Loading...
HomeMy WebLinkAboutWPO201300064 Bond Estimates 2016-03-25Project Name: Three Notch'd Center WPO file number: wpo201300064 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48") 24.0 in d 0 ES -1,2 aggregate base or drainage stone 0.0 in d 0.0 ft L Filterra 6x6 trees shrubs seedlings underdrain (LF) biofilter soil mix (Cl) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 2 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) No. Unit Unit Cost Cost 1 ea installed $150.00 0 ft $13.00 $0.00 0 ea $500.00 $0.00 1 ea $3,500.00 $3,500.00 6 ft $450.00 $2,700.00 0 EC -1 60.0 ft $50.00 $3,000.00 0.0 ft w 0.0 ton $35.00 $0.00 1 ea $6,500.00 $6,500.00 1 ea $150.00 $150.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 0 ft $5.00 $0.00 0 cy $38.00 $0.00 1 ft $1,500.00 $1,500.00 0 ft $50.00 $0.00 0.0 ft 0 $60.00 $0.00 1 $1,500.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 ea $5,000.00 $5,000.00 $0.00 cost sum $28,350.00 contingency $2,835.00 Total $31,190 3/25/2016