Loading...
HomeMy WebLinkAboutSDP200800047 Plan - Other (not approved)12 1 11 01 STONY POINT - ROAD O to A A A A A A A p of Tank EIX-4" Below per Slab T4 s 10 SITE U.S. 250 NOTE: No physical evidence found that the following affect the property shown heron. y A.T. & T. R/W D.B. 207 P.4 Vepco R/W D.B. 275, P. 92 Riverbend Dr. Vicinity Map: 1 " = 1000' 9' -0" 4' -6" ol ------------------------- - - - - -, - - 2 ._ 0 ..2' -0" 0 CV cli O 1 ' 4" Manhole rame & Cover Jeehah R- 5900 -E) 1 SP, Oil Water Separator -Plan View ca e - 6" Conc. Slab w / #5 t Grade El. Reinf. Bars 8" O.C.E.W. A A A A A A A A A A A A A A A A A A M1 A A A A A A A A A A Ayy.. ck A AA A AAAAAA A A A A I. A A a WAiaaAAAAAAAAAAAAAAA - - - ' ,(\MW VFV. _ - CV Co - Sch 38 P C Drain un to Exst. " Sanitary ewer per Site Plan 4" Thick is Concrete 8 "x30" Baffle Wall I" Die. Blodout Flow Port T VC Outlet Baffle 8' -0" ipe to Extend pproximately 12" ff the Inside Floor 9' -0" 2 SP1 Oil Water Separator - Section View Notes: 1. 1,000 Gallon Oil/Water Separator shipped in one piece weighing approximately 18,000 Lbs.2. Furnish risers to grade as shown, (not included in precast package). 3. Manhole frame and covers are shipped loose for installation by Contractor. 4.PVC Piping and Installation by Contractor.5. Oil/Water Separator design based on H2O Load Rated Unit available from The Clear Flow Co., Waynesboro, Virginia (540) 949 -8386 6. Contractor to fill tank to 1/2 capacity with water immediately after installation. Notes: 1. Plan based on plat prepared by B. Aubrey Huffman & Associates, dated July 17, 1998. 2. Property is not in a H.U.D. defined 100 year flood zone but is located in Flood Zone "C" as shown on community panel No. 510006 0230B. 3. Service utilities are underground. 4. Existing use is an automobile dealership. 5. Site is not within a reservoir watershed. 6. This site is within an Entrance Corridor Overlay District and a Certificate of Appropriateness from the Albemarle County Architectural Review Board is required. 7. A Special Use Permit is required from the Albemarle County Board of Supervisors for exterior display areas. 8. Vehicles shall not be elevated anywhere on the site. 9. Vehicles in the exterior display area illustrated on this plan shall not exceed five (5) vehicles. 10. Vehicles in the exterior display area illustrated on this plan shall be parked in an orderly, easily identifiable geometric pattern. 9 8 F o 4q: 4Q:%o CO 0 i i i U.S. Route 250 a 0 lot t%— 12 11 10 9 4" Sch 38 PVC Drain Inlet from Existing Drain at Interior Wash Bay 5,000 PSI Reinforced Concrete 0 TM 78 Par 2C Lot C Minor Amendment I Addition of Dumpster Pad & Fence and L. Q[I/Water Separator r Existing Landscaping: 410 Deciduous Trees: 3 Each: 3 -1/2" Caliper Acer Platinoides Flowering Deciduous Trees: 2 Each: 1-1/2" Caliper Cornus Florida, "White Cloud Evergreen Shrub:y ' 44 Each: 24" High Prunus Laurocerasus "Otto Luyken" 10' Virgina Telegraph & Telephone Easement D.B. 515, 8230 D.B. 529, 8471 TM 78 Par 28 Lot A 11' Permanent Easement Granted To Lot A D.B. 537, P. 193 Existing Landscaping Dominion Virginia Power R/W - D.B. 1416 -164 10 W C N MINOR AMENDMENT Enclosure of Existing Dumpster and Installation of Underground Oil/Water Separator E S Scale: 1 " = 20.00' 5 5 1 4 1 3 1 2 n 3 2 1 Professional Seal L- M B i Client Flow Mazda 1289 Stony Point Road Charlottesville, Virginia 22911 Project Flow Mazda MINOR AMENDMENT Dumpster Enclosure Oil Water Separator 1289 Stony Point Road Charlottesville, Virginia 22911 Project Information Jurisdiction: Albemarle County, VA Magisterial District: Rivanna Zoning: HC /EC Signature Panel Signature Date C D E G 0 F G K F Signature H i CAD File Name: Flow.Mazda.03.10.08 USE OF THIS DRAWING DO NOT SCALE DRAWING. The Contractor shall take field measurements and verify field conditions and shall carefullycomparesuchfieldmeasurementsandconditionsandother information known to the Contractor with the Contract Documents before commencing activities; Contractor shall carefully study and mpare the Contact Documents with each other and with nformadon furnished by the Owner and shall at once report to the Architect errors, inconsistencies or omissions discovered. If the Contractor performs any construction activity knowing It involves recognized error, Inconsistency or omission in the Contract 1DocumentswithoutsuchnoticetotheArchitect, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable cost. The intent of the Contract Documents is to Include all items necessary for the proper execution and completion of the Work b the Contractor. The Contract Documents are complementary, an what is required by one shall be as binding as If required by all; performance by the Contractor shall be required only to the exten consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the intended results. In case of conflicting requirements, the more stringent and /or costly requirement shall apply, without change to Contract Sum or Time. 0Tanizatlon of the Specifications into divisions, sections andarticles, end arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or In establishing the extent of Work to be performed by any trade. Information shown on this sheet does not authorize changes toContractSumorTimeunlessstatedinaseparateletteror Change Order. Information shown Is subject to the requirements of the Contract Documents. Contractor Is responsible for dimensions, which shall be confirmed and correlated at the site, fabrication processes, techniques of construction, quantities, the coordination of his work with all other trades and Subcontractors, and the satisfactory performance of his work. I K F Signature 12 1 11 0 INS C 1 In In G H v N Cut Slope For Drainage Fin. Grade Varies s ZDJ I AAA N A A "A A A A - F AA, I I I I I 11 I I I I I i A A A A A A A A rl A A A A AA VYAAAAAAAAAAA wAAAAAAA I I I __I A i j0 a ho F K SP2 Fence - Elevation Facing South 12 10 e _ _ 9 Y " SP2 Dumpster Pad -Plan View 3 SP2 Fence - Elevation Facing South eiiz °= 57Lei 0 0 2 Professional Seal i L A 6 Client Flow Mazda 1289 Stony Point Road Charlottesville, Virginia 22911 Project Flow Mazda MINOR AMENDMENT Dumpster Enclosure Oil Water Separator 1289 Stony Point Road Charlottesville, Virginia 22911 Project Information Jurisdiction: Albemarle County, VA Magisterial District: Rivanna Zoning: HC /EC Signature Panel Signature Date IDrawing HistoryDateDescription Mark 103.10.081 Minor Amendment I PLS CAD File Name: Flow.Mazda.03.10.08 In USE OF THIS DRAWING 11 DO NOT SCALE DRAWING. The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other Information known to the Contractor with the Contract Documents before commencing activities; Contractor shall carefully study and compare the Contact Documents with each other and with information furnished by the Owner and shall at once report to theArchitecterrors, inconsistencies or omissions discovered. If the Contractor performs any construction activity knowing It involves recognized error, inconsistency or omission In the Contract Documents without such notice to the Architect, the Contractor shall assume appropriate responsibility for such performance and shall bear an appropriate amount of the attributable cost. The intent of the Contract Documents Is to Include all items necessary for the prop execution and completion of the Work b the Contractor. The Contract Documents are complementary, an what is required by one shall be as binding as if required by all; performance by the Contractor shall be required only to the exten consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the Intended results. In case of conflicting requirements, the more stringent and /or costly requirement shall apply, without change to Contract Sum or Time. Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor In dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. Information shown on this sheet does not authorize changes to Contract Sum or Time unless stated in a separate letter or Change Order. Information shown Is subject to the requirements of the Contract Documents. Contractor is responsible for dimensions, which shall be confirmed and correlated at the site, fabrication processes, techniques of construction, quantities, the coordination of his work with all other trades and Subcontractors, and the satisfactory performance of his work. 1 C 0M F G H J K SignatureSignature