Dunlora Pond Narrative.txt
BIO- FILTER DETENTION BASIN NARRATIVE.
1. THE REQUIRED REMOVAL RATE FOR THE DEVELOPMENT AREA (5.12 ACRES) IS 5.41 POUNDS
OF PHOSPHOUROUS PER DAY. THE LOADING FOR THE DETAINED AREA (4.11 ACRES) IS 10.96
LBS OF PHOSPHOUROUS PER DAY. THE REQUIRED PERCENT REMOVAL RATE EQUALS THE REMOVAL
RATE DIVIDED BY THE LOADING OR 49 %. BASED ON THIS A BIO- FILTER DETENTION BASIN AND
SEDIMENT FOREBAY WITH A PERCENT REMOVAL RATE OF 50% HAS BEEN SELECTED.
1. SEDIMENT FOREBAY HAS BEEN SIZED TO HOLD 1/4" PER IMPERVIOUS AREA OF THE
DEVELOPMENT AREA. THE VOLUME OF THE FOREBAY IS 1,812 CUBIC FEET, WITH A WEIR
ELEVATION OF 386.98. A CONCRETE WALL WITH A RECTANGULAR WEIR AND BMP ORIFICE WILL
SEPERATE THE FOREBAY FROM THE REST OF THE POND.
2. THE WATER QUALITY VOLUME (WQV) IS EQUIVALENT TO 112" PER IMPERVIOUS AREA OF THE
DEVELOPMENT AREA OR 3,634 CUBIC FEET. THE WATER SURFACE ELEVATION FOR THE WQV IS
385.19. THIS LEAVES 1.19' BETWEEN THE BOTTOM OF POND AND THE DETENTION ORIFICE.
3. 385.19E DETENTION ORIFICE IS DIAMETER HOLE INVERT OF
STORM
BELOW THE ALLOWABLE DISCHARGE.
4. BASED ON BASINFLOW ROUTING THE 2, 10, AND 100 YEAR WATER SURFACE ELEVATIONS ARE
386.57, 387.29, AND 388.16 RESPECTIVELY.
S. THE TOP WIDTH OF THE DAMN IS 8 FEET IN ACCORDANCE WITH THE VIRGINIA STORMWATER
MANAGEMENT HANDBOOK SECTION 3.01.
6. THE EMERGENCY SPILLWAY IS 5 FEET IN LENGTH WITH AN ELEVATION OF 388.
Page 1
Short Version BMP Computations For Worksheets 2 - 6
Albemarle County Water Protection Ordinance: Modified Simple Method
Plan: Dunlora Gates Water Resources Area: Development Area
Preparer: TED Date: 27- Mar -08
Project Drainage Area Designation Total Development Area
L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ]
Rv mean runoff coefficient, Rv = 0.05 + 0.009(1)
Pj small storm correction factor, 0.9
1 percent imperviousness
P annual precipitation, 43" in Albemarle
A project area in acres in subject drainage area, A =5.12
C pollutant concentration, mg/( or ppm target phosphorus
f factor applied to RR
V required treatment volume in cy, 0.5 over imperv. area = A(1)43560(0.5/12)/27
RR required removal , L(post) - f x L(pre)
RR removal efficiency, RR100 /L(post)
Impervious Cover Computation (values in feet & square feet)
Item
pre - development Area post - development Area
Roads Length Width subtotal Length Width subtotal
0 0 0 673 26 17498
0 0 0 0 0 0
0 0 0 0
0 0 0 17498
Driveways Length Width no. subtotal Length Width no.subtotal
and walks 0 0 0 0 40 18 18 12960
0 0 0 0 628 5 1 3140
0 0 0 16100
Parking Lots 1 2 3 4 1 2 3 4
0 0 0 0 0
Gravel areas Area Area 2468.67
x 0.70 = 0 x 0.70 =1728.07
Structures Area no. subtotal Area no.subtotal
0 0 0 6691 4 26764
0 0 0 8934 1 B934
0 0 0 0 4479 1 4479 40177
Actively - grazed pasture & Area Area
yards and cultivated turf x 0.08 = 0 1467B3.53 x 0.08 =11742.7
Active crop land Area Area
x0.25= 0 x0.25=0
Other Impervious Areas
0 0
Impervious Cover 0%39%
I(pre)I(post)
Rv(post) V
0.40 134.6
New Development (For Development Areas, existing impervious cover 20 %)
C f 1 (pre)' Rv(pre) L(pre) L(post) RR RR Area Type
0.70 1.00 20% 0.23 7.23 12.64 5.41 43% Development Area
0,35 1.00 0% 0.05 0.79 6.32 5.53 88% Drinking Water Watersheds
0,40 1.00 1% 0.06 1.06 7.22 6.16 85% Other Rural Land
min. values
Redevelopment (For Development Areas, existing impervious cover > 20 %)
C f I (pre) ` Rv(pre) L(pre) L(post) RR RR Area Type
0.70 0.90 20% 0.23 7.23 12.64 6.13 49% Development Area
0.35 0.85 0% 0.05 0.79 6.32 5.65 89% Drinking Water Watersheds
0.40 0.85 1% 0.06 1.06 7.22 6.32 88% Other Rural Land
Interim Manual, Page 70 rev. 16 Feb 1998 GEB
Short Version BMP Computations For Worksheets 2 - 6
Albemarle County Water Protection Ordinance: Modified Simple Method
Plan: Dunlora Gates Water Resources Area: Development Area
Preparer: TED Date: 27- Mar -08
Project Drainage Area Designation Detained Area
L storm pollutant export in pounds, L = [P(Pj)Rv /12 J [ C(A)2.72 JRvmeanrunoffcoefficient, Rv = 0.05 + 0.009(1)
Pi small storm correction factor, 0.9
1 percent imperviousness
P annual precipitation, 43" in Albemarle
A project area in acres in subject drainage area, A = 4.11
C pollutant concentration, mg /I or ppm target phosphorus
f factor applied to RR
V required treatment volume in cy, 0.5" over imperv. area = A(1)43560(0.5/12)/27RRrequiredremoval , L(post) - f x L(pre)
RR removal efficiency, RR100 /L(post)
Impervious Cover Computation (values in feet & square feet)Item
pre - development Area post - development AreaRoadsLengthWidthsubtotalLengthWidthsubtotal
0 0 0 673 26 17498
0 0 0 0 0 0
0 0 0 0
Driveways Length Width no. subtotal
0 0
Length Width no. subtotal
0 17498
and walks 0 0 0 0 40 18 18 12960
0 0 0 0 628 5 1 3140
0 0
Parking Lots 1 2 3 4 1
0 16100
0
2 3 4
Gravel areas Area
0
Area 2468.67
0 0
x 0.70 = 0
Structures Area no. subtotal
x 0.70 =1728.069
Area no. subtotal
0 0 0 4050 3 12150
0 0 0 8934 1 8934
Actively - grazed pasture & Area
0 0 0 0 11170 1 11170 32254
yards and cultivated turf 0 x 0.08 = 0
Area
110710.93 x 0.08 =8856.8744ActivecroplandAreaArea
Other Impervious Areas
x0.25= 0 x0.25 =0
0
Impervious Cover o0 /0
0
43%
Rv(post) V
I(pre)I(post)
0.43 118.0
New Development (For Development Areas, existing impervious cover <= 20 %)
C f 1 (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type0.70 1.00 20% 0.23 5.80 10.96 5.15 47%Development Area0351.00 0% 0.05 0.63 5.48 4.85 88%Drinking Water Watersheds0-40 1.00 1% 0.06 0.85 6.26 5.41 86%Other Rural Landmin. values
Redevelopment (For Development Areas, existing impervious cover > 20 %)
C f 1 (pre) * Rv(pre) L(pre) L(post) RR % RR Area Type0.70 0.90 20% 0.23 5.80 10.96 5.73 52%Development Area0.35 0.85 0% 0.05 0.63 5.48 4.94 90%Drinking Water Watersheds0.40 0.85 1% 0.06 0.85 6.26 5.54 88%Other Rural Land
Interim Manual, Page 70 rev. 16 Feb 1998 GEB
RR required based on entire DA drainage of 5.12 Ac
L(post) loading based on area draining to pond of 4.11Ac:
Required %RR = [(RRpre /L(post)] * 100:
based on VSWMH Equation 5 -22)
5.41 lb/day
10.96 lb/day
49% < -- choose an Bio- filter detention
pond with a removal rate of 50%
Pre Development
Type A C AC
Woodlands 5.12 0.25 1.28
Total 5.12
0.9
1.28
comp. C
0.44
0.25
0.396
Post Development
Type A C AC
50' ROW 0.8 0.9 0.72
Houses 0.92 0.9 0.828
DW and Walk 0.44 0.9 0.396
Yards 2.51 0.3 0.753
Woodlands 0.45 0.25 0.1125
Total 5.12
12205.31
2.8095
comp. C
1
0.55
Un Detained
Type A C AC
50' ROW 0 0.9 0
Houses 0.18 0.9 0.162
DW and Walk 0 0.9 0
Yards 0.83 0.3 0.249
Woodlands 1 01 0.251 0
Total 1 1.011
12205.31
1 0.411
comp. C 1 1 0.41
Graphical
Modified
Detained Tc: 10 mins Rational Rational
Method Method
Type
Cf I Q
2yr 1.00 3 3.84
10yr 1.00 4 5.12
1 00 r 1.25 5.3 8.48
Graphical
Modified
Detained Tc: 10 mins Rational Rational
Method Method
Type
Cf I Q
2yr 1.00 4.1 11.52
10yr 1.00 5.4 15.17
1 00y 1.25 7 24.58
Graphical
Modified
Detained Tc: 10 mins Rational Rational
Method Method
Type
Cf I Q
2yr 1.00 4.1 1.69
10yr 1.00 5.4 2.22
1 00y 1.25 7 3.60
Graphical
Modified
Detained Tc: 10 mins Rational Rational
Method Method
Type A C AC
50' ROW 0.8 0.9 0.72
Houses 0.74 0.9 0.666
DW and Walk 0.44 0.9 0.396
Yards 2.07 0.3 0.621
Woodlands 0.06 0.25 0.015
Total 4.11
12205.31
2.418
comp. C 0.59
Freq.Cf I Q Qall Vreq Vreq
2yr 1.00 4.1 9.91 2.15 5819.175 9157.032
10yr 1.00 5.4 13.06 2.90 7617.45 12957.834
1 00y 1.25 7 21.16 4.88 12205.31 17709.819
According to BMP worksheet: 3635cf needed for WQV
Staae - Storaae
Stage- Storage: Conic Approximation Method
PROJECT: DUNLORA GATES
ENGINEER /DATE: TED 3/31/200812:04
Elevation Area Incremental Total Volume
nlume
Sc. -Ft)feet)Acres)acre -feet)acre -feet)cubic -teet)
2,436 384.00 0.056 0.000 0.000 0
3,292 385.00 0.076 0.066 0.066 2,853
4,178 386.00 0.096 0.086 0.151 6,580
5,093 387.00 0.117 0.106 0.257 11,207
6,0371 388.001 0.1391 0128 0.3851 16,766
7,0101 389.001 0.1611 0.1501 0.535 23,283
Stage- Storage
3x0 51) — -- -
380 00 = - --- ---
388 50
388,00
3X7 50 -- -
1871)11
386.50
10, 00
385011 - - --
384.511 --
183.50
0.000
i
5000 000
i i
1
T
I I i I I
7 ?00,1100 10000.000 12500.11110 15000.000 17500.000 201100.0110 22500000 251100.1100
3/31/200812:10 PM 1Stg- sto.xls
BasinFlow printout
INPUT:
Basin: Dunlora Gates
6 contour Areas
Elevation(ft)
384.00
385.00
386.00
387.00
388.00
389.00
Start—Elevation(ft)
4 outlet structures
outlet structure 0
orifice
Dunlora Gates Pond2.txt
Area(sf) computed vol.(cy)
2436.00 0.0
3292.00 105.7
4178.00 243.7
5093.00 415.1
6037.00 621.0
7010.00 862.3
384.00 vol.(cy)
name: riser outlet
area (sf) 3.142
diameter or depth (in) 24.000
width for rect. (in) 0.000
coefficient 0.620
invert (ft) 384.000
multiple 1
discharge out of riser
outlet structure 1
orifice
name: riser inlet
area (sf) 0.418
diameter or depth (in) 8.750
width for rect. (in) 0.000
coefficient 0.620
invert (ft) 385.190
multiple 1
discharge into riser
Outlet structure 2
weir
name:riser top
diameter (in)48.000
side angle 0.000
coefficient 3.300
invert (ft)388.000
multiple 1
discharge into riser
transition at (ft)1.215
orifice coef.0.500
orifice area (sf)12.566
outlet structure 3
weir
1 11
name:emergency spillway
length (ft)5.000
side angle 0.000
coefficient 3.000
invert (ft)388.000
multiple 1
discharge through dam
Page 1
Dunlora Gates Pond2.txt
3 Inflow Hydrographs
Hydrograph 0modified—Ration 2 Yearname.
C 0,590
Area (acres)4.110
IDF file: a2 10,00
time of concrecedingnfactor 1.000
time increment
limit (min)
1.00
360.00time
fudge ar - - - - - _fa 1:(3 -- cam .s orm: specified duration
Vol ume ....
cfs)
499.69
3:35-6-- -peak flowintensity (in /hr)1.384
time to peak (min)10.000
57.00durationofpeak (min)routed true
Hydrograph 1modified—Rational 10 Yearname.
C 0,590
Area (acres)4.110
IDF file: a10 10.00timeofconcerecedingfactor1.000
time increment
time limit (min)
1.00
360.00` --
fudge factorstormsrx' specified
1.00
J
peak flow (cfs)
7duration5718-volume (dv)
peak flow (cfs) - --7.55
1,intensity (in /hr)961
10.000timetopeak (min)
of peak (min)58.00
duration routed true
Hydrograph 2modified—Rational name: 100 Year
C 0.590
Area (acres) 4.110
IDF file: a100 8,00
time of concentration factor 1.000
time increment
limit (min)
1.00
360.00time
fudge factor 1.00
sto m: specified duration
volume Ccy)1068.18
peak flow (cfs)7`174
2.959intensity (in /hr)
to (min)8.000timepeak
duration of peak (min)59.00
routed true
OUTPUT:
Routing Method: storage - indication
Hydrograph 0 page 2
Hydrograph 2
Routing summary of Peaks
inflow (cfs)
discharge (cfs)
water level (ft)
storage (cy)
100 Year
7.174 at 8.00 (min)
6.792 at 67.00 (min)
388.155 at 67.00 (min)
656.012
Mon Mar 31 17:20:59 EDT 2008
Page 3
Dunlora Gates Pond2.txt
Routing summary of Peaks: 2 Year
inflow cfs)3.356 at 10.00 min)
discharge cfs)2.096 at 71.00 min)
water level ft)386.573 at 71.00 min)
storage cy)337.683
Hydrograph 1
Routing Summary of Peaks: 10 Year
inflow cfs)4.755 at 10.00 min)
discharge cfs)2.734 at 72.00 min)
water level ft)387.288 at 72.00 min)
storage cy)470.783
Hydrograph 2
Routing summary of Peaks
inflow (cfs)
discharge (cfs)
water level (ft)
storage (cy)
100 Year
7.174 at 8.00 (min)
6.792 at 67.00 (min)
388.155 at 67.00 (min)
656.012
Mon Mar 31 17:20:59 EDT 2008
Page 3
4ID
0
7
4
GIS -Web
Geographic Data Services
www.
albemarle.org
t'` (434) 296 -5832
v display purposes only • Aerial Imagery 2002 Gommonwealth of Virginia March 11, 2008
Short Version BMP Computations %W
Worksheets 2 - 6
Albemarle County Water Protection Ordinance: Modified Simple Method
Plan: Dunlora Gates Water Resources Area:
Preparer: PBC Date: 15- Feb -08
Project Drainage Area Designation DA# 2
L storm pollutant export in pounds, L = [P(Pj)Rv /12 ] [ C(A)2.72 ]
Rv mean runoff coefficient, Rv = 0.05 + 0.009(l)
Pi small storm correction factor, 0.9
1 percent imperviousness y7Pannualprecipitation, 43" in Albemarle
A project area in acres in subject drainage area, A
C pollutant concentration, mg /I or ppm target phosphorus
f factor applied to RR
V required treatment volume in cy, 0.5' over imperv. area = A(1)43560(0.5/12)/27
RR required removal , L(post) - f x L(pre)
aRR removal efficiency, RR100 /L(post)
Impervious Cover Computation (values in feet & square feet)
Item
r
Development Area
pre - development Area post - development
Roads Length Width subtotal L th W'd
Driveways
and walks
Parking Lots
Gravel areas
Structures
0
0
Length Width no.
0 0
0 0
1 2
0
Area
Actively - grazed pasture &
yards and cultivated turf
Active crop land
Other Impervious Areas
Impervious Cover
x 0.70 =
Area no.
0
0
0
Area
196020 x 0.08 =
Area
x 0.25 =
Area
0 95502 x 0.08 =
Area
0 x 0.25 =
0
0%
I(pre)
subtotal
20
0 0
0 0
0
subtotal
0 0
0 0
0
3 4
0
subtotal
1 15000
0 0
0
Rv(post)V
eng i th
0 0 600
0 0 0
0 0
New Development (For Development
0 0
C f
subtotal
Rv(pre)
Length Width no.
0 0 0 0
0 0,0 0
7.15 _54P/o
0 0
0.35 1.00
3 4 1 2
5.95 90%
0 20000
1.00 1%0.06
Area
7.56 6.67 88%
0
min. values
x 0.70 =
subtotal Area no.
0 0
Redevelopment (For Development Areas, existing
15000
0 0
f
0
0 0 0'
L(post)RR % RR
Area
0 95502 x 0.08 =
Area
0 x 0.25 =
0
0%
I(pre)
subtotal
20
0 0
0 0
0
subtotal
0 0
0 0
0
3 4
0
subtotal
1 15000
0 0
0
Rv(post)V
0.50 144.9
New Development (For Development tr "o1sAreas, existing impervious cover <= 20 ° /,)
C f I (pre) *Rv(pre)L(pre)L(post)RR % RR Area Type
0.70 1.00 20%0.23 6.07 13.23 7.15 _54P/o Development Area
0.35 1.00 0%0.05 0.66 6.61 5.95 90%Drinking Water Watersheds
0.40 1.00 1%0.06 0.89 7.56 6.67 88%Other Rural Land
min. values
Redevelopment (For Development Areas, existing impervious cover > 20 %)
C f I (pre) *Rv(pre)L(pre)L(post)RR % RR Area Type
0.70 0.90 20%0.23 6.07 13.23 7.76 59%Development Area
0.35 0.85 0%0.05 0.66 6.61 6.05 92%Drinking Water Watersheds
0.40 0.85 1 %!0.06 0.89 7.56 6.80 90%Other Rural Land
Area
34750
19227
0
32254
7640.16
0
0
post)
Interim Manual, Page 70 rev. 16 Feb 1998 GEB