HomeMy WebLinkAboutSDP200800047 Plan - Other (not approved)12 1 11
01
STONY POINT -
ROAD
O
to
A A A A A A A
p of Tank EIX-4" Below
per Slab T4 s
10
SITE
U.S. 250
NOTE: No physical evidence found that
the following affect the property shown
heron.
y A.T. & T. R/W D.B. 207 P.4
Vepco R/W D.B. 275, P. 92
Riverbend Dr.
Vicinity Map: 1 " = 1000'
9' -0"
4' -6"
ol ------------------------- - - - - -, - -
2 ._ 0 ..2' -0"
0
CV
cli
O 1 '
4" Manhole
rame & Cover
Jeehah R- 5900 -E)
1
SP, Oil Water Separator -Plan View
ca e -
6" Conc. Slab w / #5
t Grade El. Reinf. Bars 8" O.C.E.W.
A A A A A A A A A A A A A A A A A A M1 A A A A A A A A A A Ayy.. ck
A
AA A AAAAAA A A A A I. A A a WAiaaAAAAAAAAAAAAAAA - - - ' ,(\MW VFV. _ -
CV Co -
Sch 38 P C Drain
un to Exst. " Sanitary
ewer per Site Plan
4" Thick
is Concrete
8 "x30" Baffle Wall
I" Die. Blodout Flow Port
T
VC Outlet Baffle 8' -0"
ipe to Extend
pproximately 12"
ff the Inside Floor 9' -0"
2
SP1 Oil Water Separator - Section View
Notes:
1. 1,000 Gallon Oil/Water Separator shipped in one piece weighing
approximately 18,000 Lbs.2. Furnish risers to grade as shown, (not included in precast package).
3. Manhole frame and covers are shipped loose for installation by Contractor.
4.PVC Piping and Installation by Contractor.5. Oil/Water Separator design based on H2O Load Rated Unit available from
The Clear Flow Co., Waynesboro, Virginia (540) 949 -8386
6. Contractor to fill tank to 1/2 capacity with water immediately after installation.
Notes:
1. Plan based on plat prepared by B. Aubrey
Huffman & Associates, dated July 17, 1998.
2. Property is not in a H.U.D. defined 100 year flood
zone but is located in Flood Zone "C" as shown on
community panel No. 510006 0230B.
3. Service utilities are underground.
4. Existing use is an automobile dealership.
5. Site is not within a reservoir watershed.
6. This site is within an Entrance Corridor Overlay
District and a Certificate of Appropriateness from the
Albemarle County Architectural Review Board is
required.
7. A Special Use Permit is required from the
Albemarle County Board of Supervisors for exterior
display areas.
8. Vehicles shall not be elevated anywhere on the
site.
9. Vehicles in the exterior display area illustrated on
this plan shall not exceed five (5) vehicles.
10. Vehicles in the exterior display area illustrated on
this plan shall be parked in an orderly, easily
identifiable geometric pattern.
9 8
F
o
4q:
4Q:%o
CO 0
i
i
i
U.S. Route 250
a
0 lot t%—
12 11 10 9
4" Sch 38 PVC Drain
Inlet from Existing
Drain at Interior Wash Bay
5,000 PSI
Reinforced
Concrete
0
TM 78
Par 2C
Lot C
Minor Amendment
I Addition of Dumpster
Pad & Fence and
L. Q[I/Water Separator
r
Existing Landscaping:
410 Deciduous Trees:
3 Each: 3 -1/2" Caliper Acer Platinoides
Flowering Deciduous Trees:
2 Each: 1-1/2" Caliper Cornus Florida, "White
Cloud
Evergreen Shrub:y '
44 Each: 24" High Prunus Laurocerasus "Otto
Luyken"
10' Virgina Telegraph &
Telephone Easement
D.B. 515, 8230
D.B. 529, 8471
TM 78
Par 28
Lot A
11' Permanent Easement
Granted To Lot A
D.B. 537, P. 193
Existing Landscaping
Dominion Virginia Power
R/W - D.B. 1416 -164
10
W C
N
MINOR AMENDMENT
Enclosure of Existing Dumpster
and Installation of Underground
Oil/Water Separator
E
S
Scale: 1 " = 20.00'
5
5 1 4 1 3 1 2
n 3 2
1
Professional Seal
L-
M
B
i
Client
Flow Mazda
1289 Stony Point Road
Charlottesville, Virginia 22911
Project
Flow Mazda
MINOR AMENDMENT
Dumpster Enclosure
Oil Water Separator
1289 Stony Point Road
Charlottesville, Virginia 22911
Project Information
Jurisdiction: Albemarle County,
VA
Magisterial District: Rivanna
Zoning: HC /EC
Signature Panel
Signature Date
C
D
E
G
0
F
G
K
F
Signature
H
i
CAD File Name: Flow.Mazda.03.10.08
USE OF THIS DRAWING
DO NOT SCALE DRAWING. The Contractor shall take field
measurements and verify field conditions and shall carefullycomparesuchfieldmeasurementsandconditionsandother
information known to the Contractor with the Contract Documents
before commencing activities; Contractor shall carefully study and
mpare the Contact Documents with each other and with
nformadon furnished by the Owner and shall at once report to the
Architect errors, inconsistencies or omissions discovered. If the
Contractor performs any construction activity knowing It involves
recognized error, Inconsistency or omission in the Contract 1DocumentswithoutsuchnoticetotheArchitect, the Contractor
shall assume appropriate responsibility for such performance and
shall bear an appropriate amount of the attributable cost.
The intent of the Contract Documents is to Include all items
necessary for the proper execution and completion of the Work b
the Contractor. The Contract Documents are complementary, an
what is required by one shall be as binding as If required by all;
performance by the Contractor shall be required only to the exten
consistent with the Contract Documents and reasonably inferable
from them as being necessary to produce the intended results. In
case of conflicting requirements, the more stringent and /or costly
requirement shall apply, without change to Contract Sum or Time.
0Tanizatlon of the Specifications into divisions, sections andarticles, end arrangement of Drawings shall not control the
Contractor in dividing the Work among Subcontractors or In
establishing the extent of Work to be performed by any trade.
Information shown on this sheet does not authorize changes toContractSumorTimeunlessstatedinaseparateletteror
Change Order. Information shown Is subject to the requirements
of the Contract Documents. Contractor Is responsible for
dimensions, which shall be confirmed and correlated at the site,
fabrication processes, techniques of construction, quantities, the
coordination of his work with all other trades and Subcontractors,
and the satisfactory performance of his work.
I
K
F
Signature
12 1 11
0
INS
C
1
In
In
G
H
v
N
Cut Slope For
Drainage
Fin. Grade
Varies
s ZDJ
I
AAA N A A "A A A A - F AA, I I I I I 11 I I I I I i
A A A A A A A A rl A A A A
AA VYAAAAAAAAAAA wAAAAAAA I I I __I A
i
j0
a
ho
F
K
SP2 Fence - Elevation Facing South
12 10
e _ _
9
Y " SP2 Dumpster Pad -Plan View
3
SP2 Fence - Elevation Facing South
eiiz °=
57Lei 0 0 2
Professional Seal
i
L
A
6
Client
Flow Mazda
1289 Stony Point Road
Charlottesville, Virginia 22911
Project
Flow Mazda
MINOR AMENDMENT
Dumpster Enclosure
Oil Water Separator
1289 Stony Point Road
Charlottesville, Virginia 22911
Project Information
Jurisdiction: Albemarle County,
VA
Magisterial District: Rivanna
Zoning: HC /EC
Signature Panel
Signature Date
IDrawing HistoryDateDescription Mark
103.10.081 Minor Amendment I PLS
CAD File Name: Flow.Mazda.03.10.08
In USE OF THIS DRAWING 11
DO NOT SCALE DRAWING. The Contractor shall take field
measurements and verify field conditions and shall carefully
compare such field measurements and conditions and other
Information known to the Contractor with the Contract Documents
before commencing activities; Contractor shall carefully study and
compare the Contact Documents with each other and with
information furnished by the Owner and shall at once report to theArchitecterrors, inconsistencies or omissions discovered. If the
Contractor performs any construction activity knowing It involves
recognized error, inconsistency or omission In the Contract
Documents without such notice to the Architect, the Contractor
shall assume appropriate responsibility for such performance and
shall bear an appropriate amount of the attributable cost.
The intent of the Contract Documents Is to Include all items
necessary for the prop execution and completion of the Work b
the Contractor. The Contract Documents are complementary, an
what is required by one shall be as binding as if required by all;
performance by the Contractor shall be required only to the exten
consistent with the Contract Documents and reasonably inferable
from them as being necessary to produce the Intended results. In
case of conflicting requirements, the more stringent and /or costly
requirement shall apply, without change to Contract Sum or Time.
Organization of the Specifications into divisions, sections and
articles, and arrangement of Drawings shall not control the
Contractor In dividing the Work among Subcontractors or in
establishing the extent of Work to be performed by any trade.
Information shown on this sheet does not authorize changes to
Contract Sum or Time unless stated in a separate letter or
Change Order. Information shown Is subject to the requirements
of the Contract Documents. Contractor is responsible for
dimensions, which shall be confirmed and correlated at the site,
fabrication processes, techniques of construction, quantities, the
coordination of his work with all other trades and Subcontractors,
and the satisfactory performance of his work.
1
C
0M
F
G
H
J