VSMP Permit plan review —Approved
Project: Glenmore Leake K2 Lots 24-27 & 29 Amendment Plan
Plan preparer: Graham Murray, Collins Engineering [200 Garrett St., Suite K, Charlottesville,
VA 22902, graham(&collins-en ing eerieg com, scott(&collins-en ine eerieg com]
Owner or rep.: Neal Sansovich, Central Virginia Real Estate Ventures LLC
2325 Grey Heron Rd, Keswick, VA 22947
Plan received date: 27 Aug 2015
(Rev. 1) 20 Jan 2016
(Rev. 2) 31 Mar 2016 (.PDF/e-review)
Date of comments: 24 Sep 2015
(Rev. 1) 6 Mar 2016
(Rev. 2) 31 Mar 2016 —Approved
Reviewer: John Anderson
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1)
a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary.
Provide SWPPP Exhibit. May use details from WP0201300015 ESC plan, if relevant. A SWPPP
is not requested, but rather Exhibit showing PPP measures. PE -seal (signature/date) is required.
Alternatively, provide a complete SWPPP. Note: A SWPPP has been required by the Virginia
VPDES permit program for projects disturbing an acre or more since 2009, at least. Request
solicits material that should exist for WP0201300015, but I regret late request for an Exhibit.
(Rev. 2) Addressed.
B. VSMP: SWPPP: Stormwater Management Plan (WP0201500062 /Amends WP0201300015)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This
plan is approved.
1. Identify WPO Plan Number and Title being amended. Revise Title, sheet 1, to include WPO Plan number
and title being amended. (Rev. 1) Addressed.
Remaining comments, sheet 2:
2. Provide SWM Facility Access. (ACDSM.5.BMP for SWM) (Rev. 1) Partially Addressed. As follow-up:
Ref. photos 1, 2 [county; 9/24/15]: Access/guardrail conflict. Provide opening. Reference/adopt VDOT
guardrail specifications in design (GR -2, 2A). Show guardrail in both plan view images, sheet 2.
Engineering Review Comments
Page 2 of 3
Photo I/view south —Farringdon Rd.
(removed —shown with prior comments)
Photo 2/view north —Farringdon Rd.
(removed —ref prior comments)
Please provide VDOT guardrail details/design[VDOT R&B SpecNol. I -GR-2, 2A; sheets 1 and 2; rev. date 7/111
(Rev. 2) Addressed.
Label road (provide name). (Rev. 1) Addressed.
Furnish Approved basin 2-, 10-, 100 -yr routings for comparison. (Rev. 1) Addressed. As follow-up:
WP0201300015: (Apr 17, 2013 routings / peak cfs)
Q2 =17.07
Qlo =29.98
Qioo =64.02
WP0201500062/Amendment (peak cfs):
Q2 =7.59, ok, <Apr 17 2013 routings
Qlo =42.83
Qioo =76.70
WP0201500062 Qlo > WP0201300015 Qlo. DEQ has advised that a Part IIC facility that proposes to
increase rate of discharge forfeits Part IIC eligibility, writing: "Your summary of our telephone conversation
(below) is correct. "Grandfathered" projects that are subsequently amended or modified resulting in an
increase in the amount of TP leaving each point of discharge, or resulting in an increase in the volume or
rate of runoff are no longer considered "grandfathered" under Section 48 of the VSMP regulations. As a
result, the amended or modified project must be designed to comply with the new Part IIB technical criteria.
[Andrew Hammond, VDEQ —email: 12/15/2015 5:42 PM]
Please revise design to provide Qlo < Apr 17, 2013 Qlo. (Rev. 2) Follow-up Addressed.
OUTPUT:
Routing method: storage -indication
tiydrograph a
Routing summary of Peaks: 2 -yr 24 -hr Peak scs storm
inflow (cfs) 23.062 at 11.98 (hrs)
discharge (cfs) 15.919 at 12.10 (hrs)
water level (ft) 348.951 at 12.10 (hrs)
storage (cy) 738.266
nydrograph 1
Routing summary of Peaks: 10 -yr 24 -hr Peak scs storm
inflow (cfs) 48.G79 at 11.98 (hrs)
discharge (cfs) 24.846 at 12.14 (hrs)
water level (ft) 351.551 at 12.14 (hrs)
storage (cy) 1427.889
nydrograph 2
Routing summary of Peaks: 160 -yr 24 -hr Peak scs Storm
inflow (cfs) 106.565 at 11.98 (hrs)
discharge (cfs) 81.120 at 12.06 (hrs)
waterlevel (ft) 353.332 at 12.06 (hrs)
storage (cy) 2112.510
Identify Approved basin type consistent with 9VAC25-870-96.C. Table 1, or DEQ BMP Clearinghouse
nomenclature (basin is non-specific). (Rev. 1) Addressed.
Multiple references to As -built are inconsistent with site inspection, 24 -Sep 2015 (discussed briefly with
Scott, 24 -Sep). Correct existing grade to reflect As -built grades. In places, grade is 1:4, near vertical.
Steepest existing grade on WPO Plan Amendment is 1:1. Accuracy is critical. Avoid inaccurate grades
which may have contributed to conditions that required this plan amendment. (Rev. 1) Addressed —
Appreciate response: "The extended detention basin's topography and spot shots shown reflect asbuilt data
provided to Collins Engineering by Commonwealth Land Surveying, LLC. The September 24, 2015
comments reference a site visit where County Engineering observed grades of 1:4. This is in contrast to the
licensed land surveyor's topography which triangulates grades of 1:1.33 in the vicinity of the basin's steeper
areas. In both cases though, the steeper grades to the east are mitigated with the proposed grading
modifications. The proposed grading changes consist of filling the lower 6' and shrinking the bottom
footprint's length slightly. To offset this minor shortening of the basin floor, it was expanded in width.
Raising the facility 6' now allows the contractor to catch grade more easily while burying steep side slopes.
Shrinking the footprint's length also allows the contractor to grade back to the 350' contour from the new
basin floor elevation of 342' over a greater horizontal length. It is the applicant's hope that the paid 31
Engineering Review Comments
Page 3 of 3
party survey, coupled with the proposed modifications, resolves County Engineering's concerns regarding
the proposed side slopes of the extended detention basin." [Last pp.: 24 -Sep 2015 site photos]
7. Specify means of sealing existing low -flow orifice, and three 12" DIA mid -flow orifices. This requires
engineering, not flexibility. Specify materials, products, etc. Specify with level of detail to ensure orifices
are watertight. Alternatively, specify which sections of existing 42" DIA concrete riser must be replaced.
(Rev. 1) Addressed.
8. Revise profile description `to be sealed.' Revise to reference details, narrative, notes, specifications. See
item #7. (Rev. 1) Addressed.
9. Delete reference to `Equivalent trash rack' (Hanson typical, bottom margin); `Contractor may elect to install
a different trash rack.' Design cannot leave this degree of unapproved plan change to a contractor's
discretion. (Rev. 1) Addressed.
10. Specify Hanson Anti -vortex frame and grate. Grate access to 42" DIA riser is essential. Design must
specify precast Hanson Anti -vortex device with frame and grate, or alternative device. (Rev. 1) Addressed.
11. Provide field survey As -built Exhibit (not just spot shots) to accompany Plan Amendment, an exhibit based
on field survey data obtained after today. (Rev. 1) Addressed.
12. Note: A number of photos support comments, and are available. [pp. following] (Rev. 2) Acknowledged.
C. VSMP: SWPPP: Erosion Control Plan (WP0201500062)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved.
Provide Exhibit that provides ESC measure details including storm runoff bypass/diversion during period of
constructed modifications to facility. This is not request for a complete ESCP, but is essentially equivalent.
Required for SWM Plan Amendment Approval. Focus on practical measures and potential for downstream
impact since bypass of storm events during period of construction would appear essential. May revive
WP0201300015 ESC plan sheet/s to show ESC measures, if helpful. (Rev. 2) Addressed.
Please submit four (4) copies of the WPO/VSMP plan for Approval. Please also provide 2 copies of SWPPP
exhibit, and 2 copies of revised ESCP/VSMP SWPPP inserts (11" x 8.5").
Thank you.
File: WP0201500062_Glenmore Leake K2 Lots 24-27 & 29—SWM Amendment Plan_033116rev2 Approval.doc