HomeMy WebLinkAboutARB201500120 Action Letter 2016-04-05COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 229024596
Phone 434 296-5832 Fax 434 972-4126
March 25, 2016
Ashley Davies
321 East Main St Suite 400
Charlottesville VA 22902
RE: ARB -2015-120: Avinity Phase 2 Townhomes Amendment
Dear Ms. Davies,
The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday,
Monday, March 21, 2016. The Board, by a vote of 4:0, approved the request, pending staff administrative
approval of the following conditions:
1. The side elevation option with the continuous parapet is preferred.
2. Spec a screening shrub species with an available planting size that will fully screen the equipment at
planting. Coordinate the architectural and landscape plans regarding the screening shrub size. Coordinate
the plan and plant schedule regarding plant quantities.
3. Future phases that match this design can be approved administratively if no other issues arise.
Please provide:
1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision
dates on each drawing.
2. A memo including detailed responses indicating how each condition has been satisfied. If changes
other than those requested have been made, identify those changes in the memo also. Highlighting
the changes in the drawing with "clouding" or by other means will facilitate review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to
ensure proper tracking and distribution.
When staffs review of this information indicates thatall conditions of approval have been met, a Certificate of
Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
(Acting) Chief of Planning
cc: Avon Properties LLC
P O Box 1467
Charlottesville VA 22502
File
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO: Margaret Maliszewski
DATE:
PROJECT NAME: ARB -2015-120: Avinity Phase 2 Townhomes Amendment
Submittal Type Requiring Revisions () indicates submitW Code COU]n Project Number # Copies
Erosion & Sediment Control Plan &S
-Mitigation Plan )
Waiver Request (WR)
Stormwater Mana ernent Plan (SWMP
Road Plan
Private Road Request, with private/ public comparison PRR
Private Road Request — Development Area RR -DA
Preliminary Site Plan (PSP)
Final Site Plan or amendment SP
Final Plat FP
Prelimin Plat (PP)
Easement Plat (EP)
-Boundn Adjustment Plat (BAP)
Rezoning Plan Z
Special Use Permit Conc t Plan SP -CP
Reduced Concept PIan -CP)
Proffers (P
Bond Estimate Request (BER)
Draft Groundwater Management Plan -GWMP)
R Final Groundwater Management Plan F-GWMP
Aquifer Testing Work Plan (ATWP
Groundwater Assessment Report GWAR
Architectural Review Board ARB ARB21500120
Other: Please explain
(Fnr staff uqe onlv)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Margaret Maliszewski