Loading...
HomeMy WebLinkAboutSDP200700035 Review Comments 2007-05-01OF ALh i P t IRCCN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: 10 April 2007 (plan date 21 March 2007) Date of Comment: 01 May 2007 Engineer: Allan Schuck The final site plan for Abington Place Phase II, received on 10 April 2007, has been reviewed. The engineering review for current development does not recommend approval until the following items are addressed: A. Final site plan comments: 1. Please provide a signed, dated professionally seal on the plans. [18- 32.6.1 ] 2. Please provide the profiles for the entire pipe system. [18- 32.6.6d] 3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage flow drop exceeds four (4) feet. [DM 505E9] 5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe near Lot 152. [18- 32.6.6d] 6. Please provide adequate written documentation that Statement # 4 under Site Specific Notes on Sheet C 1 of 9 is correct. 7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50. 8. VDOT approval of the final site plans is required before engineering can grant final approval. 9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3] Phase I final site plan was approved under File Number SDP -2005 -00019 File: EI_tsp_ADS_07 -035 Abington Place Phase ll.doc Application #: SDP200700035 Short Review Comments Project Name: Abington Place (Phase II) - Final - Final — Residential — Commission Date Completed:04/24/2007 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments:THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF REPLACEMENT ROAD NAMES FOR "COMMUNITY ST ". DUE TO A CONFLICT WITH THE EXISTING "COMMUNITY ST" THAT IS USED IN FRONT OF THE HARRIS TEETER IT CREATES A DUPLICATE ROAD NAME IN' THE COUNTY. PLEASE CONTACT THIS OFFICE WITH A LIST OF THREE (3) REPLACEMENT NAMES. Date Completed:04127/2007 Reviewer:James Barber Fire Rescue Review Status:Requested Changes Reviews Comments:Indicate the location of fire hydrants. Hydrants must be located within 400 feet of all portions of all lot frontages by way of a prepared travel way. - Date Completed:04/27/2007 Reviewer:Julie Mahon Historic Preservation Review Status:No Objection Reviews Comments:No historic resources identified by DHR within the project area. Developed area. No adverse impact expected otherwise as a result of this proposal. Date Completed:04/18/2007 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments:Based on plans dated March 21, 2007. No comments or conditions. J Page: 1.00 County of Albemarle Printed on: Wednesday, May 02, 2007 DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 David S. Ekern, P.E. VirginiaDOT org COMMISSIONER May I st, 2007 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments May 3rd, 2007 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the May 3rd, 2007 Site Review Committee Meeting: SDP - 2007 -00035 Abington Place Phase II Final (David Pennock) A road plan for Lockwood needs to be submitted for this phase. The previous plan for Lockwood Drive only showed the vertical alignment in this section. SDP - 2007 -00036 First Christian Church Preliminary (Summer Frederick) Right of Way needs to be dedicated to accommodate the proposed turn lane. Traffic estimates need to be shown in and out of the site. Length of sight distance needs to be shown. Final site plan needs to include typical on state road, pavement structure, entrance profile, and any necessary drainage features. All work needs to be designed in accordance with the Road Design Manual and The Minimum Standards of Entrances to State Highways. A permit will be required for any work within the state RAW. SDP - 2007 -00037 Old Trail Townhouses (Upper Ballard Field — Phase IV) (Pat Lawrence) Site is part of the previously approved Ballard Field and road layouts are adequate. Final plan should included road and drainage plans with drainage and pavement computations. SUB - 2007 -00135 Pounding Branch Subdivision Phase III ( Megan Yaniglos) Sheet 5 is missing from this set and it is difficult to understand the overall plan for sheets 6 and 7. f -- YEAR5 Of TRAHSPOR1ATtON EXCEIIENCE 3 1 0 6 2 0 0 6 Intersections on rte. 637 need to line up with intersections across the state road. Typicals and proposed contours do not match. Road and drainage plans will be required with site plan. Show existing and proposed traffic on state roads and for site. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Residency Program Manager VDOT Charlottesville Residency 434 - 293 -0011 cc Allan Schuck, Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Weigand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick Lawrence, and John Giometti l.: r it I A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP -2007- 00035, Abington Place Phase II, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: 10 April 2007 (plan date 21 March 2007) Date of Comment: 01 May 2007 Engineer: Allan Schuck The final site plan for Abington Place Phase 1I, received on 10 April 2007, has been reviewed. The engineering review for current development does not recommend approval until the following items are addressed: A. Final site plan comments: 1. Please provide a signed, dated professionally seal on the plans. [18-32.6,1] 2. Please provide the profiles for the entire pipe system. [18- 32.6.6d] 3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage flow drop exceeds four (4) feet. [DM 505E9] 4. Please show the construction of Aldersgate Way to extend further southward to provide vehicular access to Lots 151 and 152. [18- 32.7.2] 5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe near Lot 152. [ 18- 32.6.6d] 6. Please provide adequate written documentation that Statement # 4 under Site Specific ,Votes on Sheet C 1 of 9 is correct. 7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50. 8. VDOT approval of the final site plans is required before engineering can grant final approval. 9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3] Phase I final site plan was approved under File Number SDP -2005 -00019 File: EI_fsp_ADS_07 -t)35 Abington Place Phase lI. doc TO: FROM: DATE: RE: David Pennock, Planner Gary Whelan, Civil Engineer May 2, 2007 Site Plan Technical Review for: Abington Place Phase II The site plan does not show or incorrectly shows: meter locations waterline locations sewer line locations easements waterline size sewer line size expected wastewater flows expected water demands TM 32B, Parcel Al) The below checked items apply to this site. SDP - 2007 -00035 X 1.This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2.An 8 inch water line is located onsite. X 3.Fire flow from nearest public hydrant, located 1070' distant from this site plan, is 3874 gpm + at 20 psi residual. X 4.An 8 inch sewer line is located onsite. 5.An Industrial Waste Ordinance survey form must be completed. X 6.No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. 9.No plans are required. X 10.Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11.Final site plan may /may not be signed. 12.RWSA apnrnval fnr water and /or se.•.er _on nectioc s. Comments:Capacity certification from RWSA required. The site plan does not show or incorrectly shows: meter locations waterline locations sewer line locations easements waterline size sewer line size expected wastewater flows expected water demands OW Vjj, County of Albemarle Department of Community Development Memorandum To: Justin Shimp — Dominion Development Resources, LLC 172 South Pantops Drive Charlottesville, VA 22911 From: David Pennock, Principal Planner Division: Zoning and Current Development Date: May 2, 2007 Subject: SDP 07 -035 — Abington Place, Phase II Preliminary and Final Site Plan The County of Albemarle Department of Community Development - Division of Zoning and Current Development has reviewed the above referenced site plan. [Each comment is preceded by the applicable reference, which is to the Zoning Ordinances (Chapter 18 of Albemarle County Code) unless otherwise specified.] I . [general] The Site Data section and all calculations indicate 63 townhouse units in this section. However, it appears there are 64. Please update the numbers, reorient the phasing line, or otherwise explain the discrepancy. 2. [general] The areas along Lockwood Drive indicate 20 parking spaces on each side. However, it appears that only 19 are shown on each side. Please amend the Site Data. 3. [general] As a follow -up to comments #1 and #2, please amend all items in the Site Data, including proposed use, parking schedule, etc. to retect the correct numbers for each of the above noted items. 4. [ZMA 02 -002: COD Table B] Please break out the calculations provided for the land use schedule in order to indicate the portions in Block I and Block V, as shown on Sheet C9. This will allow confirmation of the minimums and maximums listed in Table B. 5. [ZMA 02 -002: COD Table C] Please add a note under the "undisturbed buffer" in the Site Data to indicate that a 100 foot stream butter is also provided, as required by the Code of Development. This buffer is also indicated on most ofthe site plan sheets and should be labeled. 6. [ZMA 02 -002: COD Table C] Please indicate that the 10 -foot path is designed to the property line in order to allow oft -site extension for future developments, such as the proposed Section Al. 7. [ZMA 02 -002: COD Table D] Please change the front yard setback listed to reflect a maximum of 20 feet. 8. [ZMA 02 -002: COD Table D] The minimum front build -to line is 5 feet. As this is a planned district, encroachments in to the build -to area are only allowed as a minor variation to the approved application plan. Currently, many encroachments are indicated for porches. Please amend the plan or request a variation. 9. [ZMA 02 -002: COD Table F] Street trees are required every 50 feet along the public roads, as indicated in Table F and the "Streetscaping Guidelines ". Currently, the plan indicates a long stretch along lots 110 -117 with no trees, due to a conflict with a stormwater conveyance. Please indicate an alternative location for either the pipe or the trees. 10. [ZMA 02 -002: COD Table E] It appears in the description of Table E that Lockwood Drive was intended to include bike lanes on both sides. These are indicated, yet they stop short of the property line. Please explain or amend the plan to show potential for future extension. 11. [general] On townhouse lots with no detached garage indicated, are the garages part of the main structure? If so, please indicate on the plans and note this in the parking calculations area. 12. [32.7.9.4] Please provide a signed conservation plan checklist, to be included as part of the landscape plan. Staff can provide a copy of this checklist, if necessary. 13. [ZMA 01 -020 and ZMA 02 -02] Please coordinate with staff regarding the completion of proffered improvements and payments. Dedication of a 100 -foot greenway in Block 1, payment of cash proffers pursuant to Hollymead Town Center construction, and cash proffers specific to this section have been partially completed through previous projects, but have not been completed at this time. Please contact David Pennock in the Division of Zoning and Current Development at 296 -5832 ext. 3432 for further information. cc: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 May 3, 2007 Fax(434)972 -4126 Justin Shimp Dominion Development Resources, LLC 172 South Pantops Drive Charlottesville, VA 22911 RE: SDP 07 -035 — Abington Place, Phase II Preliminary and Final Site Plan Dear Mr. Shimp: The Site Review Committee has reviewed the development proposal referenced above. Preliminary Continents for the following agencies, as applicable, are attached: Albemarle County Department of Community Development — Current Development Planning Albemarle County Department of Community Development — Current Development Engineer Albemarle County Department of Community Development Inspections Albemarle County Service Authority Albemarle County Geographic Data Services -- E -91 I Albemarle County Department of Fire and Rescue Virginia Department of Transportation Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues which could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit seven full size copies and one 11" r 17" copy to the Department of Planning and Community Development. Responses to the attached comments of the Site Review Committee must be submitted by May 14, 2007. Failure to submit this information by this date will result in suspension of the review schedule. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, D '7,1/ David Pennock, AICP Principal Planner cc: OF ALB r.1 t RGITPrr COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: 14 May 2007 Date of Comment: June 26 2007 Engineer: Max Greene The final site plan for Abington Place Phase II, received on 14 May 2007, has been reviewed. The engineering review for current development does not recommend approval until the following items are adequately addressed: A. Final site plan comments: 1. Please provide the profiles for the entire pipe system. [18- 32.6.6d] 2. Please show the construction of Aldersgate Way to extend further southward to provide vehicular access to Lots 151 and 152. [18- 32.7.2] (Second time item mentioned) Without adequate road frontage these will not become individual lots. 3. Please provide adequate written documentation that Statement # 4 under Site Specific Notes on Sheet C 1 of 9 is correct. (Second time item mentioned) 4. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50. second time item mentioned) 5. VDOT approval of the final site plans is required before engineering can grant final approval. Comments will be forwarded as received. B. Erosion Control Plan Comments: 1. Existing topography does not match the existing conditions. Contractor has not followed phase I plans. Basins were not constructed as shown. Please show the existing conditions and how the site work will be protected from erosion and sediment loss. Could not review plan at this time due to inaccurate topography and phase 1 construction. C. Road plan Comments: 1. Plans have been forwarded to VDOT, comments will be sent as received. No continents have been received at the time of this letter. Engineering staff is available on Thursdays from 2 -4 PM to discuss these review comments. Please contact Mr. Allan Schuck, at 434.296.5832, Ext. 3069, to schedule a time to meet. Phase I final site plan was approved under File Number SDP -2005 -00019 File: F2_fsp,esc,rp_MRG_SDP20007 -00035 Abington Place Phase 1Ldoc O 1lfj tP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP -2007- 00035, Abington Place Phase 11, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: Rev. 1: 17 Mav 2007 (plan rev date 14 Xfcty 2007) 10 April 2007 (plan date 21 March 2007) Date of Comment: Rev. 1: 04 June 2007 01 May 2007 Engineer: Allan Schuck The final site plan for Abington Place Phase 11, received on 17 May 2007, has been reviewed. The engineering review for current development does not recommend approval until the following items are addressed: A. Final site plan comments: 1. Please provide a signed, dated professionally seal on the plans. [18-32.6. 1 ] Rev. 1: This comment has been adequalely adch-essecl with this plan submittal. 2. Please provide the profiles for the entire pipe system. [ 18- 32.6.6d] Rev. 1: This comment has been adequately addressed with this plan submittal. 3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage flow drop exceeds four (4) feet. [DM 505E91 Rev. 1: This comment has been aclequate1v aciclre.ssed with this plan submittal. 4. Please show the construction of Aldersgate Way to extend further southward to provide vehicular access to Lots 151 and 152. [18- 32.7.2] Rev. 1: This comment has been adequately addressed with this plan submittal. 5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe near Lot 152. [ 18- 32.6.6d] Rev. 1: This comment has been adequately addressed with this plan submittal. 6. Please provide adequate written documentation that Statement # 4 under Site Specilic Notes on Sheet C 1 of 9 is correct. Rev. 1: This comment has been aclequately addressed with this plan submittal. 7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50. Rev. 1: This comment has been adequately adch-essecl with this plan .submittal. 8. VDOT approval of the final site plans is required before engineering can grant final approval. Rev. 1: This comment has been adequalely aciclre.ssecl with this plan submittal. 9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3] Rev. 1: This comment has been adequately addressed with this plan submittal. Phase I final site plan was approved under File Number SDP - 2005 -00019 Albemarle County u, nmunity Development Engineering Review Comments Sheet 2 of 2 Nile: E2_1'sp ADS_07 -035 Abington Place Phase 11 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.1681) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: 14 May 2007 Rev. 3: 15 August 2007 (plans rev. date 25 July 2007) Date of Comment: 27 June 2007 Rev. 3: 06 September 2007 Engineer: Max Greene Rev. 3: 411(117 Schucti The final site plan for Abington Place Phase Il, received on 15 August 2007, has been reviewed. The engineering review for current development does not recommend approval until the following items are adequately addressed: A. Final site plan comments: 1. Please provide the profiles for the entire pipe system. [18- 32.6.6d] Rev. 3: This comment has been adequately addressed with this plan submittal. 2. Please show the construction of Aldersgate Way to extend further southward to provide vehicular access to Lots 151 and 152. [18- 32.7.2] (Second time item mentioned) Without adequate road frontage these will not become individual lots. Rev. 3: This comment has been adequately athh with this plant submittal. 3. Please provide adequate written documentation that Statement # 4 under Site Specific Notes on Sheet C 1 of 9 is correct. (Second time item mentioned) Rev. 3: This comment has been adequately addressed with this plan submittal. 4. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50. Rev. 3: This comment has not been adequately addressed with this plan submittal. The applicant's letter stated this document was to he included tivith the .submittal. This document was not included with the plan submittal reviewed. 5. VDOT approval of the final site plans is required before engineering can grant final approval. Comments will be forwarded as received. Rev. 3: This comment has been adequately addressed with this plan submittal. 6. Rev. 3: The applicant has down.sized sonte of the .storm pipes in the systenn without providing the necdcd computations to support the downsizing. Please revise accordingly. Albemarle County (nmunity Development Engineering Review Comments Sheet 2 of 2 Rev. 3: The applicant has removed the Storrs Drain Computation table from Sheet C5 of 9. Please insert the table with the next plan .submittal and make sure the numbers correspond correctly to the pipe sizes and drainage areas. 8. Rev. 3: The ivater main `A ' ivas reduced fi °orn a 24 "pipe to a 12 "pipe. Please provide written documentation that this reduction has been approved by ACSA. B. Erosion Control Plan Comments: 1. Existing topography does not match the existing conditions. Contractor has not followed phase 1 plans. Basins were not constructed as shown. Please show the existing conditions and how the site work will be protected from erosion and sediment loss. Could not review plan at this time due to inaccurate topography and phase 1 actual construction. 2. Rev. 3: Has there been a and application made to the County,for this review? 3. Rev. 3: Please show a construction entrance on the final plans. 4. Rev. 3: The erosion curd sediment control portion of the Water Protection Bond Estimate is $47, 000. C. Road plan Comments: 1. Plans have been forwarded to VDOT, comments will be sent as received. No comments have been received at the time of this letter. 2. Rev. 3: VDOT approval has not been received at time of tins review. Engineering staff is available on Thursdays from 2 -4 PM to discuss these review comments. Please contact Mr. Allan Schuck, at 434.296.5832, Ext. 3069, to schedule a time to meet. Phase I final site plan was approved under File Number SDP - 2005 -00019 File: E3_fsp,esc,rp_ADS &ADL_07 -035 Abington Place Phase 11 pF ALg IIRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 y a1 Phone(434)296 -5832 Fax(434)972 -4126 Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.1681) Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266) Date received: 14 May 2007 Rev. 4: 11 September 2007 (plans rev. elate 10 September 2007) Date of Comment: 27 June 2007 Rev. 4: 1 October 2007 Engineer: Max Greene Rev. 4: Phil Caster The final site plan for Abington Place Phase II, received on 11 September 2007, has been reviewed. The engineering review for current development finds this plan compliant with all county requirements and will grant approval once the ESC bond has been posted and VDOT approval has been received. A. Final site plan comments: 9. Rev. 4: All site plan comments have been addressed. B. Erosion Control Plan Comments: 4. Rev. 3: The erosion and sediment control portion of the Water Protection Bond Estimate is $47, 000. C. Road plan Comments: 1. Plans have been forwarded to VDOT, continents will be sent as received. No comments have been received at the time of this letter. Rev. 4: VDOT approval has not been received at titne of this review. Phase I final site plan was approved under File Number SDP - 2005 -00019 File: E4_fsp,esc,rp_P13C_07 -035 Abington Place Phase ll.doc Sent By: INVISIBLE; 19999999999; Jan- 15 -0£3 2:13PM; Page 2/3 Albemarle County Service Authority I ( _,2 "'i I r - 16 — _Grsfl! T)(J October 31, 2007 Dominion Development Resources, LLC Attn: Mr. Justin Shimp, P.E. 172 South Pantops Drive Charlottesville, Virgima 22911 Re: Abington Place -Phase 2 Dear Mr. Shimp: The plan, entitled "Abington Place -Phase 2" dated March 21, 2007, last revised September 26, 2007, is hereby approved for construction. One set of the approved plan is enclosed for your records. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority (ACSA) and does not relieve the contractor from responsibility for his work as it relates to the plan and specifications. The ACSA requires that a copy of the approved construction plan be on the job site. The contractor is responsible for marking up a copy of the approved construction plan showing as -built information and provide this data to your client at the completion of utility installation- The final as -built plan shall be submitted in a format of one paper copy and one mylar copy. A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project, materials, test methods and schedule, in order to expedite construction. Please have the proper party call me at 977 -4511 to schedule the meeting. This approval is valid for a period of 18 months from this date. If construction is not in progress at the end of this time period, the approval shall be void. The pressure for water may exceed 80 psi at some meter locations. 168 Spotnap Road • (Charlottesville, VA 2291 1 * Tel (434) 977-4511 • Fax (434) 979 -0698 www.serviceauthority.orq Sent By: INVISIBLE; 19999999999; Jan -15 -08 2 :14PM; Page 3/3 If you have any questions or if we can be of assistance, please give us a call at 977 -4511. Sincerely,, Thomas A. Garrison, PE Senior Civil Engineer TAG /slrb /dmg cc: Edward H. Bain, Jr. State Health Department Planning Department Building Codes & Zoning Services Soil Erosion Inspector ACSA Inspector Oa b40 Abington Place Phase 2 Engineering Lfr 103197 Page 2