HomeMy WebLinkAboutSDP200600128 Approval - Agencies 2008-03-246 I : ;
Auth4rity
Mr. Charles Armstrong
Southern Development
170 South Pantops Drive
Charlottesville, Virginia 22911
EMMMEM=
Enclosed is a copy of the construction plan approval letter dated March 24, 2008 . A
copy of the approved plan shall be on the job site throughout construction and shall be
modified by the contractor to show as-built conditions. It is the contractor's responsibility to
provide this information to you and your consultant for use in developing the final as-built
plan, which shall be submitted in the format of one paper copy and one mylar copy.
A local facility fee will be charged for the proposed connection(s) to the existing sewer
main at the prevailing rate at the time of the preconstruction meeting. This fee is to defray, in
part, the cost of installing the existing sewer main and is due prior to connecting to this main.
You will be advised of the amount of applicable connection fees for the meter installation at
a later date.
A preconstruction conference is required prior to the start of construction. I can be
reached at 977-4511 to schedule the meeting. The preconstruction conference will help to
ensure project coordination, clarify ACSA requirements pertaining to construction, and
answer any questions you may have. We have also enclosed copies of our "Utility
Inspection Policy," "Letter of Dedication," and "As-Built Guide" for your information. These
documents should be reviewed before the preconstruction conference.
A water and sewer construction inspection fee will be invoiced to you at the time of
the preconstruction conference. The inspection fee for this project is $773.52 for the water
system and $847.17 for the sewer system, for a total of $1,620.69.
A plan review fee will be invoiced to you within the next few days. It will be based
upon the actual time of plan review billed at the current hourly rate established by the
Board of Directors of the ACSA. At the end of the project, you will also be invoiced for an
as-built plan review fee. It will be billed in the same manner as the plan review fee.
16` i Road 0 Charldfesv i Ile, \iA '22`911 o Tel (434) 977 45 - 1 1 * Fax (434) 979-069o'
wwwserviceouthority.orq
I -
The ACSA cannot set permanent water meters until construction has been
completed and approved for operation. The utility easements shall be reviewed and
approved prior to recordation. Copies of the deed of easement, plat, as-built plan and
Letter of Dedication shall be submitted as soon as possible following installation of the
utility systems. Timely submission of these documents will help you avoid delays in
receiving utility service.
Please be advised the Albemarle County Department of Community Development
is instructed to hold the sewer bond amount at a minimum value of 20% of the original
amount until the dedication of the utility systems is completed.
The plan approval is valid for a period of 18 months. If construction is not in
progress at the end of the approval period, the approval shall be void.
If you have any questions or if we may be of assistance, please give us a call at
977-4511.
Sincerely,
Jeremy M. Lynn, P.E.
Senior Civil Engineer
M=
cc: ACA Inspector
050601 PavifionsArmstrongLV032508
Jeanne M. Davis, A.I.C.P.
250 Pantops Mountain Road
Charlottesville, VA 22911
Keith Lancaster, Planner
Southern Development Homes
170 South Pantops Drive
Charlottesville, VA 22911
Dear Keith:
5 March 2008
Soon, I hope, Pavilions II will go to the Planning Commission. I wanted you, and the Planning
Commissioners, to know how impressed I am with the excellent work you and Charlie Armstrong have
done with the North and West areas. Current plans for these about- to -be- developed areas are vastly
improved over the initial and early plans. As you are aware, I've been over every inch of every plan with
a magnifying glass! No complaints now, and only two suggestions.
Given the zoning, the terrain, the plans you started with, and other constraints, North and West
are as good as they can get. Both areas are much better for the people who will be living there.
At the February meeting of the Building and Grounds Committee meeting of Westminster Canterbury of
the Blue Ridge I brought members up to date about Pavilions II and other work going on, or about to
occur, on Pantops. Residents here are, of course, quite interested. The following is from my report:
Southern Development has, in my opinion, done an excellent job in changing the original plans to something much
more workable and vastly better for the people who will be living there. The final plans also are better for present and
future residents of WCBR. Charlie Armstrong, an environmental scientist, and Keith Lancaster, a planner, are to be
commended. I am sending Southern Development a letter that can be forwarded to the appropriate County
employees and to the Planning Commissioners.
My only concerns remaining relate to West. One — extending the street/dumpster access /fire engine
turnaround two feet. Two — encouraging the Home Owners Association to plant appropriate trees on the
slope behind the townhouses where trees are being removed; this will lessen erosion caused by runoff
and the probability of additional erosion caused by children racing around on foot, bicycle, etc.
One question, following discussion with our tree and nursery experts: Is the Sweet Gum proposed for
planting throughout the development a variety that won't create a nuisance for the future residents?
The East area is still of great interest to us. Some of East, shown "grayed out" on the latest plans, still
needs tweaking.
Again, the changes Southern Development has made on the North and West areas of Pavilions II result
in a much better place for people who will buy and live there.
Sincerely,
cc: Gary Selmeczi, President & CEO
Scott Hilles, CFO
John Knox, Chair, Residents' Association Council
Lois Rochester, Vice - Chair, Residents' Association Council
Tom Michie, Chair, Building & Grounds Committee
t
un "7v
i rRC"J
COUNTY OFALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
April 4, 2007
JUStin Shimp
The Engineering Groupe, Inc.
2148 Berkmar Drive
Charlottesville, VA 22901
Fax (434) 972 -4012
RE: ARB -2006 -121: Pavilions at Pantops Phase 1 : Final Revie"v of a Site Development Plan
Tax Map 078, Parcel 12)
Dear Mr. Shimp:
I have reviewed your revised submittal (Site plan sheets 1 -38 with revision date of 3/28/07) for the above -
referenced project. Outstanding conditions of ARB approval are as follows:
1. Shift the London Plane tree out of the easement west of townhouse #1. (Your memo indicated that the tree
was shifted, but our records show that it has not moved. I have attached a copy of'your plan with the tree
highlighted.)
2. Revise the covenants to include a clause stating that the Home Owner's Association will ensure that no
materials and /or colors other than those approved by the Albemarle County Architectural Review Board
shall be used for this project.
3. The elevations for townhomes 29 and 30 through 32 shall not be blank. Provide elevations for review.
Please provide:
I . Two copies of revised drawings addressing each of these conditions. Include updated ARB revision dates
on each drawing.
2. A memo indicating how each condition has been satisfied. If changes other than those requested have been
made, identify those changes in the memo also.
3. The attached "Revised Application Submittal" form. This form must be returned With your revisions to
ensure proper tracking and distribution.
When staffs review of this information indicates that all conditions of approval have been met, a Certificate of
Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Mary =aret Malisze
Principal Planner
cc: ARB -06 -121 Summer Frederick
3?
37-0 -, "' P 36 -
37-a
36
36 J
32
3QG
ERSGATE - 6 UN
i 'Z5 wo.17
P
F =REV E —REV
FF= 549.60 FF= 548:93,
13F=539.68 BF= 539
D -REV1
FF= 548.93
i BF= 539.01
C —REV - - --
FF= 548.? I_ r - B -REV
P BF= 538.34 I rF= X46.93 FF= 546.?6
BFBF01 536.34
P
47 46
46 46 44-44
P CD- _V
C -- - 2 CAR,
GAR.= GAR.=
D CAR
GAR-=
2 CAR
GAR.=
2 CAR 2 CAR
T-
548.?3 547.56 547.56.546 89
GAR.=
545.5=
CAR, _
5RL
47 t +-
47-L
f
40 46 L 45 —' +
47 ' ..''o i
4.6 %,
M h
0 -a-V 45-d-I *44=1
Q4T-2
A Q
0
7
t
Z
I 4
lJ o UVIi 6 Mrs
R
54 7.99
E
GA R = ..
GAR - -_ _
I 546.66 P
C P
GAR = P547.32
P`Mz FF= 557.60
BF =548.32 FF= 556.93 FF= 55672 FF= 555.60BF= 546.99BF= 547.6 BF= 546.: E
55D 53
54 w
P P 52
AL P P
ANDSCA I
EkSEMEN I
J I a
of ALIj,
6IRC1^ 1 P
P) t Vt
JUYy
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
MEMORANDUM
TO: Keith Lancaster, Southern Development
FROM: Summer Frederick, Senior Planner
DATE: January 17, 2007
Fax (434) 972 - 4126
RE: Pavilions at Pantops Phase II, North & West SDP200600128
The Albemarle County Department of Planning and Community Development will
approve the above - mentioned site plan amendment when the following items have been
satisfactorily addressed: [Each comment is preceded by the applicable reference.]
Please comply with the following conditions of preliminary site plan approval:
1. [13.4.1] Provide a Conservation Plan as specified in section 32.7.9 for approval
by the Zoning & Current Development Division of the Department of Community
Development. _ jtA K 1 Adyess (} S OR-- awka^S
2. [14 -317, 18 -4.7] Please submit covenants evidencing the establishment of an
owners' association and provides for ownership and maintenance of proposed
open space within SDP200600128.
3. In accordance with the agreement between North Pantops Townhouses, LLc,
Southern Development, Westminster- Canterbury of the Clue Ridge, and the
Westminster- Canterbury of the Blue Ridge Residents' Association dated October
3, 2006 (the Agreement):
o The final site plan shall show the "Potential Tree Save Areas" identified in
paragraphs 2a and 2b of the Agreement,
o A tree conservation plan for above mentioned Potential Tree Save Areas
shall be submitted,
o All plantings required by paragraph 2e of the Agreement shall be included
on the required landscape plan.
I twitS of C,(w4 rrark)y ;r hawlJ
CAS
4. [32.6.4.1] Final plan approval is subject to issuance of a Certificate of
Appropriateness from the Architectural Review Board.
In addition, please address the following;
1. [32.5.6] Indicate phase lines and proposed timing of development for all portions
of development included on Preliminary Site Plan. Information included on the
Cover Sheet must accurately reflect all information depicted on submitted sheets.
Additional comments from the other reviewing agencies will be forwarded. Please
contact me at your earliest convenience if you have questions or require additional
information.
FW: Pavilions at Pantops Phase" SDP -2006 -128
Summer Frederick
From: Keith Lancaster [klancaster @southern- development.com]
Sent: Friday, October 19, 2007 2:36 PM
To: Summer Frederick
Subject: FW: Pavilions at Pantops Phase II, SDP - 2006 -128
FYI, VDOT approval.
From: Jonathan Sharp [mailto:jsharp @albemarle.org]
Sent: Friday, October 19, 2007 1:37 PM
To: djensen @wwassociates.net; Keith Lancaster
Subject: FW: Pavilions at Pantops Phase II, SDP - 2006 -128
Below is the VDOT approval letter.
Jon
From: Denunzio, Joel D., P.E. [mailto: Joel .Denunzio @VDOT.virginia.gov]
Sent: Friday, October 19, 2007 12:27 PM
To: Jonathan Sharp
Subject: FW: Pavilions at Pantops Phase II, SDP - 2006 -128
Jon,
Below are the Pavillions at Pantops approval.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 -293 -0011 Ext. 120
joeL.denunzto@vdot.virginia.gov
From: Hamidi, Ajmal
Sent: Friday, October 19, 2007 12:03 PM
To: 'aschuck @albemarle.org'
Cc: Denunzio, Joel D., P.E.
Subject: Pavilions at Pantops Phase II, SDP - 2006 -128
Pavilions at Pantops Phase II, SDP - 2006 -128
Page 1 of 2
We have reviewed the above plan in which the only remaining issue was the sight distance at the intersection of Mountain
4/25/2008
FW: Pavilions at Pantops Phase 11 'DP- 2006 -128 Page 2 of 2
View Lane and Verona Drive. The sight distance has been adjusted to meet the 280' that we requested. However, we
would like to point out that the SD eye should be located 20' from the middle of the nearest travel lane because sheet 5 of
the plans shows that it is about 30' from the middle of the nearest travel lane. Therefore, more sight distance is being
provided than is required. The sight distance easements can be readjusted in light of this. If they are not, the current
plans are acceptable.
If you have any questions, please contact me.
AJ Hamidi
Charlottesville Residency
Aimal.Hamidi @VDOT.virginia.gov
4/25/2008
Page 1 of 2
Summer Frederick
From: Keith Lancaster [klancaster @southern- development.com]
Sent: Monday, March 24, 2008 9:06 AM
To: Summer Frederick
Subject: FW: Pavilions at Pantops Phase 2
Summer,
Here is the email from Michelle Simpson. Let me know if you want to meet.
thanks
From: Michelle Simpson [mailto:msimpson @rivanna.org]
Sent: Thursday, March 20, 2008 3:51 PM
To: 'Jeremy Lynn'
Cc: 'Justin Weiler'; Keith Lancaster; djensen @wwassociates.net; 'Glen Recknagel'
Subject: FW: Pavilions at Pantops Phase 2
Jeremy,
RWSA has reviewed revised Sheets 1, 2, 3, 5, 6, and 13 of the plans titled "Pavilions at Pantops
Phase 2 Final Site Plan" by WW Associates dated and received today (3/20/08) and it appears that all
of RWSA's comments outlined below have been addressed. Please have the engineer send two full
final sets to us for final consent. Please let me know if you have any questions and have a great
weekend!
Thanks,
Michelle
M%OkeUe .5%vupsow, P.E.
SevUor Civil. EvwgLweer
RIV - vi. a water , sewer AutkorLt
695 Moores Creel¢ L.aM
cknrtottesvULe, vet 22902
434)9Y -2J°, 6/,t. 202
434) 295 -1146 FaX
From: Michelle Simpson [mailto:msimpson @rivanna.org]
Sent: Wednesday, March 12, 2008 2:44 PM
To: 'Jeremy Lynn'
Cc: 'Justin Weiler'; 'Keith Lancaster'; 'djensen @wwassociates.net'; 'Glen Recknagel'
Subject: Pavilions at Pantops Phase 2
Jeremy,
We have reviewed the plans titled "Pavilions at Pantops Phase 2 Final Site Plan" by WW Associates
dated 2/22/08 and received on 2/26/08 and have the following comments:
4/25/2008
Page 2 of 2
1) Sheet 2 of 20 — Please add another heading (maybe after "Water and Sewer Conditions ") that
says "Rivanna Water and Sewer Authority — See Sheet 12 of 20 for General Water & Sewer
Notes ".
2) Sheet 3 of 20 — For the replacement of the 30" storm sewer with the 36" storm sewer along
Verona Drive, please provide another scaled drawing (1 " =30' or 40') on the plans for the limits
of the work for clarity. Provide a note on this storm sewer replacement plan as follows:
Contractor shall use due diligence to protect the 18" water line from damage during the
construction of the new storm sewer. Any damage to the water line and appurtenances,
trench, bedding or backfill shall be restored to original condition at the Contractor's expense to
the satisfaction of the Owner. Contractor shall contact RWSA 72 hours in advance of
beginning this work. Contractor shall maintain a minimum of a 5' offset (from outside edge of
water line to outside edge of storm pipe) during the pipe installation. Contractor shall not
undermine the water line or compromise the integrity of the bedding or backfill of the
waterline. Contractor shall employ methods of sheeting and shoring if determined necessary
by RWSA to protect the water line. Contractor shall pothole existing 18" water line to verify
offsets and depths as determined by RWSA."
3) Sheet 3 of 20 — Modify note on plans as follows: "Ex. 12" water line to be demolished
completely removed) and disposed of pro_ _perly_ at the expense of the Contractor_.
Coordinate with RWSA."
4) Sheet 5 of 20 — Note that the cross is already installed on the 18" water line (the cross does
not need to be bold black). Modify note at the cross as follows: "Contractor required to notify
RWSA 72 hours prior to connecting to water main. Permanent connections to the potable
water system are not permitted until all new water mains are disinfected and ready for service.
See RWSA General Notes — Sheet 12."
5) Sheet 6 of 20 — Per ACSA — relocate the fire hydrant at the end of Summit Lane away from the
18" water line.
6) Sheet 6 of 20 — Note that the 18 "x8" tee and 8" is installed and does not need to be in bold
black. Add note at tee as follows: "Contractor required to notify RWSA 72 hours prior to
connecting to water main. Permanent connections to the potable water system are not
permitted until all new water mains are disinfected and ready for service. See RWSA General
Notes — Sheet 12."
7) Sheet 6 of 20 — Please move the "street name sign" at the entrance of Summit Lane off the top
of the water line — a minimum 5' offset.
Please let me know if you have any questions.
Thanks,
Michelle
Michel.l.e Sivu.Psow, P.E.
Sev or CivU Ewgi,m
P.ivawwa water , sewer Author't:
C,9,5 Moores Creele (_Ruse
CkartottesvtUe, V 22902
434)j77 ext. 202
434) 295 1146 Fa
4/25/2008
J$
of AL8
IRGINIP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
NOV 0', 2006
Phone (434) 296 -5832 Fax (434) 972 -4126
October 20, 2006
David Jensen
W W Associates
1402 Greenbrier Place
Charlottesville VA 22901
RE: SDP - 2006 -00042 SDP - 2006 -0043 Pavilions at Pantops Phase 2 Preliminary Site Plan
Dear Sir:
The Planning Commission, at its October 10, 2006 meeting, granted approval of your request for the
following waivers and the preliminary site plan. Section 4.2.3 for disturbance of critical slopes and Section
4.7 for the Appropriateness of the Open Space with the following conditions:
1. [ 13.4.1 ] Prior to final approval a Conservation Plan as specified in section 32.7.9, must be approved by the
Zoning & Current Development Division of the Department of Community Development with a copy of
the original Conservation Plan and all subsequent revisions to be submitted to the Zoning & Current
Development Division.
2. [14 -317, 18 -4.7] Prior to final approval the applicant must submit covenants or other such instrument,
which evidences the establishment of an owners' association and provides for ownership and maintenance
of proposed open space. Such document shall be subject to County Attorney review and approval and shall
be in accordance with Section 14 -317 of the Subdivision Ordinance - Instrument evidencing maintenance
of certain improvements.
3. Zoning & Current Development Planning approval.
4. Zoning & Current Development Engineering approval.
5. Albemarle County Fire Rescue approval.
6. Albemarle County Service Authority approval.
7. Virginia Department of Transportation approval.
8. The final site plan shall show the "Potential Tree Save Areas" identified in paragraphs 2a and 2b of the
agreement between North Pantops Townhouses LLC, Southern Development, Westminster- Canterbury of
the Blue Ridge and the Westminster- Canterbury of the Blue Ridge Residents' Association dated October
3, 2006 (hereinafter, the "Agreement "). A tree conservation plan for the Potential Tree Save Areas shall
be submitted to the Zoning & Current Development Division for approval. The number of parking spaces
shall be reduced as provided in paragraph 2c of the Agreement to the extent that such reduction complies
with the minimum parking requirements of section 18 -4.12. The landscaping plan shall include all of the
planting required by paragraph 2e of the Agreement.
9. The final site plan shall return for review and approval by the Planning Commission.
The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of
Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on October
20, 2007. If the preliminary site plan approval expires, a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight (8) tentative plan
copies to the Department of Community Development. This letter must be submitted with the tentative
plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative
plan will be denied.
Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated
applications and fees must also be submitted with the eight (8) tentative Plans.
Once the tentative plan is submitted and reviewed you will receive comments from all
departments /divisions /agencies that have made comment on the tentative plan. Any further
responses must be made directly to each department /division /agency that has further comment.
After all aforementioned departments /divisions /agencies have granted tentative approval, you must
verify with the Planner that you may submit the final mylars (1 set), paper copies (2 sets), the final
site plan application, and final site plan fee to the Department of Community Development. Signing
of the plans will occur within one week once it is determined that the final site plan mylars reflect all
tentative approvals.
The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in
addition to the following conditions.
The Department of Community Development shall not accept submittal of the final site plan for signature
until tentative approvals for the following conditions have been obtained:
Zoning & Current Development approval to include:
All conditions of the preliminary plan reviewed by the Planning Commission on October
10, 2006.
32.6.3] Approval of a landscape plan in compliance with Section 32.7.9. The landscape
schedule will need to show the canopy calculations; and
32.6.60)] Submit a description and photograph or diagram and show the location of each
type of outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that
installation of such luminaires in the future that are not shown on this plan shall require an
amendment to this plan.
vI [32.6.60)] [4.17.4(b)] Submittal of a photometric plan on the site plan demonstrating that
luminaires are -in compliance with 4.17.4 b.
32.6.4.1 ]The final plan approval is subject to the issuance of a Certificate of
Appropriateness from the Architectural Review Board. il/liv
Please contact Francis MacCall at 296 -5832 if you have questions or require additional information
Engineering approval to include:
All applicable items as specified in the Design Standards Manual, Section 902 B.
Please contact Max Greene at 296 -5832 if you have questions or require additional information.
Albemarle County Fire Rescue approval to include:
Review and approval of fire flow and fire hydrant locations.
O At L'-
iA
L-
Please contact James Barber at 296 -5833 if you have questions or require additional information.
IrAlbemarle County Service Authority approval to include:
Review and approval of all final water and sewer plans.
Please contact Gary Whelan at 977 -4511 if you have questions or require additional information.
Virginia Department of Transportation approval to include:
Review and approval of all final road plans including drainage computations.
Please contact Joel DeNunzio at 293 -0011 Ext. 120 if you have questions or require additional
information.
Sincerely,
Francis H MacCall
Senior Planner
Zoning & Current Development
File: SDP - 2006 -00042
Cc.
NORTH PPANTOPS LLC
PO BOX 8147
CHARLOTTESVILLE VA 22906
SOUTHERN DEVELOPMENT
170 South Pantops Drive
CHARLOTTESVILLE VA 22911
JGI VIII` f '
OF
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832
Project: Pavillions at Pantops Phase II [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Contact: Keith Lancaster, Southern Development [fax 245 -0895]
Plan received date: 14 Jan 2008 (Rev4)
Date of comments: I 1 Feb 2008 (Rev4)
Reviewer: Jonathan Sharp
Fax(434)972 -4126
A. Road Plans (SDP200600128)
All comments have been addressed. Please provide 3 copies of the Road plans for our tiles.
If a final subdivision plat is to be recorded prior to the roads being built and accepted by
VDOT, the roads will need to be bonded. A schedule of completion and bond estimate request
is required prior to the County computing the road bond amounts.
B. Final Site & Drainage Plans (SDP200600128)
All Engineering comments have been addressed.
C. Stormwater Management Plan (WP0200700078)
Plan approval pending separate SWM amendment for Luxor. No additional SWM bond is
required.
D. Erosion Control Plan (WP0200700001)
The E &S bond is set at $56,000. Please provide 4 copies of the E &S plans for our files.
krtti t7 ' 36 vq
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Pavillions at Pantops Phase II [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Contact: Keith Lancaster, Southern Development [fax 245 -0895]
Plan received date: 13 Sep 2007 (Rev3)
Date of comments: 17 Oct 2007 (Rev3)
Reviewer: Jonathan Sharp
A. Road Plans (SDP200600128)
1. Please show that the horizontal curve data meets minimum radius requirements (40 feet).
2. Please label curb radii at all intersections and turnarounds.
3. Please show all necessary sight distance easements for Summit Lane (any applicable internal
easements).
4. In the North Phase: Please extend the guardrail to the east most end of the wall. Label guardrail
end sections.
5. The minimum sag K value is 15.
6. Please show all pipe and other utility crossings and clearances on the profile sheets.
7. Please show sidewalk details: minimum 4" concrete 3000 psi at 28 days and minimum 4" 21 -A
stone.
8. A road bond will be computed by the County once the plans have been approved.
B. Final Site & Drainage Plans (SDP200600128)
9. VDOT approval is required. [DSM902B]
Rev3: The latest copy of the plans has been submitted to VDOTfor review.
10. For the West phase, based on plans for Westminster Canterbury, there appears to be more than
4.31 acres draining through the 2 existing 30" concrete pipes. Please verify the actual drainage
areas. Also, please show the 30" pipes on all applicable plan sheets (not only the landscaping
plan). Please address how the ditch will make sharp turns. The ditches may need to be revised to
turn more naturally and /or be deepened.
Rev3: The pipe downstream of the two 21 "pipes and one 12 "pipe must be a minimum of 32"
to maintain the Engineering practice of increasing pipe sizes (areas) downstream).
14.
Rev3: Please provide copies of the easements to install the sanitary sewer in Fontana open
space and the junction box at Westminster Canterbury.
Albemarle C6Thty Community Development
Engineering Review Comments
Page 2 of 2
C. Stormwater Management Plan (WP0200700001)
With the increase in drainage area from Westminster Canterbury, the SWM plan serving
this project (WP0200400011) needs to be revised to show that the pond can handle the
additional drainage. This drainage was not accounted for with the Luxor plan.
Rev3: Plan approval pending SWM amendment submitted for Luxor.
D. Erosion Control Plan (WPO200700001)
The following comments pertain to the West part of the project:
4. Please provide adequate E &S measures for the site. The site below the stormwater conveyance
channel remains unprotected during portions of construction.
Rev3: E &S measures are not adequate. Inlet protection is only adequate for I acre of drainage
area. Several parts of the construction sequence are confusing: sequence 4, sequence 9. Both
appear to refer to a 36 "pipe and structure 26 which do not appear on the plans. Do you intend
to direct the runofffrom Westminster Canterbury through the engineering channel until the
pipe system is in place? The plans show the runoff draining through the existing 30 "pipes (not
shown) until the new pipe system is put in place. It also seems like it will be much more costly to
fill existing pipes with sediment which have to be cleaned out later than simply diverting most
of the runoff to the existing basin. The E&S plans may need to be phased. It appears the plans
were designed around the final build out of the plans rather than existing conditions.
6. An E &S bond amount will be computed by the County once the plans are approved.
d 0
1
Rcal
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832
Project: Pavillions at Pantops Phase iI [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Contact: Keith Lancaster, Southern Development [fax 295 -0895]
Plan received date: 08 June 2007 (Rev2)
Date of comments: 22 June 2007 (Rev2)
Reviewer: Jonathan Sharp
Fax(434)972 -4126
It appears road plans have yet to be submitted for this project. Please provide road plans for
review.
A. Final Site & Drainage Plans (SDP200600128)
L VDOT approval is required. [DSM902B
2. For the West phase, based on plans for Westminster Canterbury, there appears to be more than
4.31 acres draining through the 2 existing 30" concrete pipes. Please verify the actual drainage
areas. Also, please show the 30" pipes on all applicable plan sheets (not only the landscaping
plan). Please address how the ditch will make sharp turns. The ditches may need to be revised to
turn more naturally and /or be deepened.
3. For the North phase, EC -1 going from Structure 10 to a ditch makes a sharp turn. Please revise
this.
4. There are 1:1 slopes shown for the West Phase. The maximum allowable steepness is 2:1.
5. There is a concern with runoff drainage through more than 3 lots at a time. This could cause
drainage problems if an owner decides to regrade his yard or put in a fence /deck/patio, etc.
6. Please provide any necessary easements.
B. Stormwater Management Plan (WP0200700001)
With the increase in drainage area from Westminster Canterbury, the SWM plan serving
this project (WP0200400011) needs to be revised to show that the pond can handle the
additional drainage. This drainage was not accounted for with the Luxor plan.
C. Erosion Control Plan (WP0200700001)
The following comments pertain to the North part of the project:
1. There is silt fence located outside the limits of disturbance. There is tree protection that appears to
be placed in an erroneous location (possibly where previously proposed sewer pipes ran).
2. The outlet protection for the outfall of structure 10 is not straight.
3. There is grading still shown in a tree protection area.
The following comments pertain to the West part of the project:
4. Please provide adequate E &S measures for the site. The site below the stormwater conveyance
channel remains unprotected during portions of construction.
5. Please design the stormwater conveyance channel to bend more naturally, or provide a necessary
design so that ensures that all of the drainage will be contained within the channel /pipe system.
6. An E &S bond amount will be computed by the County once the plans are approved.
ko)v
f
may• M
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832
Project: Pavillions at Pantops Phase II [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Plan received date:
Date of comments:
28 Mar 2007 (Revl)
02 Apr 2007 (Revl)
Reviewer: Jonathan Sharp
A. Final Site & Drainage Plans (SDP200600128)
Fax(434)972 -4126
2. VDOT approval is required. [DSM90213]
Revl: We are still awaiting ! DOT approval.
3. Parking cannot exceed 5% in any direction. [18 4.12.15c]
Rev]: comments not addressed. For Pavillions II West, the parking area with S spaces appears
to have mislabeled spot elevations. The parking area with 7 spaces appears to e -viceed 5% slope.
For Pavillions II North, lam unsure as to how the parking will maintain a maximum S%
slope, as the adjacent travelways exceed S%.
4. Parking with 16' stall depths cannot overhang sidewalk. [18- 4.12.16c6]
Rev]: comments not addressed. Parking adjacent to sidewalk must maintain 18' length.
11. It appears that the existing 30 inch pipe running to the fore bay for Phase II — West appears to be
undersized resulting in pressure flow. Perhaps once the drainage area values are corrected, this will
not be the case. If it is still undersized, the pipe size will need to be increased or changes made so
Albemarle County Community Development
Engineering Review Comments
Page 2 of 3
that pipe flows do not exceed their capacity for the 10 year storm.
Revl: Please provide profiles and calculations to show that the existing pipe system running to
the forebay (fpond 3 for Pavillions H West is adequate.
12. (Revl) The proposed retaining wall shown on Pavillions II North is a concern as it is very
close to proposed lots and buildings and can potentially be a hazard. Engineering
recommends stepping the wall, thus decreasing the drop. Please provide detailed drawings
and provide railing on the walls.
B. Stormwater Management Plan (WPO200700001)
No stormwater management plans are necessary; stormwater management for Pavilions II was
addressed with WP0200400011.
Revl) A stormwater management amendment has been submitted for
WP0200400011. The amendment proposes that pond 3 be removed or decreased in
size. As this has an affect on Pavillions 2, the amendment will need to be approved
before Pavillions 2 can be approved.
C. Erosion Control Plan (WPO200700001)
The following comments pertain to the North part of the project:
The site is not protected below structure 8 (pipe outlet). Silt Fence does cannot be used for
diverting or trapping runoff.
Rev]: Please label the section of the diversion dike running through the fill area as a
Temporary Fill Diversion (FD), Minimum Standard 3.10 in the VESCH. Along with the
temporary fill diversion, include a note stating: "Fill diversion to be installed at the end of'each
work day or before a rainfall event. Exact location offill diversion to be located in the field. "
5. There is work shown in tree protection areas.
Revl: There is still grading going through a tree protection area. Please revise the grading so
that grading does not occur in the tree protection areas.
The following comments pertain to the West part of the project:
6. Please show the drainage areas draining to the sediment traps.
Revl: Please show contours for all areas which drain through the site.
The diversion dike channeling the runoff from Westmimster Cantebury to the existing forebay is
inadequate. Diversion dikes are limited to 5 acres of runoff. Also, there is grading shown on both
sides of the diversion. E &S measures should not be in the way of construction activities.
Revl: see comment 10.
9. Engineering recommends not using a drop inlet sediment trap, as they do not work well in this
area. If a drop inlet sediment trap will be used, it must be designed in complete accordance with
the VESCH. The drainage area draining to the drop inlet trap cannot exceed 1 acre. Also, the max
depth of the trap cannot exceed 2 feet below the top of the inlet structure.
Rev]: see comment 10.
10. The culvert inlet protection trap must be drawn more accurately on the plans. The plans should
include the location of the rip -rap, and storage should only include the horseshoe shaped volume
Albemarle aunty Community Development
Engineering Review Comments
Page 3 of 3
around the outside of the rip -rap.
Revl: The proposed use of diversion dikes and sediment trapping measures in not in
accordance with State code. It is not realistic to split the flow through the drainage easement
using diversion dike #2. Sediment Trap #2 will need to be a sediment basin. Also, diversion
dikes need to have sediment trapping measures at their outlet, diversion dike #2 and #4 outlet to
nothing.
Engineering recommends the following:
Remove DD2 and DD4
Upgrade ST2 to a sediment basin and shrink STI
Remove the pipe running from structure 22 to 23 in phases I and II ((show on phase III). Put
in a temporary end section and very short pipe with proper culvert inlet protection running out
of structure 22. Outlet the weir from STl into the culvert. (If a riser structure remains instead
of a weir S", the sediment trap will need to be designed as a basin, regardless of whether
or not more than 3 acres are draining to it.)
Use natural existing contours to shape the basin. The proposed design for the basin shows
filling in to make the basin, when leaving the existing contours would increase the storage of
the basin and decrease the amount of earthwork needed.
11. (Revl) For phase I, at a minimum, some type of structure will be needed at 23. (As in
comment 10, we recommend installing the pipe between 22 and 23 in phase III.) If the riser
structure is to remain on the sediment trap, another possibility is to install the pipe running
from the riser to 22 during phase II. Also, the note regarding converting the temporary riser
measure to the permanent structure should include being converted upon approval of the
E &S inspector.
12. (Revl) It appears that diversion dike #3 from phase 11 will be need to remain in place during
parts of phase III. Please show DD3 on phase III of the plans, and revise the grading, inlet
structures, and tree protection to leave enough room to keep DD3 on the plans. (At a
minimum, a width of 5 feet is needed for the berm of diversion dikes.
13. (Revl) Please sign the conservation plan checklists on sheets 18 and 19.
AP\hape(434
t '
ti O' ,1I.y,
COUNTY OF ALBEMARLE
i Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Fax (434) 972 -4126
Project: Pavillions at Pantops Phase II [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Plan received date: 20 Dec 2006
Date of comments: 16 Jan. 2007
Reviewer: Jonathan Sharp
A. Finq,"ite & Drainage Plans (SDP200600127)
L Please provide a professional signed and dated seal. [18-32.6.1]
2. VDOT approval is required. [DSM902B]
3. Parking cannot exceed 5% in any direction. [18- 4.12.15c]
4 Parking with 16' stall depths cannot overhang sidewalk. [18- 4.12.16c6]
S— adjacent to parking need to be either 6 feet minimum or bumper blocked used.
G. Pipes with slopes exceeding 16% must have anchor blocks, or pipe slope must be reduced.
DSM505E10]
7. Safety slabs are required for manholes with depths greater than 10 feet, and step down manhole
protection or inlet shaping is required for flow drops of greater than 4 feet. [DSM505E9]
81. Please provide typical or existing sections and calculations for ditches and channels. [18- 32.6.6d1,
DSM909.1A, 505C]
9. Where does the runoff from the back side of lots 8 -14 (Phase II - West) drain?
Some of the drainage area values and /or runoff coefficients appear to be incorrect. Please provide a
drainage map of the 7 acres of drainage from Westminster Cantebury.
1 V. It appears that the existing 30 inch pipe running to the fore bay for Phase II - West appears to be
undersized resulting in pressure flow. Perhaps once the drainage area values are corrected, this will
not be the case. If it is still undersized, the pipe size will need to be increased or changes made so
that pipe flows do not exceed their capacity for the 10 year storm.
B. Stormwater Management Plan (WP0200600089)
No stormwater management plans are necessary; stormwater management for Pavilions II was
addressed with WP0200400011.
C. Erosion Control Plan (WP0200600089)
Please submit a WPO application for the E &S plan. A full review cannot be given until an
application has been submitted. Looking at the submitted E &S plans, Engineering has the following
comment:
For Phase II - West, the diversion dike channeling the runoff from Westminister Cantebury to the
existing forebay is inadequate. Diversion dikes are limited to 5 acres of runoff. Also, there is grading
shown on both sides of the diversion. E &S measures should not be in the way of construction
activities.
d
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832 Fax(434)972 -4126
Project: Pavillions at Pantops Phase II [SDP200600128]
Plan preparer: David Jensen, W &W Associates [fax 978 -1444]
Owner or rep.: North Pantops Townhouses, LLC [fax 296 -3510]
Plan received date: 20 Dec 2006
Date of comments: 16 Jan. 2007
Reviewer: Jonathan Sharp
A. Final Site & Drainage Plans (SDP200600127)
1. Please provide a professional signed and dated seal. [18- 32.6.1]
2. VDOT approval is required. [DSM902B]
3. Parking cannot exceed 5% in any direction. [18- 4.12.15c]
4. Parking with 16' stall depths cannot overhang sidewalk. [18- 4.12.16c6]
5. Sidewalks adjacent to parking need to be either 6 feet minimum or bumper blocked used.
6. Pipes with slopes exceeding 16% must have anchor blocks, or pipe slope must be reduced.
DSM505E 10]
7. Safety slabs are required for manholes with depths greater than 10 feet, and step down manhole
protection or inlet shaping is required for flow drops of greater than 4 feet. [DSM505E9]
8. Please provide typical or existing sections and calculations for ditches and channels. [18- 32.6.6d1,
DSM909.IA, 505C]
9. Where does the runoff from the back side of lots 8 -14 (Phase II - West) drain?
10. Some of the drainage area values and /or runoff coefficients appear to be incorrect. Please provide a
drainage map of the 7 acres of drainage from Westminster Cantebury.
11. It appears that the existing 30 inch pipe running to the fore bay for Phase II — West appears to be
undersized resulting in pressure flow. Perhaps once the drainage area values are corrected, this will
not be the case. If it is still undersized, the pipe size will need to be increased or changes made so
that pipe flows do not exceed their capacity for the 10 year storm.
B. Stormwater Management Plan (WP0200600089)
No stormwater management plans are necessary; stonnwater management for Pavilions II was
addressed with WP0200400011.
C. Erosion Control Plan (WP0200600089)
Please submit a WPO application for the E &S plan. A full review cannot be given until an
application has been submitted. Looking at the submitted E &S plans, Engineering has the following
comment:
For Phase 11— West, the diversion dike channeling the runoff from Westminister Cantebury to the
existing forebay is inadequate. Diversion dikes are limited to 5 acres of runoff. Also, there is grading
shown on both sides of the diversion. E &S measures should not be in the way of construction
activities.
County of Albemarle
Department of Community Development
Memorandum
From: Glenn Brooks, Current Development engineering review
Date: 16 May 2006
Rev. l: 6 .Jun 2006
Rev?: 22,4 ug 2006 (substantial redesikn)
Rev.3: 3 Oct 2006 (revision)
Subject: Pavillion at Pantops, phase 2 (SDP200600042)
The preliminary site plan for townhomes on Pantops at Luxor has been reviewed. The plan % tbe
Rev. 2: This plan is rec•onz/nended denial.
Rev. 3: This plan is recolnnlentle i tar cle /alal.
fi The existing topography needs to be updated. The plan is incorrect. [18- 32.5.6r, 18- 32.5.6d]
Rev. l: rl note has been atkled to the plan stating the .site is tnulel• construction. 1 clnt hcn•ing trouble
reconciling this with the accuracy requirements of IN-32.5.6r.
Rev. 2: This C0117117e7t has not been atUresseel again. I{lis co/l"/lent must he addressed befrne fiuther
review.
Rev. 3: The applicant has repeatedly refiised to coniply with this section ofthe orclinance.
A waiver to develop on critical slopes is required. [ 18 -4.2]
Rev. I. Please see the separate ntenloralulti//l regarcling critical slopes.
Rev.': Please see the sepeirclte nlenulrcln 111n reg(Irchng critical slopes.
Re v. It is nll• understancling that Allan Schuck acldr•essed this in ill absence.
3. `. The existing features on the plan need to be clarified and shown accurately. For example, the roads
are not existing, but are under construction. [ 18- 32.5.6n]
Rev. I. Please sec coilunent 1. "I'his is all part ol'the lnix of eXi.sting topot,Traplly. cipproved pleilas. (Intl
ICtiVe perin/t.s.
Rev?: This C011117107t has not been adequately addressed again. The note clots not suffice.
Rev. 3: Design info' • lnatio/1 Ironl otllel• pl is still being USetl tis e_ inking Collclinons.
4 > 4. The conceptual storlrrwater management layout and preliminary information are in need of revision to
t address the following concerns. [ 18- 32.5.6k, 17 -303, DSM503A]
a. The forebay next to Verona Drive appears to be overtaxed and would not meet the forebay sizing
criteria of the state manual. Some of the site drainage and pipe system needs to be redirected to
the upper forebay.
Rev. l: This conlnlent has been adclressecl h_i• a revised pipe SI'Steln la_t•olit. SiZin,T will need to be
reviewed with the stor/nivater plan.
Rev.2: The plan has relocated this,forebav to the north. This location is not workable. The
fo/•ebay size and depth requirements are not achievable in this location, and it tlirlher short
AlbemarlL —flinty Community Development
Engineering Review Comments
Page 2 of 3
cir'cuitS the pcith within the hasin.
Rev.3: It was agreed in meetiniTs that the,ftrehav ar'rangenzent woulcl he restored to that shown on
the approvet/ stortmratct' management plan. C'ontrcu, to those crsrecntents, this revision shows it
tit vet another locution which shortens the flow path in the facility. anal creates a hciurd file
t'esiclenls with adclitional Ietaining walls ovet the pond This proposed revision to the approved
stormwater basin is not acceptahle.
The approved stormwater management plan shows some of the site area as one -half acre lots. fills
plan is an increase in impervious cover, and the approved stormwater plan and computations will
need to be updated.
Rev. 1: A revised stoi -i neater' plan has been received. It hus not vet been revictired.
Rev.2: l n ante nt/nte nt to the muster• sloi plum was /'eviewecl and comments provided.
Revisions have not been I'CC'civct/.
Rev.3: This issue has let to he I'csolved.
c. Vehicle access to the upper forebay is being removed with this plan, and needs to be replaced.
Rev. l: This c'onrment has been ut/ch'essecl.
Rev?: See item a.
The drainage from Westminster Canterbury and the upper watershed needs to be accommodated in the
drainage system on,-this.-plan. An easement.tltrough to the basin over an adequately sized pipe system,
and an overland relief route must be provided [18- 32.7.3, 14 -410]
Rev. 1: This comment has heen suti.cf ictot•i1v culdressed.
Rev.?: The revisions huve eliminatecl the provisions fin- channels 6t estininster Cuntet'hnt_y. The
topogl-apll_v must identifi• these areas, the ontfctll from 6Icstntinster, and the pt'oposcd convCyance (lilt/
easements.
Rev.3: Nothing could he.itund on the plan. It is noted that the match -lines are this plan set twe so
had, infiirtmition could he there that is just unrcat/able.
It appears site distance easements will be required for the parking spaces along the inside curves of the
roadways in front of lots 1 1, 92 and 23. [18- 32.7.2, 18- 32.7.3]
Rev. l: This comment has hCen ucich•essecl by easements provhlecl. Landscaping that ma_y block sight
lines will need to he out of these easements on final plans.
Rev?: The plum has climinaled these cwccus.
7. It appears the retaining wall in front of lot 18 needs to be moved back to accommodate the clear zone
of the roadway. [ 18- 32.7.2, 17- 32.7.3]
Rev 1: This cunnnetit hats heen satisfitctot'ily ackh'essecl.
Rev.?: The plan has elintittutecl these cu•e(U.
Rev.2: The 24' high retaining wall along the entrance to Phase II East is excessive. Guardrail and
safety railing must be provided. These walls should be reduced if at all possible.
Rev.3: These walls hcnVC been rCClticet/.
Rev.2: The turnaround at the ends of the private roads do not appear adequate in three locations. The
T -type turnarounds in the VDOT Road Design Manual appendix B should be consulted.
Albemarle - — OUrIty Community Development
Engineering Review Comments
Page 3 of 3
Rev. 3: Comment uciclressecl.
1 Rev.2: The requirement for 2 entrances to residential developments of 50 units or more has not been
met for Phase 11 East. [18- 32.7.2.4]
Rcv.3: The elChnlnl.till'cltloil ut the Cnunth appears to he selectively upplti ing this ,section (?/'the
orclinunce. The Planning= Commission has uppeared to allow one entrance in this case with their
reyuestecl revisions.
rhe final site plan will need to be accompanied by final private road plans, erosion control plans, and an
Updated stormwater management plan.