Loading...
HomeMy WebLinkAboutSDP200700031 Review Comments 2006-05-01Yur .ar,, J } f County of Albemarle Department of Community Development Memorandum To: David Pennock From: Mark Chambers, Engineering Technician Division: Current Development Date: May 01, 2006 Subject: Korean Community Church, (SDP200600038) David: Engineering reviewed the subject preliminary site plan. We do not recommend approval, but request the following changes to bring the plan into compliance with County Code: 1. More information is required for stormwater management (18- 32.5.61, 17 -303, 17 -315, DSM503): a. Please provide a BMP computation worksheet; b. Please label the BMP type and ensure it is adequately sized. (if the removal rate is >50 %, the BMP shown on the plan is not large enough and additional measures will be required); c. The BMP must outlet to an adequate channel. Please provide information on the downstream system i.e. conveyance channels; their cross section and linings, culvert under railroad track it's dimensions and condition, etc. It appears from the provided topography an offsite drainage easement and channel construction will be required. Please provide a letter of intent or deed of easement from the owner of the neighboring parcel and show the necessary easement and improvements on the plan. 2. More information is required regarding the existing unnamed private road being used for access to the site: a. Please show on the plan view drawing; the edge of pavement, horizontal curve data, center line, drainage, neighboring parcel boundaries, necessary easements, site distances and intersection with route 250; b. Please provide a typical cross section and pavement type; c. Please provide a profile including K values; d. Please include any improvements needed to bring the road up to current standards (18- 32.7.3). e. Please provide the road name or route number. 3. Please show the storage yard on the south east corner of the parcel. 4. The retaining wall along the south parking lot will not allow adequate over -hang for 16' parking isles. Please provide 18' parking isles or move retaining wall to allow a minimum 4' of overhang beyond back of curb. 5. Please provide curve radii for edge of pavement and centerline of internal travel ways and parking lot. 6. Please show existing access road across the north end of the parcel. The road must be retained or replaced and an access easement provided. 7. The plan proposes grading and development in areas of critical slope. Please re- design the plan to avoid impacting critical slopes or file a written request for waiver of sections 18 -42 of the County Code (18- 4.2.5). Please contact me if you have questions or require additional information (434) 296 -5832 ext 3025. pF AI,g tr9 O Rca COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone(434)296 -5832 Fax(434)972 -4126 To: David Pennock, Principal Planner From: Allan Schuck, Engineer Subject: SDP -2007- 00031, Korean Community Church, Critical Slope Waiver Request Date received: 23 January 2007 (plan rev. date 23 March 2007) Date of Comment: 12 April 2007 The request for a waiver to develop on areas of critical slope for grading incorporated with the new construction proposed on TMP 59 -23G was received on 12 April 2007. They are shown on the final site plan, rev. date 23 March 2007. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The critical slope area, within TMP 59 -23G, appears to be both natural slopes and man -made slopes. The critical slope disturbances are in the form of site plan construction; travelways, parking spaces, drainfield, and stormwater management facilities. Areas Acres Total acreage of site plan 3.851 Critical slopes 0.560 Acres Critical slopes disturbed 0.344 Acres Approx. 61.4% of total critical slopes Below, each of the concerns of Zoning Ordinance section 18 -4.2 is addressed: movement o/'soil and rock ": Proper slope construction, control of drainage, and vegetative stabilization with approved erosion control measures constructed within the standards of Virginia Erosion and Sedimentation Control Regulations will prevent any movement of soil. excessive stoi•nnmater• rim- 01)"'. Stormwater runoff will be controlled by the drainage/ stormwater management plan required for this site. siltation oi'natural tmd titan -mcule bodies of 'it ": Engineering recognizes the proposed design as being imperative to providing access to the site with minimal disturbance to the critical slope areas. Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long term stability. loss of aesthetic resource ": This site is visible from the neighboring properties. The site may be visible from State Route 250. It appears that the loss of aesthetic resources will be necessary with the proposed plan. Albemarle County m)mmunity Development Engineering Review comments Page 2 of 2 septic effluent". ": A drainfield is proposed in this project. This site does drain into a waterway that is a public drinking water supply for Albemarle County. No portion of this site plan is located inside the 100 -year flood plain area according to FEMA Maps, dated 04 February 2005. Based on the above review, there are no engineering concerns which prohibit the disturbance of the critical slopes as shown on the plans. Copy: SDP - 2007 - 00031, Korean Community Church File: E1 _csw_ADS_07 -031 Korean Community Church.doc l tI r RGAN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 To: David Pennock, Principal Planner From: Allan Schuck, Engineering Review Subject: SDP -2007- 00031, Korean Community Church, Waiver Request Date received: 28 March 2007 (plan rev. date 23 March 2007) Date of Comment: 12 April 2007 The applicant has requested a waiver for the new construction proposed on TMP 59 -23G. The waiver request was received on 28 March 2007. It is being reviewed in conjunction with the final site plan, rev. date 23 March 2007. The engineering analysis of the requests is as follows: Waiver of the requirement for curb and gutter: The applicant has requested a waiver for the construction of curb and gutter for the travelway access to this site as required per County Code Section 18.4.12.158. The proposed access to this site is from an existing 30' wide easement from State Route 250. This easement contains a paved travelway that was built before the County Code required curb and gutter street design so it does not have a curb and gutter section. The applicant is requesting that this portion of the access to the site not be required to have curb and gutter. The applicant is showing CG -6 curbing for the proposed travelways and parking spaces shown within TMP 59 -23G. In accordance with County Code section 18- 4.12.15g, the County Engineer may waive or modify this requirement if deemed necessary to accommodate SWM /BMP facility design or the existing use is located in the Rural Areas (RA) zoning district. The site plan is located entirely within a development area. The use of curb and gutter would assist with the containment of the travelway drainage and direct the flow more efficiently to the proposed SWM facility. The relief of this requirement would not accommodate the proposed SWM /BMP facility. Engineering does not recommend approval to this waiver request. Copy: SDP -2007 -00031 Korean Community Church File: El wvr_ADS_07 -031 Korean Community Church.doc Ore . r. t COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Korean Community Church [SDP200700031, WP0200700014] Plan preparer: DDR [fax 979 -1681] Primary Contact: B. Aubrey Huffman & Associates [PO Box 6124 C- ville, VA 22906] Owner or rep.: Korean Comm. Church [PO Box 6599 C- ville, VA 22906] Plan received date: 28 Mar 2007 Date of comments: 23 Apr 2007 Reviewer: Jonathan Sharp A. Final Site & Drainage Plans (SDP200700031) 1. A critical slopes waiver request is being reviewed for this project. [18- 4.2.5] 2. A waiver of curb and gutter is being reviewed for this project. [I 8.4.12.15g] 3. A waiver of minimum design standards requirements for vehicle access aisles not adjacent to parking is being reviewed for this project. [18- 4.12.17a] 4. Please extend curbing the full length of the parking spaces (18 feet) at the bottom southern end of the northern parking lot. Currently, the curb radius is only extending 16 feet and the last 2 feet of the end parking space is unprotected. [18- 4.12.15t] 5. Please provide top of wall and bottom of wall elevations for the proposed retaining wall. DSM806] 6. Parking grades cannot exceed 5 %. [18- 4.12.15c] 7. Travelway grades cannot exceed 10 %. (This is not referring to the area requesting a waiver.) [18- 4.12.17a] 8. It appears that drainage in the pipe running under the proposed entrance may be significant especially if curb and gutter is required). Please include calculations for the pipe, do not use CMP, provide end sections, provide an adequate ditch downstream of the pipe, and include a drainage easement over the ditch and pipe sections. Please provide typical sections for the ditch. 18- 32.6.6d1, DSM909.1A, B, 505C] 9. Please provide a drainage summary table and legend. [18- 32.6.6d4,5, DSM909.1C] 10. Please provide drainage areas that correspond to the calculations and pipes and inlets. [DSM909.I] 11. Pipe 7 -6 running to Pipe 6 -5 does not maintain a 90 degree or less angle of deflection. DSM505E12] B. Stormwater Management Plan (WP0200700014) 1. Pipe outlets and the outlet structure for the biofilter are at an elevation below the proposed bottom of the biofilter. 2. Detention calculations use storage beginning at elevation 613, when the bottom of the detention structure is 615. 3. Please provide pre and post drainage area maps for stormwater management. [DSM909. I] 4. Please provide biofilter details. The biofilter requires underdrains. Please specify plantings in the biofilter. [VSMH 3.11, DSM503.IF] 5. Please provide biofilter sizing calculations. [VSMH 3.11 ] 6. Outlets running to the biofilter need energy dissipaters. [DSM503.IF] 7. The biofilter appears to be short- circuiting. [VSMH 3.11 ] Albemarle- ounty Community Development Engineering Review Comments Page 2 of 2 8. The profile of the biofilter and trap shows 2:1 slopes when 4:1 slopes are shown on the plans. 9. Please provide a stormwater maintenance agreement. [17 -323, DSM909.2B] 10. Please show an easement around the stormwater facility, as well as the location for the access road to the facility. [DSM909.2A, 213(2), 503.1C, D, 1101] 11. The following note should be added to the stormwater /BMP plan for the biofilter: Contractor shall contact the water resources inspector 24 hours prior to backfilling the biofilter and request an inspection and approval of the under -drain installation and the soil mix." DSM503.1 F] C. Erosion Control Plan (WPO200700014) The following comments pertain to the E &S narrative: [VESCH checklist ch. VI pgs. 13 -14] 1. Please include stormwater runoff considerations in the narrative. 2. Critical areas should include critical slopes. 3. Please address all applicable Minimum Standards and Structural Practices. The following comments pertain to the E &S plans: 4. All stages of construction are not protected. Engineering recommends placing a sediment trap in the northwest corner of the property to catch runoff. The shown diversion dikes cannot be installed until after grading has taken place, as they are in the way of construction activities. [VESCH 3.09] 5. If the proposed trap is going to have a piped outlet structure, it will need a riser and include all sediment basin calculations. [VESCH 3.14] 6. There is no perimeter control on the western side of the property. 7. Grading along the east side of the property does not tie into existing grade and grade lines run through the existing pavement. 8. Please provide outlet protection and scour protection on all outlets. Outlet protection and scour protection should be labeled on the plan sheet and, pipe profile sheet. [VESCH 3.18] 9. Please specify length, width, and size of stone used for outlet protection. [VESCH 3.18] 10. Please provide existing drainage area maps and drainage areas going to traps and basins. [VESCH checklist ch. VI pgs. 13 -14] 11. Please include soil boundaries on the plans. [VESCH checklist ch. VI pgs. 13 -14] 12. Please provide a stockpile area and staging area. 13. Please show permanent stabilization (PS) on the plans. [VESCH 3.32] 14. Please label the bottom dimensions of all traps and basins. 15. Please provide detailed drawings for curb and drop inlet protection (IP), outlet protection (OP), culvert inlet protection (CIP), diversion dike (DD), silt fence (SF), tree protection (TP), and sediment traps /basins (ST /SB) 16. Please include the tree protection areas on the E &S plan. [VESCH 3.38] 17. The biofilter must outlet to an adequate channel. Please provide information on the downstream system i.e. conveyance channels; their cross section and linings, culvert under railroad track it's dimensions and condition, etc. It appears from the provided topography an offsite drainage easement and channel construction will be required. Please provide a letter of intent or deed of easement from the owner of the neighboring parcel and show the necessary easement and improvements on the plan. (Preliminary Site Plan comment lc) [VESCH MS -19] Atg, RGLNI COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296 -5832 Fax (434) 9724126 Project: Korean Community Church [SDP200700031, WPO200700014] Plan preparer: DDR [fax 979 -1681] Primary Contact: B. Aubrey Huffman & Associates [PO Box 6124 C- ville, VA 22906] Owner or rep.: Korean Comm. Church [PO Box 6599 C- ville, VA 22906] Plan received date: 28 Mar 2007 Date of comments: 23 Apr 2007 Reviewer: Jonathan Sharp A. Final Site & Drainage Plans (SDP200700031) X. A critical slopes waiver request is being reviewed for this project. [18- 4.2.5] A waiver of curb and gutter is being reviewed for this project. [18.4.12.15g] A waiver of minimum design standards requirements for vehicle access aisles not adjacent to parking is being reviewed for this project. [18-4.12.17a] Please extend curbing the full length of the parking spaces (18 feet) at the bottom southern end of the northern parking lot. Currently, the curb radius is only extending 16 feet and the last 2 feet of the end parking space is unprotected. [18- 4.12.15f] Please provide top of wall and bottom of wall elevations for the proposed retaining wall. DSM806] Parking grades cannot exceed 5 %. [18- 4.12.15c] 7. Travelway grades cannot exceed 10 %. (This is not referring to the area requesting a waiver.) [18- 4.12.17a] It appears that drainage in the pipe running under the proposed entrance may be significant especially if curb and gutter is required). Please include calculations for the pipe, do not use CMP, provide end sections, provide an adequate ditch downstream of the pipe, and include a drainage easement over the ditch and pipe sections. Please provide typical sections for the ditch. 18- 32.6.6dl, DSM909.1A, B, 505C] ease provide a drainage summary table and legend. [18- 32.6.6d4,5, DSM909.1C] T ease provide drainage areas that correspond to the calculations and pipes and inlets. [DSM909.1] pe 7 -6 running to Pipe 6 -5 does not maintain a 90 degree or less angle of deflection. DSM5O5EI2] re iSd__ c p .yP lac eg B. Stormwater Management Plan (WPO200700014) Pipe outlets and the outlet structure for the biofilter are at an elevation below the proposed bottom pf the biofilter. l Zoetion calculations use storage beginning at elevation 613, when the bottom of the detention ure is 615. Please provide pre and post drainage area maps for stormwater management. [DSM909.1] E4. Please provide biofilter details. The biofilter requires underdrains. Please specify plantings in the biofilter. [VSMH 3.11, DSM503.1F] of 61a s %&-' Please provide biofilter sizing calculations. [VSMH 3.11] 6•. — Outlets running to the biofilter need energy dissipaters. [DSM503.1F] Ze"The biofilter appears to be short- circuiting. [VSMH 3.11] AlbemarleYounty Community Development Engineering Review Comments Page 2 of 2 5-- 44wprofile of the biofilter and trap shows 2:1 slopes when 4:1 slopes are shown on the plans.Please provide a stormwater maintenance agreement. [17 -323, DSM909.2B]ne ,g5 laePfease show an easement around the stormwater facility, as well as the location for the access roadtothefacility. [DSM909.2A, 213(2), 503.1 C, D, 1101 ] 14-16 following note should be added to the stormwaterBMP plan for the biofilter: Contractor shall contact the water resources inspector 24 hours prior to backfilling the biofilterandrequestaninspectionandapprovaloftheunder -drain installation and the soil mix." DSM503.1 F] C. Erosion Control Plan (WPO200700014) The following comments pertain to the E &S narrative: [VESCH checklist ch. VI pgs. 13 -14]lease include stormwater runoff considerations in the narrative. ntical areas should include critical slopes. Please - address all applicable Minimum Standards and Structural Practices. The foy6wing comments pertain to the E &S plans: All stages of construction are not protected. Engineering recommends placing a sediment trap inthenorthwestcornerofthepropertytocatchrunoff. The shown diversion dikes cannot be installed until after grading has taken place, as they are in the way of construction activities. [VESCH 3.09]If the proposed trap is going to have a piped outlet structure, it will need a riser and include alldimentbasincalculations. [VESCH 3.14] b! There is no perimeter control on the western side of the property. 7 along the east side of the property does not tie into existing grade and grade lines runthroughtheexistingpavement. 8Please provide outlet protection and scour protection on all outlets. Outlet protection and scour protection should be labeled on the plan sheet and pipe profile sheet. [VESCH 3.18] Please specify length, width, and size of stone used for outlet protection. [VESCH 3.18]Please provide existing drainage area maps and drainage areas going to traps and basins. [VESCHchecklistch. VI pgs. 13 -14] 1 LPrease include soil boundaries on the plans. [VESCH checklist ch. VI pgs. 13 -14]se provide a stockpile area and staging area.I-, r4PIIeasese show permanent stabilization (PS) on the plans. [VESCH 3.32] b , label the bottom dimensions of all traps and basins. r "r3 Please provide detailed drawings for curb and drop inlet protection (IP), outlet protection (OP),culvert inlet protection (CIP), diversion dike (DD), silt fence (SF), tree protection (TP), andsedimenttraps/basins (ST /SB) 16. Pli include the tree protection areas on the E &S plan. [VESCH 3.38]0- biofilter must outlet to an adequate channel. Please provide information on the downstream system i.e. conveyance channels; their cross section and linings, culvert under railroad track it's dimensions and condition, etc. It appears from the provided topography an offsite drainageeasementandchannelconstructionwillberequired. Please provide a letter of intent or deed of easement from the owner of the neighboring parcel and show the necessary easement and improvements on the plan. (Preliminary Site Plan comment lc) [VESCH MS -19] 4rgf we, tr 10cokh0"N 51z,ea Meo.x. dr(.141 ct JVII(k P Clear Day Allan Schuck Page 1 of 2 From: Tom Muncaster [tmuncaster @ddrva.com] Sent: Friday, April 27, 2007 2:21 PM To: Allan Schuck; David E. Pennock Cc: Yong I. Kim; jdrumheller @ddrva.com Subject: Korean Community Church requested waiver of the curb and gutter requirement for the access drive serving their property Attachments: Korean Access Rd.pdf This site differs from that of other sites which have sought a waiver of curb and gutter requirements in several important respects. Most importantly the road has been in place for many years and, notably, is in very good shape with proven adequacy. Another major difference is the fact that there is no heavy truck traffic and no identified safety issues. Additionally, installation of curb and gutter within the access easement would block the supplemental parking each of the adjacent properties has installed for their uses. Comments relative to the staff report: Sec. 33.3.10: w' a. The commission may modify, waive, or accept substitution for any requirement of section 32.7 in a particular case upon f nding_that requiring such iniprov_eii-ould not, forward the purposes of this chapter or otherwise serve the public health, s_afet_o tivefare,• or in the case of substitution , that such alternative would satisfy the purpose of this chapter to at least an equivalent degree as the required improvement. J ,-, Using the existing access road the adjacent properties, and the general public, may have free access to their properties and use the existing private road unencumbered. There is no question that during construction, installation of curb and gutter along the access road will be detrimental to the public health, safety and welfare. Use of the road would be impaired and safety issues may arise due to unnecessary construction activity. Also, unnecessary disturbance of a stabilized area has the potential to result in degradation of the site and the adjacent properties. Whenever, because of unusual size, topography, shape of the property, location of the property or other unusual conditions, excluding the proprietary interests of the developer, strict application of the requirements of section 32. 7 mould result in significant degradation of the site or adjacent properties, the requirement nrav be modified or waived by the commission; provided that such modification or titi shall not be detrimental to the public health, safely or welfare, to the orderly development of the area, to sound engineering practices, or to adjacent properties. The unusual condition on this site that prevents the development from meeting the requirements of the Ordinance is that the applicant is restricted to work within 30' access easement. Curb and gutter can be installed within the easement, but it would effectively deny the use of the approved parking that each of the adjacent property owners have installed for their use. For all practical purposes the adjacent property owners would be left with a curb speed bump in the middle of their parking spaces. 5/l/2007 Clear Day Page 2 of 2 The Korean Church can only do work within the easement, but has no right to install curb and gutteraroundtheparkingontheadjacentproperties. Those properties showed their reluctance to grantadditionaleasementswhentheybothrefusedeasementsforawaterline. c. Upon finding in any case that by substituting of technique, design or materials of comparablequalitl, but differing from those required by section 32.7, a developer would achieve resultswhichsubstantiallysatisfytheoverallpurposesofthischapterinamannerequaltoorexceedingthedesiredeffectsoftherequirementinsection32.7, the commission may approvesuchsubstitutionof'technique, design or materials. We are proposing to use the existing private road. It is stabilized, has proven to be adequate over itsmanyyearsofuseanditisingoodcondition. There will be no increase in the quantity of runoff alongtheaccessroadduetothisdevelopment. The church is providing curb and gutter in all areas wheretherewillbeanincreaseinthequantityofrunoffduetothisdevelopment, that is, throughout the siteitself. d. A developer requesting a modification, waiver, or substitution pursuant to this section shall filewiththeagentawrittenrequestwhichshallstatereasonsandjustificationsforsuchrequesttogetherwithsuchalternativesasmaybeproposedbythedeveloper. Such request shall besubmittedpriortocommissionconsiderationofthepreliminaryorfinalplan, but no later thanthesitecommitteerevisiondeadline. No such request shall be considered by the commissionuntilthecommissionhasconsideredtherecommendationof, the agent. The agent mayrecommendapproval, approval with conditions or denial. A recommendation of approval orconditionalapprovalshallbeaccompaniedbyastatement,fr•om the agent as to the publicpurposeservedbysuchrecommendation, particularly in regard to the purpose and intent of thischapter, the subdivision ordinance, and the comprehensive plan. We are submitting this information to supplement our original request. Tom Muncaster, P.E. Dominion Development Resources, LLC 172 South Nntops Drive Charlottesville, VA ` 2911 13 -1 979 business 434 fax 134 cell tmuneaster@ddrva.com tin uncaster:l >earthlink.net tn1lU1CtJStel" d'AlulllIli_virginia.e 5/1/2007 TAX MAP 59 PARCEL 23G W KOREAN COMMUNITY CHURCH p USE: CHURCH cl TAX MAP 59 PARCEL 232U VIRGINIA EXPLORATION INC USE: AUTO DEALERSHIP o f : OF PAVEMENT5 ,EDGE 1SUppLIMENTAL P R K INVOLVOVOA i frtI N . t f .......... IM TSUPPLEN AL m'• N'[ M - 64, KIRTLEY PARKING DGE OF PAVEMENT TAX MAP 59 PARCEL 2361 KIRTLEY FAMILY HOLDINGS USE: DIST. WAREHOUSE w J J Lo W ti GRAPHIC SCALE I " =40'J Q 2 U 0 0 40 80 120 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4 Project: Korean Community Church [SDP200700031, WP02007000141 Plan preparer:DDR [fax 979 -1681] Primary Contact:B. Aubrey Huffinan & Associates [PO Box 6124 C- ville, VA 229061 Owner or rep.:Korean Comm. Church [PO Box 6599 C- ville, VA 22906] Plan received date:28 Mar 2007 17 May 2007 (Revl) Date of comments:23 Apr 2007 14 June 2007 (Revl) Reviewer:Jonathan Sharp A. Final Site & Drainage Plans (SDP200700031) 5. Please provide top of wall and bottom of wall elevations for the proposed retaining wall. [DSM806] Revl: The proposed retaining wall is very high. Please provide details of the wall. How will the drainfield work in conjunction with the ground elevation in that area (elev. —642) and the elevation Of the basement of the church (elev. —620)? Will sewage be pumped or will the drainfield be lower than elev. 620? The configuration of the retaining wall and grading seems unnecessary. It appears that drainage in the pipe running under the proposed entrance may be significant (especially if curb and gutter is required). Please include calculations for the pipe, do not use CMP, provide end sections, provide an adequate ditch downstream of the pipe, and include a drainage casement over the ditch and pipe sections. Please provide typical sections for the ditch. [18- 32.6.6dl, DSM909.1 A, B, 505C] Rev]: The ditch appears to end before reaching an adequate channel. Please provide ditch calculations with adequate lining. Albemarle"County Community Development Engineering Review Comments Page 2 of 3 12. (Rev]) Please provide a revised computation package. B. Stormwater Management Plan (WPO200700014) 4. Please provide biofilter details. The biofilter requires underdrains. Please specify plantings in the biofilter. [VSMH 3.11, DSM503.1F] Revl: Please show the location of the plantings in the biofilter (to ensure that treesAhrubs are not planted within the forebays). Please show the riserlbarrel configuration on the biofilter detail sheet on sheet 5. 9. Please provide a stormwater maintenance agreement. [17 -323, DSM909.2B] Rev]: The maintenance agreement has yet to be approved. 10. Please show an easement around the stormwater facility, as well as the location for the access road to the facility. [DSM909.2A, 213(2), 503.1 C, D, 1101 ] Rev]: Please show adequate access to the riser /dam structure. The access road needs to be 10 feet wide and maximum slope of 20% (over 10% needs to be graveled). 12. Revl: A SiVM bond will be computed once the plans are approved. C. Erosion Control Plan (WPO200700014) The following comments pertain to the E &S plans: 5. If the proposed trap is going to have a piped outlet structure, it will need a riser and include all sediment basin calculations. [VESCH 3.14] Rev]: comments not addressed. Proposed trap will need to be designed as a sediment basin, as its Albemari'Mounty Community Development Engineering Review Comments Page 3 of 3 outlet is a riser structure. In addition, it appears the trap elevation /configuration has changed and the plans no longer match the details. Please show the riser structure on the detail of the sediment trap /basin on sheet S. 14. Please label the bottom dimensions of all traps and basins. Revl: Please label the bottom of the new sediment trap. Please show the weir location of the trap. 16. Please include the tree protection areas on the E &S plan. [VESCH 3.38] Rev l: The tree protection on the E&S plan is not in accord with the Site Plan. 18. Rev]: All work needs to be shown with in the limits of disturbance. There is silt fence running through a ditch. 19. Rev]: Please show the location of the work to install the drainage field /septic tank. The proposed retaining wall will be bonded with the E&S plans. 20. Rev]: An E&S bond will be computed once the plaits are approved. ue 9 A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 FAD Phone (414) 296-5832 Fax (434) 972 -4126 Project:Korean Community Church [SDP200700031, WP02007000141 Plan preparer:DDR [fax 979 -1681] Primary Contact:B. Aubrey Huffinan & Associates [PO Box 6124 C- ville, VA 22906] Owner or rep.:Korean Comm. Church [PO Box 6599 C- ville, VA 229061 Plan received date:28 Mar 2007 17 May 2007 (Revl) 26 June 2007 (Rev2) Date of comments:23 Apr 2007 14 June 2007 (Revl) 16 July 2007 (Rev2) Reviewer:Jonathan Sharp Once all comments have been addressed, please provide 7 copies of the plans for our files. A. Final Site & Drainage Plans (SDP200700031) 12. (Revl) Please provide a revised computation package. Rev2: comment not addressed. Please provide a revised computation package. B. Stormwater Management Plan (WP0200700014) All Stonnwater Mangement comments have been addressed. The Stonnwater Management Bond is set at $111,000. C. Erosion Control Plan (WP0200700014) 16. Please include the tree protection areas on the E &S plan. [VESCH 3.381 Revl: The tree protection on the E&S plan is not in accord with the Site Plan. Rev2: comment not addressed. The proposed tree line on the E &S plan does not match the site plan or landscaping plan, as the sediment trap and staging area are located in tree protection areas. Please revise the tree protection /proposed tree line to stay outside the limit of disturbance on the E &S plan. Please show the location of tree protection clearly on the E &S plan. Please show the site plan, landscape plan, and E &S plan all in accord with one another in regards to the proposed tree line /tree protection. The Erosion Control Bond is set at $19,000. Page 1 of I Bill Fritz From: Gary Whelan [gwhelan @serviceauthority.org] Sent: Thursday, January 17, 2008 10:35 AM To: Bill Fritz , Subject: FW: Korean Community Church From: Michelle Simpson [mailto:msimpson @rivanna.org] Sent: Thursday, January 17, 2008 9:51 AM To: 'Jeremy Lynn'; 'Gary Whelan' Cc: 'Justin Weiler'; 'Johnny Drumheller' Subject: Korean Community Church Jeremy and Gary, RWSA has reviewed the plans titled Korean Community Church as prepared by Dominion Development Resources and dated 12/20/08 and has the following comments: 1) Revise storm profiles between structures 15 to 14 and 4 to 3 to reflect the depths of cover observed in the field during the test pits. Minimum vertical separation required is 18 ". 2) Revise the 30' sanitary sewer easement to be centered over the sewer line per our deed of easement. 3) Ensure that no light poles, E &S facilities, or trees are located in the easement. 4) At "Point A" (11.25 bend) on the drawings, show the bend in the sewer line and revise the plan of the FM to the west of Point A. 5) Offset storm structures 4 and 17 a minimum of 10' from the sewer line. 6) Provide the minimum distance required by regulatory agencies between the proposed well and the sewer force main. 7) As previously discussed, provide at least a minimum of 5:1 slope on the embankment near storm structure 17 so that we may traverse our easement with equipment. Provide a cutout in the curb for access. Please note that I will be out of the office from 1/18 -1/28. Please let me know if you have any questions. Thanks, Michelle Simpson mi.cl eUe siw psoo,, P.E. Sevaor CcVU Emq. vLeer R%vavw1Z( water,sewerAu horit o9s Moores cre6Z Lavue charLottesvUle, vA 229o2 434 9 j j -29 0 Ext. 202 434) 295 -2240 Fax 1/22/2008