Loading...
HomeMy WebLinkAboutSDP200700084 Review Comments 2007-07-05H 1f.ltFr . County of Albemarle Department of Community Development July 5, 2007 Kirsten Munz, P.E., A.I.C.P. Collins Engineering, LLC 800 East Jefferson Street, Suite 300 Charlottesville, VA 22902 RE: SDP - 2007 -037: Old Trail Townhouses Phase IV — Preliminary Site Plan Dear Ms. Munz, The Department of Planning and Community Development hereby grants administrative approval to the above - referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Zoning Ordinance Section 32.4.3.1. Therefore, the preliminary approval shall expire July 5, 2008. If the preliminary site plan approval expires, a new application must be tiled and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Planning and Colmnunity Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. A submission and review schedule is attached for your information. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed at a later date. After the initial tentative plan submittal, each department /agency will contact you to discuss any retraining conditions. After all aforementioned department /agencies have granted a tentative approval, you may submit the final mylars (1 set), three paper copies, final site plan application, final site plan fee, and a copy of all written tentative approvals to the Department of Planning and Community Development. Assuming that the final site plan mylar reflects all tentative approvals, signing of the plans will occur within one week. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Community Development Department shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained. The final site plan shall not be sigmed until the following conditions are met: Zoning & urrent Development approval to include:`. 32.7.9] A landscape plan for street trees and screening from recreational areas will be required for final site plan approval. 32. 7.9.4(b)] A conservation plan checklist must be completed and incorporated into the sitefplanwithnotestoshowhowanyindividualtreesandgroupsoftreesdesignatedtoremain will be protected during the construction of this project. The locations of any tree protection y fencing that coincides with the limits of clearing and other methods of protection from the checklist must be shown on the plan for clear identification during field inspections f Conservation Plan format also available from Planning Staff). Please contact me at 296 -5832 x.3297 if you have questions or require additional information. En;;ineerins! approval to include: Please add sidewalks to the proposed typical public street section for Killdeer Lane. These sidewalks will need to be shown on the final site plans and road plans. The engineering review for current development needs to review and approve all applicable items as specified in the Design Standards Manual, before recommending approval to the final site plan. Please contact Alan Schuck at 296 -5832 x.3064 if you have questions or require additional information. Albemarle County Service Authority approval to include: Approval of construction drawings for water service infrastructure, meters, easements. Please contact Gary Whelan at 977 -4511 if you have questions or require additional information. Fire & Rescue approval to include: Approval is subject to field inspection and verification. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: All accesses and roadways shall be designed in accordance with the current Subdivision Street Standards, The Minimum Standards for Entrances to State Highways and the Road Design Manual; Please contact Joel Denunzio at 293 -0014 if you have questions or require additional infonnation. If I may be of further assistance, please don't hesitate to call. Very truly yours, J. Patrick Lawrence, Senior Planner Zoning & Current Development File: SDP 2007 -037 OF AI, F " >RGFTP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WP0200700066, SDP200700084 Old Trail Ballard Fields Townhouses Phase 4 Plan preparer: Mr. Scott Collins, PE, Timmons Group (fax (434) 245 -0300) Owner or rep.: Mr. Gaylon Beights, March Mountain Properties LLC (fax 434.245.0300) Date received: 28 August 2007 Date of Comment: 19 September 2007 Lead Engineer: Max Greene The plans for Old Trail Ballard Field Townhouses Phase 4, received on 28 August 2007, has been reviewed. The engineering review for current development does not recommend approval of the plans until the following items are adequately addressed: A. Site Plan: Reviewed under SDP200700084 1. Please correct the contour confusions. The mix of one, two and 5 -trot contours has made a few errors on the plan. 2. Please label existing easements deed book and page. 3. Please label existing easement locations as shown on approved plats. 4. VDOT approval is required prior to final approval. B. Water Protection Plans: Reviewed under WP0200700066 1. The Lickinghole pro -rata share for this development will be determined prior to final approval. 2. Please show the soils map for the soils stated in the narrative. 3. DI -14 details and comps do not match. Please check all details and computations for congruency. 4. Sheet SWM -I note mentions drainage north and northwest of route 250. Should that reference be for Jarmans Gap route 691 ? 5. Minimum standards #1 and 45 could not be found in the narrative. Please add them and any other minimum standard that will apply to this site work. 6. Add the dust control symbol to the E &SC plan sheets. 7. Public water is available to this site. Please remove all notes about the temporary stone construction entrance being adequate. An Albemarle paved construction entrance will be required for this site. Just a reminder, DCR is enforcing the VSMP General Permit Registration Statement. Please contact Mr. Matthew Grant, DCR, at 804.225.3068 for more information. This does not affect your review /approval of this plan. Additional comments or requirements may be required due to the requested changes to the plans. Engineering staff is available on Thursdays from 2 - 4 PM to discuss these review comments. Please contact Mr. Allan Schuck, at 434?96.5832, Ext. 3069, to schedule a time to meet. File: EI_F-S(',SWM,SUF3_MRG_Old Trail Ballard Fields Io%nhouses Raw4.doc J rf I RGLNP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Old'Trail Townhouses IV (WP0200700066, SDP200700084) Plan preparer: Scott Collins [fax 245 -0300] Owner or rep.: March Mountain Properties LLC [fax 245 -0300] Date received: 28 August 2007 05 Dee 2007 (Revl) Date of Comment: 19 September 2007 17 Jan 2008 (Revl) Lead Engineer: Max Greene Jonathan Sharp (Revl) A. Final Site Plan (SDP200700084) 1. VDOT approval is required prior to final approval. A copy of the plans has been submitted to VDOT for review. 2. Once approved, please provide 3 copies of the road plans for our files. 3. Prior to approval of a final plat, the roads must be built or bonded. If you are going to bond the road, please provide a bond estimate request and a schedule of completion in conjunction with SUB200700338. B. Stormwater Management Plans (WP0200700066) 1. The Lickinghole pro -rata share for this development is set at $3586.87. This must be paid prior to approval of the SWM plans. 2. Please provide 2 copies of the SWM plans for our files. 3. No additonal SWM bond is required for this project. C. Erosion Control Plans (WP0200700066) 1. Inlet protection is not shown on all inlets during phase II of the plans. 2. Please provide 4 copies of the E &S plans for our tiles. 3. The E &S bond is set at $23,000. Just a reminder, DCR is enforcing the VSMP General Permit Registration Statement. Please contact Mr. Matthew Grant, DCR, at 804.225.3068 for more information. This does not affect your review /approval of this plan.