Loading...
HomeMy WebLinkAboutSDP200700157 Review Comments 2007-10-08ov 41fI11P tkilfirif"RGI :y \P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 8, 2007 Charles Wm. Hurt, Jr. University of Virginia Space & Real Estate Management P.O. Box 400884 Charlottesville, VA 22904 -4484 Re: Proposed Long Term Acute Care Hospital (LTACH) — zoning determination TM 59, Parcel 23B1) Dear Mr. Hurt: The purpose of this letter is to provide an official zoning determination regarding the proposed long term acute care hospital (LTACH) on the above - referenced property. As long as UVA owns or operates the building or use, the use is allowed by -right as a public use" under Albemarle County Code § 18- 27.2.1(12). Although the University of Virginia Medical Center is exempt from local zoning regulations under these circumstances as an agency of the Commonwealth, Paragraph 1 of the Three Party Agreement entered into by the University, the County and the City provides in this case for submittal of a site plan. This determination was made in consultation with the Albemarle County Attorney's office and was based on information provided by you and others, including the University of Virginia's General Counsel's Office. This decision is based on the fact that the LTACH will be owned and operated by the University of Virginia Medical Center. By letter from R. Edward Howell, CEO with University of Virginia Medical Center dated July 30, 2007, the Virginia Department of Health was informed of this fact and the fact that HealthSouth will no longer be participating in this project. (Certificate of Public Need, COPN #04053) The subject property, TM 59, Parcel 23B1, is zoned LI, Light Industry. It is located on Route 250, an Albemarle County Entrance Corridor. This property falls within Area C under the Three Party Agreement entered into between the University of Virginia, the County and the City. Paragraph 1 of the Agreement provides that the University will voluntarily comply with the land use plans and regulations (as exemplified by those listed in Exhibit 1) of either the City or the County regarding the use of real estate held in Area C on the attached map." Exhibit 1 refers to the County's comprehensive plan, the zoning ordinance, the subdivision ordinance, and the former erosion and sediment Proposed Long Term Acute Care Hospital (LTACH) — TM 59, Parcel 23B1 October 8, 2007 Page 2 control and st ormwater management ordinances that are now consolidated under the water protection ordinance. We un derstand that this property will be leased to the Rectorefor ands LLC until 2047 at wh ti ersity of Virginia (UVA) by the owners, Kirtley Fa e during th me the land wil{ be sold to UVA. The UVA General eontrol over the Office oP stated 'n an emailemailoateJulyTThewillbeoperatedsolely by the University." the term of the lease .. I will bereadytoproceedwithdiscussionabouttheproposedsiteplan,When you are realication conference with County staff. If you have any questionshappytosetapre -app in preparation for this discussion or otherwise, please let me know. If you are aggrieved by this determination, you have a right to appeal it within thirty (30)given, in accordance with Section 15. -days of the date notice of this determination is g2311oftheCodeofVirginia. If you do not file a timely appeal, this determination shallfiling final and unappealable. An appeal shall be taken only by fila g which specifies with the ZoZonng the Administrator and the Board of Zoning Appeals a notice of appeal grounds for the appeal. An appeal application must be completed and filed along with 120. The date notice of this determination was given is the same as thethefeeof $ date of this letter. Sincerely,1 4 k Amelia G. McCulley, A.I. P. Zoning Administrator Cc: Reading File TM 59, Parcel 23B1 Greg Kamptner, Deputy County Attorney Wayne Cilimberg, Director of Planning pF A/. 4116gi- r County of Albemarle Department of Community Development Memorandum To:Sam Saunders From:Gerald Gatobu, Senior Planner Division: Zoning and Current Development Date:January 07 2008 Subject: SDP2007 -00157 LTACH Preliminary The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site plan referred to above once the following comments have been addressed: Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] A) Zoning; [32.5.6a] TM 59 parcel 23B is _zoned (CI) Commercial. TM59 parcel 23B1 is ,zoned LI) Light Industry. Please correct /show this 011 the site plan. B) Minimum setback lines, yard and building separation requirements; [32.5.6aJ Show the minimum setback lines taking into consideration the height of the building 54 '. ( LI Zoning District Height Regulations): 26.6 HEIGHT REGULATIONS Except as otherwise provided in section 4.10, structures may be erected to a height not to exceed sixty -five (65) feet; provided that any structure exceeding thirty -five (35) feet in height shall be set back from any street right -of -way or single- family residential or agricultural district; in addition to minimum yard requirements, a distance of not less than two (2) feet for each one (1) foot of height in excess of thirty -five (35) feet. This would be in addition to the minimum yard requirements for the LI industrial district shown below) 26.10 MINIMUM YARD REQUIREMENTS 26.10.1 Adjacent to public streets: No portion of any structure, excluding signs, shall be erected closer than fifty (50) feet to any public street right -of -way. No off - street parking or loading space shall be located closer than ten (10) feet to any public street right -of -way. (Amended 7- 10 -85; 7 -8 -92) C) Maximum square footage for commercial and industrial uses /32.5. 6bJ Building area of the LTACH hospital is shoii'n as 29,373 SE. tVhat is the overall total square footage for the entire LTACH (taking into account all the floors ?) D) Maximum number of employees [32.5.6b] how niaiiv employees will be at the LTACH? E) Schedule of parking including maximum amount required and amount provided; [3 2.5.6b] Parking shown for the Northridge Office Building does not add up (as shown on the plan). Parking not to be separated ,f •oni use by major roads. 4.12.8. d; No parking area or spaces shall be separated from the use or structure they serve by a street whose classification is greater than a major collector, unless safe and convenient access is 1 provided from the parking area or spaces to the use or structure and is approved by the director of planning and community development. 4.12.8. e; Instrument assuring continuation of off -site parking. If stand -alone parking or off -site shared parking is to be provided, the applicant shall submit with the application for a site plan, site plan waiver or, if a site plan is not required, with an application for a zoning compliance clearance, an instrument that restricts the use of that part of the land on which parking is provided to that use, and assures that a minimum number of parking spaces as required by this section shall be established and maintained for the life of the use. The instrument shall be in a form that is suitable for recording, shall be subject to review and approval as to form and substance by the county attorney, and shall be recorded in the office of the clerk of the circuit court of the county before the site plan or site plan waiver is approved. As the parking requirements for the use or structure change, subsequent instruments may be submitted, reviewed, approved and recorded that rescind or modify the prior instrument. Proposed grading [32.5.6dJ Engineering- Is proposed grading adequately shown? Indicate if the site is located within a reservoir watershed; if so, state the name oldie watershed 32.5. ow H) Estimated traffic generation figures based upon current Virginia Department of Transportation standards (VDOT) need to be submitted. [32.5.6g] Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. j -1® 4 COUNTY OF ALBENIARLE Department of Community Development 401 Mclntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: January 8th, 2008 Ammy George 919 2nd Street S.E. Charlottes\ i1le, VA, 22902. RE: SDP- 2007 -00157 LTACH Preliminary Site Plan. Dear Sir, The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments or the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Planning (Principle Planner ARB) Albemarle County Division of Planning (Principle Planner Rural Area) Albemarle County Division of Inspections (Building Official) Virginia Department of'fransportation (VDOT). Albemarle County Service Authority (ACSA). Albemarle County Fire and Rescue. Albemarle County Geographic and Data Services (GDS) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) l 1" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by Monday January 21st 2008. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume w hen revisions are submitted along with a reinstatement fee of S65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, i 0.0 '` art Gerald Gatobu, Senior PlannerCountyol'AlbemarleDepartmentofComCurrentD ; ,munity Development40jMcIntireloptncnt Road Charlottesville, VA x,90,_4596Phone: (434)296_5Fax: (434)972-4126 832 Ext 3385 v Eavvvi Peoh ( PC' V t rytl,.County of Albemarle Department of Community Development Memorandum U:r>c' I ) L d, ttt ft 1 .4 :fira- 67C,"S - bdy To:Ammy George c. Colic it From:Gerald Gatobu, Senior Planner s({ line - C' euL v,. Division: Zoning and Current Development f2t,'-c Date:January 07 2008 Subject: SDP2007- 00157 LTACH Preliminary The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site plan referred to above once the tollowing comments have been addressed: Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] A) Zoning: [3 2.5.6a/ T.1! 59 parcel 23B is zoned (C1) Commercial. T 59 parcel 23B/ is zoned L1) Light Industry. Please corrcct;shoiw this on the site plan. B) Minimum setback lines, yard and building separation requirements; /3 2.5.6x/ Show the mininnirn setback lines taking into consideration the height oldie building 54 '. ( L! Zoning District Height Regulations): 26.6 HEIGHT REGULATIONS Except as otherwise provided in section 4.10, structures may be erected to a height not to exceed sixty -five (65) feet; provided that any structure exceeding thirty -five (35) feet in height shall be set back from any street right -of -way or single- family residential or agricultural district; in addition to minimum yard requirements, a distance of not less than two (2) feet for each one (1) toot of height in excess of thirty -five (35) feet. This would be in addition to the minimum yard requirements for the LI industrial district shown below) 26.10 MINIMUM YARD REQUIREMENTS 26.10.1 Adjacent to public streets: No portion of any structure, excluding signs, shall be erected closer than fifty (50) feet to any public street right -of -way. No off-street parking or loading space shall he located closer than ten (10) feet to any public street right -of -way. (Amended 7- 10 -85; 7 -8 -92) C) Maximum square footage for commercial and industrial uses [32.5.6bJ Building area of the LTACH hospital is shown as 29,373 SL. !lbw is the overall total square jbotage the entire LT.1CH (taking into account all the Moors; basement.') D) Maximum number of employees [32.5.6b1 how many employees will be at the LT.1CH' E) Schedule of parking including maximum amount required and amount provided: [32.5. 01 Parking shown for the Northridge (Vice Building does not add up (as shown on the plan). 4.12.6 MINIMUM NUMBER OF REQUIRED PARKING SPACES FOR SCHEDULED USES Hospital: The number of proposed spaces shall be shown in a parking study submitted by the hospital. The number of required spaces shall be determined by the zoning administrator. 1 In making the determination. the zoning administrator shall consider the recommendations in the parking study, traffic generation figures either known to the industry or estimated by the Institute of Transportation Engineers. peak parking demands, and other relevant information. Amended 2-5-03). 4.12.8. d; Parking not to be separated . front use by major roads. No parking area or spaces shall be separated from the use or structure they serve by a street whose classification is greater than a major collector, unless safe and convenient access is provided from the parking area or spaces to the use or structure and is approved by the director of planning and community development. 4.12.8. e; Instrument assuring continuation of off-site parking. If stand -alone parking or off-site shared parking is to he provided, the applicant shall submit with the application for a site plan, site plan waiver or, if a site plan is not required, with an application for a zoning compliance clearance, an instrument that restricts the use of that part of the land on which parking is provided to that use, and assures that a minimum number of parking spaces as required by this section shall be established and maintained for the life of the use. The instalment shall be in a form that is suitable for recording, shall be subject to review and approval as to form and substance by the county attorney, and shall be recorded in the office of the clerk of the circuit court of the county before the site plan or site plan waiver is approved. As the parking requirements for the use or structure change, subsequent instruments may be submitted, reviewed, approved and recorded that rescind or modify the prior instrument. F) Estimated traffic generation figures based upon current Virginia Department of Transportation standards (VDOT) need to be submitted. [32.5.hyf Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. iti JI I . iuu County of Albemarle Department of Community Development Memorandum To:Gerald Gatobu, Current Development Project Planner From:Andrew Lowe. Current Development engineering re\ iew Date:8 January 2008 Subject: SDP -2007 -00157 - UVA Long I'erm acute Care Ilospital The preliminary site plan for UVA Long term Acute Care 1Iospital has been reviewed. The following comments are provided; 1. Engineering review has concerns with sate and convenient access and circulation with the proposed layout: [18-32.7.2 & 3] a. Please connect all of the parking w ith an interior travelway. [ 18- 32.7.2. & 3.] b. Engineering is concerned that the location of the entrance is too close to the intersection with Rt. 250. The proximity creates potential queuing on public road. [1 8- 32.72] c. Please keep 12.5' minimum entrance radii. [DM] 2. Please provide traffic generation figures for the site entrances. [ 1 8- 32.5.6] 3. The critical slope waiver request has been received and will he reviewed separately. [18- 4.2.5.] 4. Please provide the SWM removal rate worksheets for the proposed B1tP's. Please also show the individual drainage areas to the BMP's. [17- 315B,C] 5. It appears that the 2:1 slopes in the hack may present problems for installing the biotilter in that location. It does not appear that there is sufficient area to install the proposed biotilter with a graded access road that meets the slope requirements. [18- 32.5.6.k.] Note: Comments for Final Site Plan 6. Please show safety railing on retaining walls of 4 feet or greater. 7. Please show sidewalks at 5' without interference from the Filtera shrub tree. Application #:SDP200700157 Short Review Comments Project Name: UVA Long term Acute Care Hospital - Prel Preliminary — Non - residential Date Completed:12/26/2007 Reviewer:Andrew Slack E911 Review Status:Requested Changes Reviews Comments: CLARIFICATION NEEDED FOR THE PRIMARY ACCESS TO THIS DEVELOPMENT. PLEASE CONTACT THIS OFFICE. Date Completed:12/27/2007 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments: Based on plans dated December 17, 2007. Provide one barrier -free. van - accessible, parking space, with its associated striped access aisle and curb, at the main entrance to the building. Delete the property line that bisects the east wing of the building, or provide a 3 -hour rated firewall along this line. Date Completed:12/21/2007 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments: This property falls within the Route 250 West Entrance Corridor; consequently, ARB approval is required prior to final site plan approval. Applications, checklists, guidelines and schedules are available on line at www.albemarle.org. Page: 1.00 County of Albemarle Printed On: Tuesday, January 08, 2008 n+Y 1 L, E 1 ' )1: i R G [ 1 DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 2271)1 VirginiaDOT.org David S, Ekern, P.E. COMMISSIONER January 8 2007 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments January 10` 2007 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the January 10 2007 Site Review Committee Meeting: SDP- 2007 -00150 Lane Bonner — Slope Waiver (Megan Yaniglos) This plan was not included in the package. SDP - 2007 -00154 ETC Building #2- Modular Laboratory Addition — Major (Patrick Lawrence) Access to the proposed lab is through private road Discovery Lane and connects to public road Lewis and Clark Drive. The increase in traffic expected from this use is minimal and the access to the state road is adequate. SDP -2007 -00155 Shadwell Market — Final (Summer Frederick) Right in/out access needs to be located on the entrance at route 250 and the entrance at route 22 should have a full access. What will the construction timeline he for the store? Construction on the road section is expected in the spring of 2008 but has not been verified. The truck turning diagram for fuel trucks shows the truck in opposing traffic lanes to enter the site. This may cause problems if there are vehicles in the left turn lane of route 22 and left turning movements from route 250 onto route 22 and a truck needs to get into the site. SDP - 2007 -00157 UVA Long Term Acute Care Hospital — Preliminary (Gerald Gatobu) The plan should add trip generations numbers for the site. lbYEARS OP TRANSPORTATION E}CCEUENCE 1 9 3 6 2 6 'e c+ There is an existing right turn lane at the proposed entrance to the site. Assuming the trip estimates are relatively low, a right turn may be all that is necessary but the numbers should he provided to determine is a left turn lane is warranted. SDP - 2007 - 00158 Vest Property/ Verizon Tier II PWSF — Final (Gerald Gatobu) The applicant has been in contact with VDOT on the multiple Verizon Tower projects throughout the county. VDOT has indicated the need for adequate sight distances on all of the sites but does not feel it to be necessary to upgrade these sites to the commercial entrance standards in order to preserve the rural nature of many of the sites. hn the few cases that the entrances do not meet the sight distance requirements, the applicant has indicated they plan to propose other safety measures be taken to ensure safety. The applicant is contacting VDOT on the individual sites and each site is being addressed for safety. SUB - 2007 - 00396 Clifton Lake, Phase I Subdivision — Preliminary (David Pennock) Are there only two phases of this subdivision? If there are additional phases, they all need to be shown on a sheet. The curve on Shadwell Road that continues the road needs to be designed as a 25 mph curve with a minimum 200 foot radius. When full implementation of Chapter 527 regulations is in effect in June 2008, this plan will fall under the threshold for a TIA. The sight distance at the intersection of Shadwell Road with route 250 is limited to the east and may not have adequate sight distance; the additional traffic causes safety concerns without proper sight distance. Please request the applicants provide a written description of revisions with re- submissions. If you have any questions or comments, please contact me prior to sharing these comments with the applicants. Sincerely, Joel DeNunzio, P.E. Residency Program Manager VDOT Charlottesville Residency 434- 293 -0011 cc Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand, Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick Lawrence, and John Giometti Thomas Jefferson Soil and Water Conservation District January 22, 2007 2134 Berkmar Dr Charlottesville, VA 22901 975 -0224 TO:Gerald Gatobu Planning Department RE:Soils Report and Comments for: UVA Long Term Acute Care 4D 76 16 19D Joins sheet 10)M 4D 37D3 i I 1 19D 36D o- 366, lifig5k 16 76 / , ,a ,,,, ,' a .y"4 S , et ' 1 s` 196 '- _19C 7;v 19 x.96 t :, . 4E h 1 ; r 19D n g 401 3jC3 m 4E 196 19D, y s 19C v 10 tn 366 29D FI4r p ° r rn *n ' n 37D3 19 C d - 9,58 20C3 19B 1' 44,4.+7Tilitipli 4%6.' s191 36B m'0..1 3 C ., 3: i 19CG'14D r 1 194 lip 2 19C I1 1 t1• wilk1,19C 2 v D3 f wa v 20b3 4.„,,,,,,,,,..,..: „s-;•16p,- oC 8lb ati b`t 3 81C v D3 :;t f1ACv y 20D3 mr ``l 0w...a ` ' - 36C isfr.. r. - ' ,..,, , 3C y c.0 e 198 op 14 19C s ; 3dL . « " ti x`{ v 38C 66E., a 0 r 0 14E 66D,81C' • x t Ate' o+ e+? .',,,I...,' t Y,.-i y r r!+,: - 9 a Y 5 190z 14E y x "- t >" y ' . C.) If s ,c.,s e ' • r L i , • s kx^.1 15E fj / 4 a 36C 6'6E 0 . . 3 $17 i x • w. 4D v S v t 4E $5E 4i7.',..!,1,,,..,,,,*n 0 j 36D 14E r 3 $ F y x 0 19C s. t z, " : 0 3 A" t +r ±" k x 56C a 4E # 4i g 1 ?. }. 14F y h ' tsv1 /1 USDA United States Natural Prepared by: Thomas Jefferson Soil & Water Department of Resources Conservation District Agriculture Conservation 434 - 975 -0224 Service Soils Report SOILS REPORT FOR: UVA — Acute Care Soil Survey Area: Albemarle County, Virginia Survey Status: Published Correlation Date: 12/01/1981 Distribution Date: 10/21/2002 Map Unit: 14D Chester loan, 15 to 25 percent slopes Description Category: Virginia FOTG Chester is a moderately steep to steep, very deep, well drained soil. Typically the surface layer is loam about 7 inches thick. The surface layer has a moderate content of organic matter. The slowest permeability is moderate. It has a moderate available water capacity and a low shrink swell potential. This soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land capability classification is 4e. The Virginia soil management group is D. This soil is not hydric. Map Unit: 19D Cullen loam, 15 to 25 percent slopes Description Category: Virginia FOTG Cullen is a moderately steep to steep, very deep, well drained soil. Typically the surface layer is loam about 8 inches thick. The surface layer has a moderately low content of organic matter. The slowest permeability is moderate. It has a moderate available water capacity and a moderate shrink swell potential. This soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land capability classification is 4e. The Virginia soil management group is N. This soil is not hydric. Map Unit: 36B Hayesville loam, 2 to 7 percent slopes Description Category: Virginia FOTG Hayesville is a gently sloping to moderately sloping, very deep, well drained soil. Typically the surface layer is loam about 7 inches thick. The surface layer has a moderate content of organic matter. The slowest permeability is moderate. It has a high available water capacity and a low shrink swell potential. This soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land capability classification is 2e. The Virginia soil management group is X. This soil is not hydric. Map Unit: 91 Urban land Description Category: Virginia FOTG No description available for Urban Land. Small Commercial Buildings - Dominant Condition Map Symbol Soil Name Rating 14D Chester loam, 15 to 25 Very limited percent slopes 19D Cullen loam, 15 to 25 Very limited percent slopes 36B Hayesville loam, 2 to 7 Somewhat limited percent slopes 91 Urban land Not Rated Thomas Jefferson SWCD 1 1/25/08 Septic Tank Absorption Fields - Dominant Condition Map Symbol Soil Name Rating 14D Chester loam, 15 to 25 Very limited percent slopes 19D Cullen loam, 15 to 25 Very limited percent slopes 36B Hayesville loam, 2 to 7 Somewhat limited percent slopes 91 Urban land Not Rated Soil Shrink - Swell - Dominant Soil Top Depth : 0 Bottom Depth : 0 Map Symbol Soil Name Rating 14D Chester loam, 15 to 25 1.5 percent slopes 19D Cullen loam, 15 to 25 1.5 percent slopes 36B Hayesville loam, 2 to 7 1.5 percent slopes 91 Urban land 0 Corrosion Concrete - Dominant Condition Map Symbol Soil Name Rating 14D Chester loam, 15 to 25 High percent slopes 19D Cullen loam, 15 to 25 Moderate percent slopes 36B Hayesville loam, 2 to 7 Moderate percent slopes Corrosion Steel - Dominant Condition Map Symbol Soil Name Rating 14D Chester loam, 15 to 25 Low percent slopes 19D Cullen loam, 15 to 25 High percent slopes 36B Hayesville loam, 2 to 7 Moderate percent slopes Thomas Jetterson SWCD 2 1/25/08 4.4 County of Albemarle Department of Community Development Memorandum To:Gerald Gatobu, Current Development Project Planner From:Andrew Lowe, Current Development engineering review Date:4 January 2008 Subject: SDP - 2007 -00157 — UVA Long Term Acute Care Hospital The preliminary site plan for UVA Long Term Acute Care Hospital has been reviewed. The following continents are provided; 1. Engineering review has concerns with safe and convenient access and circulation with the proposed layout: [18- 32.7.2 & 3] a. Please connect all of the parking with an interior travelway. [ 18- 32.7.2. & 3.] b. Engineering is concerned that the location of the entrance is too close to the intersection with Rt. 250. The proximity creates potential queuing on public road. [18- 32.7.2] c. Please keep 12.5' minimum entrance radii. [DM] 2. Please provide traffic generation figures for the site entrances. [ 18- 32.5.6] 3. The critical slope waiver request has been received and will be reviewed separately. [ 18- 4.2.5.] 4. Please provide the SWM removal rate worksheets for the proposed BMP's. Please also show the individual drainage areas to the BMP's. [17- 315B,C] 5. It appears that the 2:1 slopes in the back may present problems for installing the biofilter in that location. It does not appear that there is sufficient area to install the proposed biofilter with a graded access road that meets the slope requirements. [18- 32.5.6.k.] Note: Comments for Final Site Plan 6. Please show safety railing on retaining walls of 4 feet or greater. 7. Please show sidewalks at 5' without interference from the Filtera shrub /tree. J` Iltt ice\ L County of .Albemarle Department of Community Development Memorandum To:Gerald Gatobu, Current Development planning and zoning review From:Phil Custer, Current Development engineering review Date:29 January 2008 Subject: Vest Property, Verizon Teir II PWSF: critical slope waiver request (SDP -2007 - 00158) The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The critical slope disturbance on parcel 109 -4301 will be needed for the construction of the cell tower, fenced enclosure, and access path. The disturbed critical slope is an area of nature hardwood trees sloping towards the house at approximately 30 o. Areas Acres Total site 2.85 acres approximately Critical slopes 2.42 1 85" o of site Critical slopes disturbed 0.10 4 °'o of critical slopes Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: The disturbance to construct the drheway to the fenced enclosure is exempt for the critical slope requirements. 4.2.6e] The combined area of the exempted critical slope disturbance (which has been included in the above calculations) is 0.03 acres. This area is approximately 30''') of the critical slope disturbance. Compliance with Zoning Ordinance 18 -4.2: movement of soil and rock" Construction of the building and other site features will most likely require a temporary increased Clow down the critical slopes during a rain event. ;Movement of soil can be caught with an appropriate sediment trapping measure before site runoffenters the existing storms titer system. excessive stormwater runoff The changing of site characteristics will increase stone runoff by an insignificant amount. siltation'' Proper stabilization and maintenance will ensure long teen stability. loss of aesthetic resource" The critical slope disturbance is located 500ft from Nlaury's Lane, the nearest public space. The applicant has performed a tree survey of the area and appears to have made abom e- average efforts to impact as few existing trees and slopes as possible. septic effluent" This site will not require septic facilities. Based on the review abo\ e, there are no engineering concerns with the proposed disturbance to critical slopes that cannot be alleviated with the standard engineering and erosion control practices proposed by the applicant. 1 I' /t County of Albemarle Department of Community Development Memorandum To:Gerald Gatobu, Current Development planning and zoning review From:Phil Custer, Current Development engineering review Date:29 January 2008 Subject: UVA Longterm Acute Care Hospital critical slope waiver request (SDP -2007- 00157) The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The critical slope disturbance on parcels 59 -23B and 59-23B1 will be needed for the placement of the building, surrounding travelways, and a loading dock. The area of critical slopes located along the boundary line between the properties appears to be constructed during the development of the Northridge parking lot (parcel 59 -23B). This slope is adequately established and appears to be well - maintained. Engineering is unsure whether the critical slopes located entirely on the Kirtley property (TMP 59 -23B1) are man -made or natural. The trees on the slope appear to be mature and no scrub vegetation is present. Though, due to its location, between two level building sites, it is possible the slope was created by the development of the property decades ago. TMP 59 -23B (The Northridge Property) Areas Acres Total site 5.03 acres approximately Critical slopes 0.80 16% of site Critical slopes disturbed 0.32 41% of critical slopes TMP 59 -23B1 (The Kirtley Property) Areas Acres Total site 3.50 acres approximately Critical slopes 0.63 18% of site Critical slopes disturbed 0.30 48% of critical slopes Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: A portion of this disturbance could be considered exempt. The area behind the building which is needed to construct the biofilter could be exemptible. Although, it appears an alternative site layout or a smaller footprint would eliminate the need for a SWM facility on the critical slope. [4.2.6c] The combined area of the possible exempted critical slope disturbance (which has been included in the above calculations) is 0.078 acres. This area is approximately 13% of the critical slope disturbance. Albemarl unty Community Development Engineering Review comments Page 2 of 2 Compliance with Zoning Ordinance 18 -4.2: movement of soil and rock" Construction of the building and other site features will most likely require a temporary increased flow down the critical slopes during a rain event. Movement of soil can be caught with an appropriate sediment trapping measure before site runoff enters the existing stormwater system. excessive stormwater runoff' Stonnwater runoff will be controlled on site by an underground detention facility and a biofilter. No site runoff will run across critical slopes in the post development condition. siltation" Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long term stability. loss of aesthetic resource" The critical slope on the Northridge property (TMP 59 -23B) is visible from 250 and the Northridge building. The critical slope on the Kirtley property is only visible from the on -site warehouse. On both parcels, the critical slopes are covered by mature evergreen trees. septic effluent" This site is serviced by public sewer. Based on the review above, there are no engineering concerns with the proposed disturbance to critical slopes that cannot be alleviated with standard engineering and erosion control practices.