn: Steve Key, L.S. �, 2. Any unusual subsurface conditions shall be reported Immedlately to the Engineer. 1 LO 3. The contractor shall obtain all permits required for this work and pay all associated fees. - T _ _ I - -� . M CharlottesHlle, VA 22902 4. The contractor shall employ erosion control devices and methods as required to meet the Intent of the Local Erosion Control ordinance. 5, Contractor to clean up and restore disturbed areas Immediately upon completion of final grading In Tax Map &Parcel: 94 46 Deed Book: Na - _ __-__ __ the affected area. /-- 2SM 2A Acrea e: 10.39 Acres _ ___ � _ � .�CL 6. All grading and Improvements to be confined to the project area unless otherwise Indicated. Owner _ i �' shall obtain any offsite easements required, To ck Coo t Zoning RA (Setbacks Front: 75' 7. All fill material shall be compacted to 95% of theoretical maximum density as determined by _ - A,A,S.H.O. T-99 Method A, within plus or minus 2 percentage points of optimum moisture for the full width of fill section. 8 ' 21-A i - Side 25' B. All site grading and restoration shall be In accordance with these plans unless modified by the project engineer due to situations encountered In the field. ' � Rear: 35' 4 4000 ps I ,Magisterial District: _ S_cotts�ille 9. All dimensions, elevations and locations shall be verified In the fleld by the contractor prior to Re nForcecl Conc, � - _ beginning the work. iOveria Districts Entrance Corridor -- - - , O 0o O f 0,000-00 Waivers R uested _._a. n/a 10. The designer has conducted no studies designed to discover the presence of any hazardous v0-0 - _ _ 84 p S'dewa Ik 4' wed Q 0 , 0 O� substances on this property and assumes no responslblllty or liability resulting from the presence on any 0o O O 00 O ° , � O - - Waivers & Conditions A_-_- _%d: & Na such substance. 4 # 7 0 O 11, Prior to commencement of any construction within any existing public right of way, Including Reservoir Watershed: No. e o.o. o - O p o o 0 0 n 00 o O ° connection to any existing road, a permit for said construction shall be obtained from the Virginia �� , �• O O 0 O 0 O O O�ao Datum. Department of Transportation (hereafter abbreviated VDOT). This plan as drawn may not accurately a o a o o . o . o ,' Benchmark: Doorway Ex. SW church entrance = 500.0 ° reflect the requirements of the permit, Where any descrepancies occur, the requirements of the permit -- - - _ , _ ° Q Surrey S L. Key, Inc. _ - - � shall govern, ° 0 0 00 - 0 O Fie 12. All materials and construction shall conform to curent specifications and standards of VDOT unless 0 00 0po0^� OTopographic Information. S L. Key, Inc. (f - otherwise noted, po 0 p 0O O 00 Maximum Structure Height:- 35 ft. 13. Erosion and siltation control measures shall be provided In accodance with the approved Erosion control plan and shall be Installed prior to any clearing, grading or other construction. Paving Type: Asphalt or Prime/Dble Seal t- ~ Z Q) SUBGRADE COMPAC TED TO - - --- - 14. All slopes and disturbed areas are to be fertilized, seeded and mulched. Maximum allowable fill or Existing Tree Coverage: Sparse Wooded Contents: cut slope Is 2.1. Where reasonably obtainable, lesser slopes of 4d or better are to be achieved, 95% MAX DR Y DENS I T Y PER Previous Previous New New Total Total 1 . Cover ° 15. All drainage Inlets shall have a 2 In, local depression. Proposed Covera es Area s.f. % s.f. % s. f. 16. Paved or 9 Ip rap ditch may be required when, In the opinion of the Engineer or his designee, SUBGRADE COMPACTED TD ASTM -D-698 p° 9 2. Existing Site Survey It Is deemed necessary In order to stabilize n drainage channel 95% MAX DRY DENSITY PER _ Buildings/canopy 7400 2% 4000 1% 11400 3%° r - --- - - - -_ 17, All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices, ASTM -D-698 Parking/Drive 27078 6% 10152 2% 37230 8% 3. Site Plan Latest edition, and shall be provided by the contractor, 0 18. Unless otherwise noted, all pipe shall be Corrugated Metal pipe. Tota -1 Open/grass 418066.84 92% Na Na 403914.8 0% 4. Grading Plan �, ° _ Total _4_52544.84 1.0_0°_/0 _ 1.00% _ 4.52544.8 100% 19. All excavation for underground pipe Installatlon must comply with OSHA Standards for the Reinforcement to be Impervious Coverage: Na rJ. stormwater Management Plan .O Construction Industry (29 CFR Part 1926). 6'x6' Welded wire PA I /�/�/%� / % SEC % % a� / / V I / / v / r 1 / v 6. Erosion Control Plan or approved equal. - Parking - - - 6A. Erosion Control NarrativeEmplN, T, S,SI-DE-WALK SECTION Total 2 Spaces required N, T, S, Interior Parkin and and Trave4a s ! _ _- - 4 spaces ProHded 9 Y 4 Std (9' x 18' or larger). - 0 Handicap (16'x 18') (Van access) SHEET N0, 1 OF 6 0 Loading Space (12'x 25') DWG. No. 06-024 SIA m 0 U -D CDw � O Q D O < E cc a G. � d oi O >, O ao Z Cn 0 W m 0 U -D m o U -D � O Q D O N a 't Q O > H (n J Z Cn U OO M u m W Y � D m m = U O U Z C_ O �n w > Q D Q w Q J W¢ U O SCD I C rrTT�, W 'N V Q 0 M M J 't oNq* X O .E M _ •O LL. O � Ln U i O _N L M n L N O O L � 0 N -C (1) U N a 't Q O Ln > H (n J Z +, w Q X O U OO M u m W O °J O + O oQ C) U C_ U I C rrTT�, W 'N V Q 0 M M J 't oNq* X O .E M _ •O LL. O � Ln U i O _N L M n L SHEET NO. 3 OF 6 owc. No. 06-024 0 J Q �n Li V V ) U O O SHEET NO. 3 OF 6 owc. No. 06-024 71 x Cf) +� \ rte+ 0 U CJS Q I I U / \ / / \iiiiiiiiiiiiiiiiiiiiiillillilllllllllllllllllllloolllllllllliiiiiilllll1111111lI � � �; de \ 25 5 i O o a----___—_—� — 500 swale BMPvEl I \ t Tra p LTJ//�/�//' \ \ \ \ k C \ \ \ �j / \ \:Prop.BMP \ v y s\4afe SCC 1 0 o- / see detafl` \ — — — I 7'L - Cf) \ /il � s f l/ V I 1 v Vegetated emb-knkments as desired � I 4 ft. bottom Widti9-- C 1 151, CMP5011.f. @ 1 .0% - \ - \ / -T P BMP - I \ � I .'grassed e Out= 491 .5 \s�ra-le `� ___ \ \ 12" Depth } \ _ \ 77 7 19 f Trench Botto o BMP rench Detail ' T\ be scarified prior to\ (no scaled placement of filter i fabric ri o r aggregate \ agg I \ —� � I \ V \ moo \ \ o l \ I \ I I I I I I I F7 M m Y U _D x O I Cl I Q rt _� U) u w Y ILL M m { O CD 2- Z jI II I I I I 71 x Cf) +� \ rte+ 0 U CJS Q I I U / \ / / \iiiiiiiiiiiiiiiiiiiiiillillilllllllllllllllllllloolllllllllliiiiiilllll1111111lI � � �; de \ 25 5 i O o a----___—_—� — 500 swale BMPvEl I \ t Tra p LTJ//�/�//' \ \ \ \ k C \ \ \ �j / \ \:Prop.BMP \ v y s\4afe SCC 1 0 o- / see detafl` \ — — — I 7'L - Cf) \ /il � s f l/ V I 1 v Vegetated emb-knkments as desired � I 4 ft. bottom Widti9-- C 1 151, CMP5011.f. @ 1 .0% - \ - \ / -T P BMP - I \ � I .'grassed e Out= 491 .5 \s�ra-le `� ___ \ \ 12" Depth } \ _ \ 77 7 19 f Trench Botto o BMP rench Detail ' T\ be scarified prior to\ (no scaled placement of filter i fabric ri o r aggregate \ agg I \ —� � I \ V \ moo \ \ o l \ I \ w L M m Y — U _D M m Y U _D O >- < Q C O Q Z U) w Y ILL M m U O ~ 0Z 2- Z O CD Q O 3:< Q Q Q .E W J L W \ :��i D o_D o� nz o > 0 o CID E O c U > a U g� ❑ Z Q O E o v) E d > W Ua R � a � � "ro O U a Q C - o. a R v > c W �p O J Q >o N 0 0 0 CV .- Z w L M m Y — U _D M m Y U _D O >- < Q C O Q Z U) w Y ILL M m U O ~ 0Z 2- Z O CD Q O 3:< Q Q Q .E W J L W \ :��i D o_D o� nz z 0 0 L, IF. w O J N U (n O N I 0 N CL 00 M M J � d- 0 N X O •� (CS = C � C 21 LO V N i r �.o L m •U v .Cf) C:) o E 0 N �Q '- o D O SHEET NO. 4 OF 6 DWG. NO. 06-024 �o 2- z 0' � 0 �1 0 0 o IF. w O J N U (n O N I 0 N CL 00 M M J � d- 0 N X O •� (CS = C � C 21 LO V N i r �.o L m •U v .Cf) C:) o E 0 N �Q '- o D O SHEET NO. 4 OF 6 DWG. NO. 06-024 I J I O N E > 0 0 I X.-' I �\ f� OSW Q vI C 0 0 LIJ DA1 rn `� O )I illillillillillllllllIIIIIIIIIIIIIIIIIIIIII1111111111111111111000�� ° 43 5 / i � Q m CID 5 °' w 04 N J OO ' � eillillillill0000lk OA N p Z tl �5z �� S� / ,o O — -- — — �PeS E[S LANDSCAPING / ROPOSED _ O � iC� Area #7 / ♦ Ta NDS CAP I N q C� U, -� .� 'u ���,:° " l Area 2 oo O� — PROPOSED WA / ° o h z a X A� � .ry ` - = . ^✓dam • J _ / z 1 N Z � VC _ I 4 V z - , PROPOSED 0 �/ 4 �' `` �� x �% BUILDING BUILDING I Pr P. ` Q5 A ♦ f c P sED MQD _ \ l - I swale REE REEL NE A NE W a- o Y I— 0 Y O LLJ F— i �. 1 ) I see de t /L_J o m Y 0 o� 0 �;��, `�� - - Area #4 Landscape Wo — — — --I o � Q - Q Q z �%�':� _ - -- EXISTING LAN D ass ~� ��� ° _ _ _ �'Doc�ccess EXISTING - - - - - - Dack - - - �/ End BMP p I \� .BMP \ PROPOSED �AN�DSCAPING� - cess --� ,� �O / swale o _D CD PROPOSED �- - LANDSCAPING �R r I /area #5 \ _ D �� ,o -9 OD Oil s�� ��+ �o� lsi o �� �F� U � N __� Area # 1 �' �, A t Trap \ -9s -- s� C) s �� s�o �� 9� 0 w -� z m om > _ w J o N II wCn l �1. � ..(L- CD cyl'9,p 0 o _� (� :,Rrop. BMP o� �, //�/ U o - sv ale (SCC) x/00 x l 0 , _ o � �, t see deta� O — _ �. Cf) I ( r -� o 'p Vegetated embankments as desired 4 ft. bottom Width r CV ico Q% Cwn � P . a O Stormwater Management Narrative. ' 490 - �— _ .= � LO 1. Project Description: This site was first constructed in the 1980's with the placement of the Colonial Baptist Church. The current project of a missions building and associated parking area and travelway. The new construction shall �� ♦ — grassed swale 12" Depth `-' � c �' - N `` M proposes placement predominantly drain across the previously developed portion of the site. The water resources area is described as "other Rural land". ' �, Y+ /� —_ — Nt rl \ ; } 2. Drainage Areas: ' \ / ' k','. N�.1 gMP 6' NON- PERFORATED OUTLET PROTECTION DPVC AYLIGHT TO OVERFLOW I I I The site has been analyzed in two separate drainage areas for the purposes of Stormwater Management. Drainage 2.12 Area 2 is 0.8 - - y '� PROTECTION STONE WEIR Trench Bottom to area 1 (Eastern side toward Rt. 250) is roughly ac. while (Western side) roughly ac. BMP Trench Detail be \ < z� BERM BERM ��„— (no scale) scarified prior to placement of filter � 3. Removal rates: Required removal rates have been calculated for each drainage area as follows: -1 �� �- - _ _ _ - 3:1 SIDE I SLOPES (MAX) wdr fabric or aggregate C� DA 1- 35% DA 2- 50 /o I --— �- ,i II I 4"-6" PERFORATED PVC PIPE S °NE WE S we REORQM m of KIR ro 3:1 (—) �w � Cr 4. Utilized BMPs: DA 1- Retrofitted Sediment trap (50%) followed by wide grassed swale (20%) DA 2- Wide grassed swale (20%) � 1 - _ - _ I - ; — � INLET 11 ,� I PROTECTION/ ENERGY DISSIPATER � � I I I I I q ? x= �air°� uN-r°rsaV NIN ' ASl Cy FlNE)°a (A.SW M . aawiNa slur IN n Na. rnw soEsuovE iw ni'tE� FMC LLJ J Q Z 0 _ E , I STORM Pv1DE R R ATiosroc MOH siauuaN�"REvu"'•`cE _ ((���� W ct �� � Q 4. Removal Efficiency. d WATER CHANNEL wm nw oa cUNuua FlLL (n C)N DA 1- Series of BMPs provides greater than required removal rates - DA 2- Grassed swale provides less than required rate but is offset by overdesign of DAL Placement of landscape feature for - gin) -01T CLEAN-OUT � p grassed swale provides an appropriate and will allow minimal maintenance and upkeep. - �/ �/ TOP OF BERM W/WATERTIGHT CAP U 5. Stormwater Detention: (MS -19) 1 �* ---- � _ / STONE WEIR 1 -D O 0 Exemption from Stormwater detention requirement is requested under County Code section 17-314(g). Flows c 3 associated with this project are minimal and provisions for detention structure(s) would involve disturbance of Sediment Trap existing vegetated areas and encroachment into existing drainage networks. Retrofit (no scale) PVC6PIP° (9 %FMLN, LOAM OR GRANULAR SHEET NO. 5 OF CC — SLOPE EARTHFILL NOTE: 4"-6" PERFORATED PVC SEE DRAWING 5 FOR PIPE @ 1% MIN, SLOPE VEGETATIVE COVER OPTIONS. DWG. N0. 06-024 S Z) 2 ) E \ E » o � i 3 / 4 / r ® 7 E ? 3 0 2 n /� ƒ \ § $ f ] (A ) � A E \ / / o C%j \ \ \ «44 k � \y © � c % $ �% \ -23, � \f � 4� 03 \ \ 2 S / / / / / J % � � 2 \ \ \ \ / \ J \ \ % \ / > D o w o w e 2 .2 2 c 9 f 0 z }� q U / / CD S_J/ « z o /' y x y / m / ° a » a mgG\ z : LLJ © % .\ ± / c q y � \ S ug. S � $ N 2 � � 0 C'? � � m % t 2./LL. U / E CY) � Q \ 2 ¢ C\l ¢ R LL_ m \ � � � � _ .� _/ 4-) / c a __j C) ° f / z / �(D_ U� /.. ± D u O O O � � SHEET NO. 6 OF 6 ow% NO, 06-024 Set the stakes 6' Max /�/ flaw 2. ps5opetalong th11 xe4linerench of the stakes 3. Staple filter material to stakes 4. Backfill and compact and extend it Into the trench. the excavated soil. Sheet Flow Instollation Points "A" should be higher than Point "B° Drainageway Installation Silt Fence Installation /A Mulch Specifications Shaw or Hay- 1.5 to 20 to per or. (2.0 con. to *able cover)- free from mW and tear halter. Must be echoed. Spread by band a Boer. Fither Mukh- Mn. 15DO Ib. per one- Do cot ps per We, aver or during Mt, dry paiods' Mpli as away Con Sidles - 4-6 tan per are- Cut of sMedded into 4-6' usable. Ax dried. Do cal use in fire lust pea. Appy by had of char, Wand Chips - 4-6 tan per acre- Free of worse matter. kr di led with 12 Is nitrogen/tan Do not as a fro turf arcs. Appy by Mrd, fewer of chip barrel Durk Chips a Shredded Bok- 50-70 Cy per are- free of Cars rtmhe. Air Dried. M ad us in fine led areas. Appy by hand, all of chip hander 'When Fiber Mukb is the and, amibbk mulab doing puiods when straw shah be used, appy M rate of 2,000 111 per ac. Narrative PROJECT DESCRIPTION: The purpose of this project is the construction of Church missions Wilding. Approximately 1.5 acres are scheduled for disturbance. EXISTING SITE CONDITIONS' The topography of the site is relatively flat within all reaches. The area landcover is partly wooded area with an existing Church building, same existing parking areas and utility structures. ADJACENT AREAS: The project area is bounded by rt. 250 to the South and by unimproved or rural properties on all other sides. SOILS: Soils in this area are generally described as Nasm Silt Miami Nason are well drained with medium to rapid rural and manuals s pernsabitily. CRITICAL MEAS. Critical areas are than (such as creek channels) subject to concentrated stormflows car subsurface springs. In topography such as this, source control of sediment is critical to erosion control. Contractor should use core In scheduling and sequencing to minimize exmvwion exposure in these areas. EROSION AND SEDIMENT CONTROL MEASURES: Measures shown on the aaomparaying drawings and in this narrative are to be installed in accordance with the specifications and standards of the Virginia Erosion and Sedimentation Control Handbook, 3d Edition 1992. STABILIZATION PACTICES (Adapted from Stab Minimum Standards as effected, 13 SEP95). Standards listed here, are in summary form. In cases of duration or controversy, the Virginia Regulation VR 625-02-W shall govern. MSI Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied to denuded areas within seven (7) days to denuded smasMat may not beat final grade. but will remain dormant for longer than 30 days. Permament stabilization shall be applied to than areas which will remain dormant for longer than one year. MS2 Soil stock piles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all sail stockpiles on site as well as soil intentionally transported from the site. MS 3 A permanent vegeetive cover shall be established on denuded arses not otherwise stabilized. Permanentvegeetion shall not de considered established until a ground cover is achieved that, In the opinion of the local program administrator, or his agent, is uniform, mature enough to wrvW, and will inhibit erasion. MS4 Sediment basins and traps, perimeter dikes, sediment darien and other measures Intended to trap sediment on-site must ba constructed as a tint step in grading and be made functional before upslope land disW anm takes dam. MSS Stabilization measures shall be applied to earthen structures such a dams, dikes and diversions immediately after installation. MS$ Surface runoff from disturbed areas that is comprised at flaw from drainage areas greater than or equal to, three (3) arm, shall be controlled by a sediment basin. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading from the land disturbing activity. The outfall device or system design shall take into account the total drainage area flowing through the disturbed area fo be served by the basin. MS 7 Cut and fill slopes shall be constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization, shall be provided with additional slope stabilizing measures until the problem is compound. MS Concentrated runoff shall not flow down cut or fill slopes unless contained within adequate temporary or permanent channel, flume or shape drain structure. MS 9 WMnever water seeps from a slope face, adequate drainage or other protection shall be provided, MS 10 All storm sewer inlets that are made operable during construction shall be protected so that sediment laden water cannot enter the ="yen" system without first being filtered or otherwise treated M remove sediment. MS -11 Before newly constructed stormwater conveyance chanmis are made operational, adequate outlet protection and any required temporary or permanent chancel lining shall be installed in bath the conveyance channel and receiving channel. MS 12 When work in alive watercourse is performed, precautions shall be taken no minimize enamchment, confrol sediment transport and stabilize the soak area to the greatest extent possible during construction. Nomrodible material shall be used for the construction of museweys and cofferdams. Earthen fill may be used for these structures 0 armored by Morett ibk aver materials. MS 13 When a live watercourse must be crossed by construction vehicles more than Min in any six-month period, a temporary stream dropping corrsWcbad of mmrodible material shall be provided. MS -14 All applicable federal, state and lout regulations watching to waking in or opening live waencourses shall be met. MS -15 The bad and banks of a watercourse shall be slabilized immediately after work in the watercourse is completed. MS 16 Underground ul lines shall be installed in accordance with the following standards in addition to other applicable czitede: e. No more than 500 lirear feet of trench may be opened at one time. Is. Excavated material shall be plased on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered a passed through an approver) sediment trapping device, or both, and discharged in a marcor that does cot adversely affect flowing streams or off-site property. it. Re bilization shall be accomplished in accordance with than regulations. e. Applicable safely, regulations shall be complied with. MS -17 Whose construction vehicle aocass routes intersect paved public roan, provisions shall be made to minimize the tribnsal of sediment by variation tracking onto the paved surface. Where sediment is transported onto a blit: road sudeca the road shell be cleaned thoroughlyd the end v 9 p cling public of nuedm day. Sediment shall be w Wi from the roves by shaveling or sweeping andtransported ascan a apply to a sediment control disposal arae. Street wasbrg shall a allowed only after sediment a removed in this marcor. This provision shall apply tu individual subdivision lots as well ea to burger landdis All to activities. Ms1n All temporary rchasten and sediment control measures shall to removed within 30 a. Ta final site stabilization a after the temporary moment are M longer needed, unless suiting fr authorized by the local program administrator. sures Trapped aecsnent and me disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent tuMar erosion and.W, 19 See Sao Stien. MS19 fortnwaler management plan. Abutt, Mulch Specifications Skew or Hay- IS to 2.0 tan of be. (2.0 edn fa winter corer)- free from cads and course matter. Must be rebored. Spred b/ hard or bb r. Fier will Min. 15DO It. per nue- Do ml use as winter carer or Wring bol, dry orkeder Appy as durry. Com Stalks - 44 lax per ore- Gut art *edded !Me 4-6' ImglM1s AM dried. tu but use in fine turf care. Appy by had or visa. Yfaod Clips - 4-6 ton pe are- Fm of cams matter. Air died. Treat with 12 Ib. nitrogen/tun Do nd ase in like tai cows Appy by hod. Mbar of No handle, Bad Chips cr Shredded Bok- 50-70 C.Y. per are- per d Cors moffer Ar Dred. Do rot use in lure Ed ones. App% by hand. broken a chip hander "Aha Fiber Mulch is the only avcilable mukb doing peals when straw dmu3 be used, spur o1 rale of 2,000 Ibper a. MANAGEMENT STRATEGIES 1. Areas which are not to be disturbed shall be clearly narked by flags, signs, etc. at the oriei discretion. a The, Contractor shop be responsible for the installation and maintenance of oil erosion amid sediment control measures. EROSION AND SEDIME\T CONTROL MEASURES: Measures shown on the accompanying drawings are to be installedin accordanCie with the specifications and standards of the Virginia Erosion and Sedimentation Control Handbook, 3rd Edition 1992, MAINTENANCE In general, all Erosion and Sediment control measures will be checked daily and ci each significant rainfal(, The following items will be Checked in particular: a) should =sediment basins or traps be required, they will be cleaned and maintained according too the Virginia Erosion and Sediment Control Handbook b) All grci outlets will be checked regularly for sediment buildup that will prevent. drainage. If the gravel is clogged by sediment, it shall be removed proof cleaned or replaced. c) AI� silt carriers will be checked regularly for undermining or deterioration of the faI and repaired as required. Sediment shot( be removed when the level off sediment deposition reaches half way to the top of the barrier, d) All Seedded areas will be checked regularly to see that a good stand is ma,ntmnea. Areas should be fertilized and reseeded as needed. e) Tne acceptance of approval implies that the applicant has agreed to use the materials as indicated on the Erosion Control Plan, attachment and samples: submitted. Any changeto the approved design or materials will require appxroval by the Engineer. CALCULATIOINS1 None. PERM. SEEDIING SPECIFICATIONS. (All units in Pounds per acre) Feb. 16 tthru April 301 Kentucky 31 Fecue- 128 its.; Red Top Grass- 2 lbs.; Annual Rye- 20 lbs. Fertllizze at 1,000 lb. per acre or as determined by soil test For Sitopes steeper than 31, add 20 Ib. Crownvetch May 1 thiru August 15: Kentucky 31 Fecue- 126 lbs.; Red Top Gross- 2 lbs.; Foxtall Millet- 20 lbs. Fertilifze at 1,000 lb. per acre or as determined by soli test For Sicooes steeper than 3:1, add 20 lb. Crownvetch Aug, 16 tthru Oct. 31: Kentucky 31 Fecue- 128 Ibsd Red Top Grass- 2 lbs.; Annual Rye- 20 lbs. Fertilise at 1,000 Ib. per acre or as determined by soil test For Slopes steeper than 311, add 20 Ib. Crownvetch Nov,I tbnru Feb, 151 Kentucky 31 Fecue- 128 lbs.; Red Top Grass- 2 lbs.; Winter Rye- 20 lbs. Fertilize at 1,000 (b. per acre or as determined by soil test For SUopes steeper than 3:1, add 20 Ib, Crownvetch GENERAL REMARKS: 1. Line shot( be applied at 3 tons per acre unless otherwise noted. 2. Fertilizer shall be Type 10-20-10 unless otherwise noted. TEMP. SEEDIri SPECS. For Plantingl Dates of Sep. I to Feb. IS Use a 50/501 Mfr. of Annual Rye and Winter Rye I1BM at 50 to 1C00 Ib. per acre. For Planting) Dates of Feb. 16 to April 30 Use Annual FRyegrass at 60 to 100 lb. per acre. ! p * t seedsg For Planting) Dates of May 1 to Aug. 31 Use German Millet at 50 Ib, per acre. Covenanter, Enhance 4 Inches yS,tapls Roar . a ac urer s nsrruct ion Fold 5' Wooden Stakes TArTllingsl) Fold 5011 Stabli7ation Blanket Details SMI Fence sediment Trap United Consumption IAvarsron Tree Reaervalion Inset Prolaction omNt Production O'..'an Iced f Pal%tlon Earthwork Summary: It is expected thgt the earthwork, Ion this project well balance on site. KEY SYMBOL Ma) 1992 3.0 STONE CONSTRUCTION ENTRANCE EXISTING III 70' MIN. PAVEMENT 5:1 EX. GROUND N FILTER CLOTH MOUNTABLE BERM 6" MIN. A (OPTIONAL) SIDE ELEVATION 70' MIN. aj I B WASHRACK (OPTIONAL) z \ EX. EX. GROUXD 10' MIN. PAVEMENT N VDB (POSITIVE DRAINAGE z COURSE AGGREGATE I TO SEDIMENT ' MUST EXTEND FULL TRAPPING DEVICE o WIDTH OF INGRESS AND PLAN VIEW EGRESS OPERATION jam-- 12' MIN. JJ'3" MIN. 3" MIN, FILTER CLOTH SECTION A—A ....w REINFORCED / DRAIN SPACE CONCRETE SECTION B—B SOURCE: VA- DSWC m. Aa Outlet Protection Filter Cloth Key In 6-9" recommended for entire perimeter 1. Apron lining May be Rip Rap, grouted Riprap Captain Basket, or concrete. 2. La= length of rdprap apron as specified. 3. d= 1.5time Max atone diameter but not less than 6 in. FENCING AND ARMORING 'T 4 flowma hall a pa CORRECT METHODS OF TREE FENCING AA of 1 ;1 I j I• I , II �I i I, ( I III II �.II lI.1„n 'l IrL_IIII I� II �., Ill I,ll h qrl. `Iltll rl I i i CORRECT ARMORING add L TRIANGULAR BOARD FENCE IA " m m N 0 woy r Y a v v o 0 0 4 z uu O m m U O U F O a. E w r r w j\ w\ M5 o ai­ N Z w Z M 3 a LD N a O 00 J Q) a 0 N a O c as C _ U i C _N l�o LO M n d SHEET N0. 6A 6 _OF DWG. NO. Ur � I-4 U a ICU !n Lrr�11 ��yy O O O m 3 a LD N a O 00 J Q) a 0 N a O c as C _ U i C _N l�o LO M n d SHEET N0. 6A 6 _OF DWG. NO. 06-024 • Z • 5 w rr w 0 0 Z Colonial 13 Albemarle County Engineering General Construction Notes for Site Plans NIA issions Stora e ui in 1. Prior to any construction within any existing public right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of. ;pyo Transportation (VDOT). This plan as drawn may not accurately reflect the requirements oD of the permit. Where any discrepancies occur the requirements of the permit shall govern. Albemarle County Virginia o m 2. All paving, drainage related materials and construction methods shall conform to current Lj r� <Q specifications and standards of VDOT unless otherwise noted.a Design Narrative: I / 1. Project Description:0 This project proposes Improvement of the property such that a new building shall be constructed to house missions c 4 z 3. Erosion and siltation control measures shall be provided in accordance with the approved activities and storage purposes. The project will be adjacent to an existing buliding and parldng lot but shall utilize w m m erosion control plan and shall be installed prior to any clearing, grading or other 744 is own new parking spaces. It Is not expected that Me occupants project will have significant use of vel cles z r S� j during typical church activities, therefore minimal impact to the existing parking facility is spected. a w c, < w construction. G. 2. Sitewaik: / 6 6 Grading for the project is designed to be minimal. Paving, curbing, and drainage Is designed to minimize the 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum of sheet flow on he band reredirectoBsite sheet existing channels. S[ormwate from the new \ Impervkws arras will be directedted to to the the SoakAway swale downhill of the proposed sWctures. allowable slope is 2:1 (horizontal:vertical). Where reasonably obtainable, lesser slopes of � � � 3. water 8 Sewer: 3:1 or better are to be achieved. Water supply for the project shall be from the existing well. No improvements or changes are proposed. r p � o�L aptist Church 9 B id 9 {.S The buildings will be designed such that flreflow requirements will be satisfied by Duikllrg vpamtlon (>20 ft.) Only. 5. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the No sprinkler systems of fire hydrant provisions are proposed. a C� L N c��ac Albemarle County Director of Engineering, or the Director's designee, it is deemed / 64 Sanitary sewage system shall be provided by the existing d alnflekl. No Imp ovement > lounges are proposed. r s i n 0 uo J 30 w aJ 0 d necessary In Order t0 Stabilize a drainage Channel. Go 00 in Electric and telephone currently access the site and shall be appended to serve the new Poily,c O Q o 6. All traffic control signs shall conform with the Virlainia Manual fonUniform Traffic250 5. Landscaping:0 3 a ° o� Landscaping shall be determined by the owner at construction. Typically, trees ami lir s,ubbery will be placed o w o near the proposed buildings while lose shrubbery will be placed In and around the BMP; wale. U Control Devices. SITE 6. Signage: 7. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III. locations, expected type and dimensions, for the parcel signage shall be determined by the owner. \ 6. Stormwater Management and Erosion Control In general, stormwater management will be quality control and be accomplished by wide graced swale BMP 8. All excavation for underground pipe installation must comply with OSHA Standards for teed trenching. Such technique combines Infiltration trenches with wide stormwater conveyance channels. the Construction Industry (29 CFR Part 1926). `y ` �� 7. Trash Collection: C1.) There is no provislon for trash collection or storage with this project. ••a '.Site Data : original 12Jw06. .... N N Project. Colonial Baptist Chwch Missions 8 Storage Building -2008 04 VICINITY MAP (no scale) -- w _1 M 1 ' 1 _, Owner: Colonial Baptist Church -- _ ' I p) 3 .Alto Edwin Leake, Jr o 0 m x .PO Box _6547 -. -_ __ •N o m ChadoltesNlle, VA 22902 oath 1. The designer has attempted to locate existing subsurface utllitiesi however, such tiny ezlst that ore not shorn, _ _ r -i 'o �_ tai The contractor shell exercise care In this work so as to avoid damage to any utilities, Any L - g damage shall be the contractor's responslblllty, The contractor shall notify all utility companies as well as Contact S.L. Key, Inc. Atte Steve Key, LS. 'Miss UtNlty' 72 hours prior to construction. . I •N O M 2. Any unusual subsurface conditions shall be reported immediately to the Engineer. �PO Box 1346 I W 3, The contractor shall obtain all permits required for this work and pay all associated fees. 4. The contractor shell employ erosion control devices and methods as required to meet the Intent of {he culla, VA 22902 Local Erosion Control ordinance. 2" SM 2A 5. Contractor to clean up and restoAcreage: 1039 Acres re disturbed areas Immediately upon completion of final grading In D- elle` t the affected area, Tax Map 8 Parcel: 94-06 _ _ ci 6. All grading and Improvements to be confined to the project area unless otherwise Indicated. Owner Tach Coot shall obtain any offsite easements required.Deed Book: 986 P253 (plat p. 255) 7. All fill material shall be compacted to 95% of theoretical maximum density as determined by ts of optimum moisture for the Full -Zoning: RA (wall SP 98-23) 8" 21-A Magisterial District: A.A.S.H.O. T-99 Method A, within plus or minus 2 percentage polna.r width of flit section. B. All site grading and restoration shall be In accordance with these plans unless modified by the project overlay Districts: Entrance Comdor ✓ _ _ _,I engineer due to sltuatlons encountered In the field. 4' 4000 psi - 9. All dimensions, elevations and locations shalt be verified In the field by the contractor prbr 4o Reinforced Conc. Waivers Requested a Na _ beginning the work. S i de wa i k, 4' w i d00000 ` 0 O O O Q p 00 ` ,waivers 8 Conditions Approved aNa 10. The designer has conducted no studies designed to discover the presence of any hazardous i�- substances on ills property and assumes no responsibility or Liability resulting from the presenu on any 0Q °O - °O(-)(-)0- ` O °" O _ o O - o O - Resenoir Watershed: No. t _ n O - ._. such substance O-00 Datum Assumed - -_ 11. Prior to commencement of any construction within any existing public right of way, Including o ' .' o(� o ; ^. " o'p o ° ' o' wO O O�� OoOO o� Benchmark _ _ Doorway Ex, SW church entrance 500_0 connection to any existing road, a permit for said construction shall be obtained from the VlrgWft ' . O O 00 O O ._ - -- ___ o Department of Transportation (hereafter abbreviated VDOT). This plan as drain may not accurately -o ° o -o , e •o Survey ,S.L. Key Inc. __ _ reflect the requirements of the permit. Where any descrepancies occur, the requirements of the permit a�qq s o !Topographic Information: •S.L. Key Inc. shall govern. U� aa- o aO�. �TBB�-....... _._ _ ._._.., .. - > Maximum Structure Heigh % ITS V m 12. All materials and con shall conform {o curent specifications and standards of VDOT unless tQ� a� �O a g�0 :da` aO- A �Pinin T _�_ _ _ �_� otherwise noted, lJ (l 9 YPe:. ,Asphalt or Pdme/Dbla Seel __ _ 13. Erosion and siltation control measures shall be provided In accodanc , with the approved Erosion Existing Tree Coverage Sparse Wooded ! - control plan and shall be Installed prior to any clearing, grading or other construction. SUBGRADE COMPACTED TO _ ` -P - --! 14, All slopes and disturbed areas ore to be fertilized, seeded and mulched. Maximum allowable frit or Preuous Pre%_ New New Total Trial Contents: Cover ~ Z 95% MAX DRY DENSITY PER (- - _ -i � � �kt \ a cut slope Is 24, Where reasonably obtainable, lesser slopes of 4d or better are to be achieved. ,Proposed Coverages Area sf % s./ % sf -% I. Cover leo 15. All drainage Inlets shall have a 2 In, local depression. SUBGRADE COMPACTED r0 ASTM -D-(98 Bondi s/cavo _ 74.00 2% 4000 1% _1,400 3% 16. Paved or rip rap ditch may be required when, In the opinion of the Engkheer or his designee, 95/, MAX DRY DC TY PER - - 2. EXIStlflg Site $UfVey ,� T It Is deemed necessary In order to stabNze a drainage channel. _ __ 8% 17. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices, ASTM -D-698 --. _ OpeNgrass 41806684 _92% Na We 4039148 8� 3. Site Plan .� latest edition, and shrill be provided by the contractor. Parking/Drive py 4525M04 -^i6% 10152 10096 4529448 100% 4. Grading Plan ..-_ __. 19. Unless otherwise noted, all pier shell s Corrugated us Metal pipe. Reinforcement to be /� ' / T /� T 6npeMous Coverage Ma - O O 19. All excavation for underground pipe Installation mus{ comply with OSHA Standards for the 6'x6' Welded wire re PAVEMENT EMEN / S�C. / I �N 1 5. Stormwater Management Plan •� Construction Industry (29 LFR Part 1926). -- or approved equal. Park"g �' 6A Erosion Control Narrative - - J 6 Erosion Control Plan SIDEWALK SECTION Employees 2 - N T. S, Total i 2 Spaces I pieces M, r. S Interior Parking and and Trave*ys 4. S z srd�g�x,e) SHEET NO. 1 OF 6 0 - iB)(Van access). - 1 • Loading Space (12'x 25) 1 __. .__ _I. __ DWG. NO. 06-024 M X +� i �o CP Cf) CT, r --h M 0 II of O ICA On BSc^N SFo A N'_� . X �V a. o 0 (C%+ C 1 s GPp\� _ _ - rop. BMP I I c trofitte T. I x„ nt Trap I \ A I I �� \\ Prop. BMP ;• p I \ I \ Swale SCCA \ see detail �I I \ I I I \ I -C 1 15" CMP 501.f. 1.0% ------ n= 492.0 End BMP out= 491.5 C x swale < �I 77 _ , I ) I I 1 I I I 1 I / I I I E L Q' Bvi 2 tl , !air—W �o aux. L ndscape Wal EXISTING nnrL A --- 2g° 43 5 N 566.E 5 —PROPOSED SWALE I PROPOSED II . I BUILDING I Prop. I FF=503.5 I I BMP I swale BEELINE I (SC — I I see deta i l - _ - - - - - - - - - End BM I swale I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l o add` V91 G�'7 AN Vegetated embankments as desired .,\� l g� �-- 4 ft. bottom Width —� ° ' grassed swale —I Depth I I —I II I — I� BMP Trench Detail Trench Bottom to be scarified prior to (no scale) placement of filter fabric or aggregate z _O 111 w Q 0 0 Z ,SIA 6 00 40� 4 M m o w o�- LLJQ U U _D o mC=) W z Y M O o 0 z Z � > Q o Q Q .� W J � W D W o� 0 W � N 0 N N d. Q 4.Q)LO> Z U) J co w W Q C v 0.3 O= X Q N vUi - M p m w o (> ° ..� O o N O O Q U U 0 0 CV Q M O M _ ,� LL C �Lf) fU 0 � T o a N C i N _ CL U � M Q) L J � • r"I �•-I n p LLJ+� C o z `�I 4 LL_ -4- CtD �Q �n � �o C) O •V1 ,On O SHEET NO. 3 OF 6 SWC. N0. 06-024 M , , , I 0 N , I � S w x �0 \ r -r o a (D0< Got / rt (� / r1- i� / / z `� 001�7 __ / GT V' \ L / — --- ---- C)0. l• N C0—PROPOSED � F' c C)M _ W. SWAB o o C X M o�G� — — —_— — -- -----I / RpPpSPNp"F'Oj Q I PROPOSED I —c� z OpO Ar f? o I I o DS S� l BUILDING I —503.5 p o I P• w a 0 x U 0 x o sa — � �.° FF- I /BMP o d �\ I ( — A y a, � swale REELINE w o m m U z z _ r'vl (SC ZE US ���� M i5 n O F 0z li Z N" o, \ /�c — I I see det / o °�S C1 j �a Landscape wa — — — c -------- ----------- --------- EXISTING EXISTING - v :.. G/� '`til z N o °S OS \ �pN / _ — D ck Access Q� —500 - _ - - - _ - - EXISTING Do o / End BM 0) N N Fo y BMP _—_ 4ss— _ — , — — swale Y a °"> o . \ O , \ A / ^ /roe (I1J,p w a = W O N Retr #fitted \ ❑ / 3 Q N ® _ ��`�`e Sediment Trap \ \ \ 9 ss/ -9i /® °o °�cFO / L owoy maw 0 0 N \ Y _O, �,�Gy�9� yG�c% f � / rQ Prop. BMP � X/ / ' s*a- e (SCC) \ \ \ \ \ J O SO / \ / M see detail O_ / N _ L\ _ F L / QO 1 , ' — Vegetated embankments as desir \ / w ad LL 4 ft. bottom WV dtl -- — L ' C1 O 15" CMP / U h N a_ = 50 I.f. @ 1.0% I I n— 492.0 ., BMP yr y Out— 491.5 Out= 491 .......lt\ �� C X Ms r� \ — r. \ NN, \ _ 72" Depth 9asse3swa� III—� _ III / ►1t •�D U r IMI PEI II]El III�IIIII III I—� II19 G, o �� 2� 2Q \ \ BMP Tench Trench Bot of 0 Detail n'� F Z c O u� ° ° - _ _ \ (no scale be scarified prior toy \ placement of filter o o >0 c A \ fabric or aggregate \ \ w I • i V \ \ \ 711 �" ° U \ \ H 0 0 I c9� � l) 9 /ST 480 \ \ \ \ \ • � __ e� SHEET N0. 4 OF 6 owc. No. 06-024 M •, 1 m ' • o ,C) N 1 / / / w � , ' DA1 cy) C . /DO CD i O/ C % L G \ _ PROPOSED �� SWA . �00 X rTi - o�� i ",. l` �P�S NG pP 9� Oq �� I i-,-{ m 1° / -I \ PFZ S� o qs l PROPOSED VVSCOSF i>:: -� BUILDING I p ., I FF=503.5 I � BMPe m m LINE swa REELINE _� <' (�C tl 6 F I--- I see det / o F m= I: z 0 / N �nn V' ': i c o \ �r `, �s '��, L ndscape Wo -- ------ I I ��i�// W O LJ <.€ w� <W U j ���� O] 1>� M o n, OZ G. Z l9� />12A EXISTING O%End �F 100,0 ck Access m —500 Exlsrwc oosk9ccess BMP ' pc S�'or o BMP — _ — — —' Ao / swage s ry C�Dp ��- Retra#itte_ \ °s l ® tTrap 9ss 090 • o� ��Fo / NJ Z O� W \\ \� ����2 ' acxm ry II ��^I ) ♦'pR �� -, \ \ ` IMI ��� f�iiy�ll♦II�II�(II�//, II�II�II�II Ilr//� / 0]om y °a° �N /G Prop. BMP � O �I ;.' Swale (SCC) � / X ' l see deta-i l `1• A S / -4 s (, r -^ �� •�"` • 9�� �%r, //�, `C� Vegetated embankments as desired J - 4 ft. bottom Width N (+- - •:. I rn orad C i -.I ♦ \ i --I-- . � d O N V Storwater Management Narrative: m / \ 490` ♦ - – U- �' In n 1. Project Description: ` ` ♦ = r —III grassed swage 72" Depth III J N D III This site was first constructed in the 1980's with the placement of the Colonial Baptist Church. The current project III—II III W �LLm proposes placement of a missions building and associated parking area and travelway. The new construction shall W predominantly drain across the previously developed portion of the site. The water resources area is described as ' • ; - _ _ _ "other Rural land". A CUTLETI I I I I I I I I I 2. Drainage�„ drainage areas for the of Stormwater Management. Drainage a� 1 6' NON- PER FORAi! PVC PIPE TO PROTECTION DAYLIDH PROTECTION CTION The site has been analyzed in two separate purposes ( ) roughly area i (Eastern side toward Rt. 250 is roughly2.12 ac. while Area 2 Western side Is rou hl 0.8 ac. swab _ — —°"E'R BMP Trench Detail Trench Bottom to BERM BERM be scarified prior to � 3. Removal rates: J �� m Z� �� — J� 11 SE II SLOPES (no scale) placement of filter fabric fabric or aggregate .IF U Required removal rates have been calculated for each drainage area as follows: - - - _ _ _ t:j% (MI I , u DA 1- 35% DA 2- 50% �,r I ii u} i' 4'-6' PERFORATED d I h PVC PIPE s �• d o ma VO+ 4. Utilized BMPs: DA 1- Retrofitted Sediment trap (50%) followed by wide grassed swale (20%) �� - _ _ ) —� r t I. INLET �i li ,i� t' PROTECTION/ p u e : % ."" J O 2 Q n' rti -11111) 0 bi p O DA 2- Wide grassed swale (20%) ^I tet" ENERGY ,I II DISSIPATER ma �,� D 4. Removal Efficiency: 1 • I -� 'i ii ii STORM d " r WATER cNANNEL ^ w n Pa � C:6DA DA 1- Series of BMPs provides greater than required removal rates _II , 2- Grassed swale provides less than required rate but is offset by overdesign of DAL Placement of \ �) 01�"-0t" co grassed swale provides an appropriate landscape feature and will allow for minimal maintenance and upkeep. �•i /4 TOP OF BERM W/WATERTICM CAP p 5. Stormwater Detention: (MS -19) �l \�C Y Gi STONE i'-0 �, 1 O O O U) Exemption from Stormwater detention requirement is requested under County Code section 17-314(g). Flows r 1, , s associated with this project are minimal and provisions for detention structures would involve disturbance of p t p O _ Sediment rap � existing vegetated areas and encroachment into existing drainage networks. \ Retrofit (no scale) 4'-6' NON -PERFORATED PJC PIPE O 1R MIN, LOAM OR GRANULAR SLOPE EARTNFlLL 4'-6' PERFORMED PJC SEE DRAWING 5 FOR SHEET NO.J OF B PIPE • 1% MIN. SLOPE VEGETATIVE COVER OPTIONS. DWG. NO. 06-024 O 0000e 40 ifn i is of / / IIIIIIIIIIIIIIIIII, F Construction i � `/ I \ Limits of \ . ✓ PS \� / 0 Construction 00 �,� _ PROPOSED SWA40pa 01 0 F7 X +QQ CJS C r r- 1-7 Q l� Q ("O� ` \ 1 _ -•I �//-w ,-..y.-. (.y..pr mom..!-; . r'i I _ F \\\ A W \v 7 xi i q Yid — - - - , ,��, iD, r�k, ® PROPOSED asC os Y I P p. P 1 –lo FF -503.5 BMP swale REELIN � C i D \► �''' � , � � �-J RAS' S � '' see det 0 C L ndscap al &/x r 4 .. •• a.. Wit'; t' 4 ,,iii. .z;� . o. �y 'o �- QFZ p,P ______ EXISTING S �` ---- - ---- `� �Q �' ,DociAccess m EXISTING nd BMP I . ..: I o ` � � 500 _ Do k�A�ess i s 0� I `\ �. \ I- � cy� Fo \ I I I swale Limits of c, � 0,0 L tr itte % \ I 0 T Constr ion-�Tr ps °o a� �A d50= 6" / IT � �diment Trap \ / Lbngtb_ \ �� ��10 ft. < CA \Oep Bottom F�ccavated Area= 34x 1 �o �� ,p �%i�,40 _ - 'Rrop.BMP depth of Wvet SSSSST rage= 3 ft. \ �0 '� �, wup=5,\ Bottom of Weir= 46x30\ / Wlow= Full\ e \ `SO S� (SCC) Q,epth of dry Storage= 2 ft. \ \ O / ` Chahnel \ _ • O �loppp�f Dpi Storage= 54x38 — / - see deta _ \ \ — I �=aft. ^ � ,. \ Ho= 2 ft. I Y `490\ \ — Vegetated embiknkments as desired \ / =I / U. b0110mWidti4-- 15 CMP C1 - _ r50 I -f- @ 1 .0% e 1 r � J^ \\ '- w � n= 492.0 Soils: r:�� �r� •� BMP -� r - Out= 491 .5 \ I Nason Silt Loams \ = o 1 2 Depth 9rassed�sw Ike Dill \ P I7 �� �-� \ _ \ -�,. 2 2 9.1 BMP Trench Det a' I Trench Bottornto \ be scarified prior t� (no scale) \ placement of filter fabric or aggregate \ \ j \ DWG. N0. 06-024 z O w w Q 0 z SIA �( CDw CD E d' co N � h'W03 r M r m o w0�-Q��Q � O O � Z w m m Ld U O 0 < Q z E V (�LLJ F— Q QLLJ / Q a- \ W\ Q (D � N O U� N U � N O c} - -Y Q �Q) LC) > t— rn —J cfl w O z + Q C x a) N II QCn m�m> w 0 � o E a- — o o N oQ U U O O N V CL O 0, M W J O N of X = — LL Q6) �- : M : N L WL.L M W � d U 7� a (, �Q E Z + -+-' > O V[ 0 U O O O � Y) SHEET NO. 6 OF 6 DWG. N0. 06-024 8 8 o N U -� C N Un E 0 R R E T U 0 qv>U $ O 0 � Q E > U M af $ g C y E :03m 0 E c3 U a C a A Q C CL 3 Y3 Y3 3 � N C > C J LLJ 8 8 8 8 8 1— Q Iwi O 0 O 0 �D O N I� O 0 O O O � LO'cY d M N Z RECEIVED APPROVED by the Albemarle County FEB 21 Community Development Department . Date 2Z >i=r-�rw OM Wry E L0PMENT . • • File DP �`' ' X040 Z Albemarle Coun�y Engineering General Construction Notes for Site Plans lo S o SS r a e I I < SIA � 1. Prior to any construction within any existing public right-of-way, including connection to el any existing road, a permit shall be obtained from the Virginia Department of VV. 0 Transportation (VDOT). This plan as drawn may not accurately reflect the requirements F .L Transpo ( ) p y y q of the permit. Where any discrepancies occur the requirements of the permit shall o� 440 govern. Albemarle Count Vir inia 2. All paving, drainage related materials and construction methods shall conform to current y MM o specifications and standards of VDOT unless otherwise noted. w T_ ~ _� � ~ 9<>- _ - - - Design Narrative: 1. Project Description: 3. Erosion and siltation control measures shall be provided in accordance with the approved 1 / This project proposes improvement of the property such that a new building shall be constructed to house missions m m activities and storage purposes. The project will be adjacent to an existing building and parking lot but shall utilize w 0 o erosion control plan and shall be installed prior to an clearing, radia or other its own new 0 � Z Z Q o Q p p y g grading % 44 parking spaces. It is not expected that the occupants project will have significant use of vehicles Q � � \{� j during typical church activities, therefore minimal impact to the existing parking facility is expected. Z E Q Q � J construction. � 0_D 0 n Z E Z 2. Sitework: 6 6 Grading for the project is designed to be minimal. Paving, curbing, and drainage is designed to minimize the 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. The maximum\ / impact of sheet flow on the buildings and redirect offsite sheet existing channels. Stormwater from the new allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of impervious areas will be directed to the SoakAway swale downhill of the proposed structures. �-� 3. Water &Sewer: 3:1 or better are to be achieved. Water supply for the project shall be from the existing well. No improvements or changes are proposed. N 0 The buildings be designed such that fireflow � � � 5. Paved, rip-rapor stabilization mat lined ditch may be required when in the opinion of the �� 9 9 requirements will be satisfied by building separation (>20 ft.) only. y q p G�No sprinkler systems of fire hydrant provisions are proposed. U N > Albemarle County Director of Engineering, or the Director's designee, 1t Is deemed Ln �_ �j 4 Sanitary sewage system shall be provided by the existing drainfield. No improvements or changes are proposed. z C° necessary in order to stabilize a drainage channel. / w X ID \ 4. Utilities: 0 m _J m vUi Electric and telephone currently access the site and shall be appended to serve the new facility. _ Q 6. All traffic control signs shall conform with the Virginia Manual ,.4*2r Uniform Traffic E � a- 2 5 0 5. Landscaping: o -a w o Control Devices. ,, Landscaping shall be determined by the owner at construction. Typically, trees and or shrubbery will be placed o w 0 SITE near the proposed buildings while low shrubbery will be placed in and around the BMP Swale. U � 6. Signage: 7. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe -Cass III. - Locations, expected type and dimensions, for the parcel signage shall be determined by the owner. \ 6. Stormwater Management and Erosion Control: 8. All excavation for underground pipe installation must comply with OSHA Standards for ,, In general, stormwater management will be qualiity control and be accomplished by wide grassed swale BMP e trenching. Such technique combines infiltration trenches with wide stormwater conveyance channels. the Construction Industry (29 CFR Part 1926). 7. Trash Collection: , There is no provision for trash collection or storage with this project. Site - - -- - -- - - ,, 5 Data: Revised 25 -Jul -06 Project: Colonial Baptist Church N Missions & Storage Building -2006 - C] tl) 0 � Owner: Colonial Baptist Church M VICINITY MAP (no scale) p "' Attn: Edwin Leake, Jr.3: N M -- PO Box 6547 • CharlottesHlle, VA 22902 J � C LL 1. The designer has attempted to locate existing subsurface utlLltlesi however, such May exist that are not shown,J� APPROVED CDLo - -- - _ The contractor shall exercise care In this work so as to avold damage to any utilities, Any Contact: S.L. Key, Inc. by ft* Albemarle County c N damage shall be the contractors responslblllty, The contractor shall notify all utility companies as well as - 'Miss Utlllty' 72 hours prior to construction. Attu: Steve Key, L.S. i _ Po Box 13as Community Development Department � � o � r 2. Any unusual subsurface conditions shall be reported Immediately to the Engineer, - 2Z Zoo g M � 3, The contractor shall obtain all permits required for this work and pay all associated fees, Chadottes\ille, VA 22902 Date �,J�+dLy r� m 4, The contractor shall employ erosion control devices and Methods as required to Meet the Intent of the _ _ - File -rte • 20 o to - '000 c�d Local Erosion Control ordinance, Tax Ma & Parcel: 94-46 5, Contractor to clean up and restore disturbed areas Immedlately upon completion of final grading In page: - 10.39 Acres c the affected area. SM 2A Acre•1 _ _ _ - -_ - _ � v 6. All grading and Improvements to be confined to the project area unless otherwise Indicated, Owner Deed Book: Na shall obtain any offsite easements required. To cic COCl t Zoning: RA 7, All fill material shall be compacted to 95% of theoretical maximum density as determined by - A.A,S,H.O. T-99 Method A, within plus or minus 2 percentage points of optimum moisture for the full Setbacks: Front: 75' width of fill section, 8// 21 -A Side: 25' 8. All site grading and restoration shall be In accordance with these plans unless modified by the project Rear: 35' engineer due to situations encountered In the fleld. 4' 4000 ps l Magisterial District Scottsville 9. All dimensions, elevations and locations shall be verified In the field by the contractor prior to Re nforced Conc, - --- �, beginning the work. Overlay Districts. Entrance Corridor 10. The designer has conducted no studies designed to discover the presence of any hazardous S i cle wo 1 k, 4' w i c/ 00 O O O O 0 _ 0- O 0� 00 Waivers Requested a. n/a U substances on this property and assumes no res onslblllt or llablllt resultln from the presence on an 0 o O - o O - ° - - - - O - O O _ O - Waivers & Conditions Approved: a. n/a P P Y P Y Y 9 P Y o O °O- oO- such substance. 4 " # 7 C ° O O (� O 0� -_ - _-_ 11, Prior to commencement of any construction within any existing public right of way, Including o . o o• o o• O � O o O - �f , 0 ` O Reservoir Watershed: No. j.� ° oC7 0 obo• o O �O OO O o - o� connection to any existing road, a permit for said construction shall be obtained from the Virginia ° • . , Qo O ° 0 O 0 Oo O - O Datum: Assumed .� - - - Department of Transportation (hereafter abbreviated VDOT). This plan as drawn may not accurately • o ° 0 . o o ° O O Benchmark:: Doorway Ex. SW church entrance = 500.0 reflect the requirements of the permit. Where any descrepancles occur, the requirements of the permit - - - - 00 00 Sune S.L. Ke Inc. shall govern, 00- 8"S _ O 0 - O 0O Y - - - - y, _ � 0 0 0 O Topographic Information - S.L. Key, Inc. c 12. All materials and construction shall conform to curent specifications and standards of VDOT unless 00 - O O otherwise noted. O 0O 0 O O 00 O O- 0 0- o� Maximum Structure Height_ 35 ft. w J �, a 13, Erosion and slLtation control measures shall be provided In accodance with the approved Erosion "-- control plan and shall be Installed prior to any clearing, grading or other construction, Paving Type: Asphalt or PrimelDble Seal J Q O 14. All slopes and disturbed ureas are to be fertilized, seeded and mulched, Maximum allowable fill or SUBGRADE COMPACTED T� z -�-� Q Iq Existing Tree Coverage. Sparse Wooded Contents: - cut slope Is 2d. Where reasonably obtainable, lesser slopes of 411 or better are to be achieved, 95% MAX DRY DENSITY PER Previous Previous New New Total Total 1. Cover > - 15. All drainage Inlets shalt have a 2 In. local depression. ASTM -D-698 Proposed Coverages_ Area s.f. % s.f. % s.f. % ° 16. Paved or rip rap ditch may be required when, In the opinion of the Engineer or his designee, SUBGRADE COMPACTED TO 2. Existing Site Survey It Is deemed necessary In order to stabilize a drainage channel. 957 MAX DRY DENSITY PER - Buildings/canopy 7400 2% 4000 1% 11400 3% 17• All traffic control. signs shall conform with the Vlrglnla Manual for Uniform Traffic Control Devices,ASTM-D-698 - Parking/Drive 27078 6% 10152 2% 37230 8% 3. Site Plan o latest edition, and shall be provided by the contractor, Open/grass 418066.84 92% Na n/a 403914.8 89% U 18. Unless otherwise noted, all pipe shall be Corrugated Metal pipe. - - - 4. Grading Plan Total 452544.84 100% 100% 452544.8 100% 19• All excavation for underground pipe Installntlon must comply with OSHA Standards for the Reinforcement t o be ' ---- - -- - -- - - O O Im rvious Covera 5. Stormwater Management Plan 0 Construction Industry (29 CFR Part 1926), 6" x 6 " Welded wire pe 9e: Na g PA VEMEN T SEC T I CN _ -_ __ _ 6. Erosion Control Plan or approved equal Parking - -- -- - - 6A. Erosion Control Narrative N, T, ,S, Employees. 2 SIDEWALK SECTION - - Total 2 Spaces required N, T, s, Interior Parking and and TrQV2iWQy5 4 Spaces ProMded4 Std --(-9-'-x 18' or larger) SHEET N0. 1 OF 6 0 Handicap (16'x 18') (Van access) 0 Loading Space (12'x 26) DWG. N0. 06-024 - i I ' I I I I I I ' I I - I I I I I I I I I ' I I I I I , fTl 1 � X , I � I I + CD 1 I II I I I I I I � I \ L 1 I 1, 10 I I I I I oI I � I I I I m � V /1 I I I I I I I I I I c I � I or CD m ?< + I Cid �r I pm C/) I I I I I I � I I , I , 0 1 �,y I 1 I , I , 1 , I , I , I I I 1 I I I I I I I I I I 0���\ — i Goya . 43'- - O�O 25� sC)10 rFo << O / TREELINE 1 C� otic RET. WALL AREAE - ------ O�F4�S / ------EXISTING------------ ck Access 500----- I A ✓ � I i I . - � • Y� O� i� . � � � 1. " �+,(� os, 190 0 Oro XY ol — — — o�o 1 �490� FTI C9, 1/5 JY/ _ I ter\ \ _ X / F d v '`rf1 c9� � � \ - v1 -Y Y/ -Y" �c 1jiIA h o A,W J w C\2 E o� Ma �. v? _� U Yo 0 4¢�� m m � N aj N rl U y g LF) Q / I w Q x a) C) ._ 0 — U m m > O 0 / 0 �-- UQ / U IW-- Q I 1jiIA h o A,W J w C\2 E o� Ma �. v? _� U Yo 0 4¢�� m m � N aj N rl U y g LF) Q Qo Q) > Z J (9 w Q x a) C) ._ 0 — U m m > O 0 0 0 �-- UQ I U IW-- Q = J = J Q O �Z U - U -D o � 0 w E o z am J m _w = 0 w C E r U U m Q E O o 7 �w D� w �-D (2-Do1- g+ > U z 0 E� E U o 'o v_ W o E ' ro a ¢ a $2 _ a > > Q N o o > Q o 0 o O O 0 j PM N - Z 1jiIA h o A,W J w C\2 E o� Ma �. v? _� U Yo 0 4¢�� O •� 92 Sao, m m � N aj N rl U y LF) Q Qo Q) > Z J (9 w Q x a) C) ._ 0 — U m m > O 0 0 0 �-- UQ I U IW-- Q = J = J Q O �Z U - U -D o 0 w z am J m _w = 0 w C Z z U U m Q E O o W� �w D� w �-D (2-Do1- cn z = z O •� 92 Sao, � N i O m � N aj N rl U y LF) Q Q) > Z J (9 w Q x a) C) ._ 0 — U m m > w O (1) 0 UQ Q) U O •� 92 Sao, w 1 O J 0 U U1 r N a O M fo J � N T = C � !Lo U > r— C N 0Q� Lm c o E o� cQ a� > 0 0 U SHEET No. 2 OF 6 DWG. N0. nFi—n74 I I rl • r-•1 ,C�� Q) O �Z w 0 O w 1 O J 0 U U1 r N a O M fo J � N T = C � !Lo U > r— C N 0Q� Lm c o E o� cQ a� > 0 0 U SHEET No. 2 OF 6 DWG. N0. nFi—n74 I I 0 I � I I a� L I s� OY Com/ ruction o` C) FT �. r I I AS: C Cn C Cn d I I'Q LTJ cl CIAAFS C \ ®'"©©f w �9 sT c c s\ I P Do P 0,1 ® O.. b In s � � FA a� ' -0 Pr.40x8 ft. Sei �, BMP5 Easem E - g I U) Prop. BMP Easement I Access pt. , , I C 1 15111 CMP 5011.f. @ 1.0% \, Ing 492.0 - - . - ... -I . - - - 0-, -Z/ Note; Trap Prntprtinn shall ha rimnrip fpnrP. Ex. trees,wftnln limits oT construcuon may S be removed at the discretion of the F� contract BMP ofitted iment Trap F /r- \ , Out= 491.5 x r z � I \ I _ I YLAIVTJ1VV LiALLClI—nc—tlutclflrrc� & CONTAINER—GROWN TREES PIIN! AT THE S E GEPM AS 'MOI PREVIDIP [YW, (51WITLY NCMER IN POORORty-OR.RNED SQIS). SPRVD 00 OTS OF UW SPECIYFNS. PREPN WATERING — OEPR6wINAOE EXCWATED ARG 1 A 0 $ IWURE— TREES OVER 20' PROPOSED / PROPOSED Lighting (2) 60W recessed 0100Wall mt. at loading F aT,gdock and rear door struction may \ �t` of the JR TRE ,Ire eGne Construction) to bb removed./ Prop. 40x70 ft. BMP— Easement with 15" accessway easmt. between bldgs Area #1 consisting of: t!b 3—BetulaNigra Dura Heat" (Dura Heat River Birch) 8-10'H 11Vburnum Davidil (Davidii Viburnum) 15-18' 13—Potentilla Fruticosa (Gold Drop) 15-18" Area #2 consisting of: 3—I1ex Nellie R. Stevens (Nellie Stevens Holly) 8-10'H e 13—Spirarea x bumaldo (Magic Carpet) 15-18" Area #3 consisting of: 8 5—Acer ginrala "Flame" ("Flame" Amur Maple) 8-10'H B 20—Pinus mugo var. pumllio (Mugo Pine) 9-12" Are,, #4 consisting of: h 2—Cornus Kousa lKousa Dogwood) 8-10'H I 1—Cratoegus viridis 'winter kingg" (Winter King Hawthorn) 2.5-3"Cal. 1—Acer palmatum 'West Grove(Japanese Maple) 3-4'H k 25—Taxus Baccata "Repandens' Spreodinq English Yew) 12-15" L 25—Weigela Florida "Tango (Tango Weigela) 15-18' Area #5 conslstln, of: m 1—Cryptomeria japonica (Yoshino) 6-7'H n 3—Tsugo Conadenss (Canadian Hem''ock) 0 1—Froxinus Excelsior Golden Desert" (Golden Desert Ash) 3-3.5"Cal, P 13—Itea Virginian "Henry Is Garret" (Sweet Spired) 15-18" 75—Rudbeck�a Fulgido Speciosa goldstrum" (Black Eyed Susan) #1 cont. r 85—Salvia Nemoroso May Night" (Meadow Sage) #1 cont. Area #6 consisting of: Retaining Wall -45 L x 2'H toEeos'P' Constructed of: Archer Highland Stone 3" 1tTw.... Color: Blue Ridge Range 10stT�- ' Area #7 consisting of: Q 5—Berberis Thunbergii var. atropurpurea "CrimsonPygmy" (Crimson Pygmy Barberry) 12-15 (�)4—Spired x burn000 (Magic Carpet) 15-18" Area #8 proposed Dumpster Area with: ( 12— Syringo Patula "Miss Kim" Lilac 2.5-3 ft. I r r O I I N i Fri X � _N rt I cn o v> rt m II o I I a� L I s� OY Com/ ruction o` C) FT �. r I I AS: C Cn C Cn d I I'Q LTJ cl CIAAFS C \ ®'"©©f w �9 sT c c s\ I P Do P 0,1 ® O.. b In s � � FA a� ' -0 Pr.40x8 ft. Sei �, BMP5 Easem E - g I U) Prop. BMP Easement I Access pt. , , I C 1 15111 CMP 5011.f. @ 1.0% \, Ing 492.0 - - . - ... -I . - - - 0-, -Z/ Note; Trap Prntprtinn shall ha rimnrip fpnrP. Ex. trees,wftnln limits oT construcuon may S be removed at the discretion of the F� contract BMP ofitted iment Trap F /r- \ , Out= 491.5 x r z � I \ I _ I YLAIVTJ1VV LiALLClI—nc—tlutclflrrc� & CONTAINER—GROWN TREES PIIN! AT THE S E GEPM AS 'MOI PREVIDIP [YW, (51WITLY NCMER IN POORORty-OR.RNED SQIS). SPRVD 00 OTS OF UW SPECIYFNS. PREPN WATERING — OEPR6wINAOE EXCWATED ARG 1 A 0 $ IWURE— TREES OVER 20' PROPOSED / PROPOSED Lighting (2) 60W recessed 0100Wall mt. at loading F aT,gdock and rear door struction may \ �t` of the JR TRE ,Ire eGne Construction) to bb removed./ Prop. 40x70 ft. BMP— Easement with 15" accessway easmt. between bldgs Area #1 consisting of: t!b 3—BetulaNigra Dura Heat" (Dura Heat River Birch) 8-10'H 11Vburnum Davidil (Davidii Viburnum) 15-18' 13—Potentilla Fruticosa (Gold Drop) 15-18" Area #2 consisting of: 3—I1ex Nellie R. Stevens (Nellie Stevens Holly) 8-10'H e 13—Spirarea x bumaldo (Magic Carpet) 15-18" Area #3 consisting of: 8 5—Acer ginrala "Flame" ("Flame" Amur Maple) 8-10'H B 20—Pinus mugo var. pumllio (Mugo Pine) 9-12" Are,, #4 consisting of: h 2—Cornus Kousa lKousa Dogwood) 8-10'H I 1—Cratoegus viridis 'winter kingg" (Winter King Hawthorn) 2.5-3"Cal. 1—Acer palmatum 'West Grove(Japanese Maple) 3-4'H k 25—Taxus Baccata "Repandens' Spreodinq English Yew) 12-15" L 25—Weigela Florida "Tango (Tango Weigela) 15-18' Area #5 conslstln, of: m 1—Cryptomeria japonica (Yoshino) 6-7'H n 3—Tsugo Conadenss (Canadian Hem''ock) 0 1—Froxinus Excelsior Golden Desert" (Golden Desert Ash) 3-3.5"Cal, P 13—Itea Virginian "Henry Is Garret" (Sweet Spired) 15-18" 75—Rudbeck�a Fulgido Speciosa goldstrum" (Black Eyed Susan) #1 cont. r 85—Salvia Nemoroso May Night" (Meadow Sage) #1 cont. Area #6 consisting of: Retaining Wall -45 L x 2'H toEeos'P' Constructed of: Archer Highland Stone 3" 1tTw.... Color: Blue Ridge Range 10stT�- ' Area #7 consisting of: Q 5—Berberis Thunbergii var. atropurpurea "CrimsonPygmy" (Crimson Pygmy Barberry) 12-15 (�)4—Spired x burn000 (Magic Carpet) 15-18" Area #8 proposed Dumpster Area with: ( 12— Syringo Patula "Miss Kim" Lilac 2.5-3 ft. I N o r r O ] N N m m O w 0 0r 'tBa V m ca 'N W O o ° m = C LL a - I;! E c o 0 N O 4 U LLn W 0 o h U � z Y) C /] m m U O w 0 y o ¢ d 0 ~0 z m T 3 > V) Z E N H Q Q K o N o ` ] N N 9 J p> W O 2 yJ ac x N V m ca 'N W O o ° m = C LL a - I;! E c o 0 N O 4 U LLn t�0 N 9 J Ey ZL o ° m = C LL I;! M V 1 N w LLn W O a_ h U t�0 ry r4 n�1 FSI O � Y) C /] Z= J w ,--I y o ¢ d 0 E E z T Q V) Q] a o Z O O U SHEET NO. 3 OF 6 DWG. NO. 06-024 E o,s P w, l V 0 I I I I I I I Proposed Culvert Cl (nts) 50 Lf. - 15° CMP@ 1.0% Note; Tree Protection shall be orange fence placed along limits of construction. No Construction materials or equipment shall be permitted beneath the dripline of trees to remain. I� I Limits, of Constron � I / I Arpp oSea T� / ;tion be grange fence / instruction. No s or equipment shall/ / the dripline of tree of the �tsCtn9 Slee\ire V TREE LINE / 'sem i I ' / ,0� Ez treeswvithinlimits ofconstructibn-Tay 9 \ \ C) S- be removl�d at the discretion of the 19��Os�9 t� s contract 0". \4 ' I Vegetated embankments as desired \ ` \ 4 ft. bottom W dt C1 1511, CMP 5011.f. @ 1.0%V \ ' - - - -� — _ _ _ \° \ I n=i 492.0 - — ` � \ -III— \ \ _— \ rasse3Sw� —III Ht Out= 491.5 >. �___ -�� _ g NLI _ 12" Depth III _ —I 1 I_I \ II I ` \ � \ -- S> >> ♦ F 1 \ \\ \\ Ira IIE1I1 II I IIII I I \ )) _ \ \ \ \ Trench Botto o me oie <1 \ BMP Tench Deta l "'or trostt?e I be scarified prior tee ♦ — \ \ (no sealed \ placement of filter \ ♦ — \ \ \ \ fabric or aggregate f x X; I + � N � v� of I I I II I I �I Z w a CX v 0 .= me, M,5: ,l E o,s P w, l V 0 I I I I I I I Proposed Culvert Cl (nts) 50 Lf. - 15° CMP@ 1.0% Note; Tree Protection shall be orange fence placed along limits of construction. No Construction materials or equipment shall be permitted beneath the dripline of trees to remain. I� I Limits, of Constron � I / I Arpp oSea T� / ;tion be grange fence / instruction. No s or equipment shall/ / the dripline of tree of the �tsCtn9 Slee\ire V TREE LINE / 'sem i I ' / ,0� Ez treeswvithinlimits ofconstructibn-Tay 9 \ \ C) S- be removl�d at the discretion of the 19��Os�9 t� s contract 0". \4 ' I Vegetated embankments as desired \ ` \ 4 ft. bottom W dt C1 1511, CMP 5011.f. @ 1.0%V \ ' - - - -� — _ _ _ \° \ I n=i 492.0 - — ` � \ -III— \ \ _— \ rasse3Sw� —III Ht Out= 491.5 >. �___ -�� _ g NLI _ 12" Depth III _ —I 1 I_I \ II I ` \ � \ -- S> >> ♦ F 1 \ \\ \\ Ira IIE1I1 II I IIII I I \ )) _ \ \ \ \ Trench Botto o me oie <1 \ BMP Tench Deta l "'or trostt?e I be scarified prior tee ♦ — \ \ (no sealed \ placement of filter \ ♦ — \ \ \ \ fabric or aggregate f T L N' O ` � T .l~ � N L W ^ N U o v G �y Z w a CX v 0 .= me, M,5: Ow0 a a co c o Q U U T w10 I SHEET NO. 4 OF6 DWG. NO. 06-024 .l~ �y W a � o � � y O O O U rn w10 I SHEET NO. 4 OF6 DWG. NO. 06-024 Bi filter Notes: all 1. The Biofilter Soil Mix shall b "Luck Stone Bio -filter Mix" or a tested equivalent approved by t County Engineer. X ; 2. Biofilters must not be installed til the sit is 3 citermined to be adequately stabilized the erosion control • C, n, n n o 1 s ci�SWM V ,V1 s + n a d water resources inspectors. • E 3. The contractor shall contact the wate esourc�s it o inspector 24 hours prior to backfilling the biofi r and requestFY �� a inspection and approval of the underdrain in I=and ��� 3�,1� / �� th soil mix. G meg° 43 / a a _ E — ' Sgtn� M < < se as _ _ - — '25' Side V^2 / l 2 i 9p O DSCAPING D i / NaS A,eal 2 �0 ry l FOsns — 14 <C co cr 71 i � R X a� a Prop. BMP _ — ♦ aRetrofitted PROPOSED BUILDING II vSedime Trap0 - PoSLD� PROPOSED FF=503.5 I I f / s \ / Ar y _ ae a srEP I m m LO _ .h ' q�\ O — _ -Pn,RnOPOSED / I .` TRE d a ��3So�O_ ILAraC8NG �- / w i __ i `` wo m m o o _ ( sz �0 Area #4 L�dSI AN#e A�8' —. — —' j �� � Q � � 3 � > Q o Tn� 1 \ 9Q: �__ -�-_ wtaeNe --- / �� o� o� 'Z 1 z '!�%�"!�C EXISTING N Dock -Access. I_ D ck Access Th - \ \ 5� Prop9M Easement Access pt. I — ' PROPOSED _ _ _ _ _ _ 55 — / PROPOSED I \ LANDSCAPING\ — — _ _ _ _ -P LANDSCAPING r �= ' \ Area #5 Area # 1 ^� \ \ 9 _ O 90 Os + ° s N o Ap \ sS( o j x a c 2 VSO OS M 1 1 1 1 / / o o G` Do l _ ,6 aamp c ♦\ />1 . o T, \ Rgtrofittec�' \ \ \ J s Prop. 40x70 ft. BMF °, / X I ° Prop. 40x80 f♦ 'A `'`Sediment Trap,' \ \ \ Easement o \off \ — — — _ _ _ with 1 � accessWay / N I W easmtt. between bldgs. + �, BMP- Easeme �\ , _ — _ _ _ r / BldObrsumm pt I \ I Prop. BMP Easement- ' va \ \ ��/��c Butt«NR N 1 I \ Gl Drainage Area= 9Zi62.6 SA Y Access pt. \ , Runoff "c'H or- 0.5] \ J O r -F I +1 \ TOP gmelsialn of biofilttt mHetiaF- 4] 2] = 1268 ..I EV J ReguiraO WOV (firmt VZ )= 216] c.l. n Aslai oTaal BdlPRldWalr- 53 x e= t]49 c.f. I , Awilade Vdume= 2283.5 at � 3 Stormwater Management Narrative: �490� WO°°K o ♦ < ` BiOfittm Tap Elev.= 9945 <` N = C LL - 1 Bdtomofveir at one= 4N6.0 C 1. Project Description: ` op°rPa di abMm ,6]D K n This site was first constructed in the 1980's with the placement of the Colonial Baptist Church. The current project ♦ MabEhhM1hhm2oY aaI 4_BS9 OK 0 proposes placement of a missions building and associated parking area and travelway. The new construction shall \ ) \ , "other Rural land". " predominantly drain across the previously developed portion of the site. The water resources area is described as Raq ireallo.dPlama„oper,D9Gmtp 13 ad ' / Bt a 10 _ _ Tree 3 _ r^ Treem shall be eWnly EiMded am vl +� L _ 6" NONPERFORATED OUTLET otg ogyaooxCoapeciic d 2. Drainage Areas: PVC PIPE TO PROTECTION Rowena,,1kW s ptl Coal Flo qa) V 1 Black Wllbw ($Mp nigra) ` \ _." DAYLIGHT OVERFLOW Fri hem The site has been analyzed in two separate drainage areas for the purposes of Stormwater Management. Drainage � � r,T _ \_ �� I PROTECTION shmbs moan be ealry aiMtl� mdM°xe°ro 'om spm"a) 4 peciem: area 1 (Eastern side toward Rt. 250) is roughly 2.12 ac. while Area 2 (Western side) is roughly 0.8 ac. x �' \ SONE WEIR Anoy...rltheWal sI sa dental — \ \ Common Spcebinh (Unbera behamn) fIF �_ BERM BERM Elderberry (SamWcua o6natlersis) t]Q 3. Removal rates: F ��I mere T.e«a^es cream«race«weeuromas,hoseansnye wrw« -I SLO ELSE ii li re«mmeMatioa(z°nex3«Wenecrvse-nn�.eNewmaeemea county sopo+ee rt -i ti Required removal rates have been calculated for each drainage area as follows: \� ( U ( u I� p«mar DA 1- 35% ��� \ MA BlamarsMmrn.n DA 2- 51]p/0//� - 1 \ \ r e« a k; p•q Bio66er No p 4"-6" PERFORATED — 02nage Aram- 352836 s[ .� II III II PVC PIPE RunaV c latter. II 4. Utilized BMPs: Regwmd WOV (first 112"p 598 at N hQ)hI�1 DA 1- Retrofitted Sediment trap (50%) IN I � � m TOP Dlahah$hhe, oI ell materiel= 42 Z? = E. a t E { J w p ) l PROTECTION/ I Dimensions et Bottom of Weir- x e = 1196 of 03 N DA 2- Retrofitted Sediment trap (50%) — ENERGY „ ( « m A+,IlVdom.= 1969 of J n N DISSIPATER II II II �i+m '� WOVOK. w O +(�J �-I O ® i i WATER CHANNEL '+' �.c Biofitter TOP Elea= qgN 0 STORM Z ° N 4. Removal Efficiency: e d e �( +� o Bottom of parr stone' 495.0 L� tU /!Y c a DA 1- BMP provides greater than required removal rates /� �\ oP dpo Ping °.mc 456.D Q v1 o_ DA 2 BMP provides greater than required removal rates \ (TYP) -°N M.Elmetnnd2W a n1= Og51 OK it ° TOP OF BERM CLEAN-OUT Max Elevation of 10 yc aahbw 495 5 OK 3 W/WATERTIGHT Regurad NG. dPtals(10WIGGestV 9 5. Stormwater Detention: (MS 19) O �/s EIRE °, DAP 6nrmba T o Exemption from Stormwater detention requirement is requested under County Code section 17-314(g). Flows \ 9 �%/h 2 O shall be whey aiHtlaC emong the Missal specie.: O associated with this project are minimal and provisions for detention structure(s) would involve disturbance of pwannyOPywcotlCol Fwritl., O existing vegetated areas and encroachment into existing drainage networks. C "` �Blade WIN. al ogle, -'I Sediment TrapFries°1.(IasseaNa°ag,... I Shmbs shall be manly deal" among the klkaiog species' 4'-6" NON -PERFORATED Anpw.wotl Viburnum (Viburnum daMatum) Retrofit (no scale) SLOPE ®1R MIN, EARn10R GRANULAR Common Spoebush(Lindere bemoln) Eltlem«ry(So".,. canaeensis) 4"-6" PERFORATED PVC SSEE DRAWING 5 FOR PIPE 0 1% MIN, SLOPE VEGETATIVE COVER OPTIONS.(AbroSHEET NO. 5 OF 6 owc. No. 06-024 ' Note; I \ / Tree Protection shall be orange fence X placed along limits of construction. No `r / Construction materials or equipment shall �0< cr) / be permitted beneath the dripline of trees \ / rt // to remain. J 43 rt TP �� s• �� °�a TP its of Construction Ci F ` _ / / Note; / X52 A G� \ O � TP _ — — W Tree Protection shall be 9ra�ge fence / 9� 0�110/� `� — — — — — — PR9P6SE6 placed along limits of gonstruction. No DSC APIN Construction materiays or equipment shall/ 9 O 0 I v ` TP" OS rjea #7 PS be permitted ben�fh the dribline of tree ea fOhon remain. m % I 00 TP i 7 �c a,Q �� PROPOSED_ SWAB — / z I T PROPOSED o !/ P �� PoslEo B ING p��C I I / / \ PS 1 \ ' �Qo SCAPhNt PR I _ - , . "ithin`Br�fts o' struction may \ O �y ' SED _ be' -removed at the dis of the i- — s (tY REELfNE PROPOSED contracfiSF. Tree 1 _ .. i G A `"` LANDSCAPING / 9 _ U � ` � ,� �--� This Treelme(wrthm C-Consttito remo ed. ` � r rr ��� Fq 9O Fa: L N I Area #8 I rucon) V / Off+ \ C 1 I.. - Area #4 ds Widened %' / A / EXISTING �j�f Dock Access \C \ \ _ D ck Access '" Area EXISTING I _ Do 5 _ (9� ck Assess V PROP"LT3. �� I �� I �� I I PROPOSE a I R \ LANDSCA Of ASO�o 'j LANDSCAPING \ \ ea ❑ �+ R/ Area 1 q bOnstrLTc On 00 0, s �� e1, /® # 1 �P �� p ote; C C . IF / f \ \ 9�O O,O Ex. trees1within limits of constructian-Tay 7j �q ASO d50= 6" \ S OS be removed at the discretion of the \ �a 0 �O A 'dept 12" J 9�F9 sF L 5 contract To , R o o 0 9 SII s. ' \ ti < c Wlow= Full DC% \ A SO I Channel \ \ O / / x - _ O %.� I � r o / I W y�1 -3ed ment Trap 2 rt I \ \ /2 G — — _ — Length= 5 ft. / rt C \ - Bottom of Excavated Area= 43 _ _ � a 40x20 @/493.5 M Depth of Wet Storage= 1.5 ft. . KEY SYFEOL _ I M �-�hv \ Wet Cleanout Elev.= 494.1 / �' Ps We) Bottom pf Weir= 46x26 @ 495.0 Depth -of Dry Storage= 1.5 ft. / C�'w \ fop of Dry Storage= 52x32 @ 495.5 EllhdnC! 15" CMP \ - L — — H= 2.5 ft. / C 1 1 silttrce sF 5011J. 1.00 W= 2.5 ft. 1 @ �0 --- — -- \ _ Setllmmt Trap / ` 1n=9 492.0 _ _ j — ST ST1 ; Soils: \ �I Out= 491.5 Nason Silt L x oams \ d� I o 1 I t ,�� PasNvaum TP WO) \ 23 91 v 2� ' , Sedime- t TmV 2y Length= 13: ft. \ \ P IP \ to 1 '' \ ® \ '(teetme \ Bottom of -Excavated Area= 4'r•1x21-483.0 \ — Depth of Wet Storage= 3 ft.,, \ \ on P \ 'Bottom of Weir= 53x33 @ 4816.0 ??' Depth of Dry Storage= 2 ft. \ \ \ \ \ ;Top of Dry Stodge- 61x41 @489;0 \ \ \ ^^ CIP \ Ho= 2ft--\ \ ro l�� \ W= 2.5 ft. 'iGC I \ \ \ \ \ o� ,o DC �,a\ T \ \ eating \ L N O ` � rn � N iM m inJ g r ('np1 4' a cK W 0 0 00 � oW a-0 d 0- o oQ a U U o O 0 P3 a Z a o i m m mZ o O F Z 0 0 x E 0 3�U 3 > ¢ o a g 3 0 �z z L N O ` � rn � N iM m inJ r ('np1 4' a cK W 0 0 00 � oW a-0 d 0- o oQ a U U o O 0 P3 W Z a' o i m m mZ o O F Z 0 0 O m E 0 3�U 3 > ¢ o a �z z L N O ` � rn � N DWG. No. U inJ r ('np1 4' a cK v O 30 mvm = 00 � oW a-0 d 0- o oQ a U U am V SHEET N0. 6 G 6 DWG. No. U o � � d � o y ✓� � 0 P3 m o 0 0 0 rn V SHEET N0. 6 OF 6 DWG. No. 06-024 Set the stakes. 3. Staple filter material to stakes and extend it into the trench. A 2. upsiopet along thxe 4linerench of the stakes 4. Backfill and compact the excavated soil. Sheet Flow Installation Points 11A11 should be higher than Point 11B" Drainageway Installation Sit Fence InstcHation / A Rip Rap Headwall 1 ft. Horseshoe Shape Around Culvert 2 ft. 2:1 Culvert VDOT #3 Class I RipRap Stone Uvert net Protection 1992 STONE CONSTRUCT ON ENTRANCE EXISTING 70' MIN. PAVEMENT A 5:1 EX. GROUND FILTER CLOTH SIDE ELEVATION A 70' MIN. EX. GROUND VDOT #1— b - COURSE AGGREGATE * MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS OPERATION TOSEDIMENTv TRAPPING DEVICE PLAN VIEW - 12' MIN. FILTER CLOTH SECTION A -A 6'-7" REINFORCED CONCRETE - SOURCE: VA. DSWC SECTION B—B MOUNTABLE BERM (OPTIONAL) z_ O SEX. PAVEMENT Z 0 DRAIN SPACE I PLATE 3.02-1 Naat12. ER❑SI❑N AND SEDIMENT CONTR❑L MEASURES o T ^ MANAGEMENT STRATEGIES 1 Areas which are not to be disturbed shall be clearly (larked by flags, signs, etc, at the owner's discret,lon, EXISTING SITE CONDITIONS: accordance with the specifications and standards of the Virginia Erosion and rr V 1//�E—/i The Contractor shall be responsible for the installation and Maintenance of all Earthwork Summary: MAINTENANCE ADJACENT AREAS: In general, all [Erosion and Sediment control measures will be checked erosion and sediment control measures. daily and after each sig)nif icant rainf alt, The following items will be checked in particutar It is expected that the earthwork PROJECT DESCRIPTION: SOILS: according to the Virginia Erosion and Sediment Control Handbook. Soils in this area are generally described as Nason Silt loams. Nason are well drained with medium to rapid runoff and moderate permeability. b) All gravel outlets wiill be checked regularly for sediment buildup that on this project will balance on site. The purpose of this project is the construction of Church missions building. Approximately 1.5 acres are scheduled for disturbance. ER❑SI❑N AND SEDIMENT CONTR❑L MEASURES r m Measures shown on the accompanying drawings are to be installed in EXISTING SITE CONDITIONS: accordance with the specifications and standards of the Virginia Erosion and The topography of the site is relatively flat within all reaches. The area landcover is partly wooded area with an existing Church building, some Sedimentation Control Hiandbook, 3rd Edition 1992, existing parking areas and utility structures. tL MAINTENANCE ADJACENT AREAS: In general, all [Erosion and Sediment control measures will be checked The project area is bounded by rt. 250 to the South and by unimproved or rural properties on all other sides. daily and after each sig)nif icant rainf alt, The following items will be checked in particutar 0 a) should sediment bosuns or traps be required, they will be cleaned and maintained SOILS: according to the Virginia Erosion and Sediment Control Handbook. Soils in this area are generally described as Nason Silt loams. Nason are well drained with medium to rapid runoff and moderate permeability. b) All gravel outlets wiill be checked regularly for sediment buildup that U Willi prevent drainage, Iff the gravel is clogged by sediment, it shall be CRITICAL AREAS: removed and cleaned or rep(aced. Critical areas are those (such as creek channels) subject to concentrated stormflows or subsurface springs. In topography such as this, c) All silt barriers will be checked r c ec ed egularly for undermining or deterioration source control of sediment is critical to erosion control. Contractor should use care in scheduling and sequencing to minimize excavation exposure in of the fabric and repairred as required, Sediment shall be removed when these areas. the level of sediment de=position reaches half way to the top of the barrier, O d) All Seeded areas will, be checked regularly to see that a good stand is EROSION AND SEDIMENT CONTROL MEASURES: maintained. Areas should be fertilized and reseeded as needed, Measures shown on the accompanying drawings and in this narrative are to be installed in accordance with the specifications and standards of e) The acceptance of capproval implies that the applicant has agreed to use the Virginia Erosion and Sedimentation Control Handbook, 3rd Edition 1992. the materials as indicated on the Erosion Control Plan, attachment LLJ Q and samples submitted Any change to the approved design or materials will m require approval by the Engineer, STABILIZATION PACTICES 0 (Adapted from State Minimum Standards as effected, 13 SEP95). Standards listed here, are in summary form. In cases of question or controversy, CALCULATIONS: the Virginia Regulation VR 625-02-00 shall govern. None, MS -1 Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion PERM, SEEDING SPECIFICAaTIONS (All units in Pounds per acre) of the site. Temporary soil stabilization shall be applied to denuded areas within seven (7) days to Feb. 16 thru April 3011 denuded areasthat may not be at final grade, but will remain dormant for longer than 30 days. Permanent stabilization shall be Kentucky 31 Fecue- 128 lbs,; Red Top Grass- 2 lbs.; Annual Rye- 20 lbs applied to those areas which will remain dormant for longer than one year. Fertilize at 1,000 lb. per acre or as determined by soil test MS -2 Soil stock piles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection For Slopes steeper than 311, add 20 lb, Crownvetch and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the site. May 1 thru August 15)1 MS -3 A permanent vegetative cover shall be established on denuded areas not otherwise stabilized. Permanent vegetation shall not be considered Kentucky 31 Fecue- 128 lbs,j Red Top Grass- 2 lbs.; Foxtail Millet- 20 lbs. established until a ground cover is achieved that, in the opinion of the local program administrator, or his agent, is uniform, mature enough to Fertilize at 1,000 lbs, per acre or as determined by soil test survive, and will inhibit erosion. For Slopes steeper than 3:1, add 20 llo, Crownvetch MS4 Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment on-site must be constructed as Aug. 16 thru Oct, 31 a first step in grading and be made functional before upslope land disturbance takes place. Kentucky 31 Fecue- 128 llos.j Red Top Grass- 2 lbs,; Annual Rye- 20 (bs. MS -5 Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. Fertilize at 1,000 lb), per acre or as determined by soil test MS -6 Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to, three (3) For Slopes steeper than 311, add 20 lb. Crownvetch acres, shall be controlled by a sediment basin. The sediment basin shall be designed and constructed to accommodate the anticipated sediment Nov, 1 thru Feb, 15: loading from the land disturbing activity. The ouffall device or system design shall take into account the total drainage area flowing through the Kentucky 31 Fecue- 128 lbs,; Red Top Grass- 2 lbs,; Winter Rye- 20 lbs, disturbed area to be served by the basin. Fertilize at 1,000 lb. per acre or as determined by soil test MS -7 Cut and fill slopes shall be constructed in a manner that will minimize erosion. Slopes that are found to be eroding For Slopes steeper than 311, add 20 (b, Crownvetch excessively within one year of permanent stabilization, shall be provided with additional slope stabilizing measures until the problem is corrected. MS -8 Concentrated runoff shall not flow down cut or fill slopes unless contained within adequate temporary or permanent channel, flume or slope drain structure. MS -9 Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. GENERAL REMARKS: MS -10 All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the L Lime shall be app)tied at 3 tons per acre unless otherwise noted, conveyance system without first being filtered or otherwise treated to remove sediment. 2. Fertilizer shall be Type 10-20-10 unless otherwise noted, MS -11 Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. MS -12 When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and TEMP, SEEDING SPECS. Albemarle Count Engineering y stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and For Planting Dates of Seep, 1 to Feb, 15 Use a 50/50 Mix of Annucal Rye and Winter Rye General Construction Notes for Erosion Control Plans cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. MS -13 When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary stream crossing at 50 to 100 lb, per acl,re, constructed of nonerodible material shall be provided. For Planting Dates of Feeb, 16 to April 30 MS -14 All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. Use Annual Ryegrass at 60 to 100 lb, acre. MS -15 The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. per ES -1: Unless otherwise indicated, all vegetative and structural erosion and sediment control MS -16 Underground utility lines shall be installed in accordance with the following standards in addition to other applicable For Planting Dates of Mcay 1 to Aug. 31 practices will be constructed and maintained according to minimum standardsand criteria: a. No more than 500 linear feet of trench may be opened at one time. Use German Millet at so (ib, per acre, specifications of the Virginia Erosion and Sediment Control Handbook and Virginia b. Excavated material shall be placed on the uphill side of trenches. Regulations VR 625-02-00 Erosion and Sediment Control Regulations. c. Effluent from dewatering operations shall be filtered or passed through an $ approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. ES -2: The plan approving authority must be notified one week prior to the pre -construction d. Restabilization shall be accomplished in accordance with these regulations. (n e. Applicable safety regulations shall be complied with. conference, one week prior to the commencement of land disturbing activity, and one MS -17 Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by week prior to the final inspection. vehicular tracking onto the paved surface. Where sediment is transported onto a public road surface, the road shall be cleaned thoroughly at the end V of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual subdivision lots as well as to larger ES -3: All erosion and sediment control measures are to be placed prior to or as the first step in p land -disturbing activities. clearing. MS -18 All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the local program administrator. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. ES -4: A copy of the approved erosion and sediment control plan shall be maintained on the site MS -19 Stormwater management plan for the project details the biofilter retrofits of the sediment traps. The subsequent routing shows substantial at all times. decrease in stormwater runoff for the site. ES -5: Prior to commencing land disturbing activities in areas other than indicated on these I '1 A. Abutt( 4 inches S.top es �p er , MarlutcQt ,rer s Instruction 6r final Fold 5' 1'-2' Wooden Stakes M in�l) Fold Soil Stabilization Blanket Details p ans (mc u mg, but not llmrted to, off-site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. ES -6: The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. ES -7: All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. ES -8: During dewatering operations, water will be pumped into an approved filtering device. ES -9: The contractor shall inspect all erosion control measures periodically and after each runoff -producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. VICINITY MAP (no scale) Ouflet Protection O E o p O � s Lo o% O Filter Cloth / Key in 6-9" recommended for entire perimeter 1. Apron Lining May be Rip Rap, grouted Riprap Gabion Basket, or concrete. 2. La= length of riprap apron as specified. 3. d= 1.5time max stone diameter but not less than 6 in. FENCING AND ARMORING � r Will i 1 SNOW FENCE "`� ►/` I y I //M I t r NMRD FEDNOE �/II Cd60 FENa wra�ne n►�a CORRECT METHODS OF TREE FENCING ,} +� CORRECT TRUNK ARMORING TRIANGULAR 90ARD FENCE W 20 ft. 2:1 Dry Storage Wet Storage Dry Storage Excavated VDOT b3 Closs RipRap den th 0 0° oo ° 25° 0 00 0 0 0 VDOT M30 $ oUo 00 0 0 0 Filter Cloth e filen ra N O O U N U Q -Y Ln > Z'�, N _w QJ X N _J0 o ._ U m J m > U) o 0 C) O - _ W i a U U O W v LOW M m r m Q0 r• -a • r -i 7r 0 tL o 0 0 Fw- Q U _D U D J O Z O +� O _ ~moo z 0) w Y LLJ Q m m O o 0 z z ( V mo a 0 3:Q Q Q IJ ! — � w J o_D ly oF-- C/-) z LJ E z 6 E E 0 z 0 U (n V > �T C w 0 0 E C) Q a 2L k 0 v 0 0 p ca _J LO N w � o _ � o 0 z N O O U N U Q -Y Ln > Z'�, N _w QJ X N _J0 o ._ U m J m > U) o 0 C) O - _ W i a U U O W v LOW M m r m Q0 r• -a • r -i 7r 0 tL o 0 Fw- Q U _D U D � O Z O +� O _ ~moo z 0) w Y LLJ Q m m O o 0 z z ( V mo a 0 3:Q Q Q IJ ! — � w J o_D ly oF-- C/-) z LJ E z N O O U N U Q -Y Ln > Z'�, N _w QJ X N _J0 o ._ U m J m > U) o 0 C) O - _ W i a U U O W v LOW c 3 O Q-� U Cn cn L0 0 0 Q 00 00 M J N dM X _ .- l� u7 U > — 04 � i r �Mm �LL L CL D E SHEET No. 6A OF 6 DWG. NO. 06-024 r• -a • r -i 7r w w Z wO w L +� O _ ~moo U 0 U) ( V 0 W O 0 O � c 3 O Q-� U Cn cn L0 0 0 Q 00 00 M J N dM X _ .- l� u7 U > — 04 � i r �Mm �LL L CL D E SHEET No. 6A OF 6 DWG. NO. 06-024 _ - _ Vegetated embankments as desired41 i i I yIg Awa g > S fTl _ 71 grassed Swale —i—I III fit - D II t I I Trench Bottom to BMP Trench Detail - / i r = be scarified prior to o scale) -' placement of filter v �� I I ----I l l�• � �1 _ fabric or aggregate N FP, ,CSED , I -7 -r-r o _ O _ '` -=1`�rr'�LE PROPOSED ,. BUILDING Prop. j T r. _ ra FF=503.5 BMP' 1 F I w%' , _ . --" swale '�tE_,`Ii- S s - L_ TE I� 44 J71 see detail O` E End BM = �- F E - r _- r-0 .BMP Pti - - - - __j , - Swale _ = trofl e - _ ❑ - _ _ ? x - 4 S irri&nt Trap �zLL I � _ I TI - � -, roP I — – _wl s aeSC C c ) I I to see deta -- I r -PLANTING- - BLLED—&—BURLAP PED #I , J _ CONTAINER CROWN TRUES '/, ra obra H,,'r -,-r eIr_r , 'H& -�ndu IGa,itli ruum,a ,i'' m - -. f\� r+--�•� { �unUm' ,=-- =-Foc-ntill,j Frutiross ,_^Ij D,�p! lr-13" U 1 I H,111, _ _ 1 1 �twP I �e -n=. bumoloo 'M -orp-r - r 3�nn�l.� •lama° Fl- �m��r 61aF��= _-I�; H — f— rr C 1 15 I CMP I „ oa P�n��_ ma ��r FunII �al� ,�r, _ 3IL — - r r #4 _ .f. @ 1.0%rrI, _ I H50-IrI ' s ­id,nkn�n�m<k"l DI m�, t, r _I swaleIng 492.0 End BMP Tan I --]- Out= 491.5 = _-si��a Gonad-rsiq �rmailsr HPm.s, l) 1- c.u..c nm .. Fac c Is,. .It Id -n C- -rr sh - °hal roe s,anl r11 - r + __-�r'� a II_��_m.aMr 'L,h-' .I-s,,�,N 3r,_i ,d n rG \ - -_ P 7_1' ' \ \ _ � - UNDER 20' - TREES OVER 20' TREES - - I r