Loading...
HomeMy WebLinkAboutSDP200800006 Review Comments Minor Amendment 2008-02-22COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2008 - 00001, Monticello Visitor Center WPO Amendment SDP -2008- 00006, Monticello Visitor Center Site Plan Amendment Plan preparer: Rummel, Keppler, and Kahl LLP fax: 410.728.2834 Owner or rep.: The Thomas Jefferson Foundation, Inc fax: 434.984.0404 Date received: 15 January 2008 Date of Comment: 22 February 2008 Lead Engineer: Phil Custer The plans for the WPO and site plan amendments to the Monticello Visitor Center, received on 15 . January 2008, have been reviewed. Engineering review has no issues with the proposed changes to the WPO plan and grants approval. However, engineering will require the following changes before recommending approval to the site plan: 1. Please provide a detail for the proposed wall on both sides of the education pavilion. Please also label the critical top and bottom elevations around the wall. A wall with a height greater than 4ft will require a handrail. 2. Slopes steeper than 3:1 appear to be needed around the educational pavilion. For these slopes, a low - maintenance ground cover will be required. Please specify. 3. There appears to be a slope steeper than 2:1 (maximum allowed) located south of the storage building (F,1). This slope needs to be flattened out or a wall will be required. If a wall is required, please provide a detail on the next submittal. n COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP- 2008 - 00006, Monticello Visitor Center Site Plan Amendment Plan preparer: Rummel, Keppler, and Kahl LLP fax: 410.728.2834 Owner or rep.: The Thomas Jefferson Foundation, Inc fax: 434.984.0404 Date received: (Rev. 1) 19 May 2008 15 January 2008 Date of Comment: (Rev. 1) 12 June 2008 22 February 2008 Lead Engineer: Phil Custer The site plan amendment to the Monticello Visitor Center, received on 19 May 2008, has been reviewed. Engineering review has no objection to granting approval ofthis minor amendment. However, please note that erosion matting is not the solution to providing low maintenance grouudeover for slopes steeper than 3:1 because the matting is usual1j used to assist with the stabilization ofgrass seeding. Grassed areas are considered high maintenance dire to mowing operations. The connnh will be looking for a mulched area with woody plantings such as juniper wheat the site is inspected.