Project: SDP - 2007 - 00074, Avemore Phase III, Final Site Plan
WPO -2007- 00061, Avemore Phase I11, ESC Plan
Plan preparer: Mr. Douglas J. March, P.E., WW Associates [fax: 434.978.1444]
Owner or rep.: Mr. Trevor Henry, Stonehaus, Avemore LLC [fax: 434.974.3542]
Plan received date: 01 August 2007 (plan date 31 July 2007)
Date of comments: 28 August 2007
Reviewer: Andrew Lowe
The final site plan and erosion and sediment control plan for Avemore Phase I1I, submitted on 01
August 2007, have been reviewed. The plans cannot be approved as submitted and will require
the following changes /corrections prior to final approval. Engineering is available from 2 -4 PM
on Thursdays to discuss these review comments. Please contact Mr. Allan Schuck at 296.5832,
ext. 3069, to schedule an appointment.
Please note that Albemarle County has updated the Design Manual [DM]. The DM and
Engineering Review Final Plan Checklist can be downloaded from the County's web site under
the subtitle "Design Standards ".
A. Final Site Plan (SDP- 2007 - 00074)
1. Please provide copies of the "grading and parking easement to be acquired" prior to final approval.
DM]
2. Slopes greater than 3:1 located at the end of Avemore Pond Road need to have low maintenance
not grass) ground cover specified on the plans. [DM]
3. Show the dumpster pad on the plan sheet C -5 with the same dimensions as shown in the detail
sheet C -7. Please show additional elevation points on the plan sheet to ensure drainage does not
collect on the dumpster pad. [DM]
4. Please label the maximum height of the retaining wall and provide a typical detail. Provide a
safety rail if the retaining wall is greater than 4' tall. [DM]
rt ` 5. The 3 parallel parking spaces on Avemore Lane do not have the minimum required aisle width of
20', please revise accordingly. [DM]
6. Please show and label the available sight distance lines at the entrances. [DM]
7. Please provide a guard rail or fence /gate at the end of pavement on Avemore Pond Road. [DM]
8. Show safety slabs (SL -1) in any drainage structure taller than 12'. [DM]
9. It appears that the new storm drain easement around structures 3 and 4 will need to be wider than
20' due to the depth of pipe. [DM]
10. Trees and structures are not allowed within a drainage easement, please revise landscaping plan
accordingly. [DM]
11. Additional comments may be forthcoming on the next submittal due to the required changes.
B. Erosion Control Plan (WPO- 2007 - 00061)
Narrative
1. The Narrative appears to be adequate.
igineering Review Comments
J
Page 2 of 2
Plan
2. It appears the limits of clearing and grading may need to be expanded to include the new sidewalk
to Fontana Drive. [DM]
3. Please provide tree protection for the 3 trees to be saved along Fontana Drive. [DM]
4. The tree protection needs to be located 5' outside of the actual drip -line of the tree. [DM &
VESCH 3.38]
Please provide a CIP for the culvert to the north at Fontana Drive. [DM]
Show stockpile location along with staging and parking areas within the limits of grading. [DM]
7. Additional comments may be forthcoming on the next submittal due to the required changes.
1 %/ C. Stormwater Management and Mitigation Plan (WPO- 2007 - 00061)
1. Stormwater Management is provided through a retention basin constructed during previous phase.
County of Albemarle
Department of Community Development
Memorandum
To: Trevor Henry
From: Gerald Gatobu, Senior Planner
Division: Zoning and Current Development
Date: October 19' 2007
Subject: SDP2007 -00074 Avemore Phase III Final Site Plan
The County of Albemarle Division of Zoning and Current Development will grant or recommend
approval of the final site plan referred to above once the following comments have been addressed:
Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning
Ordinances unless otherwise specified.]
1. [32.5.6] Minimum setback lines /yard and building separation requirements are subject to zoning
review. Please expect comments from Bill Fritz Deputy Zoning Administrator.
2. [32.5.6] Parking spaces provided for this phase do not meet the minimum required. Provide a
shared parking agreement addressing how parking requirements will be met.
3. [32.5.6] Add all recent (ZMA) Zoning Map Amendment and Special Use Permit Conditions to the
site plan.
4. Lighting/Photometric Plan
A) Make sure light fixture locations do not conflict with utilities and landscaping. Some light
fixtures are shown in the same location as trees.
B) All light fixtures with 3000 or more lumens must be full cut off.
C) Provide cut sheets for each lighting fixture on a separate sheet of the site plan. (Catalog
numbers on the cut sheets must match those on the luminaire schedule).
D) Show /clearly delineate the property lines on the lighting plan.
E) Light loss factor LLF /Maintenance Factor must be 1.
F) Add the standard lighting note to the plan.
5. Landscaping Plan
A) The conservation plan checklist needs to be signed.
B) Magnolia Grandiflora/Southern Magnolia 4' -5' height has an area of 54'feet and not 82' feet as
shown on the plant list. The total for the Southern Magnolia will then be 270 and not 410. This
brings down the total area in square feet for the trees to 11,706 down from 11,846.
C) Symbols on the plat list and site plan for the Scarlet Oak and the Honey Locust do not match.
Please coordinate the symbols on the site plan to match those on the planting list.
D) The plant list shows only 8 oaks on the property. With three oaks remaining /preserved that
makes 11. Landscape tabulation shows 8 oaks being for interior landscaping and 8 more being
for parking lot landscaping. This makes 16 Oaks. Please clarify.
Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext.
3385 for further information.
o r
IRGIN
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
January 22 2008
Stonehaus Inc.
c/o Pam Strother
2421 Ivy Road
Charlottesville, VA 22903
RE: ARB200700139 Avemore Commercial
Tax Map 78B, Section 3, Parcel 1
Dear Ms. Strother:
Gerald Gatobu, Current
Development
Fax 1434) 972 -4126
The Albemarle County Architectural Review Board, at its meeting on January 7, 2008, completed a
preliminary review of the above -noted request to construct two retail /office buildings consisting of 4 units
each totaling 19,200 square feet on 1.73 acres as part of a larger residential development. The Board
offered the following comments for the benefit of the applicant's neat submittal. Please note that the
following comments are those that have been identified at this time. Additional comments may be added
or eliminated based on further review and changes to the plan.
I . Confirm the brick used for the first two phases of development. If Shenandoah Colonial was used,
revise the Phase 3 finish schedule accordingly.
2. Provide samples for the "tony taupe ", "bone white" and door colors, and for the awning material /color.
Coordinate the drawings.
3. Revise the finish schedule to include the finish for the storefront, the color for the doors, and the
material and color for the awnings. Indicate in the schedule that the "tony taupe" color is for the
stucco.
4. Provide sections from Route 20 through Building 1 showing what will be visible from the Entrance
Corridor. Show on the plan what will be visible from the Entrance Corridor. Clarify the visibility of
the HVAC as viewed from the EC.
5. Show tree protection fencing on the landscape and grading plans. Add tree protection fencing around
the trees to remain on Fontana Drive,
6. Delete the caliper entry for the white pines, magnolias and dogwoods. Delete the height entry for the
honey locust and the scarlet oak. Increase the caliper to 2 Y" minimum for the honey locust and the
scarlet oak.
7. Provide a more coordinated planting along the west side and northwest corner of the site. Distribute
Shrubs throughout this area. Continue shrubs along the full length of the north side of the western
parking area. Replace the white pines with Virginia Red Cedar.
8. Revise the landscape plan to include trees along Fontana Drive, 2 caliper minimum at planting,
spaced 40' on center. For existing trees to remain, provide tree protection fencing.
9. Revise the lighting plan to indicate the proposed color /finish for the light fixtures and poles. Add the
following note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more
initial lumens shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public
roads and property in residential or rural areas zoning districts shall not exceed one -half footcandle."
10. For the "Avemore" signs, provide sign type, material, colors, and type of illumination (if any). For the
tenant signs, provide colors and type of illumination (if any). If illumination is proposed, provide
complete details.
11. Provide glass on the third side of the tower.
12. Coordinate the line drawing elevations with the renderings. For example, circular louvers are shown in
the line drawings and rectangular louvers are shown in the renderings. The rectangular louver should
be made as wide as the window.
13. Delete from the submittal views that are not visible from the EC. For clarity, regarding the views that
are provided, indicate on the drawings where the views were taken.
14. Provide a single awning color for all of Building 1, and a single color for all of Building 2. The colors
for Building I and Building 2 can be different.
15. In the towers, narrow the Avemore sign panel width to match the width of the doors below.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on -line at www.albemarle.org/plannin
drawings addressing the comments listed above are required. Include updated ARB revision dates on
each drawing. Please provide a memo including detailed responses indicating how each comment has been
addressed. If changes other than those requested have been made, identify those changes in the memo also.
Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Margaret Maliszewski
Principal Planner
CC: Avemore LLC
2421 Ivy Road
Charlottesville, VA 22903
Gerald Gatobu, Zoning and Current Development
ill . /t6,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: SDP -2007- 00074, Avemore Phase III, Final Site Plan
WPO- 2007 - 00061, Avemore Phase 111, ESC Plan
Plan preparer: Mr. Douglas J. March, P.E., WW Associates [fax: 434.978.1444]
Owner or rep.: Mr. Trevor Henry, Stonehaus, Avemore LLC [fax: 434.974.3542]
Plan received date: 01 August 2007 (plan date 31 July 2007)
Rev. 1: 12 December 2007
Date of comments: 28 August 2007
Rev. 1: 1 Fcbruaiy 2008
Reviewer: Andrew Lowe
The final site plan and erosion and sediment control plan for Avemore Phase III, submitted on 01
August 2007, have been reviewed. The plans cannot be approved as submitted and will require
the following changes /corrections prior to final approval. Engineering is available from 2 -4 PM
on Thursdays to discuss these review comments.
Please note that Albemarle County has updated the Design Manual [DM]. The DM and
Engineering Review Final Plan Checklist can be downloaded from the County's web site under
the subtitle "Design Standards ".
A. Final Site Plan (SDP -2007- 00074)
1. Please provide copies of the "grading and parking easement to be acquired" prior to final approval.
DM]
Rev. 1: This comment has not been addressed.
2. Slopes greater than 3:1 located at the end of Avemore Pond Road need to have low maintenance
not grass) ground cover specified on the plans. [DM]
Rev. 1: This comment has been addressed.
3. Show the dumpster pad on the plan sheet C -5 with the same dimensions as shown in the detail
sheet C -7. Please show additional elevation points on the plan sheet to ensure drainage does not
collect on the dumpster pad. [DM]
Rev. 1: This comment has not been adequately addressed. Please move the dumpster pad fisrther
away from the travel lane so the ivood fence and gate do not interfere with traffic.
4. Please label the maximum height of the retaining wall and provide a typical detail. Provide a
safety rail if the retaining wall is greater than 4' tall. [DM]
Rev. 1: This comment has been « thh-essed.
5. The 3 parallel parking spaces on Avemore Lane do not have the minimum required aisle width of
20', please revise accordingly. [DM]
Rev. 1: This comment has been addressed.
6. Please show and label the available sight distance lines at the entrances. [DM]
Rev. 1: This comment has been addressed.
7. Please provide a guard rail or fence /gate at the end of pavement on Avemore Pond Road. [DM]
Rev. 1: This continent has been addressed.
8. Show safety slabs (SL -1) in any drainage structure taller than 12'. [DM]
gineering Review Comments
Page 2 of 2
Rev. 1: This comment has been addressed.
9. It appears that the new storm drain easement around structures 3 and 4 will need to be wider than
20' due to the depth of pipe. [DM]
Rev. 1: This comment has not been addressed. It appears the easement will need to be larger than
21'. From structures 5 -4 the easement needs to be 26', from structures 4 -3 the easement needs to be
28' and from structures 3 -2 should taper towards 20' as the existing ground slopes.
10. Trees and structures are not allowed within a drainage easement, please revise landscaping plan
accordingly. [DM]
Rev. 1: This comment has been addressed.
11. Additional comments may be forthcoming on the next submittal due to the required changes.
Rev. 1: There are no additional comments.
B. Erosion Control Plan (WPO- 2007 - 00061)
It appears that all previous Engineering Review comments have been addressed. Engineering
recommends approval of this plan.
The Erosion and Sediment Control Bond amount is $16,000. Please contact Pam Shifflett at 434-
296 -5832 ext 3246 for more information concerning the posting of this bond.
Please submit 4 copies of the plans for approval.
C. Stormwater Management and Mitigation Plan (WPO -2007- 00061)
1. Stormwater Management is provided through a retention basin constructed during previous phase.
l)v W.J.
I R('[^A'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:SDP -2007- 00074, Avemore Phase I1I, Final Site Plan
WPO -2007- 00061, Avemore Phase III, ESC Plan
Plan preparer:Mr. Douglas J. March, P.E., WW Associates [fax: 434.978.1444]
Owner or rep.:Mr. Trevor Henry, Stonehaus, Avemore LLC [fax: 434.974.3542]
Plan received date:01 August 2007 (plan date 31 July 2007)
Rev. 1: 12 December 2007
Rev. 2: 25 February 2008
Date of comments:28 August 2007
Rev. 1: 1 February 2008
Rev. 2: 17 March 2008
Reviewer:Andrew Lowe
The final site plan and erosion and sediment control plan for Avemore Phase III, submitted on 01
August 2007, have been reviewed. The plans cannot be approved as submitted and will require
the following changes /corrections prior to final approval. Engineering is available from 2 -4 PM
on Thursdays to discuss these review comments.
Please note that Albemarle County has updated the Design Manual [DM]. The DM and
Engineering Review Final Plan Checklist can be downloaded from the County's web site under
the subtitle "Design Standards ".
A. Final Site Plan (SDP -2007- 00074)
1. Please provide copies of the "grading and parking easement to be acquired" prior to final approval.
DM]
Rev. 1: This comment has not been addressed.
Rev. 2: This comment has not been addressed. It appears that this comment will be addressed with
the approval of SUB- 2008 -00061 that has been submitted to the County for review. We can not
recommend approval until all easements have been granted.
2. All previous engineering review comments have been addressed.
B. Erosion Control Plan (WPO -2007- 00061)
1. It appears that all previous Engineering Review comments have been addressed. Engineering
recommends approval of this plan.
2. The Erosion and Sediment Control Bond amount is $16,000. Please contact Pam Shiftlett at 434-
296 -5832 ext 3246 for more information concerning the posting of this bond.
3. Please submit 4 copies of the plans for approval.
C. Stormwater Management and Mitigation Plan (WPO -2007- 00061)
Stonnwater Management is provided through a retention basin constructed during previous phase.
Alemade Coumy
Service Auth4rit
Serving A Conserving
WW Associates
Attn: Douglas J. March, P.E.
1402 Greenbrier Place
Charlottesville, Virginia 22901
Re: Avemore, LLC Phase III — Final Site Plan
Dear Mr. March:
The plan, entitled Avemore, LLC Phase III — Final Site Plan dated July 31, 2007,
last revised April 2, 2008, is hereby approved for construction. One set of the approved
plan is enclosed for your records. Any previously approved plans are voided with this
approval. This approval is for basic compliance with the General Water & Sewer
Construction Specifications of the Albemarle County Service Authority (ACSA) and does
not relieve the contractor from responsibility for his work as it relates to the plan and
specifications.
The ACSA requires that a copy of the approved construction plan be on the job
site. The contractor is responsible for marking up a copy of the approved construction
plan showing as -built information and provide this data to your client at the completion of
utility installation. The final as -built plan shall be submitted in a format of one paper copy
and one mylar copy.
A preconstruction conference shall be scheduled with the project manager to
ensure coordination and answer any questions. This will be a short meeting to review the
project, materials, test methods and schedule, in order to expedite construction. Please
have the proper party call me at 977 -4511 to schedule the meeting.
This approval is valid for a period of 18 months from this date. If construction is
not in progress at the end of this time period, the approval shall be void.
The pressure for water may exceed 80 psi at some meter locations.
168 Spotnop Road • Charlottesville, VA 22911 * Tel (434) 977-4511 . Fax (434) 979 -0698
www.serviceauthority.org
If you have any questions or if we can be of assistance, please give us a call at
434) 977 -4511.
Sincerely,
Thomas A. Garrison, P.E.
Senior Civil Engineer
TAG /dbh
cc: Avemore, LLC
State Health Department
Planning Department
Bldg Codes & Zoning Services
Soil Erosion Inspector
050601 AvemoreLLCWWAssoclates041508
llH
1
Y GI-Sk, .
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
Date: May 14, 2008
Greg Kamptner
County Attorney's Office
401 McIntire Road
Charlottesville, VA 22902
Regarding:
Fax (434) 972 -4126
Project Name: SDP 200700074 Avemore .Phase III Final
Date Submitted: 08/13/2007
Dear Mr. Kamptner:
Stonehause has submitted a deed of cross easements (shared parking agreement) for
the above named project. The project is a final site plan with off site shared parking.
Please find enclosed a deed of cross easements for the above project as per section
14.12.8.e of the Albemarle County Zoning Ordinance. At your earliest convenience,
please review the deed of cross easements (shared parking agreement) for form and
substance. Should you have any questions or comments please feel free to contact
me.
Sincerely,
Gerald Gatobu Senior Planner
County of Albemarle
Department of Community Development
Division of Zoning and Current Development
401 McIntire Road
Charlottesville, VA 22902
ggatobu@atbemarte.org
434)296 -5832, phone ex.3385
434)972 -4126 fax
Jdj rll N
COUNTY OF ALBEMARL.E
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832
Project: SDP- 2007 - 00074, Avemore Phase III, Final Site Plan
W PO- 2007 - 00061, Avernore Phase 111, ESC Plan
Plan preparer: Mr. Douglas J. March, P.E., WW Associates
Owner or rep.: Mr. Trevor Henry, Stonehaus, Avemore LLC
Plan date: July 31, 2007
Date of comments: June 4, 2008
Reviewer: Andrew Lowe
Fax(434)972 -4126
fax: 434.978.1444]
fax: 434.974.3542]
A. Final Site Plan (SDP -2007- 00074)
1. All previous engineering review comments have been addressed. Engineering recommends
approval of this plan.
B. Erosion Control Plan (WPO -2007- 00061)
1. It appears that all previous Engineering Review comments have been addressed. Engineering
recommends approval of this plan.
2. The Erosion and Sediment Control Bond amount is $16,000. Please contact Pam Shifflett at 434-
296 -5832 ext 3246 for more information concerning the posting of this bond.
C. Stormwater Management and Mitigation Plan (WPO -2007- 00061)
1. Stormwater Management is provided through a retention basin constructed during previous phase.