Loading...
HomeMy WebLinkAboutSDP200700099 Application 2007-09-25l y "bfl County of Albe.arle Planning Application 9 TMP 07800-00-00-014DO Owner(s): LINKOUS, JANICE S Application # SDP200700099 Community elopment Department, Zoning & — Current Development Division 401 McIntire Road Charlottesville, VA 22902-4596 Voice : (434) 296-5832 Fax : (434) 972-4126 Legal DescriptionACREAGE FLOW V.W.-MAZDA Magisterial Dist. 'Rivanna Land Use Primary Commercial Current AFD Not in A/F District Current Zoning PrimarylHighway Commercial House # Street Name Apt / Suite City State Zip -- - - - -- - - -- Street Address -- Entered By: Carla Harris on 09/25/2007 Application Type Site Development Plans Project: Flow Automotive - Major Received Date 09/24/2007 Received Date Final - -� Submittal Date 09/24/2007 1 Submittal Date Final Closing File Date Revision Number Comments: Legal Ad Total Fees 270.00 1 Total Paid ,270.00 [S,243.00 • Type Sub Application Date Comments — r Major Amendment - _ 709/25/2007 ] —J • s • -- -- ---` Primary Contact Ph # a34 2- - - Name SCOTT COLLINS, P.E. Fax # ( ) 93-3719 Phone Street Address ,800 EAST ON JEFFERSName [SC_ST.- CHARLOTTESVILLE VA ZipCoder22902-0000 City /State - '-- - ( -) --- -- Email �SGOTT@COLLINS ENGINEERING C.0 OM - Cellular #� Owner/Applicant Name LINKOUS JANICE S Phone # ( ) - Street A.- 2 205 SHEPHERDS RIDGE RD -� Fax #_- -_T- - - -- zip Code 22901 City / State CHARLOTTESVILLE VA -'� — E-mail Cellular #�( ) - Applicant Name (FLOW COMPANIES/ DON I Street Address 11425 PLAZA DRIVE -- - -- - City / State � WINSTON SALEM, NC E-mail LSPEIGHT@FLOWAUTO.COM Signature of Contractor or Authorized Agent Date Phone # '(336) 760-5211 Fax # (336) 760-7009 -J Zip Code! 27103-0000_' Cellular # — - Application # ISDP200700099 Project Name Flow Automotive - Major Application Type Site Development Plans All Applications: --,'5DP200400027 IWPO200400077 IARB200400092 ISDP200500029 Tax Map Parcel 107800-00-00-014DO I --- --'-"-------ARB200300177 Project Description Request for major site Plan Amendment approval for the construction of a canopy and a 672 square foot service building addition. The property, IAR8200700095 described as Tax Map 78, Parcel 14D contains 1.377 acres and is located in SDP200700099 the Rivanna Magisterial District on the south side of Route 250E, at 1313 Richmond Road. The property Is zoned (HC) Highway Commercial and (EC) entrance corridor. The Comprehensive Plan designates this property as Regional Service in the Neighborhood 3 (Pantops) Development Area. TMP Proffer Status Review Coordinator Site Inspector Date Assigned Entered By: Jonathan Sharp on 1112712007 unassigned Gatobu Reviewer ID Submittal Type Group or Agency Status Received -7 D - ue — Com pl - eted n - - I 1—thnCh w - chain I Mar Amend.ent, Fmm s,t� I EnoineerZ&CD pia- ---- - --- ---7No Objection 111/27/2007 1 111/28/2007 I Gerald Gatobu Major Amendment, Fi CDZCD Requested Changes 09/25/2007 10/16/2007 10/16/2007 Margaret Ma llszewski Major Amendment, Pr ARB Requested Changes 09128/2007 10/15/2007 09/28/2007 Andrew Slack n r Major Amendment, Pr E-911 Approved 09/27/2007 10/15/2007 10/03/2007 James Barber Major Amendment, Pr Major m n f, Fire Rescue No Objection 09/28/2007 10115/2007 10/11/2007 Jay Schlothauer Major Amendment, Pr j � in r Inspections Requested Changes 09/27/2007 10/15/2007 10/23/2007 Gerald Gatobu Major Amendment, F1 CDZCD Pending 10/29/2007 Jonathaa Shavp- MaW Amenciffient, F! Engineer -Z&CD W:ObjectloA 11/27/2007 JaySch,oihauer Major Amendment, Pr Inspections Requested Changes 11/27/2007 11/28/2007 Jonathan Sharp Major Amendment, Pr Engineer Z&CD Requested Changes 10/09/2007 10/11/2007 Comments Document (cioume-ciICK in green new LU UPWOU Comments: The box below is meant for short comments. JAII Engineering comments have been addressed. Date Sent Application for Major & Minor Site Plan Amenuments and All Reinstatements of Denied or Deferred Site Plans Major Amendment (Subject to Planning Commission Review) = $270 ❑ Minor Amendment (alterations to parking, circulation, I7jolded copies ojpfan are required building size, location) = S95 8 olded copies of sketch plan are required ❑ Reinstate Plan Review After 10 day Denial = $200 ❑ Reinstate Plan After Site Review Denial or Suspension = $65 ❑ Reinstate Plan Deferred by Applicant ❑ To a specific date = $35 ❑ Indefinitely = $75 17folded copies ofp1an are required Was a groundwater review conducted for the existing site plan? �oNI�T ❑YESI� FJ NO g CC)LAMT-t WA1� �-WER c IC YES: What is the average gallons of water used per day for the existing use(s) ? and What is the NEW average gallons of water used per day? If NO: What is tate average gallons of water used per day for the all use(s) ? ❑ Tier 3 Groundwater Review = $400 plus $25 per dwelling unit (Required for all plans showing a use that uses less than 2,000 gallans ofwater per day average) ❑ Tier 4 Groundwater Review = $1,000 (Required for all plans showing a use that uses greater than 2,000 gallons ofwater per dayaverage) ❑ Relief from conditions of approval from Planning Commission or Landscape waiver by agent = $180 ❑ Extension of approval prior to expiration of an approved plan - $45 ❑ Rehearing of Site Development Plan by the Planning Commission or Board of Supervisors = S190 ❑ Appeal of Site Development Plan to the Board of Supervisors = S240 Project Name: Fl._Q Lv A LATat`-t oTs J & Tax map and parcel: Ts- - f y 6 Magisterial District: K_T\ )AN/9 A Zoning: � C Physical Street Address (if assigned): Location of property (landmarks, intersections, or other): ScuTFt DF 13 43 f2a c rtM a"ROAD NGn ��o2 To / C -Row N (l�CCoNIG7r�y� (UDCA-C-o ON VE -a",_0 ` J Contact Person (Who should we call/write concerning this project?): Address az) s-� ,lmitPiSp t' City State1�Zip QQ `7U.1. Daytime Phone di( J4) )� 2 - 2 X19 Fax TJ ONS E-mail S4.y4o Celff:r, - grt �-roc/1:�r o.-+ Owner of Record _OKJJ r 7 A rv.i S L N k' ow' T YP, 4 -19 , vi � 3� Address City State Zip Daytime Phone (___) Fax # (—__) E-mail Applicant (Who is the Contact person representing?): FL-m\J C_0 T) pi `?P Ex -64 -rt Address I L�a S PLAaA �)lRS'jc City �\J�eiS10- - SAL -C" State NC Zip c?7103 Daytime Phone -76 U ` 5DI t Fax # 336 -760-'7005 E-mnii D5? r--1 6 k1 TC) FLOu A uTD, cotit FOR OFFICE USE ONLY I j l SD�P�}y# ` fee Amount Dale M r I 7 , tivha7lstK�i,i.y1� in � Receipt # �' ([./ � By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 5/1/06 page 1 oft Intended use or justification for request: Cos�sTRu�T�o1v nF !a c/AN09Y —�a Ex T �r-",o 0,FF-ac E. Owner/Applicant Must Read and Sign This site plan as submitted contains all of the information required by Section 32.5 (Preliminary Plan) or Section 32.6 (Final Plan) of the Albemarle County Zoning Ordinance. i understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.3 as the case may be. For Final Plans Only: To the best of my knowledge, I have complied with Section 32.4.3.1 and obtained tentative approvals for all applicable condif s, om the appropriate agencies. Signature of Owner, Contract Purchaser, Agent Date Print Name Daytime phone number of Signatory 5/1/06 Page 2 o1'2 App kation for Review of Erosion & Sediment Control Plan & Stormwater Management/BMP Plan & Stream Buffer Mitigation Plan �rosion & Sediment Control Plan 2--<tormwater Management/BMP Plan ❑ Stream Buffer Mitigation Plan (2 copies of plan & narrative) (2 copies of plan & computations) (2 copies of plan) Project Name: Tax map and parcel: (_)G) C �_(' 6()n UT S r+ G' Zoning: Amount of Land Disturbance: Acres Location of property (landmarks, intersections, or other): -1-11c ) oi'C,ybecC 1011 O� 4 v(.tV'aull C Ocri L"s Contact Person (Who should we call/write concerning this project?):T (N,mo o5 "(')1�t) p C/0 -,–Art, S -}1�' cteys } Address cl 7,46 S+- S � • city tt-CWIb�SV1IIE State VN Zip2_2��JCZ_ Daytime Phone (�) 3?1i 1o2�s Fax # ) ZGS- L1514 E-mail suM •ScL"nders C -fi>v ktons . CO L1 Owner of Record -es Address L(iP I[Q [2M Z2,2– City ��Ql'�O (IP_ State QA Zip Daytime Phone C'& M2,– USO Fax # C�Nb 9 4Zl 'A0q E-mail R U LLEY l W CLI1'�'eMLi.V IP. 0� Contractor — Address Daytime Phone () Fax # () City E-mail State Zip Plan Preparer-UMMO f, N Oupp nn II,, __ �} Address q I I 70 S; - - S City � ut State LA /Zip 2 Daytime Phone '1l 3' 1 3Z� &9, 3 Fax # ) Z, S • 0/ E-mail �/Y1 SCI LLi7� tSJ{'S /�% 7 tAAXVV3 , 6071- Owner/Applicant Must Read and Sign By signing this application as owner, I hereby certify that all requirements of the approved Erosion Control Plan, Stormwater Management/BMP Plan, and/or Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plan. Signature of O r, Cont t Purchas r Dat, '' n )7Y Sc Print Name Daytime phone number of Signatory FOR OFFICE USE ONLY WPO # Fee Amount $ Date Paid By who? Receipt # Ck# By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126 5/1/06 Page I oft TYPE OF PLAN FEE EROSION CONTROL PLAN: (SUBMIT 2 COPIES) 1. Plan for a Single Family Dwelling Unit ...................................... $130 2. Plan for Non -Exempt Agricultural Land Disturbing Activity.... $130 3. Plan for All Other Land Disturbing Activity: $320 plus $125/acre of disturbed area or portion thereof Acre(s) x $125 = $ + $320 = .................... $ _ 4. Major Amendment of Plan.......................................................... $150 5. SUBTOTAL EROSION CONTROL PLAN ........................... $ STORMWATER MANAGEMENT/BMP PLAN: (SUBMIT 2 COPIES) 6. Stormwater Management/ BMP Plan .......................................... $130 7. Major Amendment of Plan.......................................................... $100 8. SUBTOTAL SWMIBMP PLAN .............................................. $ STREAM BUFFER MITIGATION PLAN: (SUBMIT 2 COPIES) 9. Mitigation Plan........................................................................... $70 10. SUBTOTAL MITIGATION PLAN ........................................ $ TOTAL APPLICATION FEE: (Add lines 5, 8 and 10) (NOT TO EXCEED $3,000) THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL FEES WHICH MAYBE CHARGED TO THIS PROTECT. 5/1/06 Page 2 of 2 N, 0 k! 2 G 2 (J 0 7