Loading...
HomeMy WebLinkAboutSUB201600054 Checklist - Project Closeout (Administrative) 2016-03-31 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please com I lete this form within 30 days of final action,place in folder and forward to CDA FOR QC and sta : lel. CDA will forward to the Imaging Center for digital closeout. SD /S B # 0164`;� PROJECTTITLE (U J o��,44f-1d-1176 — �}- FULL `AME OF LEAD REVIEWER Q4)s ,..,, FINAL ACTION DATE: 3 -3F/6' CountyView— 1Application,Page 2 Data Entered Assessment, or other documents placed in "Docs&Pics" Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse 7 chronological order(latest on top). j Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" I next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. I I Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the 1 document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. SOMELIFIRLOTIMPHIMINNeweesumm_tion �k,aii u ,dation ,❑'Application(signature copy) „2Scan ❑ Saved location nce scan U AMIN. Applicant Correspondence(to/from, memos/emails) Haer Scan ❑ Saved location Complete set of printed Review Comments ,O Scan 0 Saved location Approved lan/plat(signed, or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location 610111.1111111MIPII6dministrative Approval) — ► ❑ Saved location iiiiiiii6/BOS Meeting Package- Staff Report(include plan/plat presented,PC/BOS Action Letter) 141/1111111■■• 0 Saved location h `'_".•. 1 "iii n j fssments 0 Saved location –i.e. Studies) kimismm 0 Saved location dies) d location Slimmaipiumeillaiimisimmaissinapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. 0 Scan 0 Saved location I I j fAdditional Information on this project: