HomeMy WebLinkAboutSDP200800052 Approval - County 2008-07-03AL
U u"u t
IRG1 X
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
July 3, 2008
Keith Whipple
McKee Carson
301 East High Street
Charlottesville, VA 22903
RE: SDP2008 -00052 Sieg Maintenance (Parking)
AND
SDP2008 -00053 UVa Long Term Acute Care Hospital — Preliminary
Dear Mr. Whipple:
The Albemarle County Planning Commission, at its meeting on June 24, 2008, approved the above -noted
petition, by a vote of 5:0.
Please note the approval was based on the following conditions:
1. Provision of screening between Northridge and adjacent Rural Areas property if disturbance for
installation of sewer line occurs and establishment of screening buffer, if adequate buffer does
not currently exist.
2. Applicant shall submit a traffic study to address signal warrants for a signal prior to approval of
final site plan.
3. All existing lighting on Northridge site shall be modified to meet the current requirements of
Section 4.17.
4. Provision of inter - parcel connection to allow vehicle access between Tax Map Parcels 59 -23B
and 59 -23C1. The access shall not exceed 10% slope.
In reference to the parking determination dated June 12, 2008 from Amelia McCulley, Zoning
Administrator, the following conditions of the preliminary site plan approval (for both plans) related to
parking are recommended:
1. One or more additional parking studies shall be conducted throughout a typical business day to
determine actual parking occupancy;
2. Both site plans shall either be combined into one site plan, or shall be approved together so the
LTACH development may not proceed without the parking and circulation infrastructure provided
with the Sieg Maintenance site plan;
3. The final site plan shall detail the following:
a) Existing and proposed parking;
b) Parking requirements and provisions for each of the uses on all of these properties;
c) The cumulative requirements and;
d) Any provisions to enforce /implement the restrictions for employee parking, such as signage
and the like.
Page 2
Keith Whipple
July 3, 2008
If you should have any questions or comments regarding the above action, please do not hesitate to
contact me at (434) 296 -5832.
Sincerely,
Gerald Gatobu
Senior Planner
Zoning and Current Development Division
GG /ebg
cc: Rectors & Visitors of the University of Virginia, The
P O Box 400726
Charlottesville, VA 22904
Timmons Group
9192 nd Street SE
Charlottesville VA 22902
A/
COUNTY OF ALBENIARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
DA'L'E 07/15/2008
Ani my George
Nimmons Group
919 2 " Street S.F
Charlottesville, VA 22902.
Keith Whipple
McKee Carson
301 East High Street
Charlottesville, VA 22903.
RE: SDP - 200800052 and 200800053 Lone Term Acute Care Hospital and SicE Maintenance
Buildin!
Dear Sir and Madam:
The Department of Community Development hereby grants administrative approval to the above
referenced site plan (s).
The approval of the preliminary site plan is valid for ( I ) one year in accordance with Section 32.1.3.1 of
Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on
07/15/2009. If the preliminary site plan approval expires, a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight (8) tentative plan
copies to the Department of Community Development. This letter must be submitted vv ith the tentative
plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative
plan will be dented.
Frosion and Sediment Control. l3MP Stormvvater Management, and road plans with the associated
applications and fees must also be submitted with the eight (8) tentative Plans.
Once the tentative plan is submitted and reviewed you will receive comments from all
departments /divisions /agencies that have made comment on the tentative plan. Any further
responses must be made directly to each department /division /agency that has further comment.
After all aforementioned departments /divisions /agencies have granted a tentative approval, you
must verify with the Planner that you may submit the final inylars (2 sets), two paper copies, the
final site plan application, and final site plan fee to the Department of Community Development.
Signing of the plans will occur within one week once it is determined that the final site plan mylars
reflect all tentative approvals.
The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in
addition to the following conditions.
The Department of Community Development shall not accept submittal of the final site plan for signature
until tentative approvals for the following conditions have been obtained:
Zoning & Current Development approval to include:
Section 4.12.81An instrument assuring continuation of offsite parking: Please
provide an instrument assuring continuation of offsite parking
Section 4.12.111 Please apply for a boundary line adjustment to rennedy the need for
a special use permit for stand alone parking on "far Map and Parcel Nunnber 59 -23C 1.
Planning Commission condition of approval] Prov ision of screening between
Northridge and adjacent Rural Areas property if disturbance for installation of sewer line
occurs and establishnnent of screening buffer, if adequate buffer does not currently exist.
Planning Commission condition of approval[ Applicant shall submit a traffic study to
address signal warrants for a signal prior to approval of final site plats.
Planning Commission condition of approvallAll existing lighting on Northridge site
shall be modified to meet the current requirements of Section 4.17.
Planning Commission condition of approval I Provi sion of inter - parcel connection to
allow vehicle access between Tar Map Parcels 59 -23B and 59 -23C I . "file access shall not
exceed 10% slope.
Annelia McCulley, Zoning Administrator June 12, 2008 Parking Determination for —
L'fACH, Northridge and Sieg Warehouse (TM 59, Parcels 2313 and 23131). 1 recommend
the following conditions of preliminary site plan approval (for both plans) relating to
parking:
1. Otte or more addition(!l parking stitelies shall he conthictetl throughout a tnpical
business clan' to Cletertnine actiml parking occupant - v:
Both site phins shall either he combinetl into one site plan or shall he approved
together so the LT ICfl tlecelopinent inaV not proceed withotd the parking antl
circultitlon inf wstrilcture provitletl with the ,Sieg Maintenance Site plain:
3. The final site plan shall de tail the fi)llowing:
a. Existing antl proposed parking
b. Parking requirements anti provisions,for each of the uses on all of these
properties
c. The ciinndatire requlreinenis ailtl
tl :sill'Provisions to eiifoi - ce impleinent the restrictions n einplol'ee parking, Such
as signtWge antl the like.
Please contact Gerald Gatobu at 296 -5832 ext 3385 if you have questions or require additional
inforniatloll.
Engineering approval to include:
l 7- 300]Approval of a SWM nlanagennent plan.
17-2031 Approval of an ESC plan
VESCH] Compliance with VESCH NIS -19
DM] Canopy over the SWNI facility is removed
4.12.15.g] Upgrading of travelway from the ambulance drop -off area to Route 250 to
elect Ordinance standards
Please contact Philip Custer at 296 -5832 ext 3072 if you have questions or require additional information.
Albemarle County Service Authority approval to include:
All Albemarle County Service Authority comments must be addressed before final site
plan approval can be granted.
Please contact Gary Whelan at 977-4511 if you have questions or require additional information.
Fire & Rescue approval to include:
All Albemarle County fire and rescue comments must be addressed before final site plan
approval can be granted.
Please contact James Barber at 296 -5833 if you have questions or require additional inrormation.
VDOT approval to include:
I have reviewed the Traffic Analysis update (dated May 19 ° ' 1008) and have the following comments:
Approval of "Traffic Analysis /Study to address signal warrants.
Please contact Joel Denunzio at 434-293-0011 F,st. 120 if you have questions or require additional
information.
ARB Architectural Review Board approval to include:
Address all comments listed for ARB 2008 - 00018 UVA Long Term Acute Care
Hospital.
Please contact Margaret NIaliszewski at 296 -5832 est 3276 if you have questions or require additional
information.
Sincerely.
Gerald Gatobu
Senior Planner
Zoning & Current Development
File: SDP - 2008 -52 & 53
Cc: University or Virginia Health Services Foundation
500 Ray C Hunt Drive
Charlottesville VA 22903
UVA Facilities and Capital Development
P.O Box 800799
Charlottesville VA 22908