HomeMy WebLinkAboutSDP200600109 Review Comments 2006-09-27COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Westminister Cantebury (SDP200600095)
Plan preparer: Gloeckner Eng /Surveying, Inc. (fax 293 -7612)
Owner or rep.: Scott Hilles (fax 980 -9173)
Plan received date: 28 Aug 2006
Date of comments: 27 Sep 2006
Reviewers: Jonathan Sharp
A. Final site plan and drainage comments:
1. There is too much information on each sheet of the plans which makes it confusing and
difficult to read. Please make separate sheets for existing conditons, final layout, and
utility plans.
2. Please supply drainage areas and calculations to show how runoff will drain from the site
and where it will drain.
3. Please provide a professional seal that is signed and dated. [ 18- 32.6.1 ]
4. Please show all needed easements for drainage /utilities /etc. [18- 32.6.6d, 32.7.5.2]
5. Please provide general construction notes on the plans, verbatim. [DSM902134, CD -10]
6. Additional comments may be necessary upon resubmittal.
B. Stormwater management comments:
Please submit a stormwater amendment application and plans for review. If the detention basin will be able
to handle the additional runoff from site improvements, please supply the calculations to show that this is
the case.
C. Erosion Control Plan:
Please submit an Erosion Control application and plans.
ti
County of Albemarle
Department of Community Development
Memorandum
To: Kurt Gloeckner [fax 293 -7612]
From: Jonathan Sharp, Current Development Engineering review
Date: 11 Dec 2006
Subject: Westminster Canterbury Minor Ammendment
We visited Westminster Cantebury on Friday. In addition to looking at the existing cottages, we went and
looked at the other trench drains in place at Westminster. The trench drain we saw was fully clogged for
half of the roadway.
Engineering recommends installing curb and gutter and inlets instead of the trench drain system. We also
recommend a sidewalk apron such as CG -9A for maintaining the sidewalk along the driveways. If a trench
drain system is used, slotted pipe drains must be used with piping of a 12" minimum, as few pipe bends as
possible, and the drains which run parallel to the road must stay outside of the travelway and not within the
sidewalk area for pedestrians. Also, calculations or a layout (such as drains in a sump location) must be
provided to ensure adequate runoff makes it to the trench drains.
e° Dlq; CHEDUC i , -
P -V C- 5fS'7. - T GRADE)
t i _ r _ •- GRATE - 1 SEEL. SO 6FEE
N9 TRENCH bR*aWDgq,N Y EDGE PAVEMENT -'L:j
14.0` T
HEA
R N- -C "EC _i
10' BRAIN ib" N IN 7HEA U7Y CRATE w Uir 0 iEi 30.d TRENCH DRAIN
b0 h g ' 2 `J' t0•' HEAVY DUTY GRA
GOi °] ` SQbNEAWOH RAWDUGRATE ; `4 b 33.0' TRENCH DR41 -_ - N Z. - -- ' - '
58+ ; . 10' HEAW DUTY ORATE
s Existingo ,45 9. 56 . . Pipe
I
UNIT A 4
UNIT A
F.F,= 567.( O. F.F.= 571.25
C
lUNiT \
Also, during our site visit we noticed there
is an existing storm pipe running through
proposed Unit 4.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832
Project: Westminister Cantebury (SDP200600095)
Plan preparer: Gloeckner Eng /Surveying, Inc.
Owner or rep.: Scott Hilles
Plan received date: 05 Jan 2006
Date of comments: 09 Jan 2007
Reviewers: Jonathan Sharp
Fax(434)972 -4126
fax 293 -7612)
fax 980 -9173)
The Site Plan Ammendment and Stormwater Management Plan are approved. Revised E &S plans
are still needed. When submitting E &S plans, please submit 4 copies of the plans.
A. Final site plan and drainage comments:
The minor amendment site plan is approved by Engineering. Please provide 1 additional
set of plans.
B. Stormwater management comments:
The Stormwater plans are approved by Engineering. A bond will be computed when the E &S bond
is computed.
Ct CO/ f 6 'T J tkc G4 r A
4' , lo6
S
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
Project: Westminister Cantebury (SDP200600095)
Plan preparer: Gloeckner Eng /Surveying, Inc.
Owner or rep.: Scott Hilles
Plan received date: 0 -TTJn 0G zoo 7
Date of comments: 17 3%A 2va
Reviewers: Jonathan Sharp
Ili 7' ZO67
Fax (434) 972 -4126
fax 293 -7612)
fax 980 -9173)
A. Final site plan and drainage comments:
The minor amendment for the site plan is approved by Engineering.
B. Stormwater management comments:
The stonnwater plans are approved by Engineering. The stormwater bond is set at $12,000.
C. Erosion & Sediment Control comments:
The E &S plans are approved by Engineering. The E &S bond is set at $18,000.