Loading...
HomeMy WebLinkAboutSDP200700076 Review Comments 2007-09-05Y 0' .i1J, 1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone(434)296 -5832 Project: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Fax(434)972 -4126 SDP -2007- 00076, Workman - Hoffman Building, Minor Amendment Kelly Gilmore, Keeney & Co. Architects [fax: 434.978.7438] HWK, LLC [fax: 434.296.9825] 09 August 2007 (plan revision date 8 August 2007) 05 September 2007 Andrew Lowe The minor amendment for the Workman - Hoffman Building, submitted on 09 August 2007, has been reviewed. Engineering cannot recommend approval without the following additional information. Engineering is available from 2 -4 PM on Thursdays to discuss these review comments. Please contact Mr. Allan Schuck at 296.5832, ext. 3069, to schedule an appointment. Please note that Albemarle County has updated the Design Manual [DM]. The DM and Engineering Review Final Plan Checklist can be downloaded from the County's web site under the subtitle "Design Standards ". A. Minor Amendment (SDP- 2007- 00076) 1. Please provide a structural detail for the bridge and abutment design. [DM] 2. Please provide handrails for the bridge. [DM] 3. All sidewalks must be at minimum 5'wide exclusive of curb. Please revise the new 3' sidewalk. DM] 4. All proposed slopes must be at least 2:1 or flatter. Please revise the 1:1 slopes at the bridge. A retaining wall may be needed to achieve appropriate slopes. [DM] 5. Please specify ground cover for the critical slope area. [DM] COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 ° Charlottesville, Virginia 22902 -4596 # 9: Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2007 - 00076, Workman- Hoffman Building, Minor Amendment Plan preparer: Kelly Gilmore, Keeney & Co. Architects [fax: 434.978.7438] Owner or rep.: HWK, LLC [fax: 434.296.98251 Plan received elate: Rev. 1: 31 October 2007 (plan rev. date 31 October 2007) 09 August 2007 (plan revision date 8 August 2007) Date of comments: Rev. 1: 20 November 2007 05 September 2007 Reviewer: Rev. 1: Allan Schuck Andrew Lowe The minor amendment for the Workman - Hoffman Building, submitted on 31 October 2007, has been reviewed. Engineering has no objection to this submittal of the minor amendment. A. Minor Amendment (SDP- 2007 - 00076) 1. All previous review comments have been adequately addressed with this plan submittal. Page 1 of 1 Patrick Lawrence From: Patrick Lawrence Sent: Thursday, September 03, 2009 1:35 PM To: Amelia McCulley; Rob Heide; Pam Shifflett Subject: Re: Workman / Hoffman Building Yesterday, September 2nd , I received from Mrs. Jennifer Workman a plot and inventory of the trees at the building site. This morning, I made a site inspection to verify the landscaping conditions and checked the canopy calculations. I am of the opinion that the requirement for landscaping and canopy cover have substantially fulfilled and that the landscape bond may be released. If I may be of further assistance, please don't hesitate to call. Patrick Lawrence 9/9/2009