HomeMy WebLinkAboutSDP200700037 Approval - Agencies 2007-07-05111 V County of Albemarle Deaartment of Communitv Development July 5, 2007 Kirsten Munz, P.E., A.LC.P. Collins Engineering, LLC 800 East Jefferson Street, Suite 300 Charlottesville, VA 22902 RE: SDP -07 -047: Old Trail Townhouses Phase IV — Preliminary Site Plan Dear Ms. Munz, The Department of Planning and Community Development hereby grants administrative approval to the above - referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the preliminary approval shall expire July 5, 2008. If the preliminary site plan approval expires, a new application must be tiled and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Planning and Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. A submission and review schedule is attached for your information. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed at a later date. After the initial tentative plan submittal, each department /agency will contact you to discuss any remaining conditions. After all aforementioned department /agencies have granted a tentative approval, you may submit the final mylars (1 set), three paper copies, final site plan application, final site plan fee, and a copy of all written tentative approvals to the Department of Planning and Community Development. Assuming that the final site plan mylar reflects all tentative approvals, signing of the plans will occur within one week. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Community Development Department shall not accept submittal of the final site plan for si =n ature until tentative approvals for the following conditions have been obtained. The final site plan shall not be signed until the following conditions are met: Zoning & Current Development approval to include: 32. 7.9] A landscape plan for street trees and screening from recreational areas will be required for final site plan approval. 32.7.9.4(h)] A conservation plan checklist must be completed and incorporated into the site plan with notes to show how any individual trees and groups of trees designated to remain will be protected during the construction of this project. The locations of any tree protection fencing that coincides with the limits of clearing and other methods of protection from the checklist must be shown on the plan for clear identification during field inspections Conservation Plan format also available from Planning Staff). Please contact me at 296 -5832 x.3297 if you have questions or require additional information. En$ineering approval to include: Please add sidewalks to the proposed typical public street section for Killdeer Lane. These sidewalks will need to be shown on the final site plans and road plans. The engineering review for current development needs to review and approve all applicable items as specified in the Design Standards Manual, before recommending approval to the final site plan. Please contact Alan Schuek at 296 -5832 x.3064 if you have questions or require additional information. Albemarle County Service Authority approval to include: Approval of construction drawings for water service infrastructure, meters, easements. Please contact Gary Whelan at 977 -4511 if you have questions or require additional information. Fire & Rescue approval to include: Approval is subject to field inspection and verification. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: All accesses and roadways shall be designed in accordance with the current Subdivision Street Standards, The Minimum Standards for Entrances to State Highways and the Road Design Manual; Please contact Joel Denunzio at 293 -0014 if you have questions or require additional information. If I may be of further assistance, please don't hesitate to call. Very truly yours, J. Patrick Lawrence, Senior Planner Zoning & Current Development File: SDP 07 -037