HomeMy WebLinkAboutSDP200600082 Review Comments 2008-03-06Page 1 of 1 Philip Custer From: Philip Custer Sent: Thursday, March 06, 2008 11:49 AM To: 'hmccardle @mckeecarson.com' Cc: Bill Fritz Subject: Wood Residence Guardrail Hunter, 6R- I spoke with Bill regarding the field change of constructing a VDOT.fw1 steel guardrail in place of the timber guardrail with steel backing that was on the approved plan SDP - 2006 - 00082. This change will not require a minor amendment. With your permission, I will edit the approved plan to reflect this change. Please keep this email for your records. The engineering review for the minor amendment, submitted 2/13/08, is pending. Thanks, Phil x3072 3/6/2008 County of Albemarle Department of Community Development Memorandum From: Max Greene, Current Development engineering review Date: 7 August 2006 Subject: Wood Residence (SDP200600082) Review Coordinator: Steve Tugwell The Site development plan for Wood Residence has been reviewed. The engineering review for current development cannot recommend approval of the plan until the following items have been adequately addressed. A. Final Site Plan submitted as Preliminary Site Plan: (SDP200600082) 1. The existing dwelling should use the same entrance as the proposed units. Please show the existing entrance closed. 2. Guardrail required along top of slope and back of curb along entrance. [DSM 803. LA, DSM 605] 3. Please show a benclrrnark on the plan sheets. [DSM CD -15] 4. Easement and /or letter of intent are required from adjacent property owner. [DSM 1102] 5. Minimum storm drainage pipes are 15" diameter unless the County engineer approves 12" drainage pipes. DSM 505.D.5, DSM 505.E.5] 6. New drainage channel for outlet of VDOT 15" Concrete pipe will be armored per VESCH and VDOT guidelines to adequate outfall. 7. Please note on plan the travel way will not exceed 10 %, slope in any direction. 8. Please show existing critical slopes in the proposed entrance area. [ 18- 4.2.5] 9. Durnpster storage /screening area does not appear accessible to truck removal. How will dumpster be accessed for disposal'? Will there be a stop point located outside of dumpster enclosure to keep dumpster from rolling into SWM? 10. Please add the "General Construction Notes" verbatim from the Design Manual. [DSM 902.B.4, DSM CD- 10] 11. Parking sheet flow opening to SWM will require armament and safety guard rail. [DSM 6051 12. Please verify the Planting requirements for Agnor /Hurt School are maintained with this Proposal. Site plan amendment may be required for Agnor /Hurt school. 13. Professional Seal, signed and dated, is required prior to final approval. [18-3- 14. Approved WPO plans are required prior to final approval. The WPO submittals are in the final site plan review queue and will be reviewed as soon as possible. 15. VDOT approval is required prior to final approval. [DSM 902.B] Additional comments and /or conditions may be forthcoming due to the requested changes to the plan. Engineering staff is available on Thursdays from 2 -4 PM to discuss these review comments. Please contact Mr. Glenn Brooks, PE, at 434.296.5832, Ext. 3273, to schedule a time to meet. J County of Albemarle Department of Community Development Memorandum From: Max Greene, Current Development engineering review Date: 7 August 2006 Subject: Wood Residence (SDP200600082) Review Coordinator: Steve Tugwell The Site development plan for Wood Residence has been reviewed. The engineering review for current development cannot recommend approval of the plan until the following items have been adequately addressed. A. Final Site Plan submitted as Preliminary Site Plan: (SDP200600082) 1. The existing dwelling should use the same entrance as the proposed units. Please show the existing entrance closed. 2! Guardrail required along top of slope and back of curb along entrance. [DSM 803.1.A, DSM 605_ Please show a benchmark on the plan sheets. [DSM CD -15] 4 Easement and /or letter of intent are required from adjacent property owner. [DSM 1102] 5. Minimum storm drainage pipes are 15" diameter unless the County engineer approves 12" drainage pipes. [DSM 505.D.5, DSM 505.E.5] 6. ew drainage channel for outlet of VDOT 15" Concrete pipe will be armored per VESCH and VDOT guidelines to adequate outfall. Please note on plan the travel way will not exceed 10% slope in any direction. Please show existing critical slopes in the proposed entrance area. [18- 4.2.5] W Dumpster storage /screening area does not appear accessible to truck removal. How will dumpster be accessed for disposal? Will there be a stop point located outside of dumpster enclosure to keep dumpster from rolling into SWM? tLe Please add the "General Construction Notes" verbatim from the Design Manual. [DSM 902.13.4, DSM CD -10] 1. arking sheet flow opening to SWM will require armament and safety guar rail. [DSM 605] lease verify the Planting requirements or Agnor /Hurt School are maintained with this Proposal. Site plan amendment may be required for Agnor /Hurt school. J,r Seal, signed and dated, is required prior to final approval. [18-32.6.1] W Approved WPO plans are required prior to final approval. The WPO submittals are in the final site plan review queue and will be reviewed as soon as possible. 1 VDOT approval is required prior to final approval. [DSM 902.13] Application #: SM00600081 Project Name: Wood Residence Date Completed: 08/11/2006 Reviewer: Andrew Slack Review Status: No Objection Reviews Comment: NO OBJECTION. Short Review Comrnts i Final — Residential — Commission E911 Date Completed: 08/14/2006 Reviewer: James Barber Fire Rescue Review Status: No Objection Reviews Comment: Verify adequate fire flow is available. Ensure hydrants are within 400 feet of the building by way of a prepared travel way. Date Completed: 09/06/2006 Reviewer: Max Greene Engineer Z &CD Review Status: Administrative Approval Reviews Comment: Preliminary site plan can be approved as submitted. Please adequately address all requirements from County Code 18 -32.6 with the final submittal. Page: 1.00 County of Albemarle Printed 0 Thursday, September 07,