Loading...
HomeMy WebLinkAboutSDP200700022 Review Comments 2002-05-23COUNTY OF ALBEMARLE Department of Planning & Community Development 401 McIntire Road, Room 2 IS l`i arlottc5 iilc, Virginia 434) 296 - ]823 Fax 14 - 4012 May 23, 2002 Dex Sanders 134 Burgess Lane Charlottesville, VA 22902 RE: SP- 2001 -047 Albemarle Baptist Church, Tax Map 61, Parcel 1E Dear Mr. Sanders: The Albemarle County Board of Supervisors, at its meeting on May 15, 2002, approved the above -noted request. Please note that this approval is subject to the following conditions: 1. All requirements of the Architectural Review Board shall be met, including the site plan indicating the existing tree line and specific trees of six (6) inches or greater and retaining significant trees. 2 The church's improvements and the scale and location of the improvements shall be developed in substantial compliance with the master plan entitled Albemarle Baptist Church, prepared by Dex A. Sanders, and dated 11/28/01. 3. The area of assembly shall be limited to a maximum four - hundred - thirty -five (435) -seat sanctuary. 4. Health Department approval of well and septic systems prior to final site plan approval. 5. Commercial setback standards, as set forth in Chapter 18, § 21.7.2 of the Albemarle County Zoning Ordinance, shall be maintained adjacent to residential uses or residentially zoned properties. 6 Any number of parking spaces in excess of the required minimum shall not be paved. 7. There shall be no day care center or private school on -site without approval of a separate special use permit. 8. Construction of Phase 1 [six- thousand (6,800) sq. ft. sanctuary] shall commence within forty -eight 48) months or this special use permit shall expire. 9. All requirements of VDOT shall be met prior to final site plan approval, including approval of one entrance from Roselyn Ridge Road, with a one - hundred (100) -foot right -turn lane and one - hundred 100) -foot taper lane. In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within twenty -four (24) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance Page 2 May 23, 2002 Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296 -5832. If you should have any questions or comments regarding the above -noted action, please do not hesitate to contact me. Sincerely, U V. Wayne Cif berg Director of Planning & VWC /jcf Cc: Amelia McCulley Jack Kelsey Tex Weaver Steve Allshouse Matt Grimes, VDOT ent of Al, , O® 1 IRGII COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 29, 2006 Albemarle Baptist Church James A. Winkey, James B. Nelson and James E. Wilder, Trs P.O. Box 7057 Charlottesville, VA 22906 Dave Connolly Artisan Construction, Inc. 1130 E. Market St Charlottesville, VA 22902 Re: Official Determination Regarding SP- 2001 -047, Albemarle Baptist Church Tax map 61, Parcel 1E Dear Sirs: The purpose of this letter is twofold: 1) to provide an official determination regarding the validation of this special use permit and 2) to provide notice of the zoning violation relating to tree removal. With regards to item #2, this letter also includes notice that a certificate of occupancy for the new construction will be withheld until the violation has been abated. 1) Special Use Permit The Albemarle Baptist Church received approval of SP- 2001 -047 on May 15, 2002. A condition of that permit states: 8 Ccnstruction cf phase . [six - thousand (6.800) sq. Ft. sanLtuarv) shall commence within For y -eight 48) months or this special use permit shall expire On January 3, 2005 a building permit application was made for construction of the sanctuary. It was reviewed and approved for issuance by a zoning reviewer on January 28, 2005. However, other departments and agencies did not sign off on the building permit application until as late as May and July of 2006. When a preliminary zoning was scheduled in October 2006, it was discovered that the special use permit had expired and therefore, the building permit could not be issued. In the ensuing discussions between the church's representatives and the County, it became known that the well may have been constructed during the time the special use permit was valid. Albemarle Baptist Church 2 November 29, 2006 The following is a relevant excerpt from the Albemarle County Zoning Ordinance, Section 31. 31.2.4.4 REVOCATION Any special use permit issued pursuant to this chapter may be revoked by the board of supervisors, after notice and hearing pursuant to Virginia Code § 15.2 -2204, for willful noncompliance with this chapter or any conditions imposed under the authority of section 31.2.4.3. If the use, structure or activity for which a special use permit is issued is not commenced within twenty-four (24) months after the permit is issued, the permit shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, if the use authorized by the permit requires the construction of one or more structures, the term "commenced" means starting the lawful physical construction of any structure necessary to the use authorized by the permit within twenty-four (24) months after the permit is issued. The board of supervisors may, as a condition of approval, impose an alternative period in which to commence the use, structure or activity as may be reasonable in a particular case. A determination that a permittee has commenced a use, structure or activity under this section is not a determination that the permittee has acquired a vested right under Virginia Code § 15.2 -2307. (Amended 10 -3 -01) This section states specifically that starting the lawful physical construction of any structure necessary to the use qualifies as "commencing construction." A well is a structure. A well sized and designed to serve a church is specifically necessary for this use. It therefore carries the force of vesting the special use permit. The Board of Supervisors' approval granted this church 48 months to commence construction rather than the 24 months quoted in this section, thereby giving them until May 15, 2006. A copy of the well completion report was presented to this office stating that a well was constructed for the church and completed on August 23, 2002. This construction of a well meets the zoning ordinance test which requires the "lawful physical construction of any structure necessary to the use" within the four years granted under SP 2001 -047. With this knowledge, the special use permit remains valid and did not expire. The County Attorney's office has been consulted and agrees with this determination. (While the vesting analysis is used, it is not legally a "vesting" under Virginia Code § 15.2- 2307.) 2) Zoning Violation Although the SP has now been determined to be valid, during the Preliminary Zoning inspection related to building permit 2005- 028NI, it was discovered that the site is technically in violation of the conditions of SP 2001 -047, SDP 2004 -030 and the Architectural Review Board's requirements regarding tree retention and the limits of clearing on the parcel. The issues are tree protection and the limits of clearing including fencing. The following are the first two conditions of the SP: 1. All requirements of the Architectural Review Board shail be met, including the site plan indicating the exrsting tree tine and specific trees of six (8) inches or greater and retainina significant trees. he church's improvements and the scale and location of the improvements shall be developed if' substantial compliance with the master plan entitled Albemarle Baptist Church. prepared by Dex A Sanders, and dated 11, 128.`01 The site plan shows tree protective fencing around the entire limits of clearing and "tree armor" Albemarle Baptist Church 3 November 29, 2006 around individual trees. Neither the fencing nor the armor was installed or erected prior to clearing. The limits of clearing were expanded beyond the approved plan and several trees intended to be protected were removed. The County has issued the building permit for this church, however, no certificate of occupancy will be issued unless and until all of the following are amended and any new conditions are met: the special use permit (SP2001- 047), the site plan (SDP - 2004 -030) and the Architectural Review Board's certificates of appropriateness (ARB- 2003 -183 and 2004 -019). In conclusion, Albemarle Baptist Church may not legally occupy the new structure until and unless the site is in compliance with conditions of the special use permit, site plan and ARB approval. Please begin this amendment approval process as soon as possible because it is a somewhat lengthy process. If you are aggrieved by this determination, you have a right to appeal it within thirty (30) days of the date notice of this determination is given, in accordance with Section 15.2 -2311 of the Code of Virginia. If you do not file a timely appeal, this determination shall be final and unappealable. An appeal shall be taken only by filing with the Zoning Administrator and the Board of Zoning Appeals a notice of appeal which specifies the grounds for the appeal. An appeal application must be completed and filed along with the fee of $120. The date notice of this determination was given is the same as the date of this letter. Sincerely, r Janice D. Sprinkle Deputy Zoning Administrator Cc: SP2001 -047 SDP 2004 -030 ARB2003 -183 and 2004 -019 Larry Davis, County Attorney Lisa Green, Zoning Inspector Jay Schlothauer, Building Official ti~ OF :1 GIi'tr COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 November 29, 2006 Albemarle Baptist Church James A. Winkey, James B. Nelson and James E. Wilder, Trs Dave Connolly Artisan Construction, Inc. 1 130 E. Market St Charlottesville, VA 22902 Fax(434)972 - 4126 Re: Official Determination Regarding SP- 2001 -047, Albemarle Baptist Church Tax map 61, Parcel I Dear Sirs: The Albemarle Baptist Church received approval of SP -2001 -047 on May 15, 2002. A condition of that permit stated: r,i nStf.,v Cf Ci ftl':•i iIX tf 7 3 iCj • l ".f tt 1 y;',J .:VTP,'• r,. .tlt`If "t itj day "iI :TV 1t - S f! 1 _ ;.?,.f a; ,:5C PfT"it `i t'',3z I r?Y ('io On January 3, 2005 a building permit application was made. It was reviewed and approved for issuance by a zoning reviewer on January 28, 2005. However, other departments and agencies did not sign off on the building permit application until as late as May and July of 2006. When a preliminary zoning was scheduled in October 2006, it was discovered that the special use permit had expired and therefore, the building permit could not be issued. In the ensuing discussions between the church's representatives and the County, it became known that the well may have been constructed during the time the special use pen was valid. The following is an excerpt from the Albemarle County Zoning Ordinance, Section 31. 31.2.4.4 REVOCATION Any special use permit issued pursuant to this chapter may be revoked by the board of supervisors, after notice and hearing pursuant to Virginia Code § 15.2-2204. for willful noncompliance \r ith this chapter or any conditions imposed under the authority of section 31 2.4.3. If the use, structure or activity for which a special use permit is issued is not commenced within t -four (24) months after the permit is issued, the permit shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section. if the use authorized by the permit requires the construction of one or more structures, the term "commenced" means starting the lawful physical construction of any structure Albemarle Baptist Church November 29, 2006 necessary to the use authorized by the permit within twenty -four (24) months after the permit is issued. The board of supervisors may, as a condition of approval, impose an alternative period in which to commence the use, structure or activity as may be reasonable in a particular case. A determination that a permittee has commenced a use, structure or activity under this section is not a determination that the permittee has acquired a vested right under Virginia Code § 15.2-2307. (Amended 10 -3 -01) This section states specifically that starting the lawful physical construction of any structure necessary to the use qualifies as "commencing construction." It therefore carries the force of vesting the special use permit. The Board of Supervisors granted this church 48 months to commence construction rather than the 24 months quoted in this section, thereby giving them until May 15, 2006. A copy of the well completion report was presented to this office stating that a well was constructed for the church and completed on August 23, 2002. This construction of a well meets the zoning ordinance test which requires the "lawful physical construction of any structure necessary to the use" within the four years granted under SP 2001 -047. With this knowledge, the SP has been vested. Although the SP has now been determined to be valid, during the Preliminary Zoning inspection related to building permit 2005- 028N1, it was discovered that the site is technically in violation of the conditions of SP 2001 -047, SDP 2004 -030 and the Architectural Review Board's requirements regarding tree retention and the limits of clearing on the parcel. The issues are tree protection and the limits of clearing including fencing. The following are the first two conditions of the SP: cf the . ich tec'Ura'l ReV'''WI Board shall ::e - ret, n II:: rig 'he ;ite 1);an inrjlcjtt :re c'St rr) ine and specific 'rL;es of s;x iti nches or g-e,-rter .s^ r .:a;nirg :,ign;ficart .gees. he d y s 'irut ccation ::'f f - e rnprc'werrerts 'Dual{ t- d UCSt-in` . - amp" nC2 '.V'Ith 'ha rr. sr r p °an f'r .. "E'd r% ;eirar!e 83p ?1st ;`t Jr urep irc o by anctlrs and '.3:x°1 The site plan showed tree protective fencing around the entire limits of clearing and "tree armor" around individual trees. Neither the fencing nor the armor was erected prior to clearing and thus the limits of clearing were expanded and several trees intended to be protected were removed. The County has issued the building permit for this church, however, no certificate of occupancy will be issued unless and until all of the following are amended and any new conditions are met: The special use permit (SP2001 -047), the site plan (SDP -2004 -030) and the Architectural Review Board's certificates of appropriateness (ARB- 2003 -183 and 2004 -019). The county attorney's office was consulted and agreed with this determination. If you are aggrieved by this determination, you have aright to appeal it within thirty (30) days of the date notice of this determination is given, in accordance with Section 15.2-2311 of the Code of Virginia. If you do not file a timely appeal, this determination shall be final and unappealable. An appeal shall be taken only by filing with the Zoning Administrator and the Board of Zoning Appeals a notice of appeal which specifies the grounds for the appeal. An appeal application must be completed and filed along with the fee of $ 120. The date notice of this determination was given is the same as the date of this letter. Albemarle Baptist Church 3 Sincerely, Janice D. Sprinkle Deputy Zoning Administrator Cc: SP2001 -047 SDP 2004 -030 ARB2003 -183 and 2004 -019 Larry Davis, County Attorney Lisa Green, Zoning Inspector Jay Schlothauer, Building Official November 29, 2006 ALg,rtr COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 March 26, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel IE) Dear Mr. Sanders: I have reviewed your recent submittal for the above referenced project consisting of the following sheets: Sheet 00.0 1, latest revision date 11-29-06 Sheet C1.01 & C1.02, latest revision date 6 -15 -04 Sheet 01.03, date 2 -14 -07 Sheet L 1.0 1, latest revision date 11 -29 -06 The purpose of this amendment is to address the fact that certain trees designated in the approved site plan as being preserved, were, in fact, removed during the site grading process. I met with you on March 21, 2007 to discuss how the site plan would have to be amended to address this situation. As a follow up, I would like to outline what was agreed would mitigate the impacts created by that tree removal. Required revisions to the landscape plan are shown in italics after each tree removal violation. Also, the limits of grading and clearing shown on the landscape plan will need to be revised, as per our phone conversation of March 28, 2007, to reflect the existing and approved limits. 1. As indicated on Sheet 1-1.01, two 12" Oaks and one 13" Poplar, located approximately 70' southeast of the proposed phase 1 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape Plan to show three proposed Willow or Pin Oak trees, 3'/ " caliper mininnun, planted 20' on center in the scene general location. As indicated on Sheet L1.01, one 15 ", 14 ", 13 ", 11", two 10" Oaks, and one 12" Cedar, adjacent to the southeast end of the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show fbur proposed Willow or Pin Oak trees, 2 % "caliper mininu nt, planted 20' on center in the area adjacent to the southeast end of the phase 2 sanctuary. As indicated on Sheet L1.01, one 20" Oak, 11" Poplar, and 12" Cedar, located approximately 70' west of the main entrance to the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the lanclsc'ape plan to show tht'o proposed Oak or Maple trees, 212 caliper mininnan, planted 20' on center in the saute general location but outside of the area designated fir future Parking. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File Page 1 of 2 Patrick Lawrence From: Brent Nelson Sent: Wednesday, July 18, 2007 2:18 PM To: Patrick Lawrence Subject: FW: ARB 2007 -16 Albemarle Baptist Wall FYI Brent Brent W. Nelson Landscape Planner Albemarle County Department of Community Development 434 - 296 -5832, ext 3272 434 - 972 -4012 (fax) ARB Web Page: http: //albemarle.org;' department. asp ?department =plan ill ng&:rclpagc -2'164 From: Dex Sanders [mailto:dsanders @sanders- pc.com] Sent: Wednesday, July 18, 2007 2:17 PM To: Brent Nelson Cc: 'Dave Connolly' Subject: RE: ARB 2007 -16 Albemarle Baptist Wall Thank you Brent. Due to schedule, the contractor is going to proceed with the wall per the sketch we sent. We will submit a revised plan showing both the new trees and the wall as a minor amendment that hopefully can be approved before the job is ready for occupancy. Dex A. Sanders 540 - 829 -2590 From: Brent Nelson [mailto:bnelson @albemarle.org] Sent: Wednesday, July 18, 2007 11 :50 AM To: Dex Sanders Subject: RE: ARB 2007 -16 Albemarle Baptist Wall Hi Dex - At this time, I do not see any ARB issues with the proposed change to the retaining walls. You should include this in your site plan amendment so we can review it all together. Brent Brent W. Nelson Landscape Planner Albemarle County Department of Community Development 7/18/2007 Page 2 of 2 434 - 296 -5832, ext 3272 434 - 972 -4012 (fax) ARB Web Page: http :, % /albemarle.org- 'department. asp' ?department= planning &relpagc - =2464 From: Dex Sanders [mailto:dsanders @sanders- pc.com] Sent: Thursday, July 12, 2007 2:29 PM To: Brent Nelson Subject: ARB 2007 -16 Albemarle Baptist Wall Brent, We have recently re -filed Sheet L1.01 reflecting revised landscaping. Yesterday, at the on -site meeting, we discovered a need to change the (3) retaining walls shown on the site plan of record to (1) wall that is not as tall or long as the (3) original walls. I have attached an 8.5x11 sketch showing the proposed (1) new wall location and elevations. No change is proposed in material or color. No change is proposed in the landscaping. The maximum elevation of the approved wall was 79.57. The new wall maximum elevation is 77.0 The maximum length of the approved wall was 56 feet. The proposed wall is 38 feet long with an average elevation of 74.33 For reference, the height of the earthen berm required by the ARB to screen the lower basement mass of the building from the EC remains at 76.0. Please let me know if we can include this change with the current minor amendment. Project completion is scheduled for September. Thank you. Dex A. Sanders SANDERS .Archiiechire. PC 16125 Raccoon Ford Rd Culpeper, VA 22701 540- 829 -2590 v 540- 829 -2591 fax 7/18/2007 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 July 18, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16 Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above - referenced project consisting of Sheet 1-1.01, revised 7 -6 -07. Outstanding issues that will need to be further addressed are shown in bold after the italicized comments from the Action Letter of June 26, 2007, which are after the original comment from the Action Letter of March 26, 2007. As indicated on Sheet L1.01, two 12" Oaks and one 13" Poplar, located approximately 70' southeast of the proposed phase 1 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show three proposed Willow or Pin Oak trees, 3'/z" caliper minimum, planted 20' on center in the same general location. Revise the landscape plan to show the three proposed 6Villotiv Oak trees planted 20' on renter. Provide a revision elate on the drawing. Revise the landscape plan to show the three proposed Willow Oak trees planted 20' on center. These trees, clustered together, are located at the southwest corner of the future multi - purpose building. Currently, they are drawn with 20', 16', and 15' spacing Action Taken: Trees in question are repositioned and now shown with precisely and exactly 20' spacing. 2. As indicated on Sheet 1-1.01, one 15 ", 14 ", 13 ", 11 ", two 10" Oaks, and one 12" Cedar, adjacent to the southeast end of the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show four proposed Willow or Pin Oak trees, 2' /z "caliper minimum, planted 20' on center in the area adjacent to the southeast end of the phase 2 sanctuary. Revise the landscape plan to show the proposed Pin Oak trees planted 20' on center. Revise the landscape plan to show the four proposed Pin Oak trees planted 20' on center. These trees, clustered together, are located at the south side of Future Sanctuary Phase 2. Currently they are drawn with a 20', 28', and 28' spacing Action Taken: Trees in question are repositioned and now shown with precisely and exactly 20' spacing. As indicated on Sheet L1.01, one 20" Oak, 11" Poplar, and 12" Cedar, located approximately 70' west of the main entrance to the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show two proposed Oak or Maple trees, 2` /z" caliper minimum, planted 20' on center in the same general location but outside of the area designated for future parking. Revise the landscape flan to show the tivo proposed Willow Oak trees in the swine general location but outside of the area designated for_firture parking. Revise the landscape plan to also show the proposed "Shademaster" Locust and the Pinoak trees in the same general location, but outside of the area designated for future parking. Currently, they appear to be located within the boundary of a future curb or sidewalk at the future parking. Action Taken: Trees in question are adjusted to clear `Future Sidewalk % Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the nemo, also. Clear, specific, and accurate infonnation will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File 01 AL 1, C O I9r C >RC:INIPF COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 July 18, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above - referenced project consisting of Sheet L1.01, revised 7 -6 -07. Outstanding issues that will need to be further addressed are shown in bold after the italicized comments from the Action Letter of June 26, 2007, which are after the original comment from the Action Letter of March 26, 2007. As indicated on Sheet L1.01, two 12" Oaks and one 13" Poplar, located approximately 70' southeast of the proposed phase 1 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show three proposed Willow or Pin Oak trees, 3' /2" caliper minimum, planted 20' on center in the same general location. Revise the landscape plan to show the three proposed Willow Oak trees planted 20' on center. Provide a revision date on the drawing. Revise the landscape plan to show the three proposed Willow Oak trees planted 20' on center. These trees, clustered together, are located at the southwest corner of the future multi - purpose building. Currently, they are drawn with 20', 16', and 15' spacing 2. As indicated on Sheet L1.01, one 15 ", 14 ", 13 ", 11 ", two 10" Oaks, and one 12" Cedar, adjacent to the southeast end of the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show four proposed Willow or Pin Oak trees, 2' /z "caliper minimum, planted 20' on center in the area adjacent to the southeast end of the phase 2 sanctuary. Revise the landscape plan to show the proposed Pin Oak trees planted 20' on center. Revise the landscape plan to show the four proposed Pin Oak trees planted 20' on center. These trees, clustered together, are located at the south side of Future Sanctuary Phase 2. Currently they are drawn with a 20', 28', and 28' spacing As indicated on Sheet L1.01, one 20" Oak, 11" Poplar, and 12" Cedar, located approximately 70' west of the main entrance to the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show two proposed Oak or Maple trees, 2'h" caliper minimum, planted 20' on center in the same general location but outside of the area designated for future parking. Revise the landscape plan to show the ht proposed Willo a Oak trees in the same general location but outside of the area desigrtated parking. Revise the landscape plan to also show the proposed "Shademaster" Locust and the Pinoak trees in the same general location, but outside of the area designated for future parking. Currently, they appear to be located within the boundary of a future curb or sidewalk at the future parking. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File Page 1 of 2 Patrick Lawrence From: Amelia McCulley Sent: Tuesday, June 19, 2007 6:35 PM To: Erika Castillo Cc: John Shepherd; Patrick Lawrence; Greg Kamptner Subject: RE: SUP 2001 -47 Albemarle Baptist Church Importance: High Attachments: Albemarle_Bapt_Ch.doc; SP -01- 047% 20ALBEMARLE %20BAPTIST %20CHU.pdf Concern: noncompliance with two conditions of the special use permit approval (see attached Jan Sprinkle's letter of November, 2006). By this letter, Jan determined that this site is in violation of these two SUP conditions. They did not appeal. It is our opinion that we cannot administratively allow them to amend the site plan and have them still comply with these two conditions of SUP. (Greg see the pdf with all conditions of the SP). We informed them over 6 months ago that they need to amend the SP, amend the site plan and amend the ARB approval. They have not yet submitted an amendment to the SP. I've left multiple messages for Dex Sanders to inform him that Monday is a deadline for SP submittals and they need to submit to get this handled asap. Greg — I need to know asap if you are going to take a different position on this. I think it's pretty clear and we've been very clear with the applicant since last week at least. Patrick and John — have we sent out our review letter yet? From: Erika Castillo Sent: Tuesday, June 19, 2007 4:32 PM To: Amelia McCulley; Ana Kilmer; John Shepherd; Patrick Lawrence Cc: Greg Kamptner Subject: SUP 2001 -47 Albemarle Baptist Church Hello Amelia, Ana, John and Patrick: We have had several discussions with several persons involved with this construction project. Greg has spoken with Ray Jones, the attorney from Martin & Raynor and I have spoken with Doug Lowe, who is with Artisan Construction, concerning the anticipated completion of this project. This office is aware of the concerns involved with completion, we are reviewing the situation, and we are trying to work with everyone involved to get it resolved. Please let me know the concerns of the Zoning Department and the updated status of the construction project. I really appreciate the feedback from all of you and I hope we can resolve this situation as expeditiously and amicably as possible for everyone. Thank -you kindly and I look forward to hearing from you soon. Regards, Erika Castillo 6/20/2007 Page 2 of 2 Paralegal Albemarle County Attornev's Office 401 McIntire Road Charlottesville, Virginia 22902 431) 972 -4067 ext. 3408 FAX: (434) 972 -4068 ecastillow 6/20/2007 OF A1,g IRc:tNt COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 June 20, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: SDP 2007 -022, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel IE) Dear Mr. Sanders: I have completed my review of the above listed site landscape plan amendment and await comments from Architectural Review staff and /or certificate of appropriateness. The final approval of this latest submission must address all of the conditions of the Architectural Review Board approval to fulfill the requirements of a minor amendment to the site plan. This approval is predicated upon the fact that the materials and placement of scheduled plantings, as submitted for review, will be used. The acceptance of this approval implies that the applicant has agreed to execute the design as indicated on the revised site plan as directed by the Architectural Review Board Certificate of Appropriateness. Any change in the approved design or materials will require further amendment to the site plan and must be reviewed and approved. This plan may be considered to be approved upon the issuance of a Certificate of Appropriateness by the Architectural Review Board. If I may be of further assistance, please don't hesitate to call, Very truly yours, J. Patrick Lawrence, Senior Planner cc: John Shepherd, Chief of Current Development Brent W. Nelson, Landscape Planner IRGIN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 June 26, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: 1 have reviewed your recent submittal for the above - referenced project consisting of Sheet L1.01, received 5- 31 -07. Outstanding issues that will need to be further addressed are shown in italics after the original comment from the Action Letter of March 26, 2007. As indicated on Sheet L1.01, two 12" Oaks and one 13" Poplar, located approximately 70' southeast of the proposed phase I sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show three proposed Willow or Pin Oak trees, 3%2" caliper minimum, planted 20' on center in the same general location. Revise the landscape plan to show the three proposed Willow Oak trees planted 20' on center. Provide a revision date on the drawing. Action "Taken: Complied. As indicated on Sheet L1.01, one 15 ", 14 ", 13 ", 1 1 ", two 10" Oaks, and one 12" Cedar, adjacent to the southeast end of the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show four proposed Willow or Pin Oak trees, 2'/2 "caliper minimum, planted 20' on center in the area adjacent to the southeast end of the phase 2 sanctuary. Revise the landscape plan to show the four proposed Pin Oak trees planted 20' on center. Action Taken: Complied. As indicated on Sheet 1-1.01, one 20 Oak, 1 1" Poplar, and 12" Cedar, located approximately 70' west of the main entrance to the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show two proposed Oak or Maple trees, 2'/" caliper minimum, planted 20' on center in the same general location but outside of the area designated for future parking. Revise the landscape plan to show the two proposed Willow Oak trees in the same general location but outside of the area designated for fiiture parking. Action Taken: Complied. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File oF Algtr9r IN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 June 26, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above- referenced project consisting of Sheet L1.01, received 5- 31 -07. Outstanding issues that will need to be further addressed are shown in italics after the original comment from the Action Letter of March 26, 2007. As indicated on Sheet L1.01, two 12" Oaks and one 13" Poplar, located approximately 70' southeast of the proposed phase 1 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show three proposed Willow or Pin Oak trees, 3' /z" caliper minimum, planted 20' on center in the same general location. Revise the landscape plan to show the three proposed Willow Oak trees planted 20' oil center. Provide a revision date on the drawing. As indicated on Sheet 1-1.01, one 15 ", 14 ", 13 ", 11 ", two 10" Oaks, and one 12" Cedar, adjacent to the southeast end of the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show four proposed Willow or Pin Oak trees, 2` /z "caliper minimum, planted 20' on center in the area adjacent to the southeast end of the phase 2 sanctuary. Revise the latdscape plan to show the four proposed Pin Oak trees planted 20' on center. As indicated on Sheet L1.01, one 20" Oak, 11" Poplar, and 12" Cedar, located approximately 70' west of the main entrance to the phase 2 sanctuary and designated on the approved site plan as remaining, were in fact removed. Revise the landscape plan to show two proposed Oak or Maple trees, 2'/2 caliper minimum, planted 20' on center in the same general location but outside of the area designated for future parking. Revise the landscape plan to show the Avo proposed TVillow Oak trees in the saute general location but outside of the area designated for fitture parking. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File SOY AI „ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 27, 2007 Albemarle Baptist Church James A. Winkey, James B. Nelson and James E. Wilder, Trs. P.O. Box 7057 Charlottesville, VA 22906 Dave Connolly Artisan Construction, Inc. 1130 E. Market Street Charlottesville, VA 22902 Re: REVISED Official Determination Regarding Compliance with SP 2001 -047 Albemarle Baptist Church Tax Map 61, Parcel 1E Dear Sirs: This letter serves to revise and reverse the official determination letter from Jan Sprinkle dated November 29, 2006 with regards to compliance with the above - referenced special use permit. With her letter, Ms. Sprinkle found that clearing and tree removal beyond the approved limits necessitate an amendment to the first two conditions of SP 2001 -047 Albemarle Baptist Church. By her letter, Ms. Sprinkle informed you that this special use permit amendment was required prior to our issuance of your certificate of occupancy for the new building. In formulating this revised determination, the County Attorney and I reviewed the file which includes the conditions of approval, the staff report and the plan referred to in the conditions. The wording of the special use permit conditions does not clearly require compliance with a specific limit of clearing. The referenced plan with the special use permit also does not provide clear limits of clearing and tree preservation. We also did not find discussion within either the special use permit or the ARB staff report about these items. With that said, we recognize that there was an intention to preserve some larger trees. We understand that remediation for the removal of those trees has been part of the ARB revised plan review. Therefore, it is my conclusion that once the revised site plan has been approved by the ARB and Current Development, the site can be in compliance with the first two (subject) conditions of special use permit approval. You will note that I say "can" because any REVISED Official Deermination Regarding Compliance vTih SP 2001 -047 Albemarle Baptist Church Tax Map 61, Parcel 1 E June 27, 2007 Page 2 plantings or other non - safety improvements which are not yet complete will need to be bonded. Please be advised that the revised plan must be approved and the site must be built and /or bonded in accordance with that revised approved plan prior to our issuance of a certificate of occupancy. Please remember to call for final zoning inspections no later than two (2) weeks prior to your desired date for occupancy. This is to give sufficient time for our inspection and bond calculation and your posting of any necessary bonds. If you are aggrieved by this determination, you have a right to appeal it within thirty (30) days of the date notice of this determination is given, in accordance with Section 15.2- 2311 of the Code of Virginia. If you do not file a timely appeal, this determination shall be final and unappealable. An appeal shall be taken only by filing with the Zoning Administrator and the Board of Zoning Appeals a notice of appeal which specifies the grounds for the appeal. An appeal application must be completed and filed along with the fee of $120. The date notice of this determination was given is the same as the date of this letter. If you have any questions, please do not hesitate to contact me. Sincerely, Amelia G. McCulley, A.I C.P. Zoning Administrator Cc: Lisa Green Zoning Inspector II Patrick Lawrence, Senior Planner Brent Nelson, ARB Planner Rtl w COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 August 2, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16 Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above - referenced project consisting of the following: Sheet L 1.0 1, Landscaping Plan — Phase 1, latest revision date 7/20/07 Retaining Wall Submittal The revisions included in this submission address all outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. If you have any questions, please do not hesitate to call. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) ARB File tY Ar . COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2007 - 00022, Albemarle Baptist Church Minor Site Plan Amendment Plan preparer: Mr. Dex A. Sanders (tax 540.829 2591) Owner or rep.: Albemarle Baptist Church (fax unknown) Date received: 25 July 2007 (plan rev. elated 20 .July 2007) Date of Comment: 7 August 2007 Engineer: Phil Custer The Minor Site Plan Amendment plan for the Albemarle Baptist Church, received on 25 July 2007, has been reviewed. The plans cannot be approved as submitted and will require the following changesicorrections prior to final approval. A. SDP- 2007 -00022 I . In plan, please provide a safety railing along the wall where the height is over 4tt tall per the county Design Manual [DM]. Please provide a detail of this railing as well. 2. Show an appropriately sized swale from the curbing in the parking lot to the biofilter. If possible, please keep swale centerline away from any tree trunks. 3. Show end sections on the inlets and outlets of all culverts. [DM] In addition, our records do not indicate that a SWM /B.NIP agreement and fee have been submitted to the county. Please submit this firm and fee. Please also note that the applicant must apply for a separate building pennit with the Zoning Department for the construction of the retaining wall southeast of the new building. Please contact me at (434)296 -5832 ext. 3072 should you have any questions. File: E I _sdp_PBC_07 -00022 Alhernarle Baptist Church 'Minor Site Plan Amendment.doc Cc: Pat Lawrence Brent Nelson Engineering File Page 1 of 1 Patrick Lawrence From: Allan Schuck Sent: Friday, August 24, 2007 4:00 PM To: Dex Sanders Cc: Patrick Lawrence; Philip Custer Subject: RE: SDP - 2007 -00022 Albemarle Baptist Church Mr. Sanders: That statement is true. The SWM maintenance agreement has been approved and recorded in DB 2955 PG 374 -377. There are no further engineering review comments for this minor amendment submittal. Thanks, Allan Schuck From: Dex Sanders [mailto:dsanders @sanders- pc.com] Sent: Friday, August 24, 2007 3:42 PM To: Allan Schuck Subject: RE: SDP - 2007 -00022 Albemarle Baptist Church In my last conversation Phillip Custer found that the SWM/ BMP application and fee was paid. Thank you. Dex A. Sanders 540- 829 -2590 From: Allan Schuck [mailto:aschuck @albemarle.org] Sent: Friday, August 24, 2007 2:08 PM To: dsanders @sanders - pc.com Cc: Patrick Lawrence; Brent Nelson; Philip Custer Subject: SDP -2007 -00022 Albemarle Baptist Church Good Afternoon: All of the previous engineering review comments have been adequately addressed with the most recent plan submittal. The review comments are attached to this e -mail. Thanks, Allan Schuck 8/27/2007 Page 1 of 1 Allan Schuck From: Allan Schuck Sent: Friday, August 24, 2007 2:08 PM To: dsanders @sanders - pc.com Cc: Patrick Lawrence; Brent Nelson; Philip Custer Subject: SDP - 2007 -00022 Albemarle Baptist Church Attachments: E2_fsp_ADS_07 -022 Albemarle Baptist Church Minor Amendment.doc Good Afternoon: All of the previous engineering review comments have been adequately addressed with the most recent plan submittal. The review comments are attached to this e-mail. Thanks, Allan Schuck 8/24/2007 a t IRGINI COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4 Project:SDP - 2007 - 00022, Albemarle Baptist Church Minor Site Plan Amendment Plan preparer:Mr. Dex A. Sanders (fax 540.829.2591) Owner or rep.:Albemarle Baptist Church (fax unknown) Date received:Rev. 1: 15.4ugust 2007 (plat( rev. date 07 August 2007) 25 July 2007 (plan rev. dated 20 July 2007) Date of Comment:Rev. 1: 24 August 2007 07 August 2007 Engineer:Rev. 1: Allan Schuck Phil Custer The Minor Site Plan Amendment plan for the Albemarle Baptist Church, received on 15 August 2007, has been reviewed. Engineering recommends approval to the minor amendment. A. SDP - 2007 -00022 1. In plan, please provide a safety railing along the wall where the height is over 4ft tall per the county Design Manual [DM]. Please provide a detail of this railing as well. Rev. 1: This comment has been adequately addressed with this plan submittal. 2. Show an appropriately sized swale from the curbing in the parking lot to the biofilter. If possible, please keep Swale centerline away from any tree trunks. Rev. 1: This comment has been adequately ad(h - essed with this plan submittal. Show end sections on the inlets and outlets of all culverts. [DM] Rev. 1: This comment has been adequately addressed with this plan submittal. In addition, our records do not indicate that a SWM /BMP agreement and fee have been submitted to the county. Please submit this form and fee. Please also note that the applicant must apply for a separate building permit with the Zoning Department for the construction of the retaining wall southeast of the new building. File: E2_tsp_ADS_07 -022 Albemarle Baptist Church Minor Amendment lr O IRIN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 August 29, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: SDP 2007 -22, ARB 2007 -16 Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above - referenced project consisting of Sheet 1-1.01, revised 8 -7 -07. Outstanding issues that will need to be further addressed are listed below. The landscape contractor for this project has indicated that an imitation stone material is proposed for the 18" high wall surrounding the proposed sign. Revise the Landscape Plan to include a cutsheet of the proposed imitation stone material. The sign /planter, in the southeast corner of the site, is shown on a steep embankment. Revise the proposed grading in this area to show additional fill that would provide an even surface for the planter to rest on. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Patrick Lawrence (via email) File U OF ALg v IRGINI COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 September 24, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: ARB 2007 -16, Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: Beth Robinson, of Hightech Signs, has submitted a revised sign design that has been approved. The revised design, however, necessitates a revision to my previous Action Letter of September 19, 2007 concerning the landscaping. In that letter, I requested that the Liriope (ground cover), previously shown on each side of the sign, be replaced with a low evergreen shrub. Beth's new sign panel however is lower to the ground; therefore, the requested shrubbery would block views of the sign text. I have directed Mark Harris to have you revise the site plan amendment to show what ever ground cover liriope, grass, etc) would fit that situation. Please coordinate with Mark Harris and resubmit accordingly. As per my previous Action Letter of September 19, 2007, the sign wall will need to be removed from the site plan amendment. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. Clear, specific, and accurate information will facilitate the review of your submittal. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: Mark Harris (via email) Patrick Lawrence (via email) Beth Robinson (via email) File llF is COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4035 September 28, 2007 Dex Sanders 16102 Raccoon Ford Road Culpeper, VA 22701 -0000 RE: SDP 2007 -022 / ARB 2007 -16 Albemarle Baptist Church — Minor Amendment Tax Map 61, Parcel 1 E) Dear Mr. Sanders: I have reviewed your recent submittal for the above - referenced project consisting of the following: Sheet L1.01, Landscaping Plan — Phase 1, latest revision date 9/14/07, received 9/26/07. The revisions included in this submission address all outstanding conditions of approval. An ARB Certificate of Appropriateness, previously issued on August 2, 2007 for the Minor Amendment, will remain in effect. Proposed changes in the above referenced drawing involve substitutions to approved trees species, and the location of the monument sign. These changes do not represent a substantial change to that Minor Amendment and meet all the guidelines observed in the original approval. As a result, the Certificate of Appropriateness, issued on August 2, 2007, will remain in effect. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be resubmitted, reviewed and approved. If you have any questions, please do not hesitate to call. Sincerely, Patric t`bsfce Senior Planner cc: Brent Nelson (via email) Mark Harris (via email) pastorabc(@embargmail.com SDP File