Loading...
HomeMy WebLinkAboutSUB201500140 Bond Estimates 2016-04-05Subdivision Name: Avinity Phase 2 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O150O140 Item Road Name: Avinity Place station 10+00 to 12+91 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6) ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) C:\Users\mgreene\Documents\A-Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.xls 4/5/2016 No. Unit Unit Cost Cost installed % compete cost remaining road length 291.0 ft 5.0 in d 291.0 ft L 20.0 ft W 169.8 ton $35.00 $5,941.25 0% $5,941.25 291.0 ft L 20.0 ft W 646.7 sy $10.00 $6,466.67 0% $6,466.67 2.5 in d 291.0 ft L 20.0 ft W 89.1 tons $100.00 $8,911.88 0% $8,911.88 1.5 in d 291.0 ft L 20.0 ft W 53.5 tons $120.00 $6,416.55 0% $6,416.55 0.0 ft $13.00 $0.00 0% $0.00 480.0 ft $15.00 $7,200.00 0% $7,200.00 245.0 ft $17.00 $4,165.00 0% $4,165.00 1 ft $350.00 $350.00 0% $350.00 2 each $200.00 $400.00 0% $400.00 5 each $200.00 $1,000.00 0% $1,000.00 0 Each 0 each $150.00 $0.00 0% $0.00 0 ES @ 0 0.0 ft $17.00 $0.00 0% $0.00 5 each $3,500.00 $17,500.00 0% $17,500.00 0 each $500.00 $0.00 0% $0.00 25 ft $450.00 $11,250.00 0% $11,250.00 15.0 in d 0 ES -1,2 0 EC -1 182.0 ft $35.00 $6,370.00 0% $6,370.00 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 0.0 cy $4.00 $0.00 0% $0.00 0.0 cy $9.00 $0.00 0% $0.00 291.0 ft L 0.05511 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 291.0 ftL 0.05511 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 0Isum $500.00 $0.00 0% $0.00 291.0 ftL 0.582 inc of 500' 2 each $200.00 $320.00 0% $320.00 291.0 ft L 0.582 inc of 500' 2 each $200.00 $320.00 0% $320.00 291.0 ft L 0.582 inc of 500' 2 each $200.00 $320.00 0% $320.00 291.0 ft L 0.582 inc of 500' 2 each $200.00 $320.00 0% $320.00 291.0 ft L 0.582 inc of 500' 2 each $200.00 $320.00 0% $320.00 182 ft $1.00 $182.00 0% $182.00 291.0 ft L 0.05511 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 291.0 ft L 0.05511 mi. 0 Lanes $150.00 $0.00 0% $0.00 291.0 ft L 0.05511 mi. 0 Lanes $100.00 $0.00 0% $0.00 $83,753.34 $83,753.34 cost sum contingency $8,375.33 $8,375.33 C:\Users\mgreene\Documents\A-Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.xls 4/5/2016 Subdivision Name: Avinity Phase 2 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500140 Item Road Name: Avinity Place No. Unit Unit Cost Cost installed % compete cost remaining Total $92,130 $92,130 C:\Users\mgreene\Documents\A_Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.x1s 4/5/2016 Subdivision Name: Avinity Phase 2 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500140 Item Road Name: Avinity Lane station 10+00 to 12+00 aggregate base blotted or prime&double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6) ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") pipe, rcp, cm (15 to 48") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) C:\Users\mgreene\Documents\A-Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.xls 4/5/2016 No. Unit Unit Cost Cost installed % compete cost remaining road length 200.0 ft 5.0 in d 200.0 ft L 20.0 ft W 116.7 ton $35.00 $4,083.33 0% $4,083.33 200.0 ft L 20.0 ft W 444.4 sy $10.00 $4,444.44 0% $4,444.44 2.5 in d 200.0 ft L 20.0 ft W 61.3 tons $100.00 $6,125.00 0% $6,125.00 1.5 in d 200.0 ft L 20.0 ft W 36.8 tons $120.00 $4,410.00 0% $4,410.00 0.0 ft $13.00 $0.00 0% $0.00 435.0 ft $15.00 $6,525.00 0% $6,525.00 150.0 ft $17.00 $2,550.00 0% $2,550.00 1 ft $350.00 $350.00 0% $350.00 0 each $200.00 $0.00 0% $0.00 5 each $200.00 $1,000.00 0% $1,000.00 0 Each 0 each $150.00 $0.00 0% $0.00 0 ES @ 0 0.0 ft $17.00 $0.00 0% $0.00 1 each $3,500.00 $3,500.00 0% $3,500.00 0 each $500.00 $0.00 0% $0.00 12 ft $450.00 $5,400.00 0% $5,400.00 15.0 in d 0 ES -1,2 0 EC -1 34.0 ft $35.00 $1,190.00 0% $1,190.00 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 0.0 cy $4.00 $0.00 0% $0.00 0.0 cy $9.00 $0.00 0% $0.00 200.0 ft L 0.03788 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 200.0 ft L 0.03788 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 0Isum $500.00 $0.00 0% $0.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 200.0 ft L 0.4 inc of 500' 1 each $200.00 $280.00 0% $280.00 34 ft $1.00 $34.00 0% $34.00 200.0 ft L 0.03788 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 200.0 ft L 0.03788 mi. 0 Lanes $150.00 $0.00 0% $0.00 200.0 ft L 0.03788 mi. 0 Lanes $100.00 $0.00 0% $0.00 $47,011.78 $47,011.78 cost sum contingency $4,701.18 $4,701.18 C:\Users\mgreene\Documents\A-Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.xls 4/5/2016 Subdivision Name: Avinity Phase 2 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201500140 Item Road Name: Avinity Lane No. Unit Unit Cost Cost installed % compete cost remaining Total $51,720 $51,720 C:\Users\mgreene\Documents\A_Review Comment Ietters\Avinity Phase 2 Road Plan\RP_bond_est_April 2015.x1s 4/5/2016