Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: 10 April 2007 (plan date 21 March 2007)
Date of Comment: 01 May 2007
Engineer: Allan Schuck
The final site plan for Abington Place Phase II, received on 10 April 2007, has been reviewed. The
engineering review for current development does not recommend approval until the following items are
addressed:
A. Final site plan comments:
1. Please provide a signed, dated professionally seal on the plans. [18- 32.6.1 ]
2. Please provide the profiles for the entire pipe system. [18- 32.6.6d]
3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage
flow drop exceeds four (4) feet. [DM 505E9]
5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe
near Lot 152. [18- 32.6.6d]
6. Please provide adequate written documentation that Statement # 4 under Site Specific Notes on
Sheet C 1 of 9 is correct.
7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50.
8. VDOT approval of the final site plans is required before engineering can grant final approval.
9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3]
Phase I final site plan was approved under File Number SDP -2005 -00019
File: EI_tsp_ADS_07 -035 Abington Place Phase ll.doc
Application #: SDP200700035 Short Review Comments
Project Name: Abington Place (Phase II) - Final - Final — Residential — Commission
Date Completed:04/24/2007
Reviewer:Andrew Slack E911
Review Status:Requested Changes
Reviews Comments:THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF REPLACEMENT ROAD
NAMES FOR "COMMUNITY ST ". DUE TO A CONFLICT WITH THE EXISTING "COMMUNITY ST"
THAT IS USED IN FRONT OF THE HARRIS TEETER IT CREATES A DUPLICATE ROAD NAME IN'
THE COUNTY. PLEASE CONTACT THIS OFFICE WITH A LIST OF THREE (3) REPLACEMENT
NAMES.
Date Completed:04127/2007
Reviewer:James Barber Fire Rescue
Review Status:Requested Changes
Reviews Comments:Indicate the location of fire hydrants. Hydrants must be located within 400 feet of all portions of all lot
frontages by way of a prepared travel way. -
Date Completed:04/27/2007
Reviewer:Julie Mahon Historic Preservation
Review Status:No Objection
Reviews Comments:No historic resources identified by DHR within the project area. Developed area. No adverse impact
expected otherwise as a result of this proposal.
Date Completed:04/18/2007
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments:Based on plans dated March 21, 2007.
No comments or conditions. J
Page: 1.00 County of Albemarle Printed on: Wednesday, May 02, 2007
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper Virginia 22701
David S. Ekern, P.E.
VirginiaDOT org
COMMISSIONER
May I st, 2007
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments May 3rd, 2007 site review meeting
Dear Mr. Brooks:
Below are VDOT's comments on the Site Plans for the May 3rd, 2007 Site Review Committee
Meeting:
SDP - 2007 -00035 Abington Place Phase II Final (David Pennock)
A road plan for Lockwood needs to be submitted for this phase. The previous plan for
Lockwood Drive only showed the vertical alignment in this section.
SDP - 2007 -00036 First Christian Church Preliminary (Summer Frederick)
Right of Way needs to be dedicated to accommodate the proposed turn lane.
Traffic estimates need to be shown in and out of the site.
Length of sight distance needs to be shown.
Final site plan needs to include typical on state road, pavement structure, entrance profile, and
any necessary drainage features. All work needs to be designed in accordance with the Road
Design Manual and The Minimum Standards of Entrances to State Highways.
A permit will be required for any work within the state RAW.
SDP - 2007 -00037 Old Trail Townhouses (Upper Ballard Field — Phase IV) (Pat Lawrence)
Site is part of the previously approved Ballard Field and road layouts are adequate.
Final plan should included road and drainage plans with drainage and pavement computations.
SUB - 2007 -00135 Pounding Branch Subdivision Phase III ( Megan Yaniglos)
Sheet 5 is missing from this set and it is difficult to understand the overall plan for sheets 6 and
7.
f -- YEAR5 Of
TRAHSPOR1ATtON EXCEIIENCE
3 1 0 6 2 0 0 6
Intersections on rte. 637 need to line up with intersections across the state road.
Typicals and proposed contours do not match.
Road and drainage plans will be required with site plan.
Show existing and proposed traffic on state roads and for site.
Please request the applicants provide a written description of revisions with re- submissions. If you
have any questions or comments, please contact me prior to sharing these comments with the
applicants.
Sincerely,
Joel DeNunzio, P.E.
Residency Program Manager
VDOT Charlottesville Residency
434 - 293 -0011
cc Allan Schuck, Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell,
Judith Weigand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer
Frederick, Patrick Lawrence, and John Giometti
l.:
r it I A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP -2007- 00035, Abington Place Phase II, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: 10 April 2007 (plan date 21 March 2007)
Date of Comment: 01 May 2007
Engineer: Allan Schuck
The final site plan for Abington Place Phase 1I, received on 10 April 2007, has been reviewed. The
engineering review for current development does not recommend approval until the following items are
addressed:
A. Final site plan comments:
1. Please provide a signed, dated professionally seal on the plans. [18-32.6,1]
2. Please provide the profiles for the entire pipe system. [18- 32.6.6d]
3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage
flow drop exceeds four (4) feet. [DM 505E9]
4. Please show the construction of Aldersgate Way to extend further southward to provide
vehicular access to Lots 151 and 152. [18- 32.7.2]
5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe
near Lot 152. [ 18- 32.6.6d]
6. Please provide adequate written documentation that Statement # 4 under Site Specific ,Votes on
Sheet C 1 of 9 is correct.
7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50.
8. VDOT approval of the final site plans is required before engineering can grant final approval.
9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3]
Phase I final site plan was approved under File Number SDP -2005 -00019
File: EI_fsp_ADS_07 -t)35 Abington Place Phase lI. doc
TO:
FROM:
DATE:
RE:
David Pennock, Planner
Gary Whelan, Civil Engineer
May 2, 2007
Site Plan Technical Review for: Abington Place Phase II
The site plan does not show or incorrectly shows:
meter locations
waterline locations
sewer line locations
easements
waterline size
sewer line size
expected wastewater flows
expected water demands
TM 32B, Parcel Al)
The below checked items apply to this site. SDP - 2007 -00035
X 1.This site plan is within the Authority's
jurisdictional area for:
X A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
X 2.An 8 inch water line is located onsite.
X 3.Fire flow from nearest public hydrant, located 1070'
distant from this site plan, is 3874 gpm + at 20 psi
residual.
X 4.An 8 inch sewer line is located onsite.
5.An Industrial Waste Ordinance survey form must be
completed.
X 6.No improvements or obstructions shall be placed
within existing or future easements.
7.and plans are currently under review.
8.and plans have been received and
approved.
9.No plans are required.
X 10.Final water and sewer plans are required for our
review and approval prior to granting tentative
approval.
11.Final site plan may /may not be signed.
12.RWSA apnrnval fnr water and /or se.•.er _on nectioc s.
Comments:Capacity certification from RWSA required.
The site plan does not show or incorrectly shows:
meter locations
waterline locations
sewer line locations
easements
waterline size
sewer line size
expected wastewater flows
expected water demands
OW Vjj,
County of Albemarle
Department of Community Development
Memorandum
To: Justin Shimp — Dominion Development Resources, LLC
172 South Pantops Drive
Charlottesville, VA 22911
From: David Pennock, Principal Planner
Division: Zoning and Current Development
Date: May 2, 2007
Subject: SDP 07 -035 — Abington Place, Phase II Preliminary and Final Site Plan
The County of Albemarle Department of Community Development - Division of Zoning and Current
Development has reviewed the above referenced site plan. [Each comment is preceded by the
applicable reference, which is to the Zoning Ordinances (Chapter 18 of Albemarle County Code)
unless otherwise specified.]
I . [general] The Site Data section and all calculations indicate 63 townhouse units in this section.
However, it appears there are 64. Please update the numbers, reorient the phasing line, or
otherwise explain the discrepancy.
2. [general] The areas along Lockwood Drive indicate 20 parking spaces on each side. However,
it appears that only 19 are shown on each side. Please amend the Site Data.
3. [general] As a follow -up to comments #1 and #2, please amend all items in the Site Data,
including proposed use, parking schedule, etc. to retect the correct numbers for each of the
above noted items.
4. [ZMA 02 -002: COD Table B] Please break out the calculations provided for the land use
schedule in order to indicate the portions in Block I and Block V, as shown on Sheet C9. This
will allow confirmation of the minimums and maximums listed in Table B.
5. [ZMA 02 -002: COD Table C] Please add a note under the "undisturbed buffer" in the Site
Data to indicate that a 100 foot stream butter is also provided, as required by the Code of
Development. This buffer is also indicated on most ofthe site plan sheets and should be
labeled.
6. [ZMA 02 -002: COD Table C] Please indicate that the 10 -foot path is designed to the property
line in order to allow oft -site extension for future developments, such as the proposed Section
Al.
7. [ZMA 02 -002: COD Table D] Please change the front yard setback listed to reflect a
maximum of 20 feet.
8. [ZMA 02 -002: COD Table D] The minimum front build -to line is 5 feet. As this is a planned
district, encroachments in to the build -to area are only allowed as a minor variation to the
approved application plan. Currently, many encroachments are indicated for porches. Please
amend the plan or request a variation.
9. [ZMA 02 -002: COD Table F] Street trees are required every 50 feet along the public roads, as
indicated in Table F and the "Streetscaping Guidelines ". Currently, the plan indicates a long
stretch along lots 110 -117 with no trees, due to a conflict with a stormwater conveyance.
Please indicate an alternative location for either the pipe or the trees.
10. [ZMA 02 -002: COD Table E] It appears in the description of Table E that Lockwood Drive
was intended to include bike lanes on both sides. These are indicated, yet they stop short of the
property line. Please explain or amend the plan to show potential for future extension.
11. [general] On townhouse lots with no detached garage indicated, are the garages part of the
main structure? If so, please indicate on the plans and note this in the parking calculations area.
12. [32.7.9.4] Please provide a signed conservation plan checklist, to be included as part of the
landscape plan. Staff can provide a copy of this checklist, if necessary.
13. [ZMA 01 -020 and ZMA 02 -02] Please coordinate with staff regarding the completion of
proffered improvements and payments. Dedication of a 100 -foot greenway in Block 1,
payment of cash proffers pursuant to Hollymead Town Center construction, and cash proffers
specific to this section have been partially completed through previous projects, but have not
been completed at this time.
Please contact David Pennock in the Division of Zoning and Current Development at 296 -5832 ext.
3432 for further information.
cc:
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
May 3, 2007
Fax(434)972 -4126
Justin Shimp
Dominion Development Resources, LLC
172 South Pantops Drive
Charlottesville, VA 22911
RE: SDP 07 -035 — Abington Place, Phase II Preliminary and Final Site Plan
Dear Mr. Shimp:
The Site Review Committee has reviewed the development proposal referenced above. Preliminary
Continents for the following agencies, as applicable, are attached:
Albemarle County Department of Community Development — Current Development Planning
Albemarle County Department of Community Development — Current Development Engineer
Albemarle County Department of Community Development Inspections
Albemarle County Service Authority
Albemarle County Geographic Data Services -- E -91 I
Albemarle County Department of Fire and Rescue
Virginia Department of Transportation
Comments reflect information available at the time the development proposal was reviewed, and should not
be considered final. However, the Site Review Committee has attempted to identify all issues which could
affect approval of the proposed project.
Please make the revisions that have been identified as necessary for preliminary approval by the Site Review
Committee. If you choose not to make the requested revisions, please submit in writing justification for not
incorporating such revisions. Submit seven full size copies and one 11" r 17" copy to the Department of
Planning and Community Development. Responses to the attached comments of the Site Review Committee
must be submitted by May 14, 2007. Failure to submit this information by this date will result in suspension
of the review schedule.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
D '7,1/
David Pennock, AICP
Principal Planner
cc:
OF ALB
r.1
t RGITPrr
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: 14 May 2007
Date of Comment: June 26 2007
Engineer: Max Greene
The final site plan for Abington Place Phase II, received on 14 May 2007, has been reviewed. The engineering
review for current development does not recommend approval until the following items are adequately addressed:
A. Final site plan comments:
1. Please provide the profiles for the entire pipe system. [18- 32.6.6d]
2. Please show the construction of Aldersgate Way to extend further southward to provide vehicular
access to Lots 151 and 152. [18- 32.7.2] (Second time item mentioned) Without adequate road
frontage these will not become individual lots.
3. Please provide adequate written documentation that Statement # 4 under Site Specific Notes on
Sheet C 1 of 9 is correct. (Second time item mentioned)
4. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50.
second time item mentioned)
5. VDOT approval of the final site plans is required before engineering can grant final approval.
Comments will be forwarded as received.
B. Erosion Control Plan Comments:
1. Existing topography does not match the existing conditions. Contractor has not followed phase I
plans. Basins were not constructed as shown. Please show the existing conditions and how the site
work will be protected from erosion and sediment loss. Could not review plan at this time due to
inaccurate topography and phase 1 construction.
C. Road plan Comments:
1. Plans have been forwarded to VDOT, comments will be sent as received. No continents have been
received at the time of this letter.
Engineering staff is available on Thursdays from 2 -4 PM to discuss these review comments. Please
contact Mr. Allan Schuck, at 434.296.5832, Ext. 3069, to schedule a time to meet.
Phase I final site plan was approved under File Number SDP -2005 -00019
File: F2_fsp,esc,rp_MRG_SDP20007 -00035 Abington Place Phase 1Ldoc
O 1lfj tP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP -2007- 00035, Abington Place Phase 11, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.168 1)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: Rev. 1: 17 Mav 2007 (plan rev date 14 Xfcty 2007)
10 April 2007 (plan date 21 March 2007)
Date of Comment: Rev. 1: 04 June 2007
01 May 2007
Engineer: Allan Schuck
The final site plan for Abington Place Phase 11, received on 17 May 2007, has been reviewed. The
engineering review for current development does not recommend approval until the following items are
addressed:
A. Final site plan comments:
1. Please provide a signed, dated professionally seal on the plans. [18-32.6. 1 ]
Rev. 1: This comment has been adequalely adch-essecl with this plan submittal.
2. Please provide the profiles for the entire pipe system. [ 18- 32.6.6d]
Rev. 1: This comment has been adequately addressed with this plan submittal.
3. Please show or label inlet shaping, IS -1, on the drainage profiles or tables, where the drainage
flow drop exceeds four (4) feet. [DM 505E91
Rev. 1: This comment has been aclequate1v aciclre.ssed with this plan submittal.
4. Please show the construction of Aldersgate Way to extend further southward to provide
vehicular access to Lots 151 and 152. [18- 32.7.2]
Rev. 1: This comment has been adequately addressed with this plan submittal.
5. Please provide a drainage structure where the 12" roof drain connects to the 24" HDPE pipe
near Lot 152. [ 18- 32.6.6d]
Rev. 1: This comment has been adequately addressed with this plan submittal.
6. Please provide adequate written documentation that Statement # 4 under Site Specilic Notes on
Sheet C 1 of 9 is correct.
Rev. 1: This comment has been aclequately addressed with this plan submittal.
7. Please provide a written copy of the letter of intent to allow temporary grading on TMP 32 -50.
Rev. 1: This comment has been adequately adch-essecl with this plan .submittal.
8. VDOT approval of the final site plans is required before engineering can grant final approval.
Rev. 1: This comment has been adequalely aciclre.ssecl with this plan submittal.
9. An approved E &SC plan is required before the final site plan can be approved. [18- 32.7.4.3]
Rev. 1: This comment has been adequately addressed with this plan submittal.
Phase I final site plan was approved under File Number SDP - 2005 -00019
Albemarle County u, nmunity Development
Engineering Review Comments
Sheet 2 of 2
Nile: E2_1'sp ADS_07 -035 Abington Place Phase 11
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.1681)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: 14 May 2007
Rev. 3: 15 August 2007 (plans rev. date 25 July 2007)
Date of Comment: 27 June 2007
Rev. 3: 06 September 2007
Engineer: Max Greene
Rev. 3: 411(117 Schucti
The final site plan for Abington Place Phase Il, received on 15 August 2007, has been reviewed. The
engineering review for current development does not recommend approval until the following items are
adequately addressed:
A. Final site plan comments:
1. Please provide the profiles for the entire pipe system. [18- 32.6.6d]
Rev. 3: This comment has been adequately addressed with this plan submittal.
2. Please show the construction of Aldersgate Way to extend further southward to provide
vehicular access to Lots 151 and 152. [18- 32.7.2] (Second time item mentioned)
Without adequate road frontage these will not become individual lots.
Rev. 3: This comment has been adequately athh with this plant submittal.
3. Please provide adequate written documentation that Statement # 4 under Site Specific
Notes on Sheet C 1 of 9 is correct. (Second time item mentioned)
Rev. 3: This comment has been adequately addressed with this plan submittal.
4. Please provide a written copy of the letter of intent to allow temporary grading on TMP
32 -50.
Rev. 3: This comment has not been adequately addressed with this plan submittal. The
applicant's letter stated this document was to he included tivith the .submittal. This
document was not included with the plan submittal reviewed.
5. VDOT approval of the final site plans is required before engineering can grant final
approval. Comments will be forwarded as received.
Rev. 3: This comment has been adequately addressed with this plan submittal.
6. Rev. 3: The applicant has down.sized sonte of the .storm pipes in the systenn without
providing the necdcd computations to support the downsizing. Please revise accordingly.
Albemarle County (nmunity Development
Engineering Review Comments
Sheet 2 of 2
Rev. 3: The applicant has removed the Storrs Drain Computation table from Sheet C5 of
9. Please insert the table with the next plan .submittal and make sure the numbers
correspond correctly to the pipe sizes and drainage areas.
8. Rev. 3: The ivater main `A ' ivas reduced fi °orn a 24 "pipe to a 12 "pipe. Please provide
written documentation that this reduction has been approved by ACSA.
B. Erosion Control Plan Comments:
1. Existing topography does not match the existing conditions. Contractor has not followed
phase 1 plans. Basins were not constructed as shown. Please show the existing conditions
and how the site work will be protected from erosion and sediment loss. Could not review
plan at this time due to inaccurate topography and phase 1 actual construction.
2. Rev. 3: Has there been a and application made to the County,for this review?
3. Rev. 3: Please show a construction entrance on the final plans.
4. Rev. 3: The erosion curd sediment control portion of the Water Protection Bond Estimate
is $47, 000.
C. Road plan Comments:
1. Plans have been forwarded to VDOT, comments will be sent as received. No comments
have been received at the time of this letter.
2. Rev. 3: VDOT approval has not been received at time of tins review.
Engineering staff is available on Thursdays from 2 -4 PM to discuss these review comments. Please
contact Mr. Allan Schuck, at 434.296.5832, Ext. 3069, to schedule a time to meet.
Phase I final site plan was approved under File Number SDP - 2005 -00019
File: E3_fsp,esc,rp_ADS &ADL_07 -035 Abington Place Phase 11
pF ALg
IIRGINIP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
y a1
Phone(434)296 -5832 Fax(434)972 -4126
Project: SDP - 2007 - 00035, Abington Place Phase II, Final Site Plan
Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources, LLC (fax 434.979.1681)
Owner or rep.: Mr. Greg Baldwin, Tribal Properties, LLC (fax 434.979.6266)
Date received: 14 May 2007
Rev. 4: 11 September 2007 (plans rev. elate 10 September 2007)
Date of Comment: 27 June 2007
Rev. 4: 1 October 2007
Engineer: Max Greene
Rev. 4: Phil Caster
The final site plan for Abington Place Phase II, received on 11 September 2007, has been reviewed. The
engineering review for current development finds this plan compliant with all county requirements and will
grant approval once the ESC bond has been posted and VDOT approval has been received.
A. Final site plan comments:
9. Rev. 4: All site plan comments have been addressed.
B. Erosion Control Plan Comments:
4. Rev. 3: The erosion and sediment control portion of the Water Protection Bond Estimate
is $47, 000.
C. Road plan Comments:
1. Plans have been forwarded to VDOT, continents will be sent as received. No comments
have been received at the time of this letter.
Rev. 4: VDOT approval has not been received at titne of this review.
Phase I final site plan was approved under File Number SDP - 2005 -00019
File: E4_fsp,esc,rp_P13C_07 -035 Abington Place Phase ll.doc
Sent By: INVISIBLE; 19999999999; Jan- 15 -0£3 2:13PM; Page 2/3
Albemarle County
Service Authority
I ( _,2 "'i I r - 16 — _Grsfl! T)(J
October 31, 2007
Dominion Development Resources, LLC
Attn: Mr. Justin Shimp, P.E.
172 South Pantops Drive
Charlottesville, Virgima 22911
Re: Abington Place -Phase 2
Dear Mr. Shimp:
The plan, entitled "Abington Place -Phase 2" dated March 21, 2007, last
revised September 26, 2007, is hereby approved for construction. One set of the
approved plan is enclosed for your records. Any previously approved plans are
voided with this approval. This approval is for basic compliance with the General
Water & Sewer Construction Specifications of the Albemarle County Service
Authority (ACSA) and does not relieve the contractor from responsibility for his
work as it relates to the plan and specifications.
The ACSA requires that a copy of the approved construction plan be on the
job site. The contractor is responsible for marking up a copy of the approved
construction plan showing as -built information and provide this data to your client
at the completion of utility installation- The final as -built plan shall be submitted in
a format of one paper copy and one mylar copy.
A preconstruction conference shall be scheduled with the project manager
to ensure coordination and answer any questions. This will be a short meeting to
review the project, materials, test methods and schedule, in order to expedite
construction. Please have the proper party call me at 977 -4511 to schedule the
meeting.
This approval is valid for a period of 18 months from this date. If
construction is not in progress at the end of this time period, the approval shall be
void.
The pressure for water may exceed 80 psi at some meter locations.
168 Spotnap Road • (Charlottesville, VA 2291 1 * Tel (434) 977-4511 • Fax (434) 979 -0698
www.serviceauthority.orq
Sent By: INVISIBLE; 19999999999; Jan -15 -08 2 :14PM; Page 3/3
If you have any questions or if we can be of assistance, please give us a
call at 977 -4511.
Sincerely,,
Thomas A. Garrison, PE
Senior Civil Engineer
TAG /slrb /dmg
cc: Edward H. Bain, Jr.