HomeMy WebLinkAboutSDP200700147 Review Comments 2007-12-17Ji l 2 „Itht ....,_,..,,,,,, J COUNTY OF ALBENIARLE Department of Community Development 401 `Iclntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:SDP200700147, Avon Park 11 Final Site Plan Prior to Preliminary Tax Map 90 Parcel # 31 Primary Contact: Alan Franklin, c/o Terra Concepts (434.295.4005) (fax 434?952 102) 224 Court Square Charlottesville, VA 22902 E -mail -- afrankliniu terraconceptspc.com Owner or rep.:Weather Hill Development, LLC (434.296.9484) (fax 434.296.2560) 703 E. Jefferson Street Charlottesville, VA 22902 E -mail — frankuc \veatherhilldev.com Date received:03 December 2007 Date of Comment: 17 December 2007 Planner:Patrick Lawrence, Senior Planner Site Review Committee Meeting - Room 235 --Thursday, December 27, 2006, 10:00 AM The current Development Planning Division of the Albemarle County Community Development Department has reviewed the above referenced final site plan prior to preliminary site plan received on 3 December 2007 has been reviewed for presentation to the Site Review Committee meeting listed above. The Planning division recommends approval of the final site plan upon the resolution of the following comments. [Each comment is preceded by the applicable reference, which is to the Zoning Ordinances (Chapter 18 ofthe Albemarle County Code) unless otherw ise specified.] As preliminary and final site plans shall be in substantial agreement, this final site plan, without benefit of a preliminary site plan, must contain the following elements of a preliminary site plan as described in 32.5.6 et seq. of the Albemarle County Code: 1. 32.5.6( Please amend the "General Notes" to include the zoning district EC Entrance Corridor. 2. 23.5. 6(cg If phasing is planned, please show phase lines and proposed timing of development. 3. 3 2 .5.6 (/)1 Please indicate if the site is located within a reser\ oir watershed district. 4. 18 32.5.6 (n)J Please show any outdoor lighting such as street lighting plus any and all signage. Final site plans according to Section 18 — 32.6 et seq. of the Albemarle County Code shall contain the following: 5. 32. 6.6(a)J Specific written schedules or notes as necessary to demonstrate that the requirements of this chapter are being satisfied such as an indication as to whether the units are sale or rental units, number of bedrooms per unit, specifications for recreational facilities. 6. 3 2.6.6(C)J Please show the location of any and all proposed easements and whether the same are to be Albemarle County Communy Development Engineering Review Comments Sheet 2 of 2 publically or privately maintained. 7. 32.6.6(0/ Please make sure that the landscape plan is in conformance with 32.7.9 of the Albemarle County Code. 8 /32.6.601 If outdoor lighting is planned. please provide: an outdoor lighting intormation including a photometric plan, location, description, photograph or diagram of each type of outdoor luminaire. Final approval of the site plan is subject to approvals from all agencies and departments. Ji1 "III iN i COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park II [SDP200700147, WP0200700103] Plan preparer:Alan Franklin, Terra Concepts [fax 295 -2102] Owner or rep.:Frank Pohl, Weatherhill Development [fax 296 -2560] Plan received date: 05 Dec 2007 15 Feb 2007 (Revl) Date of comments: 27 Dec 2007 19 Feb 2007 (Revl) Reviewer:Jonathan Sharp A. Preliminary Site Plans (SDP200700147) 1. Please provide any necessary offsite easements. [policy] Revl: See comment #8. 2. Interconnections are required to extend to the property line. [ 18- 32.7.3] Revl: See comment #6. 3. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. Revl: See comment #31. 5. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. This must be addressed with the final site plan. [DM] Revl: See comment #10. B. Final Site Plans (SDP200700147) 6. In order to administratively waive the extension requirement of the interconnection to the property line, a waiver request must be reviewed and approved by the agent. Criteria for the waiver request can be found in 14 -409D. Revl: The waiver request has been received and has been submitted to the agent, Bill Fritz, 7. The gore between Avon Park I and Avon Park II appears to be an issue. Revl: Once the BLA plat correcting the gore gets recorded (SUB200800027), please show the parcel boundary lines per recorded plat. 8. It appears that construction/grading easements are needed from the following parcels: TMP 90 -6D, 90FA 1, 90F -9, and the gore parcel. Revl: Please provide deed book and page reference for the shown 20' grading easements. 10. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. Revl: comments not addressed. I do not anticipate Glenn or Mark altering the Design Manual Albemarle County Community Development Engineering Review Comments Page 2 of 4 requirements. Please fulfilling the Design Manual requirements. 13. Provisions and easements for drainage across 3 or more lots is required. Dense development where fencing, decking, etc is expected should provide yard inlets and pipes rather than ditches. Revl: Please provide yard inlet and pipes. 16. Please provide inlet shaping (IS -1) on all inlets. Revl: I cannot find the reference for IS -1 on the plans. 18. Please provide inlet calculations for A16, E2, and G1. Revl: comments not addressed. C. Road Plans (SDP200700147) 20. VDOT approval is required. Revl: comments not addressed. 21. With the shown gore, continuous right -of -way is not being provided. Please provide continous right -of -way. Revl: See comment #7. 28. Please show and label cross drain locations with VDOT designations (CD -1,2) at every major cut and till transition or sag curve on the street profile sheets. Revl: I cannot find the cross drains on the plans or profiles. 30. A road bond amount will be computed by the County once the plans have been approved. Albemarle County Community Development Engineering Review Comments Page 3 of 4 D. Stormwater Management Plan (WPO200700103) 31. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. Revd: The removal rate provided should read "50 %, " not "15 %, " in Table 12 of the SWM plans. 32. Per the application plan, a biofilter is required. Along with providing adequate stormwater detention, it must treat the first half inch of runoff for stonnwater quality (sized for 2.5% of all impervious area draining to the facility). Revl: Please provide adequate biofilter cross - section details, including all required items from the Design Manual Checklist. For example, cross section of dam, biofilter media, underdrain /gravel, etc. 35. Sediment forebays shall be provided for all biofilter at all inlets. Revd: No plantings /underdrains /media should be located in the sediment forebay. Riprap can be installed at the same elevation as the forebay floor so that no ponding occurs. 36. Please show the vehicle access road to the SWM facility. The road should be located in a SWM easement. Revd: Please specify the location of the access to the riser structure and forebay. 37. Additional comments may be needed upon resubmittal. Revd: Please show the compliance for the 2 year storm in Table 14 of the SWM plans. Please specify the barrel slope of the SWM facility and specify the clean out locations in the biofilter: 38. A SWM bond amount will be computed by the County once the plans have been approved. E. Erosion Control Plan (WPO200700103) 39. Per Proffer #3: "The Owner shall, to the maximum extent practicable as determined by the County's Program Authority, provide additional erosion and sediment controls to achieve a sediment removal rate of eighty percent (80 %) the Property." Please provide additional E &S measures to comply with this proffer. Please include a narrative describing what types of measures you intend to provide in order to achieve a sediment removal detainment ?) rate of 80% (can be included in the E &S narrative). At the end of the comment letter is an attached County Engineer's Commentary discussing Extra Erosion and Sediment Control. Revl: We have provided the following comments on above and beyond measures: Third Party Inspections — This is acceptable. Please provide additional information about these inspections. Please provide how often inspections will take place and how to report the inspections to the County. Correcting downstream impacts resulting from failure — This is not above and beyond. This is a requirement. Reinforced Silt Fence — This is one of the minimum standards, not above and beyond. Engineering recommends using Super Silt Fence (reinforced chain link fence with steel posts) as an acceptable above and beyond measure. Extra storage in trap — Engineering recommends using Super Silt Fence around the northwest perimeter of the site as the E &S measure in lieu of the proposed trap. Extra storage in basin — This is acceptable. Please specify the percent increase in storage this will be. Matting on slopes — This is acceptable. Albemarle County Community Development Engineering Review Comments Page 4 of 4 Please include the list of acceptable additional measures in the E &S narrative. 40. It appears that construction /grading easements are needed from the following parcels: TMP 90 -6D, 90FA1, 90F -9, and the gore parcel. Revl: See comment #8. 43. All existing vegetation shown to be preserved should be in accord with the tree conservation plan. Tree protection should be located outside the drip edge of trees. 44. Erosion Control measures are in the way of construction /grading. For example, diversions are located in fill. Revl: Erosion Control measures are still in the )'ay of construction /grading. 46. Protection is not provided for all stages of construction. For example, no protection is provided below sediment trap 2. Also, no protection is shown for the area of offsite construction near the construction entrance. Protection on the northwestern portion of the property appears to be inadequate. Revl: Protection is still not provided for all stages of construction. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. Engineering recommends using Super Silt Fence all along the Northwest perimeters for the areas not draining to the basin. For the areas draining to the basin, Engineering recommends using diversion dikes and /or Stormwater Conveyance Channel configuration to get sediment to the basin, rather than a temporary slope drain. 47. Silt fence should not be used across contours. Revl: Silt fence is shown in the way of construction /grading. 49. Please provide adequate channels (MS -19) at the outfall of the SWM facility. Revl: Based on Technical Bulletin #1 regarding the interpretation of MS -19, providing detention for the 2 year and 10 year storm does necessarily provide adequate downstream channels, especially if downstream channels are not adequate for the existing conditions. Technical Bulletin #1 can be found at: http: / /wri'w.der. 'in.'i ia.J oL' /.coil & n'ater /documents /techltnl.P1)F. Pipes and channels downstream of the site must be adequate. The 21" pipe running under Rte. 742 discharges directly into the yard of TMP 90 -24, with no existing channel in place. This is a major concern. 50. Additional comments may be needed upon resubmittal. 51. An E &S bond amount will be computed by the County once the plans have been approved. t ti COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park II [SDP200700147, WP0200700103] Plan preparer:Alan Franklin, Terra Concepts [fax 295 -2102] Owner or rep.:Frank Pohl, Weatherhill Development [fax 296 -2560] Plan received date: 05 Dec 2007 15 Feb 2007 (Revl) Date of comments: 27 Dec 2007 19 Feb 2007 (Revl) Reviewer:Jonathan Sharp A. Preliminary Site Plans (SDP200700147) 1. Please provide any necessary offsite easements. [policy] Revl: See comment #8. Interconnections are required to extend to the property line. [18- 32.7.3] Revl: See comment #6. 3. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. Revl: See comment #3L All slopes steeper than 3:1 will require non grassed low maintenance ground cover. This must be addressed with the final site plan. [DM] Revl: See comment #10. B. Final Site Plans (SDP200700147) g) In order to administratively waive the extension requirement of the interconnection to the property line, a waiver request must be reviewed and approved by the agent. Criteria for the waiver request can be found in 14 -409D. i Revl: The waiver request has been received and has been submitted to the agent, Bill Fritz_r r_" The gore between Avon Park I and Avon Park II appears to be an issue. T,.!° i4levl: Once the BLA plat correcting the gore gets recorded (SUB200800027), please show the parcel boundary lines per recorded plat. C 8. It appears that construction/grading easements are needed from the following parcels: TMP 90 -6D, 90FA1, 90F -9, and the gore parcel. Revl: Please provide deed book and page reference for the shown 20' grading easements. X10 All slopes steeper than 3:1 will require non grassed low maintenance ground cover. Revl: comments not addressed. I do not anticipate Glenn or Mark altering the Design Manual Albemai ounty Community Development Engineering Review Comments Page 2 of 4 requirements. Please fulfilling the Design Manual requirements. 13. Provisions and easements for drainage across 3 or more lots is required. Dense development where fencing, decking, etc is expected should provide yard inlets and pipes rather than ditches. Revl: Please provide yard inlet and pipes. X 16. Please provide inlet shaping (IS -1) on all inlets. Revl: I cannot find the reference for IS -1 on the plans. 18. Please provide inlet calculations for A16, E2, and G1. 1116. Revl: comments not addressed. C. Road Plans (SDP200700147) 20. VDOT approval is required. Y_<*:`Revl: comments not addressed. 21. With the shown gore, continuous right-of-way is not being provided. Please provide continousggYgPp right -of -way. Revl: See comment #7. 28. Please show and label cross drain locations with VDOT designations (CD -1,2) at every major cut and fill transition or sag curve on the street profile sheets. Revl: I cannot find the cross drains on the plans or profiles. 30. A road bond amount will be computed by the County once the plans have been approved. Albemar ounty Community Development Engineering Review Continents Page 3 of 4 D. Stormwater Management Plan (WPO200700103) 31. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. Revl: The removal rate provided should read "50%," not "15%," in Table 12 of the SWM plans. 32. Per the application plan, a biofilter is required. Along with providing adequate stormwater4to detention, it must treat the first half inch of runoff for stormwater quality (sized for 2.5% of all impervious area draining to the facility). Revl: Please provide adequate biofilter cross - section details, including all required items from the Design Manual Checklist. For example, cross section of dam, biofilter media, underdrain /gravel, etc. Sediment forebays shall be provided for all biofilter at all inlets. Revl: No plantings /underdrainshnedia should be located in the sediment fnrebay. Riprap can be installed at the same elevation as the forebay so that no ponding occurs. 36. Please show the vehicle access road to the SWM facility. The road should be located in a SWM easement. Revl: Please specify the location of the access to the riser structure and forebay. x 37. Additional comments may be needed upon resubmittal. Revl: Please show the compliance for the 2 year storm in Table 14 of the SWM plans. Please specify the barrel slope of the SWMfacility and specify the clean out locations in the biofilter. X 38. A SWM bond amount will be computed by the County once the plans have been approved. E. Erosion Control Plan (WPO200700103) 302. Per Proffer #3: "The Orrncr shall, to the maximum extent practicable as determined by the County's Program Authority, provide additional erosion and sediment controls to achieve a sediment removal rate qf eighty percent (SO %for the Property. Please provide additional E &S measures to comply with this proffer. Please include a narrative describing what types of measures you intend to provide in order to achieve a sediment removal detainment ?) rate of 80% (can be included in the E &S narrative). At the end of the comment letter is an attached County Engineer's Commentary discussing Extra Erosion and Sediment Control. X Rev1: We have provided the following comments on above and beyond measures: Third Party Inspections — This is acceptable. Please provide additional information about these inspections. Please provide how often inspections will take place and how to report the inspections to the County. Correcting downstream impacts resulting from failure — This is not above and beyond. This is a requirement. Reinforced Silt Fence — This is one of the minimum standards, not above and beyond. Engineering recommends using Super Silt Fence (reinforced chain link fence with steel posts) as an acceptable above and beyond measure. Extra storage in trap — Engineering recommends using Super Silt Fence around the northwest perimeter of the site as the E &S measure in lieu of the proposed trap. Extra storage in basin — This is acceptable. Please specify the percent increase in storage this will be. Matting on slopes — This is acceptable. Albemal ounty Community Development Engineering Review Comments Page 4 of 4 Please include the list of acceptable additional measures in the E &S narrative. 40. It appears that construction /grading easements are needed from the following parcels: TMP 90 -6D, 90FA 1, 90F -9, and the gore parcel. Revl: See continent #8. 43. All existing vegetation shown to be preserved should be in accord with the tree conservation plan. Tree protection should be located outside the drip edge of trees. C 44. Erosion Control measures are in the way of construction /grading. For example, diversions are located in fill. Revl: Erosion Control /measures are still in the way of construction /grading. p('46. Protection is not provided for all stages of construction. For example, no protection is provided below sediment trap 2. Also, no protection is shown for the area of offsite construction near the construction entrance. Protection on the northwestern portion of the property appears to be inadequate. Revl: Protection is still not provided for all stages of construction. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. Engineering recommends using Super Silt Fence all along the Northwest perimeters for the areas not draining to the basin. For the areas draining to the basin, Engineering recommends using diversion dikes and /or Stornlwater Conveyance Channel configuration to get sediment to the basin, rather than a temporary slope drain. Silt fence should not be used across contours. Revl: Silt fence is shown in the way of construction /grading. 1t' 49. Please provide adequate channels (MS -19) at the outfall of the SWM facility. Revl: Based on Technical Bulletin #1 regarding the interpretation of MS -19, providing detention for the 2 year and 10 year storm does necessarily provide adequate downstream channels, especially if downstream channels are not adequate for the existing conditions. Technical Bulletin #1 can be found at: http://www.dcr.virtgitia.gov/soil & water /doct,,nents /tecblt111.PDF. Pipes and channels downstream of the site must be adequate. The 21" pipe running under Rte. 742 discharges directly into the yard of TMP 90 -24, with no existing channel in place. This is a major concern. 50. Additional comments may be needed upon resubmittal. 51. An E &S bond amount will be computed by the County once the plans have been approved. ZMA- 2007 -05 Avon Park II Page 3 of 3 From: Denunzio, Joel D., P.E. [mailto: Joel .Denunzio @VDOT.virginia.gov] Sent: Friday, August 03, 2007 10:11 AM To: Rebecca Ragsdale Subject: ZMA- 2007 -05 Avon Park II Rebecca, I have reviewed the plan and responses for the above re- zoning and have only one comment. VDOT's policy is that any feature of a public road that is to be maintained by VDOT shall have no less than 1 foot of Right of Way behind the outermost feature that will be maintained. I understand that the first phase of this development aligns the back of the sidewalk and the ROW but this is incorrect. If the developer chooses to keep the design this way they run the risk of VDOT not being able to maintain the sidewalk and it would be the responsibility of the homeowners to repair it. I recommend that they consider adjusting the typical on phase II and consider putting easement behind the sidewalk for the previous phase if possible. If you have any questions, please contact me. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio©VirgrniaDOT.org 5/20/2008 Albemarle Ciunty Community Development Engineering Review Continents Page 4 of 5 i J County of Albemarle Department of Community Development County Engineer's Commentary Number 3: Extra Erosion and Sediment Control 3 Dec 2007 Question: What is erosion control above and beyond current regulatory requirements? Background: This question has arisen during recent rezoning, special use permit, and waiver applications before the Planning Commission and the Board of Supervisors. Erosion control has become a public concern over large, highly visible, and prolonged disturbances for projects such as Hollymead Town Center on Rt. 29, Luxor on Rt. 250 at Pantops, and White Gables, Kenridge, and Old Trail on Rt. 250 in Ivy and Crozet. As a result, recent approvals for Northtown Center, North Point, Hollymead Town Center Area A, Biscuit Run, and others have proffered to provide erosion control above and beyond ordinance requirements. In each case, consultants and developers have come to the county wondering what this means, and asking for solutions. Commentary: It is generally acknowledged that the best erosion control protection for a site is a sediment basin at the perimeter. It requires the least maintenance and inspection, and captures the most sediment. Yet, the Virginia Erosion and Sediment Control Handbook (Green Book) warns that they are, "at best, 60% effective ". This is not very good, and we know it is worse when the rules are not followed and measures are missing or incorrectly installed. There are also many measures allowed by the state handbook, which we know have a very high failure rate. Silt fence for example, which many designers rely solely on, almost always fails and needs repair. Checks dams and inlet protection measures are other examples. We know from frequent inspection that these measures have a miserable success rate, yet by state mandate they are the standards. It is also not a secret that the county does not have the personnel to monitor every construction site, and often relies on local contractors and the public to point out violations. The state mandate is to visit each site every two weeks, and each site within 48 hours after a rainfall. The county has 4 inspectors, each of whom can cover an average of about three construction sites on a given day, provided there are not too many meetings, complaints, stop work violations, or compliance issues. This covers about half of the current active sites in two weeks, not including hundreds of single family residential building permits. Lastely, one of the weakest areas of the existing state program is in the amount of time land can remain denuded and open to erosion. State minimum standards (4VAC50- 30 -40) generally say areas must be seeded within 7 days of finishing, or if the site is to remain dormant Albemarle C unty Community Development Engineering Review Comments Page 5 of 5 for longer than 30 days. The result is a game contractor's sometimes play. At least every 29 days or so, someone runs the dozers around and restarts the calendar. The county has had huge sites like I-Iollymead and Pantops remain disturbed for many years. Considering these week areas in the existing state of erosion control, there is plenty of room for providing erosion control measures above and beyond regulatory requirements. Here are a few suggestions; commit to a small maximum area exposed at one time. (from Basic Principles, p.II- 13, Green Book) commit to a short maximum time of exposure (from Basic Principles, p.II -13, Green Book) commit to finishing, stabilizing and closing out the permit by a given date commit to daily stabilization and inspections, with reporting to the county provide independent third party professional inspections and documentation provide on -line video monitoring commit to measuring and meeting downstream thresholds commit to correcting downstream impacts off-site use reinforced silt fencing (or a similar standard like super silt fence) provide additional wet storage in traps and basins provide additional dry storage in traps and basins (for the 50yr storm for example) use tackifiers in seeding or soil stabilization applications apply erosion control matting to all slopes apply redundancy in design (backup measures in case the first line of measures fails) use easily installed pre - manufactured silt control devices (as inlet protection for example) hire an independent contractor to install, monitor and maintain erosion control measures separate conservation and buffer areas by barriers or chain link fence provide slope benching and slope drains I will try to add to this list as new ideas emerge. Service kuth‘rity TO: Pat Lawrence FROM: Gary Whelan, Civil Engineer DATE: December 14, 2007 RE: Site Plan Technical Review for: Avon Park II - Final SDP200700147 TM 90 Par. 31 The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. An 8 inch water line is located approximately 35'distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. A 8 inch sewer line is located approximately 40' distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. 9. No plans are required. X 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434977 -4511 • Fax (434)979 -0698 www.serviceauthoriy.org iF Jil ilip' J 4. m COUNTY OF :1LBEM:ARLE Department of Community Development 101 ;McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park II [SDP200700147, WPO200700103] Plan preparer:Alan Franklin, Terra Concepts [fax 295 -2102] Owner or rep.:Frank Pohl, Weatherhill Development [fax 296 -2560] Plan received elate: 05 Dec 2007 Date of comments: 20 Dec 2007 Reviewer:Jonathan Sharp A. Preliminary Site Plans (SDP200700147) 1. Please provide any necessary offsite easements. [policy] 2. Interconnections are required to extend to the property line. [ 18- 32.7.3] 3. Drainage areas for remol, al rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: [pre _ 20 %, Ipost = 31'1/0(1.4 of 4.5 acres), RR — 30%. 4. Per the application plan, a hiotilter is required. Along with providing adequate stormwater detention, it must treat the first half inch of runoff for stormwater quality (sized for 2.5 %,'o of all impervious area draining to the facility). 5. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. This must he addressed with the final site plan. [DM] B. Final Site Plans (SDP200700147) 6. Please C. Road Plans (SDP200700147) 7. Please D. Stormwater Management Plan (WPO200700103) 8. Please E. Erosion Control Plan (WP0200700103) 9. Please OF AL COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park 1I [SDP200700147, WP0200700103] Plan preparer:Alan Franklin, Terra Concepts [fax 295 -2102] Owner or rep.:Frank Pohl, Weatherhill Development [fax 296 -2560] Plan received date: 05 Dec 2007 Date of comments: 21 Dec 2007 Reviewer:Jonathan Sharp A. Preliminary Site Plans (SDP200700147) 1. Please provide any necessary offsite easements. [policy] 2. Interconnections are required to extend to the property line. [18- 32.7.3] 3. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. 4. Per the application plan, a biofilter is required. Along with providing adequate stormwater detention, it must treat the first half inch of runoff for stormwater quality (sized for 2.5% of all impervious area draining to the facility). 5. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. This must be addressed with the final site plan. [DM] 6. Final Site Plans, E &S, and SWM plans comments are forthcoming. I -1 1 rt I DEPARTMENT OF TRANSPORTATION 1 3Q1 hr,=, :C1i? Ro Id rn ,1! OT orqDavidS. Ekern, P.E. CU':'1.1ISSIONER December 1 2007 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments December 27 20{)7 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the December 27 20)7 Site Review Committee Meeting: SDP -2007 -00147 Avon Park II — Final (Patrick Lawrence) A maintenance agreement for private maintenance of the sidewalks will need to he in place prior to VDOT accepting the proposed public road in this development. SDP -2007- 00148 Old Trail Village Block 3, Phase 6 — Preliminary (Megan Yaniglos) The sight distance for 25 mph is 280 feet and needs to be shown from 20 feet hack from the middle of the nearest through lane. Projected traffic needs to he shown on the plan. The final plans will need to include road and drainage plans. SDP -2007- 00149 East Pantops Complex — Preliminary (Gerald Gatohu) Access to this site needs to he made only through the existing 40 trot access easement. A right in /out off route 250 will not he permitted. The entrance needs to he designed in accordance with VDOTs Minimum Standards of Entrances to State Highways. SDP - 2007 - 00392 Bellair #1 — Preliminary (Megan Yaniglos) Access shown on this plat may he permitted once the di ision of land is made. OOVM1S')F 1RANSiPORTAtiON EXCEIEE`iCE Please request the applicants provide a written description of revisions with re-submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Residency Program Manager VDOT Charlottesville Residency 434-293-0011 cc Bill Fritz, David Benish. Juan Wade. Elaine Echols, Joan McDowell, Judith Wiegand, Margaret Maliszewski, David Pennock, Francis McCall. Jon Sharp. Summer Frederick, Patrick Lawrence. and John Giometti e' lima f.eV.i 2. /27/ Iml . Y a I krty n COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park II [SDP200700147, WP0200700103] Plan preparer:Alan Franklin, Terra Concepts [fax 295 -2102] Owner or rep.:Frank Pohl, Weatherhill Development [fax 296 -2560] Plan received date: 05 Dec 2007 Date of comments: 27 Dec 2007 Reviewer:Jonathan Sharp A. Preliminary Site Plans (SDP200700147) 1. Please provide any necessary offsite easements. [policy] 2. Interconnections are required to extend to the property line. [18- 32.7.3] 3. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31 % (1.4 of 4.5 acres), RR = 30 %. 4. Per the application plan, a biofilter is required. Along with providing adequate stonnwater detention, it must treat the first half inch of runoff for stormwater quality (sized for 2.5% of all impervious area draining to the facility). 5. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. This must be addressed with the final site plan. [DM] B. Final Site Plans (SDP200700147) 6. In order to administratively waive the extension requirement of the interconnection to the property line, a waiver request must be reviewed and approved by the agent. Criteria for the waiver request can be found in 14 -409D. 7. The gore between Avon Park I and Avon Park II appears to be an issue. 8. It appears that construction /grading easements are needed from the following parcels: TMP 90 -6D, 90FA1, 90F -9, and the gore parcel. 9. Please show details of how the curb and gutter around the parking spaces for Lots 21/22 and 23/24 transitions from zero to half a foot in height. 10. All slopes steeper than 3:1 will require non grassed low maintenance ground cover. 11. Please provide retaining wall details on the plans. 12. Please provide adequate overland relief for structure B 1. The failure of any system shall not cause structures or yards to flood. 13. Provisions and easements for drainage across 3 or more lots is required. Dense development where fencing, decking, etc is expected should provide yard inlets and pipes rather than ditches. 14. On sheet 6, part of a storm sewer easement is missing for Pipe A14 -13. 15. All utility crossings require to he shown on the pipe profile sheets. 16. Please provide inlet shaping (IS -1) on all inlets. 17. Please label the length and width and stone depth and size of the scour protection on the pipe profile sheets. 18. Please provide inlet calculations for A16, E2, and G1. 19. Please provide outlet protection computations. Albemarle 'County Community Development Engineering Review Continents Page 2 of 5 C. Road Plans (SDP200700147) 20. VDOT approval is required. 21. With the shown gore, continuous right -of -way is not being provided. Please provide continous right -of -way. 22. The existing curb and gutter on Hathaway drive does not match proposed curb and gutter. 23. The proposed hammerheads shall maintain a minimum of 20 feet in width. 24. Label all curb radii at street intersections on the plans. 25. Label the street tree species and height or caliper on the street plans. 26. Please provide pavement designs. 27. The proposed road exceeds 10% in grade. 28. Please show and label cross drain locations with VDOT designations (CD -1,2) at every major cut and fill transition or sag curve on the street profile sheets. 29. The crown for Hathaway Street should be shown between the opposing travelways, rather than on the center line of the road. 30. A road bond amount will be computed by the County once the plans have been approved. D. Stormwater Management Plan (WP0200700103) 31. Drainage areas for removal rate calculations should not include offsite drainage areas. The removal rate calculations should be as follows: Ipre = 20 %, Ipost = 31% (1.4 of 4.5 acres), RR = 30 %. 32. Per the application plan, a biofilter is required. Along with providing adequate stormwater detention, it must treat the first half inch of runoff for stormwater quality (sized for 2.5% of all impervious area draining to the facility). 33. Please provide the Albemarle County general stormwater notes. 34. The flow path must be 2:1 or greater in all water quality facilities (flow cannot short - circuit). 35. Sediment forebays shall be provided for all biofilter at all inlets. 36. Please show the vehicle access road to the SWM facility. The road should be located in a SWM easement. 37. Additional comments may be needed upon resubmittal. 38. A SWM bond amount will be computed by the County once the plans have been approved. E. Erosion Control Plan (WP0200700103) 39. Per Proffer #3: "The Owner shall, to the 111CW/17wn extent practicable as determined by the County's Program Authority, provide whlitiollal erosion and .Sediment controls to achieve a sediment removal rate ql eighty percent (8O %)1Or the Property. Please provide additional E&S measures to comply with this proffer. Please include a narrative describing what types of measures you intend to provide in order to achieve a sediment removal detainment?) rate of 809/0 (can be included in the E &S narrative). At the end of the comment letter is an attached County Engineer's Commentary discussing Extra Erosion and Sediment Control. 40. It appears that construction /grading easements are needed from the following parcels: TMP 90 -6D, 90FA1, 90F -9, and the gore parcel. 41. Please include the acreage of disturbance in the project description of the narrative. 42. The construction entrance should drain to an adequate sediment trapping measure. 43. All existing vegetation shown to be preserved should be in accord with the tree conservation plan. Tree protection should be located outside the drip edge of trees. 44. Erosion Control measures are in the way of construction /grading. For example, diversions are located in till. 45. Engineering recommends using the stormwater facility as a sediment basin through -out the project. 46. Protection is not provided for all stages of construction. For example, no protection is provided Albemarle o unty Community Development Engineering Review Comments Page 3 of 5 below sediment trap 2. Also, no protection is shown for the area of offsite construction near the construction entrance. Protection on the northwestern portion of the property appears to be inadequate. 47. Silt fence should not be used across contours. 48. Inlet protection is required on inlet GI. 49. Please provide adequate channels (MS -19) at the outfall of the SWM facility. 50. Additional comments may be needed upon resubmittal. 51. An E &S bond amount will be computed by the County once the plans have been approved. Application #:SDP200700147 '" Short Review orm @nts Project Name: Avon Park II - Final Final — Residential — Commission Date Completed:12/13/2007 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments: THE ROAD NAME OF STRATFORD WAY IS NOT AN APPROVED ROAD NAME. THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF THREE (3) REPLACEMENT ROAD NAMES TO BE SUBMITTED TO REPLACE THIS ROAD NAME Date Completed:12/13/2007 Reviewer:James Barber Fire Rescue Review Status:No Objection Reviews Comments: Verify adequate fire flow is available. Approval is subject to field inspection and verification. Date Completed:03/19/2008 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Based on plans revised February 8, 2008. Provide a van - accessible, barrier -free parking space, with its associated striped access aisle and curb i, cut, at the building containing 21/22 - 23/24. Date Completed:12/06/2007 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: ,Provide a van - accessible, barrier -free parking space, with its associated striped access aisle and curb cut at the building containing 21/22 - 23/24. Date Completed:12/12/2007 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: This proposal is scheduled for ARB review on January 7, 2008. Comments will be provided after that meeting. Date Completed:02/14/2008 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: This proposal will be reviewed by the ARB on March 3, 2007. Comments will be available after that meeting. See ARB-08-12. Date Completed:03/10/2008 Reviewer:Patrick Lawrence Planner Z &CD Review Status:Pending Reviews Comments: no comment Date Completed:02/21/2008 Reviewer:Rebecca Ragsdale Planning Review Status:Pending Reviews Comments: There were no waivers of interconnection requirements discussed or granted at the time of rezoning review. (ZMA 07 -05) At a minimum, the ROW for the future interconnection should extend to the property line. Page: 1.00 County of Albemarle Printed On: Friday, March 21, 2008 Application #:SDP200700147 Short Review Comn nts Project Name: Avon Park II - Final Final — Residential — Commission Date Completed:12/13/2007 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments: ''THE ROAD NAME OF STRATFORD WAY IS NOT AN APPROVED ROAD NAME. THE APPLICANT SHOULD CONTACT THIS OFFICE WITH A LIST OF THREE (3) REPLACEMENT ROAD NAMES TO BE SUBMITTED TO REPLACE THIS ROAD NAME Date Completed:12/13/2007 Reviewer:James Barber Fire Rescue Review Status:No Objection Reviews Comments: 'Verify adequate fire flow is available. Approval is subject to field inspection and verification. Date Completed:04/04/2008 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Based on plans revised April 1, 2008. Provide a van - accessible, barrier -free parking space, with its associated striped access aisle and curb' cut, at the building containing 21/22 - 2/324.J Date Completed:12/06/2007 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Provide a van - accessible, barrier -free parking space, with its associated striped access aisle and curb cut, at the building containing 21/22 - 23/24. Date Completed:03/19/2008 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: ( Based on plans revised February 8, 2008. Provide a van - accessible, barrier -free parking space, with its associated striped access aisle and curb,, cut, at the building containing 21/22 - 23/24. Date Completed:05/06/2008 Reviewer:Jonathan Sharp Engineer Z &CD Review Status:No Objection Reviews Comments: Date Completed:05/06/2008 Reviewer:Jonathan Sharp Engineer Z &CD Review Status:Pending Reviews Comments: Road Bond: $264,400. Date Completed:04/23/2008 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: This proposal was reviewed by the ARB on May 21, 2008. Minor conditions remain outstanding. The ARB's action will be appended as soon as it is available. Date Completed:02/14/2008 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Page: 1.00 County of Albemarle Printed On: Tuesday, July 01, 2008 Reviews Comments: This proposal will be wed by the ARB on March 3, 2007. Comrr will be available after that meeting. See ARB -088L. Date Completed:12/12/2007 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: ''This proposal is scheduled for ARB review on January 7, 2008. Comments will be provided after that meeting. Date Completed:03/10/2008 Reviewer:Patrick Lawrence Planner Z &CD Review Status:Pending Reviews Comments: I no comment Date Completed:04/01/2008 Reviewer:Patrick Lawrence Planner Z &CD Review Status:No Objection Reviews Comments: Parking Revisions and lay out shown on sheet 1 and 4, respectively, are correct per 18- 4.12.6 Engineering and ARB issues remain outstanding. 4/1/08 JPL Date Completed:05/05/2008 Reviewer:Patrick Lawrence Planner Z &CD Review Status:No Objection Reviews Comments: Distribution 4/02/08 JPL No comment 5/5/08 Date Completed:02/21/2008 Reviewer:Rebecca Ragsdale Planning Review Status:No Objection Reviews Comments: There were no waivers of interconnection requirements discussed or granted at the time of rezoning review. (ZMA 07 -05) At a minimum, the ROW for the future interconnection should extend to the property line. Page: 2.00 County of Albemarle Printed On: Tuesday, July 01, 2008 ALB44,Patrick Lawrence, Current Development Mc.11 . COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 January 22, 2008 Weather Hill Development Frank Pohl 703 East Jefferson Street Charlottesville VA 22902 RE: ARB200700138 Avon Park 1I Tax Map 90, Parcel 31 Dear Mr. Pohl: The Albemarle Count' Architectural Review Board, at its meeting on January 7, 2008, completed a preliminary review of the above -noted request to construct an extension of the phase 1 development to include a mix of single - family detached and multi - family attached units in a combination of townhomes and condominiums. The Board offered the following comments for the benefit of the applicant's next submittal. Please note that the following comments are those that have been identified at this time. Additional comments may be added or eliminated based on further review and changes to the plan. 1. Revise the grading so that all contours are rounded to meet adjacent conditions. 2. Revise the E&S plan (and all other relevant plans) to show tree protection fencing around all individual trees to remain and at the perimeter of all wooded areas to remain. Revise the proposed grading and /or the "tree line to remain" accordingly. Revise the demolition plan to clearly distinguish between trees to remain and trees to be removed. Coordinate the proposed grading and the existing trees southwest of the proposed retaining walls. 3. Revise the plans to include the fence details. 4. Revise the landscape plan to provide the required 31/2" caliper trees at 35'spacing along the EC, but maintain the naturalistic layout. Revise some of the species along the EC to provide some continuity with the Phase 1 frontage. Increase the planting size of the shrubs to 24" high minimum. Revise the shrubs to eliminate the extended use of a single species. Revise the spacing of shrubs to accommodate their mature size and still provide for a hedge appearance. 5. Revise the grading, the position of the pipe, the end treatment of the pipe, and /or landscaping to achieve an appropriate appearance for the pond as viewed from the EC. Engineered features shall be screened from view and the pond shall be fully integrated into the landscape. Provide a revised site section through the pond and the EC, showing how the facility will be treated and clarifying its visibility from the EC. 6. Provide color samples for review. Indicate all proposed materials and colors in a finish schedule on the elevation sheet. 7. Provide additional sections through the pond and through the area north on Avon Street. The forebay outlet weir preference is for grass if possible. If it is necessary to have rock, fieldstone or brownstone shall be used in lieu of bluestone riprap. 8. The biofilter plantings shall be reviewed by the ARB. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line at www.albemarle.org /planning. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to call me. Sincerely, AA/L r)/ 6, - 21/4, L Margaret Maliszewski Principal Planner CC: Patrick Lawrence, Zoning and Current Development ot , Ar.e 1 County of Albemarle Department of Community Development Memorandum To:Jonathan Sharp From:Bill Fritz Division: Zoning and Current Development Date:February 25, 2008 Subject: SDP 2007 - 147 Avon Park II Request for Relief of Street Extension I have reviewed the request for relief of construction of the street extension to adjacent property for this project. The extension of the street is required by Chapter 14, Section 409 of the Albemarle County Code. A waiver of the extension requirement may be administratively approved subject to subsection D. I will address each provision of that section. D. Waiver by agent of extension requirement. The requirements of subsection (B) may be waived by the agent as provided in section 14- 224.1. A request for a waiver may be made prior to or with submittal of a preliminary plat or with an application to rezone the land, as follows: 1. Information to be submitted. If such a request is made, it shall include: (i) a justification for the request; (ii) a vicinity map showing a larger street network at a scale no smaller than one (1) inch equals six hundred (600) feet; iii) a conceptual plan at a scale no smaller than one (1) inch equals two hundred (200) feet showing surveyed boundaries of the property; (iv) topography of the property at five (5) foot intervals for the property being subdivided and on abutting lands to a distance of five hundred (500) feet from the boundary line or a lesser distance determined to be sufficient by the agent; (v) the locations of streams, stream buffers, steep slopes, floodplains, known wetlands; (vi) the proposed layout of streets and lots, unit types, uses, and location of parking, as applicable; and (vii) identification of the location of the nearest development and rural area boundaries and the maximum number of lots proposed in the subdivision. The applicant has provided the necessary information with the application for SDP 2007 -147 Avon Park II Final Site Plan. 2. Consideration and findings. In reviewing a waiver request, the agent shall consider whether: (i) extending the street to the abutting property line would require offsite easements; (ii) the need for the extension outweighs the impacts on environmental resources such as streams, stream buffers, steep slopes, and floodplain; (iii) alternative connections to the abutting lands from a different location would provide a better connection; (iv) the subdivider would contribute to the cost to complete the extension to the abutting property line when the adjoining lands are developed, and how; and (v) the street would be extended into the rural areas. In approving a waiver, the agent shall find that requiring extension would not forward the purposes of this chapter or otherwise serve the public interest; and granting the waiver would not be detrimental to the public health, safety or welfare, to the orderly development of the area, to sound engineering practices, and to the land adjacent thereto. Extending the street would require an offsite easement. The Avon Park development will be connected to adjacent development to the north. The developer will reserve the necessary right of way for dedication. The proposal extends the street to within 20 feet of the property line. 3. Requirements if ivaiver granted. If the agent grants the waiver: (i) the public street shall be constructed past the point at which the primary structures on the lots abutting the street would rely on the finished grade for landscaping and other improvements, but in no case less than thirty (30) feet beyond the curb line or ditch line on those lots; (ii) the subdivider shall dedicate the required right of way to the abutting property line, along with all easements required to allow the street connection to be constructed in the fut; (iii) the required easements shall prohibit any improvements being established therein; (iv) the subdivider shall provide a surety guarantee or an escrow of funds for its share of the cost to complete the extension if determined by the agent to be necessary; the type of surety guarantee or the escrow shall be acceptable to the county engineer and be approved by the county attorney; and (v) the agent may require that the subdivider install and maintain a sign at the end of the constructed portion of the street stating that the street is a future through street, and that the sign is maintained until the county grants final approval of extending the street to the abutting property. The street is to be constructed past all proposed structures. This modification request is being made during the review of the site plan and no subdivision plat has been submitted. As a condition of plat approval this modification is approved subject to: 1. The necessary right of way will be dedicated and necessary easements will be provided. 2. The subdivider shall provide a surety guarantee or an escrow of funds for its share of the cost to complete the extension. The type of surety guarantee or the escrow shall be acceptable to the county engineer and be approved by the county attorney. 3. The subdivider shall install and maintain a sign at the end of the constructed portion of the street stating that the street is a future through street. The sign shall be maintained until the county grants final approval of extending the street to the abutting property. Cc: Pat Lawrence Alan Franklin of AL.0 1 17t2G1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Mach 17, 2008 Weather Hill Development c/o Frank Pohl 703 E Jefferson Street Charlottesville, Va 22902 RE: ARB2008 -00012 Avon Park II Tax Map 90, Parcel 31 Dear Mr. Pohl: The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, March 3, 2008. The Board approved the request, by a vote of 4:0, pending staff administrative approval of the following conditions: 1. Provide the planting sizes for the shrubs in the plant list as 24" minimum. 2. Replace the Eleagnus with a non - invasive species. 3. Correct the 7 AA note in the stormwater facility. 4. Include a finish schedule on the elevation drawings. 5. Provide for review the revised plan showing the alternative stormwater outlet, which was to be emptied out above the emergency egress driveway and now must be exited south of that driveway per VDOT's and the County Engineer's requirements. Ensure that none of the street trees or other landscaping features are obstructed. 6. Submit for review at a work session (to be scheduled by staff), end elevations that face Avon Street for Units 1, 16 and 20, with revisions to Unit 24 showing a smaller louver and, at the applicant's discretion, a wider end bay projection. Call out all materials on the elevations. (For example, on Unit 24, the siding rendered above the cornice line in the gable ends is rendered differently from the HardiePlank and it is not clear what that material is). 7. Also, provide for review at a work session the siding colors. (Staff should notify the board to go by and see Avon Park Phase I, which has the same colors currently proposed.) The applicant may want to bring an alternative blue with more gray or less chroma. 8. At the work session, provide for review a conceptual illustration of the picnic shelter showing that the materials matching the development. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner Cc: Patrick Lawrence, Zoning and Current Development ARB File F lft(;ly COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project:Avon Park II [SDP200700147, WP0200700103] Plan preparer:Alan Franklin, Terra Concepts [email: ff; a 1 Iif F °f, _€ ;. -cm cpt,13c ci Owner or rep.:Frank Pohl, Weatherhill Development [email: Fr,aik E 1.ac Et(wrltitpl I] Plan received date: 05 Dec 2007 15 Feb 2007 (Rev]) 01 Apr 2008 (Rev2) Date of comments: 27 Dec 2007 19 Feb 2007 (Rev 1) 06 May 2008 (Rev2) Reviewer:Jonathan Sharp A. Preliminary Site Plans All preliminary site plan comments have been addressed. B. Final Site Plans All final site plan comments have been addressed. C. Road Plans VDOT has no road plan comments. However, there is a concern that with the right -of -way shown in proximity to the sidewalks, VDOT will not accept the responsibility of maintenance. The sidewalks will fall on the responsibility of the HOA. See forwarded email. Please provide a Schedule of Completion and Road Bond Estimate Request. The roads must be built and accepted by VDOT and the County or bonded prior to the approval of any subdivision plats. Please submit 3 copies of the Road Plans for our files. D. Stormwater Management Plan Please submit a Stormwater Maintenance agreement, with the appropriate fee to Pain Shiftlett. Please submit 2 copies of the SWM Plans for our files. E. Erosion Control Plan (WP0200700103) All ESC plan comments have been addressed. Please submit 4 copies of the ESC Plans for our files. ZMA - 2007 -05 Avon Park It Page 1 of Jonathan Sharp From: Denunzio, Joel D., P.E. [Joel.Denunzio @VDOT.virginia.gov] Sent: Tuesday, May 06, 2008 11:17 AM To:Jonathan Sharp Subject: Avon Park 11 Avon Park II Jon, I have reviewed the above plan and have no comments. Please see below on previous comments for the sidewalk and ROW lines. The ROW has not been adjusted so prior to VDOT acceptance an agreement will need to be made tor the homeowners associations to accept maintenance responsibility tor the sidewalks. If you have any questions, please contact me. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 From: Denunzio, Joel D., P.E. Sent: Wednesday, October 03, 2007 1:34 PM To: 'Rebecca Ragsdale' Subject: RE: ZMA- 2007 -05 Avon Park II Rebecca, I have reviewed the latest Avon Park Phase II and noticed that the sidewalks and right of way lines have not changed. Please inform the applicant that the Homeowners Association will need to enter into an agreement to maintain the sidewalks in this development prior to VDOT taking over maintenance of Hathaway. If you have any questions, please let me know. fnanks. Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 From: Rebecca Ragsdale [mailto:rragsdale @albemarle.org] Sent: Friday, August 03, 2007 10:16 AM 5/6/2008 ZMA- 2007 -05 Avon Park II Page 2 of 2 To: Denunzio, Joel D., P.E. Subject: RE: ZMA- 2007 -05 Avon Park II T°ianKs for your comments. i will recommend hits as a rc a r °ed chance ind o..id nuoce( E.' iiifin`t m,-Ike a revisions to the street sections on he latesi re'v lion. a 0 111,1 1i ..'i i^ P,t 10, Ks From: Denunzio, Joel D., P.E. [mailto:Joel.Denunzio @VDOT.virginia.gov] Sent: Friday, August 03, 2007 10:11 AM To: Rebecca Ragsdale Subject: ZMA - 2007 -05 Avon Park II Rebecca, I have reviewed the plan and responses for the above re- zoning and have only one comment. VDOT's policy is that any feature of a public road that is to be maintained by VDOT shall have no less than 1 foot of Right of Way behind the outermost feature that will be maintained. I understand that the first phase of this development aligns the back of the sidewalk and the ROW but this is incorrect. If the developer chooses to keep the design this way they run the risk of VDOT not being able to maintain the sidewalk and it would be the responsibility of the homeowners to repair it. I recommend that they consider adjusting the typical on phase II and consider putting easement behind the sidewalk for the previous phase if possible. If you have any questions, please contact me. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 5/6/2008 oY ALfl 4116#11r , "r COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 May 9, 2008 Weather Hill Development c/o Frank Pohl 703 East Jefferson Street Charlottesville, VA 22902 RE: ARB- 2008 -12: Avon Park 11 Tax Map 90, Parcel 31 Dear Mr. Pohl: The Albemarle County Architectural Review Board, at its meeting on April 21, 2008, held a work session on ARB- 2008 -12: Avon Park II. The ARB took the following actions: It was the consensus of the ARB that the approved colors are: Quill DCR102 Salt Marsh Bermuda Stone Hurricane Blue DCR056 Cherokee Rose Yellow (cannot be used on end units) Regarding the two white colors, it was the consensus of the ARB that: The Charleston White DCR100 paint needs to be revised to a creamier white, which can be administratively approved, and The Simply White Duron 2143 -70 stain was approved. Regarding the picnic shelter, it was the consensus of the ARB that the applicant could choose either of the designs submitted. Regarding the side elevations, it was the consensus of the ARB that the elevations were approved with the condition that either the board and batten or the shake siding be used (but not both) at the upper gable ends. Following the meeting, you submitted trim samples painted with Duron DCR101 "Aunt Betty's China ". This is an acceptable revision to the Charleston White and is approved. These work session items were the last outstanding ARB issues for this project. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future delays. If you have any questions concerning this action, please feel free to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: Patrick Lawrence, Zoning and Current Development ARB File ZMA- 2007 -05 Avon Park II Page 1 of 3 Patrick Lawrence From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov] Sent: Tuesday, May 20, 2008 8:32 AM To:Patrick Lawrence Subject: FW: Avon Park II Pat, Please see below e -mails for approval of the above plan. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Tuesday, May 20, 2008 8:21 AM To: 'Jonathan Sharp' Subject: FW: Avon Park II Jon, I missed the note on the plan of the sidewalk maintenance easements. All of my comments have been addressed. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 noel .denunzio@uvdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Tuesday, May 06, 2008 11:17 AM To: 'Jonathan Sharp' Subject: Avon Park II Avon Park II Jon, I have reviewed the above plan and have no comments. Please see below on previous comments for the sidewalk and 5/20/2008 ZMA- 2007 -05 Avon Park II Page 2 of 3 ROW lines. The ROW has not been adjusted so prior to VDOT acceptance an agreement will need to be made for the homeowners associations to accept maintenance responsibility for the sidewalks. If you have any questions, please contact me. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio©vdot.virginia.gov From: Denunzio, Joel D., P.E. Sent: Wednesday, October 03, 2007 1:34 PM To: 'Rebecca Ragsdale' Subject: RE: ZMA - 2007 -05 Avon Park II Rebecca, I have reviewed the latest Avon Park Phase II and noticed that the sidewalks and right of way lines have not changed. Please inform the applicant that the Homeowners Association will need to enter into an agreement to maintain the sidewalks in this development prior to VDOT taking over maintenance of Hathaway. If you have any questions, please let me know. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio ©VirginiaDOT.org From: Rebecca Ragsdale [ mailto:rragsdale @albemarle.org] Sent: Friday, August 03, 2007 10:16 AM To: Denunzio, Joel D., P.E. Subject: RE: ZMA- 2007 -05 Avon Park II Thanks for your comments. I will recommend this as a required change and had noticed they didn't make any revisions to the street sections on the latest revision. R.sa ®bate ."9erki,8 m ='nt V:\ „';_?S) { #;< i i {'& i. 3 13 l ( 4 :1 1 £ sd ', ' 5/20/2008 Page 1 of 3 Patrick Lawrence From: Frank Pohl [Frank ©weatherhilldev.com] Sent: Monday, June 30, 2008 4:56 PM To:Patrick Lawrence Cc:Bill Fritz; Alan Franklin Subject: FW: Avon Park II Outstanding Engineering Items needs for WPO approval Pat, Can you please confirm that you are ready for us to submit mylars on this project? SDP200700147 and WP0200700103. Thanks, Frank V. Pohl, PE Weather Hill Development 434 - 296 -9484 (ph) 434 -296 -2560 (fax) 434- 566 -2110 (cell) From: Jonathan Sharp [mailto:jsharp©albemarle.org] Sent: Monday, June 30, 2008 10:48 AM To: Frank Pohl Cc: Alan Franklin Subject: RE: Avon Park II Outstanding Engineering Items needs for WPO approval The agreement has been approved. The Engineering plans should have been turned over to our ESC inspectors. All WPO items have been addressed. All Engineering items have been addressed with the site plan, but there may be other outstanding issues with other divisions or departments. Talk with the planner, Pat Lawrence, about the site plan, as he is the review coordinator for the site plan. A preconstruction meeting can be held once all approvals have been granted and all bonds have been posted. Jon From: Frank Pohl [mailto :Frank @weatherhilldev.com] Sent: Monday, June 30, 2008 10:37 AM To: Jonathan Sharp Cc: Alan Franklin Subject: RE: Avon Park II Outstanding Engineering Items needs for WPO approval Jon, Are we close to getting approval on this project? Who would I check with to find out the status of the agreement we submitted? This email references the WPO approval. How about approval of SDP200700147? Can this be done or are these two projects hand -in -hand? Thanks, Frank V. Pohl, PE Weather Hill Development 434 - 296 -9484 (ph) 7/1/2008 Page 2 of 3 434 - 296 -2560 (fax) 434 - 566 -2110 (cell) From: Jonathan Sharp [mailto:jsharp @albemarle.org] Sent: Wednesday, June 04, 2008 1:47 PM To: Frank Pohl Cc: Alan Franklin Subject: RE: Avon Park II Outstanding Engineering Items needs for WPO approval Frank, An agreement for Liberty Hall was attached? I don't think the agreement for Avon Park 11 has been completed yet. If you contact Pam Shifflett, she can help you get the agreement taken care of. Thanks, Jon From: Frank Pohl [mailto :Frank @weatherhilldev.com] Sent: Wednesday, June 04, 2008 1:39 PM To: Jonathan Sharp Cc: Alan Franklin Subject: RE: Avon Park II Outstanding Engineering Items needs for WPO approval Jon, Here is a copy of the recorded SWM maintenance agreement. Please confirm that this is what you needed. I'll have the Schedule of Completion and Bond Estimate Request in to you today. Thanks, Frank V. Pohl, PE Weather Hill Development 434 - 296 -9484 (ph) 434 - 296 -2560 (fax) 434 - 566 -2110 (cell) From: Jonathan Sharp [mailto:jsharp©albemarle.org] Sent: Wednesday, June 04, 2008 11:44 AM To: Alan Franklin Cc: Frank Pohl Subject: Avon Park II Outstanding Engineering Items needs for WPO approval COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax 434) 972 -4126 7/1/2008 Page 3 of 3 Project:Avon Park II [SDP200700147, WPO200700103] Plan preparer:Alan Franklin, Terra Concepts [email: afranklirr !u%terraconceptspc.com] Owner or rep.:Frank Pohl, Weatherhill Development [email: Frank(ar!weatherhilidev.c om] Plan received date: 05 Dec 2007 15 Feb 2007 (Rev l ) 01 Apr 2008 (Rev2) 27 May 2008 (additional copies of plans for our files) Date of comments: 27 Dec 2007 19 Feb 2007 (Revl ) 06 May 2008 (Rev2) 04 Jun 2008 (additional copies of plans for our files) Reviewer:Jonathan Sharp Bond amounts for the Roads, SWM, and ESC will be provided once the SWM maintenance agreement has been submitted and approved and once a Schedule of Completion form and Bond Estimate Request form have been submitted. A. Preliminary Site Plans All preliminary site plan comments have been addressed. B. Final Site Plans All final site plan comments have been addressed. C. Road Plans Please provide a Schedule of Completion and Road Bond Estimate Request. The roads must be built and accepted by VDOT and the County or bonded prior to the approval of any subdivision plats. D. Stormwater Management Plan Please submit a Stormwater Maintenance agreement, with the appropriate fee to Pam Shifflett. E. Erosion Control Plan (WPO200700103) All ESC plan comments have been addressed. 7/1/2008 County of Albemarle Department of Community Development July 1, 2008 Alan Franklin c/o Terra Concepts, Ltd. 224 Court Street Charlottesville, Virginia 22902 E- mail: afranklingterrccnccptespc.com RE: SDP -07 -0147 — Avon Park II — Final Site Plan Dear Mr. Franklin, The Department of Planning and Community Development hereby grants administrative approval to the above - referenced site plan. The approval of the final site plan is valid for five (5) years in accordance with Zoning Ordinance Section 32.4.3.8 (a). Therefore, the final site plan approval shall expire July 1, 2013. If the site plan approval expires, a new application must be filed and processed. The final site plan shall not be signed until the following conditions are met: Zoning & Current Development approval to include: Please provide a van accessible, barrier free parking space, with its associated striped access aisle and curb cut, at the building containing 21/22 and 23/24. Please show any street lighting along with a lighting plan, if applicable If you have any further questions please contact me at 296 -5832 x.3297 if you have questions or require additional information. Engineering approval to include: Please contact Amy Pflaum at 296- 5832 x.3069 if you have questions or require additional information. Albemarle County Service Authority approval to include: Approval of construction drawings for water service infrastructure, meters, easements. Please contact Gary Whelan at 977 -4511 if you have questions or require additional information. VDOT approval to include: All accesses and roadways shall be designed in accordance with the current Subdivision Street Standards, The Minimum Standards for Entrances to State Highways and the Road Design Manual; Please contact Joel Denunzio at 293 -0014 if you have questions or require additional information. All tentative final approvals must be granted prior to submitting the plan for signatures. If all tentative approvals have been received the final site plan may be signed. You must verify with the planner that you may submit the mylars for signing. You will need to submit the $410 fee with two signed and sealed mylar copies of the site plan (the original and a copy for County records) and two paper copies. Once submitted the plan should be signed within one week. If you have any questions about the comments of a specific agency please contact that agency directly. If you have any questions about the review process please feel free to contact me. Very truly yours, J. Patrick Lawrence, Planner Zoning & Current Development E -ail: plawrence()albemarle.org File: SDP 07 -147 Cc: Frank Pohl c/o Weather Hill Development 703 E. Jefferson Street Charlottesville, VA 22902 E -mail: trank(aweatherhilldevcom