September 8, 2006
Andrew Krochak
Weather Hill Development
703 East Jefferson Street
Charlottesville, VA 22902
RE: ARB- 2006 -93: Liberty Hall - Preliminary Review of a Site Development Plan
Tax Map 56, Parcel 97)
Dear Mr. Krochak:
The Albemarle County Architectural Review Board, at its meeting on August 21, 2006, completed a preliminary
review of the above -noted request to construct three buildings: a three story, eight -unit live -work building, and two
three -story townhouse buildings with 22 units. The Board offered the following comments for the benefit of the
applicant's next submittal. Please note that the following comments are those that have been identified at this time.
Additional comments may be added or eliminated based on further review and changes to the plan.
1. Provide south and east end elevation drawings of all three buildings coded for proposed materials and
colors. Provide roofing and building samples for the south and east end elevations of each building.
2. Revise the site plan to indicate that 30% of the hedgerow plantings between the existing hedgerow and
the northern woodland will be 1 -1/2" caliper trees. Provide a note on the site plan showing how the
requested breakdown of plant types and sizes within that hedgerow has been met.
3. Provide guidelines on the site plan for the long term maintenance of the hedgerows, and the existing
woodland.
4. Submit a plan for review showing all proposed changes to the storm water detention pond including
proposed landscaping.
5. Proposed building mechanical equipment and above ground utilities are other site elements that need
to be screened. Show their location and the proposed method of screening to eliminate visibility from
the EC if needed.
6. Provide a completed and signed Tree Conservation Plan Checklist with the next submission.
7. Revise the site plan to show a proposed three board black fence along both sides of Radford Lane
starting at the existing hedgerow and going southward to the intersection with Route 250.
8. Provide a lighting photometric plan showing the location of all proposed site, building and decorative
lighting. Provide a luminaire schedule of all proposed exterior lighting. Indicate in the schedule all
lighting options chosen, and the colors proposed for the fixtures and poles. All proposed fixtures are to
be full cut off.
1h .
1=
lftGi'r'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:Liberty Hall (SUB200600102, WP0200600072)
Plan preparer:Timmons Group [fax 295 -8317]
Owner or rep.:Weather Hill Development LLC [fax 296 -2560]
Plan received date:1 1 Sep 2006
Date of comments:29 Sep 2006
Reviewer:Jonathan Sharp
The plans for Liberty Hall, received on September 11, 2006, have been reviewed. The
engineering review for current development cannot recommend approval of the plans until the
following items are adequately addressed:
A. Final site plan, Road Plan, Drainage Plans (SDP200600223)
1. VDOT approval is required.
2. Please show all necessary drainage easements. [ 18- 32.7.4, DSM 1101 B]
3. Please revise the grading in the parking lot to show a 5% maximum grade in all directions. [18-
4.12.15c]
4. Sidewalk adjacent to parking spaces must be 6 feet wide or bumper blocks provided. [18- 4.12.16e]
5. The concrete dumpster pad must extend a minimum of 8 feet beyond the location of the dumpster.
I 8-4.12.19a,b]
6. Pipe deflection angles must be 90 degrees or less. [DSM505E12]
B. Stormwater Management Plan (WP0200600057)
1. For the stormwater detention summary sheet of the calculations you provided, in addition to the
runoff volumes, please provide the C values, times of concentration, and acres used for pre and
post development, and differentiate between what amount of acreage goes into the detention
facility versus what bypasses the facility.
2. The maximum ponding depth for biofilters is 1 foot. The ponding depth for the proposed
modification of the existing biofilter is 2.3 feet. If you lower the weir elevation to I foot above the
bottom elevation of the biofilter, the runoff exceeds your pre development runoff values. However,
I am unsure of the pre development runoff values given. They seem rather low. Can you explain
how you got the pre development runoff values for drainage area 1? Is it based on Clover Lawn's
values? I looked at the preliminary plan calculations for Liberty Hall and it appeared to show 6.3
cfs for drainage area 1, using a drainage area of 1.6 acres. The drainage area is shown to be 5.22
acres on the current plans. If the runoff calculations are incorrect, simply lowering the weir may be
adequate. If the runoff calculations are correct, the biofilter will need modification in order to
maintain and a maximum ponding depth of I foot and adequate detention.
3. Is the biofilter area being increased in order to serve both developments, or is it already oversized?
Please show that the biofilter is large enough to support both developments.
4. The biofilter appears to be short- circuiting. The inlet and outlet runoff locations should be spaced
accordingly so that all of the biofilter is used for water quality.
5. The pro rata share for the portion of the site draining to Licking Hole Basin will be $5700.
6. The underground detention pipe system details on sheet 8 labels a slope of 0.05% Please correct
ngineering Review Comments
Page 2 of 2
this label to read 0.5 %.
7. Please provide a stormwater maintenance agreement.
S. Please show all necessary stormwater management easements on the plan.
9. Please provide all necessary offsite easements.
C. Erosion Control Plan (WPO200600057)
I . Phase II does not appear to be fully protected. For example, the sediment traps installed in phase I
are not in phase II of the plans, and the portion of the site near Rte. 250 does not appear to be
protected. Please revise phase 11 of the plans so that the entire site is protected. The plans and
narrative do not agree; the narrative calls for the removal of sediment traps after the installation of
construction measures. Many of the erosion control measures are in the way of construction
measures, including sediment traps, silt fence, and diversion dikes.
2. hi phase I, the drainage areas going to sediment traps 1 and 2 appear to be incorrect. It appears a
good portion of the area shown draining to sediment trap 2 will actually drain to sediment trap 1.
The sediment traps may need to be resized to account for the increase /decrease in drainage area.
3. The sediment basin outlet structure needs to be shown in phase I of the plans.
4. The construction entrance location is adequate for phase 1, but not phase 11. The construction
entrance will need to be adjacent to the entrance at Rte. 250 during phase 11. The pipe meant to run
from the washrack to the sediment trap is not located within the construction entrance.
5. Please remove all grading within tree protection areas.
6. Please show all work inside the limits of disturbance.
7. The dewatering orifice size in the sediment basin calculations does not match the details of the
sediment basin in the plans.
8. Please include Temporary Stabilization (TS) and Permanent Stabilization (PS) on the plans.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
ishaip(u!albemarle.org We have engineering meetings every Thursday from 2 -4pm where people can come
in and discuss their plans with us. If you would like to schedule a time to meet, call our Senior Engineer
Glenn Brooks at ext. 3273, or email him at gbrooks((olbemarle.org
r
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
r4A to - Tax,
Phone(434)296 -5832 Fax(434)972 -4126
Project: Liberty Hall (SUB200600102, WPO200600072)
Plan preparer: Timmons Group [fax 295 -8317]
Owner or rep.: Weather Hill Development LLC [fax 296 -2560]
Plan received date: 11 Sep 2006
Date of comments: 29 Sep 2006
Reviewer: Jonathan Sharp
The plans for Liberty Hall, received on September 11, 2006, have been reviewed. The
engineering review for current development cannot recommend approval of the plans until the
following items are adequately addressed:
A. Final site plan, Road Plan, Drainage Plans (SDP200600223)
1. VDOT approval is required.
2. Please show all necessary drainage easements. [18- 32.7.4, DSM 1 101 B]
3. Please revise the grading in the parking lot to show a 5% maximum grade in all directions. [18-
4.12.15c]
4. Sidewalk adjacent to parking spaces must be 6 feet wide or bumper blocks provided. [18- 4.12.16e]
5. The concrete dumpster pad must extend a minimum of 8 feet beyond the location of the dumpster.
18- 4.12.19a,b]
6. Pipe deflection angles must be 90 degrees or less. [DSM505E12]
B. Stormwater Management Plan (WPO200600057)
1. For the storinwater detention summary sheet of the calculations you provided, in addition to the
runoff volumes, please provide the C values, times of concentration, and acres used for pre and
post development, and differentiate between what amount of acreage goes into the detention
facility versus what bypasses the facility.
2. The maximum ponding depth for biofilters is 1 foot. The ponding depth for the proposed
modification of the existing biofilter is 2.3 feet. If you lower the weir elevation to 1 foot above the
bottom elevation of the biofilter, the runoff exceeds your pre development runoff values. However,
I am unsure of the pre development runoff values given. They seem rather low. Can you explain
how you got the pre development runoff values for drainage area 1? Is it based on Clover Lawn's
values? I looked at the preliminary plan calculations for Liberty Hall and it appeared to show 6.3
cfs for drainage area 1, using a drainage area of 1.6 acres. The drainage area is shown to be 5.22
acres on the current plans. If the runoff calculations are incorrect, simply lowering the weir may be
adequate. If the runoff calculations are correct, the biofilter will need modification in order to
maintain and a maximum ponding depth of 1 foot and adequate detention.
3. Is the biofilter area being increased in order to serve both developments, or is it already oversized?
Please show that the biofilter is large enough to support both developments.
4. The biofilter appears to be short- circuiting. The inlet and outlet runoff locations should be spaced
accordingly so that all of the biofilter is used for water quality.
5. The pro rata share for the portion of the site draining to Licking Hole Basin will be $5700.
6. The underground detention pipe system details on sheet 8 labels a slope of 0.05% Please correct
igineering Review Conmlents
Page 2 of 2
this label to read 0.5 %.
Please provide a stormwater maintenance agreement.
Please show all necessary stormwater management easements on the plan.
Please provide all necessary offsite easements.
C. Erosion Control Plan (WPO200600057)
1. Phase II does not appear to be fully protected. For example, the sediment traps installed in phase I
are not in phase II of the plans, and the portion of the site near Rte. 250 does not appear to be
protected. Please revise phase II of the plans so that the entire site is protected. The plans and
narrative do not agree; the narrative calls for the removal of sediment traps after the installation of
construction measures. Many of the erosion control measures are in the way of construction
measures, including sediment traps, silt fence, and diversion dikes.
2. In phase 1, the drainage areas going to sediment traps 1 and 2 appear to be incorrect. It appears a
good portion of the area shown draining to sediment trap 2 will actually drain to sediment trap 1.
The sediment traps may need to be resized to account for the increase /decrease in drainage area.
3. The sediment basin outlet structure needs to be shown in phase I of the plans.
4. The construction entrance location is adequate for phase I, but not phase II. The construction
entrance will need to be adjacent to the entrance at Rte. 250 during phase 11. The pipe meant to run
from the washrack to the sediment trap is not located within the construction entrance.
5. Please remove all grading within tree protection areas.
6. Please show all work inside the limits of disturbance.
7. The dewatering orifice size in the sediment basin calculations does not match the details of the
sediment basin in the plans.
8. Please include Temporary Stabilization (TS) and Permanent Stabilization (PS) on the plans.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
jshar(u?albemarle.org We have engineering meetings every Thursday from 2 -4pm where people can conic
in and discuss their plans with us. If you would like to schedule a time to meet, call our Senior Engineer
Gleam Brooks at ext. 3273, or email him at gbrooks(a)albemarle.orj
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Liberty Hall (SUB200600102, WP0200600072)
Plan preparer: Timmons Group [fax 295 -8317]
Owner or rep.: Weather Hill Development LLC [fax 296 -2560]
Plan received date: 11 Sep 2006
Date of comments: 29 Sep 2006
Reviewer: Jonathan Sharp
The plans for Liberty Hall, received on September 11, 2006, have been reviewed. The
engineering review for current development cannot recommend approval of the plans until the
following items are adequately addressed:
A. Fiial site plan, Road Plan, Drainage Plans (SDP200600223)
1. VDOT approval is required.
2- -please show all necessary drainage easements. [ 18- 32.7.4, DSM 1101 B]
3. Please revise the grading in the parking lot to show a 5% maximum grade in all directions. [18-
4.12.15c]
4. Sidewalk adjacent to parking spaces must be 6 feet wide or bumper blocks provided. [18- 4.12.16e]
5. } The concrete dumpster pad must extend a minirr of 8 feet beyond the location of the dumpster.
i18- 4.12.19a,b]
6. ; /Pipe deflection angles must be 90 degrees or less. [DSM505E12]
B. Stormwater Management Plan (WP0200600057)
1. For the stormwater detention summary sheet of the calculations you provided, in addition to the
runoff volumes, please provide the C values, times of concentration, and acres used for pre and
post development, and differentiate between what amount of acreage goes into the detention
facility versus what bypasses the facility.
2. The maximum ponding depth for biofilters is 1 foot. The ponding depth for the proposed
modification of the existing biofilter is 2.3 feet. If you lower the weir elevation to 1 foot above the
bottom elevation of the biotilter, the runoff exceeds your pre development runoff values. However,
I am unsure of the pre development runoff values given. They seem rather low. Can you explain
how you got the pre development runoff values for drainage area 1? Is it based on Clover Lawn's
values? I looked at the preliminary plan calculations for Liberty Hall and it appeared to show 6.3
cfs for drainage area 1, using a drainage area of 1.6 acres. The drainage area is shown to be 5.22
acres on the current plans. If the runoff calculations are incorrect, simply lowering the weir may be
adequate. If the runoff calculations are correct, the biotilter will need modification in order to
maintain and a maximum ponding depth of 1 foot and adequate detention.
3 , \, Is the biofrlter area being increased in order to serve both developments, or is it already oversized?
Please show that the biotilter is large enough to support both developments.
4. The biofrlter appears to be short- circuiting. The inlet and outlet runoff locations should be spaced
accordingly so that all of the biofrlter is used for water quality.
5. The pro rata share for the portion of the site draining to Licking Hole Basin will be $5700.
6. The underground detention pipe system details on sheet 8 labels a slope of 0.05% Please correct
Engineering Review Comments
Page 2 of 2
this label to read 0.5 %.
7. Please provide a stormwater maintenance agreement.
Please show all necessary stormwater management easements on the plan.
9. Please provide all necessary offsite easements.
C. FXosion Control Plan (WPO2006000517)
1. Phase II does not appear to be fully protected. For example, the sediment traps installed in phase I
are not in phase I1 of the plans, and the portion of the site near Rte. 250 does not appear to be
protected. Please revise phase 11 of the plans so that the entire site is protected. The plans and
narrative do not agree; the narrative calls for the removal of sediment traps after the installation of
construction measures. Many of the erosion control measures are in the way of construction
measures, including sediment traps, silt fence, and diversion dikes.
2: In phase 1, the drainage areas going to sediment traps 1 and 2 appear to be incorrect. It appears a
good portion of the area shown draining to sediment trap 2 will actually drain to sediment trap 1.
The sediment traps may need to be resized to account for the increase /decrease in drainage area.
3. The sediment basin outlet structure needs to be shown in phase I of the plans.
4. The construction entrance location is adequate for phase I, but not phase 11. The construction
entrance will need to be adjacent to the entrance at Rte. 250 during phase II_ The pipe meant to run
from the washrack to the sediment trap is not located within the construction entrance.
5.` Please remove all grading within tree protection areas.
6. Please show all work inside the limits of disturbance.
7 The dewatering orifice size in the sediment basin calculations does not match the details of the
sediment basin in the plans.
8. Please include Temporary Stabilization (TS) and Permanent Stabilization (PS) on the plans.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
jsAarpLcialhe We have engineering meetings every Thursday from 2 -4pm where people can come
in and discuss their plans with us. If you would like to schedule a time to meet, call our Senior Engineer
Glenn Brooks at ext. 3273, or email him at ;brooks (n`albemarVc ` org.
it
j h I c , d "f !' r "ti ' ;J" rt - F f , t 1 f
bll
i
P
i r.
Application #-. SDP2006001O Short Review Comnients
Project Name: Liberty Hall - Final Site Plan Final — Residential — Administrative
Date Completed: 09/19/2006
Reviewer: James Barber Fire Rescue
Review Status: No Objection
Reviews Comment! Verify adequate fire flow is available.
Date Completed: 10/09/2006
Reviewer: Jay Schlothauer Inspections
Review Status: Requested Changes
Reviews Comment: Provide a curb cut at the southern -most barrier -free parking space's striped access aisle (space for
turnaround).
Date Completed: 09/29/2006
Reviewer: Jonathan Sharp Engineer Z &CD
Review Status: Requested Changes
Reviews Comment: see wpo 2006 72 E &S for comments
Page: 1.00 County of Albemarle Printed 0 Tuesday, October 10, 2001
l iH \Lh6 •Ii
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Liberty Hall (SUB200600102, WP0200600072)
Plan preparer: Timmons Group [fax 295 -8317)
Owner or rep.: Weather Hill Development LLC [fax 296 -2560]
Plan received date: I 1 Sep 2006
14 Nov 2006 (Rev])
Date of comments: 29 Sep 2006
20 Nov 2006 (Revl )
Reviewer: Jonathan Sharp
The revisions for Liberty Hall, received on November 14, 2006, have been reviewed. The
engineering review for current development cannot recommend approval of the plans until the
following items are adequately addressed:
A. Final site plan, Road Plan, Drainage Plans (SDP200600223)
1. VDOT approval is required.
Rev]: comments not addressed.
Please revise the grading in the parking lot to show a 5% maximum grade in all directions. [18-
4.12.15c]
Rev]: comments not addressed.
5. The concrete dumpster pad must extend a minimum of 8 feet beyond the location of the dumpster.
18- 4.12.19a.b)
Rev]: The dumpster pad extends into a parking space.
6. Pipe deflection angles must be 90 degrees or less. [DSM505E121
Rev]: comments not addressed.
B. Stormwater Management Plan (WP0200600057)
1. For the stormwater detention summary sheet of the calculations you provided, in addition to the
runoff volumes, please provide the C values, times of concentration, and acres used for pre and
post development, and differentiate between what amount of acreage goes into the detention
facility versus what bypasses the facility.
Rev]: The detention facility is not adequate. The routed post development runoff rate leaving
the facility exceeds the pre development runoff rate. Please provide routing calculations. In
addition, please show details of how the piping with connect with the raintank system. Also, the
8" low flow pipe must be increased to a minimum IS "pipe per county requirements (Add a
weir plate to create an opening equivalent to an 8 "pipe for detention purposes.).
2. The maximum ponding depth for biofilters is 1 foot. The ponding depth for the proposed
modification of the existing biofilter is 2.3 feet. If you lower the weir elevation to 1 foot above the
bottom elevation of the biofilter, the runoff exceeds your pre development runoff values. However,
Engineering Review Comments
Page 2 of 3
I am unsure of the pre development runoff values given. They seem rather low. Can you explain
how you got the pre development runoff values for drainage area I ? Is it based on Clover Lawn's
values? 1 looked at the preliminary plan calculations for Liberty Hall and it appeared to show 6.3
cfs for drainage area 1, using a drainage area of 1.6 acres. The drainage area is shown to be 5.22
acres on the current plans. If the runoff calculations are incorrect, simply lowering the weir may be
adequate. If the runoff calculations are correct, the biofilter will need modification in order to
maintain and a maximum ponding depth of 1 foot and adequate detention.
Rev]: The drainage areas for Clover Lawn on this plan do not match the drainage areas for the
original Clover Lawn plans. I cannot tell if the biofilter provides adequate detention. I am
including original plan sheets from Clover Lawn.
3. Is the biofilter area being increased in order to serve both developments, or is it already oversized?
Please show that the biofilter is large enough to support both developments.
Rev]: See comment 2.
5. The pro rata share for the portion of the site draining to Licking Hole Basin will be 55700.
Rev]: comment not addressed.
7. Please provide a stormwater maintenance agreement.
Revl: comment not addressed.
9. Please provide all necessary offsite easements.
Rev]: comment not addressed.
C. Erosion Control Plan (WPO200600057)
I . Phase II does not appear to be fully protected. For example, the sediment traps installed in phase I
are not in phase II of the plans, and the portion of the site near Rte. 250 does not appear to be
protected. Please revise phase II of the plans so that the entire site is protected. The plans and
narrative do not agree; the narrative calls for the removal of sediment traps after the installation of
construction measures. Many of the erosion control measures are in the way of construction
measures, including sediment traps, silt fence, and diversion dikes.
Revl: It appears that additional phasing is going to be needed in order for the site to remain
protected at all tittles. The sediment traps shown in phase 77 of the plans are in the way of
construction; the construction in these areas will have to not take place until after the areas
draining to them are stabilized. In addition, it appears that the diversion dike going to the basin
is flowing uphill. There is also silt fence running down slopes. We have engineering meetings
every Thursday (except for this Thursday, of course) from 2 -4fpm where people can come in and
discuss their plans with us. If you would like to schedule a time to "feet, call our Senior
Engineer Glenn Brooks at ext. 3273, or email him at gbr °or 'k.c lid rrle.rtr " * .
4. The construction entrance location is adequate for phase I, but not phase 1I. The construction
Engineering Review Comments
Page 3 of 3
entrance will need to be adjacent to the entrance at Rte. 250 during phase Il. The pipe meant to run
from the washrack to the sediment trap is not located within the construction entrance.
Rev]: Is the existing biofilter going to be used as an E &S measure? If so, inlet protection is
needed for the biofilter outlet. If it is not going to be used for E &S measures, on site drainage
cannot drain into the biofilter.
Please remove all grading within tree protection areas.
Revl: What is the meaning of "buffer areas" on the E &S plans? A buffer area defined by the
County is an area which cannot be disturbed. The buffer areas on your plans have disturbance
within their limits. If these areas are not true buffer areas please label them differently. There
are still problems with the tree protection areas. The tree protection is shown inside of the drip
lines of trees, and there is now grading through silt fence. There are still grade lines through
tree protection areas. Sonte of the tree save /removal areas have very odd geometries and do not
seem realistic. The bold tree lines are supposed to represent trees to be removed; however it
appears that many of the trees labeled in bold appear inside of tree protection areas.
Please show all work inside the limits of disturbance.
Rev]: Please show the limits of disturbance on the plans.
The dewatering orifice size in the sediment basin calculations does not match the details of the
sediment basin in the plans.
Rev]: comments not addressed.
New comments:
9. The plans call for access driveways to remain operational at all times, but this does not
occur during any of the phases of the project.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
i- ll<4r (W all)enl —Ofg.
file:, Cob-dtsO I /CityViewLnk Doc s /2006 %2OApphcations /2006 °- ,020SDPs /SDP2006001
From: Denunzio, Joel D., P.E. [ Joel .DenunziogVDOT.virginia.gov]
Sent: Monday, December 18, 2006 1:37 PM
To: Glenn Brooks
Cc: 'Turner Bradford'; Allan Schuck; Jonathan Sharp; David E. Pennock
Subject: Liberty Hall Site Plan Rte. 250 SDP -2006 -00070
Liberty Hall Site Plan Rte. 250 SDP - 2006 -00070
Glenn,
I received comments from our district office on the above site plan. I apologize for not sending them sooner but I didn't realize I had not sent them until Ireceivedane -mail from the engineer this morning. I received another e -mail from Mike after he received the inlet and pipe computations and he said thedrainagedesignisadequatesothefinalcommentdoesnotapplyanymore.
If you have any questions, please contact me.
Thanks,
Joel
Joel DeNunzio, P.E.
Residency Program Manager
434 - 293 -0011 Ext. 120
aoel.denunzio.a: Virg iniaDOT. org
From: Viar, Michael E.
Sent: Thursday, November 30, 2006 10:54 AM
To: Baber, Charles T.
Cc: Giometti, John A. P.E.; Denunzio, Joel D., P.E.
Subject: Liberty Hall Site Plan, Rte.250, Albemarle County
Charles,
I have reviewed this site plan and would like to provide comments.
On sheet 4 of 17 (Layout Plan Sheet), the alignment of Radford Lane should be re- evaluated. Curve C19 has a 150' radius and the total trafficvolumeforthisdevelopmentis463. The minimum centerline radius for streets exceeding 400 vpd is 200'.
1 of 2
3/14/2007 2:05 PM
file: i/ /// Cob- dts01/ CityViewLnk /Docs%?006° /o20Applications /?006° %20SDPs /SDP2006001..
There is an angle break on the centerline at approximate station 11 +34 Radford Lane. Horizontal curve data should be provided since angle breaksarenormallydisallowed.
The curb return right of approximate station 12 +25 Radford Lane, could be reduced to a 25' radius if it would improve the right thru lane alignment.
The inlet and pipe computations have been requested from Scott Collins but have not yet been received. If they arrive soon, I'll review them andmakecommentsbacktoyou.
All other roadway design items appear satisfactory.
Unless otherwise directed, I will keep this copy of the plans for my files. If there are any questions, please contact me.
Vit""ee E. vim
Hydraulic /Plan Review Engineer
VDOT - Culpeper District Office
540 - 829 -7549
2of2
3/14/2007 2:05 PM
rltGl
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832 Fax
Project: Liberty Hall (SDP200600102, WP0200600076)
Plan preparer: Timmons Group [fax 295 -8317]
Owner or rep.: Weather Hill Development LLC [fax 296 -2560]
Plan received date: 27 Dec 2006
Date of comments: 24 Jan. 2007
Reviewer: Jonathan Sharp
972 -4126
A. Final site plan, Road Plan, Drainage Plans (SDP2006001023)
1. VDOT approval is required.
2. Please provide a Road Bond Estimate Request and a Schedule of Completion for Bonded
Improvements. [DSM BD -9 and BD -101 A bond amount for the roads will be computed once the
request is received and once we receive VDOT approval.
B. Stormwater Management Plan (WP0200600076)
1. A pro rata share of $5700 to the Licking Hole Basin must be posted before the Stormwater
management plans can be approved.
2. The raintank sheet (sheet 19 on the site plans) needs to be included with the Stormwater
management plans. Please provide 2 sets of Stormwater Management Plans (It can simply be the
combined 9 sheets of E &S plans plus sheet 19 on the Site Plan)
3. A bond amount will be computed when the E &S bond is computed.
C. Erosion Control Plan (WP0200600076)
1. Please show all work inside the limits of disturbance. There are still several areas which show
work/E &S measures outside the limits of disturbance (the biofilter, silt fence, tree protection, etc.).
Tree protection does not need to be shown for the areas for placing the sanitary sewer line or for
the trails.
2. Please provide 4 sets of E &S plans.
3. A bond amount will be computed when all E &S comments are addressed.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or any email:
j sharpi /r'al bemarle.urg
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
Project: Liberty Hall (SDP200600102, WP0200600076)
Plan preparer: Timmons Group [fax 295 -8317]
Owner or rep.: Weather Hill Development LLC [fax 296 -2560]
Plan received date: 02 May 2007
Date of comments: 31 May 2007
Reviewer: Jonathan Sharp
A. Final site plan, Road Plan, Drainage Plans (SDP2006001023)
The bond amount for roads is $656,320.
Please send us 3 copies of the Road Plans for our files.
B. Stormwater Management Plan (WP0200600076)
The bond amount for Stormwater Management is set at $218,000.
C. Erosion Control Plan (WP0200600076)
The bond amount for E &S is set at $73,000.
Fax (434) 972 -4126
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
jsharp(a)albeinarle.or"
YkW .\L"
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Liberty Hall (SDP200600102, WP0200600076)
Plan preparer: Timmons Group [fax 295 -8317]
Owner or rep.: Weather 14111 Development LLC [fax 296 -2560]
Plan received date: 05 Mar 2007 (rev3)
Date of comments: 15 Mar 2007 (rev3)
Reviewer: Jonathan Sharp
A. Final site plan, Road Plan, Drainage Plans (SDP2006001023)
1. VDOT approval is required.
Rev3: A latest copy of the plans has been sent to VDOT for review.
2. Please provide a Road Bond Estimate Request and a Schedule of Completion for Bonded
Improvements. [DSM BD -9 and BD -10] A bond amount for the roads will be computed once the
request is received and once we receive VDOT approval.
Rev3: A bond amount for the roads will be computed once we receive VDOT approval.
B. Stormwater Management Plan (WP0200600076)
3. A bond amount will be computed when the E &S bond is computed.
Rev3: The bond amount for Storm water Management is set at $218,000.
C. Erosion Control Plan (WP0200600076)
1. Please show all work inside the limits of disturbance. "There are still several areas which show
work/E &S measures outside the limits of disturbance (the biofilter, silt fence, tree protection, etc.).
Tree protection does not need to be shown for the areas for placing the sanitary sewer line or for
the trails.
Rev3: There is still silt fence shown outside the limits of disturbance in the location where the
proposed sanitary sewer line is located. Please show the limits of disturbance in this area.
2. Please provide 4 sets of E &S plans.
Rev3: Ifyou can send me 6 copies of'sheet 3 of the E&S plan with the revised limits of
disturbance around the sanitary sewer line, I can replace the updated sheet with the original
sheet.
3. A bond amount will be computed when all E &S comments are addressed.
Rev3: The bond amount for E &S is set at $73,000.
If you have any questions, you can reach me, Jonathan Sharp, at (434) 296 -5832 ext. 3025, or my email:
js wgf,a alhcm4rlc.or'9.
ARB 2006 -093 Liberty Hall
Page 2
September 8, 2006
9. Provide a signage proposal including location, and design for all signs that are proposed.
10. For the live /work building, the following changes shall be made. Reference the drawings annotated by
Mr. Missel at the meeting.
Create two evenly spaced vertical elements along the length of the facade on the EC side to add
articulation to the long roof line.
On the side elevations, only arch the center three windows at the first story and remove the lower
white panels from the end windows to better relate the rear and side windows.
Add a water table to the EC side of the building and wrap it around to the side elevation, or
illustrate how plants will mitigate the appearance of the lower portion of the building.
Add brick corner treatments to the projecting bay of the end elevations; downspouts may be
acceptable as alternate corner accents.
Add vertical articulation between the rear bays; downspouts may be acceptable.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on -line at www.albemarle.org/planning
Revised drawings addressing the comments listed above are required. Please include a memo outlining how each
comment has been addressed. If changes other than those requested have been made, identify those changes in the
memo also.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
701 / J ,
Brent W. Nelson
Landscape Planner
Planning Division
B WN /aer
Cc: Cross, Robert & Jeanne
610 Radford Lane, Charlottesville, VA 22903
Coble, Edsel Max & J Arlene Coble Trs of The Coble Living Trust
682 Radford Lane, Charlottesville, VA 22903
Gerald Gatobu
File
OH ALg,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
January 11, 2007
Andrew Krochak
Weather Hill Development
703 East Jefferson Street
Charlottesville, VA 22902
RE: ARB 2006 -126: Liberty Hall (Tax Map 56, Parcel 97A1)
Dear Mr. Krochak:
I have reviewed your revised submittal for the above - referenced project which consisted of site plan sheets
1, 4, 6, 13, and 15 -17 of 19, latest revision date December 20, 2006, and building elevation drawings (side
and front) of the townhouse and live /work buildings, latest revision date January 2, 2007. The revisions
included in this submission address all outstanding conditions. You may consider this letter your
Certificate of Appropriateness.
This approval is predicated on the fact that the design and materials, as proposed and exhibited for review,
will be used. The acceptance of approval implies that the applicant has agreed to execute the design as
indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any
change in the approved design or materials will require an amendment to the plan and must be reviewed
and approved by the Architectural Review Board.
If you have any questions, please do not hesitate to call.
Sincerely,
Brent W. Nelson
Landscape Planner
Planning Division
Cc: Robert and Jeanne Cross
610 Radford Lane, Charlottesville, VA 22903
Gerald Gatobu (via email)
File
p
Service Auth4rit
rrvin C;nser rind
Timmons Group
March 14, 2007
Attn: Ms. Ammy George
9192 nd Street SE
Charlottesville, VA 22902
Re: Liberty Hall
Dear Ms. George:
The plan, entitled "Liberty Hall Site Plan" dated September 11, 2006, last revised January 10, 2007 is
hereby approved for construction. One set of the approved plan is enclosed for your records. Any previously
approved plans are voided with this approval. This approval is for basic compliance with the General Water
Sewer Construction Specifications of the Albemarle County Service Authority (ACSA) and does not relieve
the contractor from responsibility for his work as it relates to the plan and specifications.
The ACSA requires that a copy of the approved construction plan be on the job site. The contractor
is responsible for marking up a copy of the approved construction plan showing as -built information and
provide this data to your client at the completion of utility installation. The final as -built plan shall be submitted
in a format of one paper copy and one mylar copy.
A preconstruction conference shall be scheduled with the project manager to ensure coordination
and answer any questions. This will be a short meeting to review the project, materials, test methods and
schedule, in order to expedite construction. Please have the proper party call me at 977 -4511 to schedule
the meeting.
The pressure for water may exceed 80 psi at some meter locations.
This approval is valid for a period of 18 months from this date. If construction is not in progress at
the end of this time period, the approval shall be void.
If you have any questions or if we can be of assistance, please give us a call at (434) 977 -4511.
Sincerely,
JMUslrb
cc: Mr. Pohl
State Health Department
E--V`lanning Department
Bldg Codes & Zoning Services
Soil Erosion Inspector
05 540 E Approval Ltr Liberty Hall 03 -15 -07
Jerer; iy M. Lynn
Civil Engineer
168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977-4511 • Fax (434) 979 -0698
www.serviceauthority.org