HomeMy WebLinkAboutSDP200700099 Review Comments 2007-10-16OF ALg t 7 O R('V COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: October 16th, 2007 Scott Collins 800 East Jefferson St Charlottesville, VA, 22902. RE: SDP - 2007 -00099 Flow Automotive Major Amendment. Dear Sir, The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Zoning & Current Development (GDS E -911) Albemarle County Division of Planning (ARB Principle Planner) Albemarle County Division of Inspections (Building Official) Albemarle County Fire and Rescue Albemarle County Service Authority (Comments Pending) Virginia Department of Transportation (Comments Pending) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by Monday October 29` 2007. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please note that there will be a 15 day period for response to the second round of comments after October 29 Failure to submit information within the 15 day period will result in denial of the preliminary site plan. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Gerald Gatobu, Senior Planner County of Albemarle Department of Community Development Current Development 401 McIntire Road Charlottesville, VA 22902 -4596 Phone: (434)296 -5832 Ext 3385 Fax: (434)972-4126 tr9 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 To: Scott Collins From: Gerald Gatobu, Senior Planner Division: Zoning and Current Development Date: October 16, 2007 Subject: SDP 2007 — 00099 Flow Automotive Major Amendment. The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site development plan referred to above once the following comments have been addressed: [Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] 1. [32.5.6.A] Please show the zoning of adjacent parcels. 2. [32.5.6.13] Please indicate the maximum height of all structures. 3. Indicate the schedule of parking including maximum amount required and amount provided. 4. Include the maximum amount of impervious cover on the site. Please contact Gerald Gatobu in the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. Application #:SDP200700099 - hort Review Comm its Project Name: Flow Auto - Major LMajor Amendment Date Completed:10/03/2007 Reviewer:Andrew Slack E911 Review Status:Approved Reviews Comments:APPROVED. Date Completed:10/11/2007 Reviewer:James Barber Fire Rescue Review Status:No Objection Reviews Comments:Must comply with the Virginia Statewide Fire Prevention Code. Date Completed:09/28/2007 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:This proposal is scheduled for ARB review on November 5, 2007. Comments will be provided after that meeting. Page: 1.00 County of Albemarle Printed On: Tuesday, October 16, 2007 O' Al, .v County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Current Development planning review From: Jonathan Sharp, Current Development engineering review Date: 11 Oct 2007 Subject: Flow Automotive - Major (SDP200700099) Before Engineering can recommend preliminary and final approval to the major amendment, the following comments must be addressed: 1. One hundred feet on -site sight distance must be maintained by use of curbed islands a minimum 6' off building corners or other obstructions. 2. Curbing required on all proposed parking areas and travelways with VDOT designation (CG -2, CG,6) 3. All parking rows must be protected by curbed islands (for both the parallel and perpendicular spaces). The parallel spaces must be also be protected by curbed islands on the back side (side adjacent to the canopy. Curb islands must be a minimum 3' in width. 4. Will the existing perpendicular parking area directly adjacent to the guardrail and trees be removed or relocated? 5. Proposed parking areas cannot exceed 5% grade in any direction. 6. Please provide pavement design /details for proposed paving. 7. Please provide an adequate sidewalk detail: minimum 4" stone base and 4" of concrete of 3000 psi at 28 days, or stronger. 8. Please provide Albemarle County general construction notes per Design Manual. 9. The tree protection is shown in the pavement. There doesn't appear to be any work near the trees. Tree protection is probably not needed. ILB jRGIN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 August 7, 2008 Scott Collins Collins Engineering 800 E. Jefferson Street Charlottesville, VA 22904 Peter Sheeran Sheeran Architects 226 East High Street Charlottesville, VA 22902 RE: ARB 2007 -95: Flow Auto — Maintenance Building Addition Dear Scott and Peter: I have reviewed the recent submittal for the above - referenced proposal, including site plan sheet S -1 with revision date of 8/6/08 and architectural plans A2.1 and A2.1 with revision date of 8/5/08. The revisions made in these drawings resolve the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note that this application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. If you have questions, feel free to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: File Michael Wall, Flow Companies, Inc., via email LW I f J 4 County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Current Development planning review From: Jonathan Sharp, Current Development engineering review Date: 11 Oct 2007 Subject: Flow Automotive - Major (SDP200700099) Before Engineering can recommend preliminary and final approval to the major amendment, the following comments must be addressed: 1. One hundred feet on -site sight distance must be maintained by use of curbed islands a minimum 6' off building corners or other obstructions. 2. Curbing required on all proposed parking areas and travelways with VDOT designation (CG -2, CG,6) 3. All parking rows must be protected by curbed islands (for both the parallel and perpendicular spaces). The parallel spaces must be also be protected by curbed islands on the back side (side adjacent to the canopy. Curb islands must be a minimum 3' in width. 4. Will the existing perpendicular parking area directly adjacent to the guardrail and trees be removed or relocated? 5. Proposed parking areas cannot exceed 5% grade in any direction. 6. Please provide pavement design /details for proposed paving. 7. Please provide an adequate sidewalk detail: minimum 4" stone base and 4" of concrete of 3000 psi at 28 days, or stronger. 8. Please provide Albemarle County general construction notes per Design Manual. 9. The tree protection is shown in the pavement. There doesn't appear to be any work near the trees. Tree protection is probably not needed. V.IRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 VirginiaDOT.org David S. Ekern, P.E. COMMISSIONER October 15, 2007 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments October 18' 2007 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the October 18' 2007 Site Review Committee Meeting: SDP - 2007 -00099 Flow Automotive — W or Amendment (Gerald Gatobu) It appears that the amendment for the additional space and canopy will not increase the use of the existing entrances to the site off route 250. Please verify that this amendment will not increase the traffic in and out of the site. SDP-2007-00100 Sprouse Property / Verizon Tier II PWSF — Final (Megan Yanielos) Adequate sight distance needs to be verified at the intersection with route 240. The speed on route 240 is 45 mph and the corresponding sight distance is 500 feet. SDP - 2007 -00101 Herring Property / Verizon Tier II PWSF — Final (Megan Yanhdos) No comments SUB - 2007 -00298 Bonner Lane — Two lot — Final (Megan Yaniglos) Because of the reduction of frontage along Deer Path Road for each lot, it is recommended that a shared use entrance easement be required to be centered on the property line that divides the proposed lots. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. goo 'S` 1OF TRA NSPORTATCOR EXCELLEAfCE 9 0 6 2 1) 0 6 Sincerely, Joel DeNunzio, P.E. Residency Program Manager VDOT Charlottesville Residency 434 - 293 -0011 cc Allan Schuck, Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Suminer Frederick, Patrick Lawrence, and John Giometti AL, t 'l Gi1lP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 November 15, 2007 Sheeran Architects c/o Peter Sheeran 226 East High Street Charlottesville, Va 22902 RE: ARB2007 -00095 Flow Auto - Maintenance Building Addition Tax Map 78, Parcels 14D Dear Mr. Sheeran: Gerald Gatobu Zoning and Current Development Fax (434) 972 -4012 The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, November 5, 2007. The Board by a vote of 5:0 approved the request, pending staff administrative approval of the following conditions: 1. Provide for review front and side elevations of the addition, and side elevations of the canopy, to clarify the relationship of both the addition and canopy to the existing building and to each other, and to clarify the method of support for the canopy. Provide all elevations to scale and indicate the scale on the drawings. 2. Revise the architectural elevations to include a materials schedule specifying the following materials and colors: a. EIFS: Sto, gray dawn b. Storefront: Aluminum with clear anodized frames and clear insulated glass c. Fascia: To match EIFS color d. Brick: To match brick base at front of dealership building 3. Revise the photometric plan to show illumination levels calculated using a maintenance factor of 1.0. Ensure that lighting levels do not exceed 30 footcandles. Revise the luminaire schedule to clearly note the color of the proposed fixtures. 4. Provide for review complete details on all proposed signs. (Reference the ARB Sign Review Checklist.) 5. Revise the site plan to show the proposed planter on the west side of the building. Provide for review complete information on the plants proposed for the planter. Indicate on the plan that the brick for the planter will match the brick at the front of the showroom building. 6. Add understory of evergreen shrubs in island between Entrance Corridor and building. 7. Drawing as submitted 11 -5 -07 A2.1 showing full frontage addition shall govern. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 1 A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner Cc: Don Speight 1425 Plaza Drive Winston- Salem, N.C. 27103 Linkous, Janice S 2205 Shepherds Ridge Rd Charlottesville Va 22901 Gerald Gatobu, Zoning and Current Development