HomeMy WebLinkAboutSDP200800053 Approval - County 2008-07-03SOY ;11.ht w A tRCNI* COUNTY OF ALBEMARLE Department of Community Development 401 Nlclntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 July 3, 2008 Keith Whipple McKee Carson 301 East High Street Charlottesville, VA 22903 RE: SDP2008 -00052 Sieg Maintenance (Parking) AND SDP2008 -00053 UVa Long Term Acute Care Hospital — Preliminary Dear Mr. Whipple, Fax (434) 972 -4012 The Albemarle County Planning Commission, at its meeting on June 24, 2008, approved the above -noted petition, by a vote of 5:0. Please note the approval was based on the following conditions: 1. Provision of screening between Northridge and adjacent Rural Areas property if disturbance for installation of sewer line occurs; and establishment of screening buffer, if adequate buffer does not currently exist. 2. Applicant shall submit a traffic study to address signal warrants for a signal prior to approval of final site plan. 3. All existing lighting on Northridge site shall be modified to meet the current requirements of Section 4.17 4. Provision of inter - parcel connection to allow vehicle access between Tax Map Parcels 59 -23B and 59- 23C1. The access shall not exceed 10% slope. In reference to the parking determination dated June 12, 2008 from Amelia McCulley, Zoning Administrator, the following conditions of the preliminary site plan approval (for both plans) related to parking are recommended: One or more additional parking studies shall be conducted throughout a typical business day to determine actual parking occupancy; Both site plans shall either be combined into one site plan or shall be approved together so the LTACH development may not proceed without the parking and circulation infrastructure provided with the Sieg Maintenance site plan; The final site plan shall detail the following: a) Existing and proposed parking b) Parking requirements and provisions for each of the uses on all of these properties c) The cumulative requirements and d) Any provisions to enforce /implement the restrictions for employee parking, such as signage and the like. Keith Whip July 3, 2008 Page 2 If you should have any questions or comments regarding the above noted action, please do not hesitate toSincerely, Gerald Gatobu Senior Planner Zoning and Current Development Division cc: Rectors & Visitors Of ThePOBox400726 University Of Virginia, The Charlottesville, Va 22904 Timmons Group 919 2nd Street SE Charlottesville VA 22902 OF r1Gti COUNTY OF ALQENIARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE 07/1 5i2OO8 Ammy George Nimmons Group 919 2"" Street S.E Charlottesville, VA 22902. Keith Whipple McKee Carson 301 East High Street Charlottesville, VA 22903. RE: SDP - 200800052 anti 200800053 Long Term Acute Care Hospital and Sieg Maintenance Buildine Dear Sir and Madam: The Department of Community Development hereby grants administrative approval to the above referenced site plan (s). The approval of the preliminary site plan is valid for ( I ) one year in accordance with Section 32.1.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on 07/15/2009. If the preliminary site plan approval expires, a new application must be tiled and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. '['his letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Lrosion and Sediment Control, B:\ StormNvater Llanagement, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan nylars reflect all tentative approvals. Tile final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Zoning & Current Development approval to include: Section 4.12.8jAn instrument assuring continuation of offsite parking: Please provide all instrunleilt assuring continuation of offsite parking Section 4.12.11 Please apply for a boundary line adjustment to remedy the need for a special use permit for stand alone parking on Fax Map and Parcel Number 59 -23C 1. Planning Commission condition of approval) Provision of screening between Northridge and adjacent Rural Areas property if disturbance for installation of sewer line occurs and establishnent of screening buffer. if adequate buffer does not currently exist. Planning Commission condition of approval[Applicant shall submit a traffic study to address signal warrants for a signal prior to approval of final site plan. Planning Commission condition of approvallAll existing lighting oil Northridge site shall be modified to sleet the current requirements of Section 1.17. Planning Commission condition of approval[Provision of inter- parcel connection to allow vehicle access between Tax Map Parcels 59 -23a and 59 -2301. The access shall not exceed 10% slope. Amelia McCulley, Zoning Administrator June 12, 2008 Parking Determination for — LTACH, Northridge and Sieg Warehouse (TM 59, Parcels 2313 and 23131). l recommend the following conditions of preliminary site plan approval (for both plans) relating to parking: I. One or more mklitlollal parking Slitllies shall he con(htclell throughout a tllncal business dav to determine actual parkhkig occulmitcv: 2. Both Site plans shall either he coinhtned into one Site plait or shall he approved togelher so the LT.ICliclevelopment Inay clot proceed li'lthout the pcnrking and circidalion inlraslPlicture provided vrith the Sieg Mainlenance site plait: 3. The final site plan shall delail the following: a. Existing and proposed parking h. Parking requirements anll provisions for each of'the uses on all of these proper! ies c. The cunmlalive reyuirenienl.c and d. -InY provisions to eglbree, implement the restrictions for employee parking, such cis signage and the like. Please contact Gerald Gatobu at 296 - 5832 ext 3385 if you have questions or require additional information. Engineering approval to include: 17- 300]Apprw al of a SWN1 management plan. 17 -203 [ Approval of an ESC plan VE,SCEI] Compliance with VESCH NIS -19 Df] Canopy over the SWNI facility is removed 4.12.15.gl Upgrading of travelway from the ambulance drop -off area to Route 250 to meet Ordinance standards Please contact Philip Custer at 296 -5832 ext 3072 if you have questions or require additional information. Albemarle County Service Authority approval to include: All Albemarle County Service Authority comments must be addressed before final site plan approval can be granted. Please contact Gary Whelan at 977 -451 1 if you have questions or require additional information. Fire & Rescue approval to include: All Albemarle County fire and rescue comments must be addressed before final site plan approval can be granted. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: I have reviewed the Traffic Analysis update (dated May 19' 2008) and have the following comments: Approval of Traffic Analysis/Study to address signal warrants. Please contact Joel Denunzio at 434-293-0011 Fxt. 120 if you have questions or require additional information. ARB Architectural Review Board approval to include: Address all comments listed for ARB 2008 -00048 UVA Long Term Acute Care Hospital. Please contact Margaret Nlaliszewski at 296 -5832 ext 3276 if you have questions or require additional information. Sincerely, r Gerald Gatobu Senior Planner Zonin« & Current Development File: SDP - 2008 -52 & 53 Cc: University of Virginia Health Services Foundation 500 Ray C I lunt Drive Charlottesville VA 22903 UVA Facilities and Capital Development P.O Box 800799 Charlottesville VA 22908