Loading...
HomeMy WebLinkAboutSDP200700065 Calculations 2007-08-28PRELIMINARY DRAINAGE CALCULATIONS FOR LEWIS AND CLARK EXPLORATORY CENTER August 28, 2007 LOCATION: Tax Map 62, Parcel 23 Rivanna District, Albemarle County, Virginia OWNER: County of Albemarle and The City of Charlottesville 401 McIntyre Road Charlottesville, Virginia 22902 APPLICANT: Lewis and Clark Exploratory Center PREPARED BY: Dominion Development Resources 172 South Pantops Road Charlottesville, VA 22911 434.979.8121 F) 434.979.1681 LD -268 Roadside Ditch Calculation Lewis and Clark Exploratory Center I G-hti I o. + +;,,- I i-;-, SCC 2 0. 9 0. 5 0. 3 CA Tc 12 Q2 Slope Allow n selec n =.03 n =.05 V n =.015 110 Q10 DEP Remarks STA STA WS CA WS CA WS CA Inc Acc ft/ ft Vel 20 Vel Qn VEL IDEP JQn IDEP 0. 051 SCC 2 I 211 20 10 0. 0211 44 0. 051 137 0. 095 0. 166 0. 166 5. 0 5. 5 0. 91 0. 100 4. 0 0. 05 0. 05 2. 83 0. 36 7. 07 1. 17 0. 39 EC -2 201 19 10 0. 021 48 272 0. 188 0. 264 0. 429 5. 6 5. 3 2. 27 0. 100 4. 0 0. 05 0. 11 3. 56 0. 50 6. 87 2. 95 0. 56 EC -2 191 18 10 0. 0211 36 0. 041 110 0. 076 0. 138 0. 567 6. 1 5. 1 2. 92 0. 100 4. 0 0. 05 0. 15 3. 79 0. 55 6. 71 3. 81 0. 61 EC -2 18 17 40 0. 083 82 0. 094 178 0. 123 0. 3 0. 867 6. 5 5. 0 4. 36 0. 100 4. 0 0. 05 0. 22 4. 19 0. 64 6. 58 5. 70 0. 71 EC -3 " ", 17 16 10 0. 021 161 0. 0181 75 0. 0521 0. 091 0. 958 6. 9 4. 9 4. 71 0. 100 4. 0 0. 05 0. 24 4. 27 0. 66 6. 46 6. 19 0. 74 16 15 10 0. 021 16 0. 018 4319 2. 98 3. 019 3. 977 7. 3 4. 8 19. 14 0. 100 4. 0 0. 05 0. 96 6. 07 1. 12 6. 34 25. 23 1. 25 E0 15 14 10 0. 021 16 0. 018 127 0 .088 0. 127 4. 104 7. 6 4. 7 19. 47 0. 100 4. 0 0. 05 n a7l A nal 1 .13 6. 26 25. 71 1. 25 EC- 3,"..: PROJECT: wi n irk RI4 2r C nr_Date: 8 27107 Tc= 21. 6 min CA= 0. 30 x 12. 8 = 3. 84 x 3. 85 (110)Road:Rood A 010 =14. 78 cfs Station 14 +26 Culvert A CL Elev: 325. 34 Shoulder Elev: 325. 14 i L lnv Elev: 3 1. 0 So: =00- Inv Elev: 32 0148- L: _.52' _ I HEADWATER COMPUTATIONS CONT OUTLET j CULVERT TYPE SIZE Q Inlet Con Outlet Control HW VELOCITY ELEVHW /D HW Ke do dc +D) /2 ho H LSo HW CM Smooth 24" RCP 14. 78 1. 11 2. 22 0. 5 1. 40 1. 70 1. 70 0. 57 0. 5 1. 75 323. 22 7. 7 I i I PROJECT: LQw6s- -and- -C1Qr- k - xPkrotQry —Gen tp— r— Tc = 5. 0 min CA= 0. 65 x 0. 20 = 0. 13 x 7. 1 (110) 010 = 0. 92 cfs Shoulder Elev: -349U5 Date: 8127107 Road: Road A Station 17 +97 Culvert B CL Elev: 349. 55 Inv Elev: 3 So: Q, Q4-76 Inv Elev: -343 GQ- L: --6 -- CULVERT TYPE SIZE HEADWATER COMPUTATIONS CONT HW ELEV OUTLET VELOCITYQInletConOutletControl HW /D HW Ke do I (dc +D) /2 ho H LSo HW CM Smooth 15" RCP 0. 92 0. 40 0. 50 0. 5 0, 381 0. 82 0. 82 0. 401 3. 0 346. 50 6. 5 NOTE: USGS TOPO (10' CONTOURS) HAS br- EN ADDED TO THE SITE TOPO (2' CONTOURS) ORDER 10 SHOW THE DRAINAGE AREA MAP i' =:.•.a,; c.: -3r. " N t. °':• \, .:' 's - " ' i - .' \ t `. r — 'C>,` 3 , %e ` d`•• "v' -° -.. '-- ..- _ °_:.___ == r - " v _- t,_ l.v _ _ t x \ r _j • 600 '. <,',.. s `i+ ta. z._ __ _____ _ `""'' .°- '- :- `„__ - -._;- _^ ;< ^,'\ '?t` {+ , a 5 , Mw x I s, , q -• -_ _ .. \' .. " q i I - . , eYttl. <a r,• l '^: -,." ' _ _„r. -__ - <..- `'-=:•- .. -_r. _ -. m.- .v\ "_` - " 1 ' ' . i tx5 'St, 1 i ta r' r', -' _ _ _- °` =S _ _ ~ ` - - ' \`'" 5! f O k7 3a t (a / tt - -- ` `` ` \ / ` ` 2 _ _ _ -_ \ • t° • ,l t ` ` • I !4 } ...1 d it ;r e ' i ' . / ! ___ ". - - -:. \ __ _ '° _ - _ _ .- - \ ` y ^ t' 1 •`\ ` . 5 55 ` r ` x r ` ° et I 5 i e I ri I - -- _ _ _ -- -_ _ mow. -_ - - _, --- --- - ` ' k t ! ` t \ \ rI \ CULVERT A, Tc = 2 I mug i' ; , IF jt ' tF I I / d r\ a \ - _ _ - - - . \ t t ` min T `` \., <.\ , t \ - - - - -- - . _ `y4rr* 'x` r • \'• ctOverlandFlow = 7 0 Shallow Concentrated Flow Concentrated flow —, 3. 3 r O, - - -- - -. -- . 'trams.,•,, .. a, r a OL > N \• \ - - - - - _ ` - - Y \ ' - \\, , ' \ \ <'r\ , '`,'_ ,. C' UL'VERT A` - -- - -_r _ T - 2 1 \ \ `1' 11n, 0 t x r . s LEWIS AND CLARK EXPLORATORY CENTER DRAINAGE AREA MAP for CULVERTS r r f 28 20 0 AN GUS i ` . . 100 0 100, 200 \ sop AN I NOTE USGS Too coN )HAS _ \ THETO (ADDED AREA MAPS -- _THE DRAINAGE - - -ORDER TO SHOW _3 ' ". . ?,'y :.aro-. a w ~»`.'`.'; .- .,°.4•'v ' ^ ri-. i t " e t aJ _ _ 'f• yi`i y ^ ,.f °yy ,,.. -: _^ = = '^+.:' - ,;;vv. , \rte t -= .-' .__ -° P_'`,•. i,,.:.. ^y4` ='; ;'..,.a - §, , X•% a-- '.."`x A" o F t '_ • \ \. \ *.rt 4i :'i"` -Y Y i' f -=- SS I "/ L 4 l' .--.°^.^«+ .: '" « ^_'r'•- 'i= .^..-- '.v?" a .-"- Q, 3 ' ____ tt y , s t i4 P R'== - . =ter -- -- _''< _ , I `,' \~ \. • ` t` it. \ ` , L / .x. *mo /` *a, - - - `-. ,.. _.- ...._ -"'• - `' - - \'•. - _ 3 !^ i P 1 r f ir i + .j. - r `. ./ v. t °•• -,. _ y + t '3, s, t n i iaa 3' r 1 I ----- -- t. t* .rt `s a ;e I i I i 1t P I , ' : _ - - __ /<. t \• '? - - -- -_ -- - - - "- - . - - - -- _ - - -.- - ,• 'r aiLL t\ \ `A 3 H I i :i ii I / \ _ - - - __ __ __ y\` \ • \?t t '°n \. rr t t '' \ A. i p 3 i el t- S, • ,,\ ___ - ________ - - $ \i4 \'trt t" y; i `: t ` ' t a` I • Y;, ii £1 i 1 .. t Y . ' _ _ _ • \. ' a. •tt °L. \ t t tP' itR^`; 1l t ' ii. + N (({ 141 1 `,.\, ',teva \t'.,*•`• z \t - R yh.4 n : / ' O P ' af i - -- - - . • • t \, - - - a a typl:"t` a "`lt * # , t fi g'. r ' ' 3 0 ti + i - - _ _ _ _ _`" _ - - °O. "` a `\ v' °;'`''t ' i \ \.S ` N n r - _ -- - " _ f '" '•' fit, -., 4 M sip LEWIS AND CLARK EXPLORATORY CENTER t,\ r A MAP forREDRAINAGEA CONVEYANCE CHANNELSrSTORM r SCALE. 1" = 100 r rrw GUS 28, 2AUI 100 200 31000 r, *•`1N Short Version BMP Computations For Worksheets 2 - 6 Albemarle County Water Protection Ordinance: Modified Simple Method Plan: LAMBERT CABLE COMPANY Water Resources Area: Prep, NDN Date 26- Jul -07 Project Drainage Area Designatio 1310- FILTER 1 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 1 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage al A = I 0.71 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(1)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item pre - development Area post - development Area Roads Length 0 0 Width subtotal 0 Length 0 0 0 Width 0 0 0 subtotal 0 0 0 0 0 01 0 0 0 0 0 Driveways Length Width and walks 0 0 01 0 no. 1 0 subtotal 0 0 0 0 Length Width no.subtotal 0 0 0 01 0 0 0 0 010 Parking Lots 1 2 0 3 4 0 1 2 3 4 676067600 Gravel areas Area x0.70=0 Area x0.70=0 Structures Area 0 E10 no. 0 0 0 subtotal 0 0 0 0 Area 0 no. 11 0 1 subtotal 0 0 0 0 Actively - grazed pasture Area yards and cultivated to 6856.3 x 0.08 =549 1 Area 21293.51x 0.08 =1703.48 Active crop land Area x0.25=0 Area x0.25=0 Other Impervious Areas 0 1 0 Impervious Cover 2% I(pre) I(post) V(posj V 0.30 1 13:1' New Development For Development Areas, existini 1 impervious cover <= 20% C f I (pre) *Rv(pre)L(pre)L(post)RR RR Area Type 0.70 1.00 20%0.23 1.00 1.29 0.29 22% Development Area 0.35 1.00 0%0.07 0.14 0.65 0.50 78% Drinking Water Watersheds 0.40 1.00 11 %0.07 0.16 0.74 0.57 78% Other Rural Land min. values Redevelopment (For Development Areas, existing impervious cover > 20 %) C f I pre *Rv pre L pre L post RR RR Area Type 0.70 0.90 20%0.23 1.00 1.29 0.39 30%Development Area 0.35 0.85 0%0.07 0.14 0.65 0.52 81%Drinking Water Watersheds 0.40 0.85 1 0.07 0.16 0.74 0.60 81%Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Project Drainage Area Designatio BIO- FILTER 2 L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ] Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 1 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage a A = 1 2.15 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(1)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item f I (pre) *Rv(pre)L(pre)L(post)RR RR Area Type pre - development 1.00 20% Area post - development 1.29 0.29 Area Roads Length Width subtotal 0 0.14 Length 0 0 0 Width 0 0 0 subtotal 0 0 0 0 0 0 01 0 0 0 0 0.57 780 /0 0 0 Driveways Length Width and walks 0 0 0 0 no. 1 0 subtotal 0 0 0 0 Length Width no.subtotal 0 0 0 1 0 0 0 0 0 0 Parking Lots 1 2 0 3 4 0 1 2 3 4 4526.4324526.43221 1 0 Gravel areas Area x0.70=0 Area Ix 0.70=01 Structures Area 0 0 0 no. 0 0 0 subtotal 0 0 0 0 Area 0 no. 0 0 subtotal 0 0 0 0 Actively - grazed pasturE Area yards and cultivated to 28232 x 0.08 =2259 Area 71014.5 x 0.08 =5681.16 Active crop land Area x0.25=0 Area Ix 0.25=0 Other Impervious Areas 0 0 Impervious Cover 7% l(pre) ((post) v pos V 0.30 1 13.1 New Development For Development Areas, existing impervious cover <= 20% C f I (pre) *Rv(pre)L(pre)L(post)RR RR Area Type 0.70 1.00 20%0.23 1.00 1.29 0.29 22%Development Area 0.35 1.00 00 %0.07 0.14 0.65 0.50 78%Drinking Water Watersheds 0.40 1.00 1 %0.07 0.16 0.74 0.57 780 /0 Other Rural Land min. values Redevelopment (For Development Areas. existina impervious cover > 20 %1 C f I pre *Rv pre L pre L post RR % RR Area Type 0.70 0.90 20%0.23 1.00 1.29 0.39 30%Development Area 0.35 0.85 0%0.07 0.14 0.65 0.52 81%Drinking Water Watersheds 0.40 0.85 1%0.07 016 0.74 0.60 81%Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB Project Drainage Area DesignatiC 1310- FILTER 3 L storm pollutant export in pounds, L = [P(Pj)Rv /12 j [ C(A)2.72 ) Rv mean runoff coefficient, Rv = 0.05 + 0.009(1) Pj small storm correction factor, 0.9 1 percent imperviousness P annual precipitation, 43" in Albemarle A project area in acres in subject drainage al A = I 0.94 C pollutant concentration, mg /I or ppm target phosphorus f factor applied to RR V required treatment volume in cy, 0.5" over imperv. area = A(1)43560(0.5/12)/27 RR required removal , L(post) - f x L(pre) RR removal efficiency, RR100 /L(post) Impervious Cover Computation (values in feet & square feet) Item f I (pre) *Rv(pre)L(pre)L(post)RR RR Area Type pre - development 1.00 20% Area post - development 1.29 0.29 Area Roads Length Width subtotal 0%0.07 Length Width subtotal 78% 0 01 0 1 %0.07 0 0 0 78% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Driveways Length Width no.subtotal Length Width no.subtotal and walks 0 0 11 0 0 0 1 0 0 0 01 0 0 0 0 0 0 0 0 0 Parking Lots 1 2 3 4 1 2 3 4 0 0 14977.414977.4 1 0 Gravel areas Area Area x0.70=0 x0.70=0 Structures Area no.subtotal Area no.subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Actively - grazed pasturE Area Area yards and cultivated to 5654.5 x 0.08 =452 1 15570.81x 0.08 =1245.664 Active crop land Area Area x0.25=0 x0.25=0 Other Impervious Areas 0 0 Impervious Cover 1% 1 52% I(pre) I(post) V(posl V 0.30 1 13.1 New Development For Development Areas, existin impervious cover <= 20% C f I (pre) *Rv(pre)L(pre)L(post)RR RR Area Type 0.70 1.00 20%0.23 1.00 1.29 0.29 22 %Development Area 0.35 1.00 0%0.07 0.14 0.65 0.50 78%Drinking Water Watersheds 0.40 1.00 1 %0.07 0.16 0.74 0.57 78%Other Rural Land min. values Redevelopment (For Development Areas. existing impervious cover > 20 %) C f I (pre)*Rv pre L pre L post RR % RR Area Type 0.70 0.90 20%0.23 1.00 1.29 0.39 30%Development Area 0.35 0.85 0%0.07 0.14 0.65 0.52 81%Drinking Water Watersheds 0.40 0.85 1%0.07 0.16 0.74 0.60 81%Other Rural Land Interim Manual, Page 70 rev. 16 Feb 1998 GEB