HomeMy WebLinkAboutSDP200800056 Review Comments 2008-05-01Application #:' - SDP200 Short Review Comments Ji,5 . FGA' 1?h cl 5lr
Project Name:[Wick Pond (Phase II) Preli Site Development Plan i Preli — Non-residential
Preliminary — Residential
Date Completed: 12/01/2006
Reviewer: Andrew Slack E911
Review Status: Requested Changes
Reviews Comments: !THE APPLICANT SHOULD CONTACT THIS OFFICE WITH THREE (3) POSSIBLE ROAD NAMES
F EACH ROAD SHOWN BEFORE SUBMITTING FINAL PLATS.
Date Completed: 11/21/2006
Reviewer: Brent Nelson ARB
Review Status: Requested Changes
Reviews Comments: ;ARB review was limited to Phase 2B. Phase 2A was not reviewed due to it's lack of visibility from the
IEC in the current proposal. Should changes in the project result in an increase in visibility of Phase 2A
f EC, ARB review may be required
Date Completed: 12/04/2006
Reviewer: Claudette Grant Planning
Review Status: Requested Changes
Reviews Comments: Proffers should probably be added to the cover sheet of plans.
Applicant was going to request a variation to Wickham Pond I in order to address landscaping
c relating to proffer 4.
1 Date Completed: 11/3012006
r
Reviewer: Jay Schlothauer Inspections
r Review Status: Requested Changes
Reviews Comments: Based on plans dated November 13, 2006.
Provide barrier -free parking spaces, in the buildings' parking garages, as follows:
Bldg. A - one van - accessible space
Bldg. B - one van - accessible space
I Bldg. C - one van - accessible space, and one regular space
Bldg. D - one van - acce space, a one regular space.
Ki6t t1Cl t - t II EC " L' `1)l11 a t L:(Ctt,; Jj,tbC i 1L l
t.t l /- CDL LAC "yvYLt aZS
f
N
l
A ` ` '
Page: 1.00 County of Albemarle Printed On: Wednesday, April 30, 2008
Application #:I SDP200800056 — Short Review Comindnts
Project NameMic Pond (Phase II -Block 2) -Final Final — Residential —Administrative
Date Completed: 04/23/2008
Reviewer: Brent Nelson ARB
Review Status: Approved
Reviews Comments: ARB 07 -58, Wickham Pond II, Block 2 was approved on 8 -30 -07 (see posted approval). Subsequent
additions or revisions to the site plan that were not reviewed by the ARB (or conflict with the approved
plan) will require review /approval from ARB staff. Applicant should provide drawings clearly denoting
all such changes.
Some issues identified:
The dumpster enclosure shown adjacent to the north elevation of Building B is not part of the ARB
japproval and would not be approved by staff due to its proximity to the EC.
Approved hedgerow plantings, adjacent to Route 240, are not labeled.
Approved street trees on the east side of Wickham Place and the south side of Wickham Way are not
labeled on the landscape plan. The installation of these trees is required prior to the completion of
Phase I I - Block 2.
Page: 1.00 County of Albemarle Printed On: Tuesday, April 29, 2008
O r
C I,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
Memorandum
To: Ammy George, Tinunons Group
From: Lisa Glass, Principal Planner
Division: Zoning and Current Development
Date: May 2, 2008
Subject: SDP 08 -56: Wickham Pond, Phase II, Block 2: Final Site Plan
Fax(434)972 -4126
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be approved when the following items have been
satisfactorily addressed. Each comment is followed by a reference to the Albemarle County Zoning
Ordinance.
The Site Plan comments below are from the Current Development Planner only. Other conunents will be
forth coming under separate cover. Please work directly with each reviewer to obtain tentative approvals.
The final site plan must match the approved ARB plan. For example, the dumpster near Route
240 will require ARB approval or needs to be removed.
2. Provide minimum setback lines, yard and building separation requirements. This may be by a
schedule or indicated on the plan. (Section 32.5.6 a)
3. Proffers include some site plan specifics. The plan should include the board fence, a note
regarding full cut -off lighting and not shoe -box, and that landscape shall be completed as part of
Phase 1. Please add a statement on the plan regarding the specifics to building C and D regarding
when Certificates of Occupancy (CO's) can be requested. Let me know if you have questions or
concerns regarding this continent. (Section 32.5.6 a and ZMA 05 -18)
4. Please add a schedule or note indicating the maximum amount of impervious cover, amount of
paved parking and circulation, proposed uses and acreage in each use. (Section 32.5.6.b )
5. Show Handicap Parking. The number and type of spaces to be provided are indicated in the
Inspection comments dated 11/30/06 from Jay Schlothaur (attached). (Section 32.5.6 b)
6. Please show easements for water and sewer lines, as well as easement for other utilities. (Section
32.5.6 j, k and 1)
7. Please indicate paved surface materials on plan, for all walks, parking lots and driveways (both
outside and in garage). (Section 32.5.6.n and Section 32.6.8)
8. Please state that there is no signage or show location for proposed signs. (Section 32.5.6.n)
Comments 6 -10 from Preliminary approval letter:
9. Approval of screening around dumpsters. (Section 32.5.6 and 14.12.19)
10. Provide loading space calculations. Also, the 300 feet between Building C and the loading spaces
is not reasonably "adjacent to the structure it serves ". Consider another space that is closer the
building C. (Section 14.12.13 and 14.12.19)
11. Please correct the parking schedule so they do not contradict each other, using the correct 2.5
multiplier. And realign the text so it is easier to read. (Section 32.5.6.b, and ZMA 05 -18)
12. Approval of the Landscape Plan: Refer to continents from ARB and the approved ARB plan
regarding the need for hedge rows and street trees, and match the final plan to the prelim plan and
approved ARB plan. (Section 32.7.9)
13. Approval of the lighting plan: Please indicate location of out door lighting, type and illumination
plan or indicate no outside lighting. (Sections 32.5.6.n, 32.6 j and 4.17)
Comments from Final Site Plan Check list:
14. Detailed water and sewer plans, please copy the Current Development planner on ACSA
approval. (Section 32.6 c)
15. Detailed drainage and grading: please copy Current Development planner on Eng Approvals.
Consider how the lower level of the parking garage will drain; and the height for entry and use of
a dumpster truck if that is used for the dumpster enclosure. (Section 32.6d)
16. Note that traffic generation figures need final approval from Engineering. (Section 32.5.6 q)
Attachments:
Inspection comments dated 11/30/06 from Jay Schlothaur
CC: File SDP 2008 -0056
a IIt'i
Fax (434) 972 -4126
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be approved when the following items have been
satisfactorily addressed. Each comment is followed by a reference to the Albemarle County Zoning
Ordinance.
The Site Plan comments below are from the Current Development Planner only. Other comments will be
forth coming under separate cover. Please work directly with each reviewer to obtain tentative approvals.
1. The final site plan must match the approved ARB plan. For example, the dumpster near Route
240 will require ARB approval or needs to be removed.
Provide minimum setback lines, yard and building separation requirements. This may be by a
schedule or indicated on the plan. (Section 32.5.6 a)
3. Proffers include some site plan specifics. The plan should include the board fence, a note
reoarding full cut -off lighting and not shoe -box, and that landscape shall be completed as part of
Phase 1. Please add a statement on the plan regarding the specifics to building C and D regarding
when Certificates of Occupancy (CO's) can be requested. Let me know if you have questions or
concerns regarding this comment. (Section 32.5.6 a and ZMA 05 -18)
4. Please add a schedule or note indicating the maximum amount of impervious cover, amount of
paved parking and circulation, proposed uses and acreage in each use. (Section 32.5.6.b )
5. Show Handicap Parking. The number and type of spaces to be provided are indicated in the
Inspection comments dated 11/30/06 from Jay Schlothaur (attached). (Section 32.5.6 b)
6. Please show easements for water and sewer lines, as well as easement for other utilities. (Section
32.5.6j, k and 1)
7. Please indicate paved surface materials on plan, for all walks, parking lots and driveways (both
outside and in garage). (Section 32.5.6.n and Section 32.6.8)
8. Please state that there is no signage or show location for proposed signs. (Section 32.5.6.n)
0 , A1,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434)296 -5832
Memorandum
To:Ammy George, Timmons Group
From:Lisa Glass, Principal Planner
Division:Zoning and Current Development
Date:May 2, 2008
Subject:SDP 08 -56: Wickham Pond, Phase 11, Block 2: Final Site Plan
a IIt'i
Fax (434) 972 -4126
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be approved when the following items have been
satisfactorily addressed. Each comment is followed by a reference to the Albemarle County Zoning
Ordinance.
The Site Plan comments below are from the Current Development Planner only. Other comments will be
forth coming under separate cover. Please work directly with each reviewer to obtain tentative approvals.
1. The final site plan must match the approved ARB plan. For example, the dumpster near Route
240 will require ARB approval or needs to be removed.
Provide minimum setback lines, yard and building separation requirements. This may be by a
schedule or indicated on the plan. (Section 32.5.6 a)
3. Proffers include some site plan specifics. The plan should include the board fence, a note
reoarding full cut -off lighting and not shoe -box, and that landscape shall be completed as part of
Phase 1. Please add a statement on the plan regarding the specifics to building C and D regarding
when Certificates of Occupancy (CO's) can be requested. Let me know if you have questions or
concerns regarding this comment. (Section 32.5.6 a and ZMA 05 -18)
4. Please add a schedule or note indicating the maximum amount of impervious cover, amount of
paved parking and circulation, proposed uses and acreage in each use. (Section 32.5.6.b )
5. Show Handicap Parking. The number and type of spaces to be provided are indicated in the
Inspection comments dated 11/30/06 from Jay Schlothaur (attached). (Section 32.5.6 b)
6. Please show easements for water and sewer lines, as well as easement for other utilities. (Section
32.5.6j, k and 1)
7. Please indicate paved surface materials on plan, for all walks, parking lots and driveways (both
outside and in garage). (Section 32.5.6.n and Section 32.6.8)
8. Please state that there is no signage or show location for proposed signs. (Section 32.5.6.n)
Comments 6 -10 from Preliminary approval letter:
9. Approval of screening around dumpsters. (Section 32.5.6 and 14.12.19)
10. Provide loading space calculations. Also, the 300 feet between Building C and the loading spaces
is not reasonably "adjacent to the structure it serves ". Consider another space that is closer the
building C. (Section 14.12.13 and 14.12.19)
11. Please correct the parking schedule so they do not contradict each other, using the correct 2.5
multiplier. And realign the text so it is easier to read. (Section 32.5.6.b, and ZMA 05 -18)
12. Approval of the Landscape Plan: Refer to comments from ARB and the approved ARB plan
regarding the need for hedge rows and street trees, and match the final plan to the prelim plan and
approved ARB plan. (Section 32.7.9)
13. Approval of the lighting plan: Please indicate location of out door lighting, type and illumination
plan or indicate no outside lighting. (Sections 32.5.6.n, 32.6j and 4.17)
Comments from Final Site Plan Check list:
14. Detailed water and sewer plans, please copy the Current Development planner on ACSA
approval. (Section 32.6 c)
15. Detailed drainage and grading: please copy Current Development planner on Eng Approvals.
Consider how the lower level of the parking garage will drain; and the height for entry and use of
a dumpster truck if that is used for the dumpster enclosure. (Section 32.6d)
16. Note that traffic generation figures need final approval from Engineering. (Section 32.5.6 y)
Attachments:
Inspection comments dated 11/30/06 from Jay Schlothaur
CC: File SDP 2008 -0056
2
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Memorandum
To:Ammy George, Timmons Group
From:Lisa Glass, Principal Planner
Division:Zoning and Current Development
Date:May 2, 2008_
Subject:SDP 08 -56: Wickham Pond, Phase II B1ocL Final Site Plan
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be approved when the following items have been
satisfactorily addressed. Each comment is followed by a reference to the Albemarle County Zoning
Ordinance.
The Site Plan comments below are from the Current Development Planner only. Other comments will be
forth coming under separate cover. Please work directly with each reviewer to obtain tentative approvals.
The final site plan must match the approved ARB plan. For example, the dumps er near Route
240 will require ARB approval or needs to be removed.6LW A 12 2,, D g , 00
2 minimum setback lines, yard and building separation requirements. This may be by a
sStLduk or indicated on the plan. (Section 32.5.6 a) i,1x 4 eV1 C4* Cj
J t aOJ 1 V Proffers include some site plan specifics. The plan should include the board fence, a note
In Q WX regardin full cut -off lighting and not shoe -box, and that landscape shall be completed as part of
Phase 1 . Please add a statement on the plan regarding the specs ics to building C and D regarding
u9 bU v when Certificates of Occupancy (CO's) can be requested. Let me know if you have questions or
n0. ` _y• concerns regarding this comment. (Section 32.5.6 a and ZMA 05 -18)
i
bt 4o Please add a schedule or note indicating the maximum amount of impervious cover Amount of
paved parking and circulation proposed uses and adage in each use. (Section 32.5.6.b )
how Handicap Parking. The number and type of spaces to be provided are indicated in the
Inspection comments dated 11/30/06 from ay chlothaur (att c ed). (Section 32.5.6 b)
q ajj ,ave_a pL GM l,,C6 . ) Please show easements for water and sewer lines, as well as easement for other utilities. (Section
32.5.6 j, k and 1) ew) tV% e-y['. C;c dACi C_1.(,t
Please indicate paved surface materials on plan, for all walks, parking lots and driveways (both
outside and in garage). (Section 32.5.6.n and Section 32.6.8)
Please state that there is no signage or show location for proposed signs. (Section 32.5.6.n)
Comments 6 -10 from Preliminary approval letter:
lgf/Approval of screening around dumpsters. (Section 32.5.6 and 14.12.19)
S-Vfrovide loading space calculations. Also, the 300 feet between Building C and the loading spaces
is not reasonably "adjacent to the structure it serves ". Consider another space that is closer the
buil di C (Section 14.12.13 and 14.12.19)
ODPlease correct the parking schedule so they do not contradict each other, using the correct 2.5
multiplier. And realign the text so it is easier to read. (Section 32.5.6.b, and ZMA 05 -18)
ko tads 12 Approval of the Landscape Plan: Refer to comments from ARB and the approved ARB plan
regarding the need for hedge rows and street trees, and match the final plan to the prelim plan and
approv ARB plan. (Section 32.7.9)
Approval of the lighting plan: Please indicate location of out door lighting, type and illumination
plan or indicate no outside lighting. (Sections 32.5.6.n, 32.6 j and 4.17)
Comments from Final Site Plan Check list:
4. Detailed water and sewer plans, please copy the Current Development planner on ACSA
approval. (Section 32.6 c)
1 Detailed drainage and grading: please copy Current Development planner on Eng Approvals.Consider how the lower level of the parking garage will drain; and the height for entry and use of
a dumpster truck if that is used for the dumpster enclosure. (Section 32.6d)
VS. Note that traffic generation figures need final approval from Engineering. (Section 32.5.6 q)
Attachments:
Inspection comments dated 11/30/06 from Jay Schlothaur
CC: File SDP 2008 -0056
J t
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Wickham Pond Phase 2 Block 2 [SDP200800056, WPO200800033]
Plan preparer: The Timmons Group fax 295 -8317
Owner or rep.: Weather Hill Development, LLC fax 296 -2560
Plan received date: 25 March 2008
Date of comments: 9 May 2008
Reviewer: Phil Custer
The site, SWM, and ESC plans for Wickham Pond Phase 2 Block 2 have been reviewed. The plans cannot
be approved as submitted and will require the following changes.
A. Final Site Plan [SDP- 2008 - 000561
1. Please provide a benchmark on the plan with a set elevation. A benchmark is referred to but is not
near the project area and must be shown on the plan. [DM]
2. Please specify a VDOT standard entrance for each site access point onto the roadway.
3. Sight distance does not appear to be shown to the VDOT standard for entrances onto the roadway.
One hundred feet of sight distance is required for all internal intersections and not entrances onto
VDOT ROW.
4. Please show the necessary walls and pillars from the structural plans for the garage on sheet S -1.
The garage configuration and layout must be approved by the Zoning department in order to waive
the ION internal sight distance requirement specified in our ordinance.
5. Please provide traffic control devices on the site. There appears to be several conflict points in the
garage and surrounding drive aisle that may need signage.
6. The dumpster and loading space configurations are not currently acceptable to engineering review.
The dump trucks and vehicles using the loading spaces will not be permitted to back out into the
roadway. The loading spaces also cannot block the dumpsters. [18- 32.7.2]
7. Please provide greater detail with regards to grading throughout the site, specifically of the garage,
courtyard, and access aisles from the roadway to the garage. Entrances cannot exceed 4% for the
first 40' from the intersected street. Across the garage there appears to be a vertical drop of l Ott.
8. Please provide more detail in reference to the "stairs to elevator" specified on sheet S -1.
9. Please provide more information regarding the drainage system around the buildings, in the plaza,
and around the parking structure. Will the buildings have roofdrains taking runoff to the biofilter
or is there an underground drainage system taking water around the parking structure? How is
infiltrated water from the courtyard reaching the biotilter? Please also show the trenchdrains.
10. Please provide a section detail for the replacement of the paved pedestrian path.
11. Please do not provide an entrance from the VDOT ROW for the biotilter maintenance path. The
access must be given from another entrance on site.
12. On all slopes steeper than 3:1, please specify a low - maintenance groundcover. [DM]
13. Additional comments may be forthcoming on the next submittal due to the required changes.
B. Stormwater Management Plan [WPO- 2008 - 000331
14. The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been approved.
Albemarle County Community Development
Engineering Review Comments
Page 2 of 2
15. The hydrologic characteristics of Post - Development Drainage area 1 are not reasonable. I do not
see how the time of concentration increases from 16 minutes to 19 minutes. I believe a post -
development time of concentration between 5 and 10 minutes would be much more reasonable.
Please provide a breakdown of the C coefficient for the DA 1. It is likely that grassed area over
the courtyard will be highly compacted and a coefficient of around 0.6, rather than 0.3, should be
used.
16. Please submit a modified simple spreadsheet for DA 1.
17. The project area data seems to be incorrect in "Table 12.
18. Please provide a detention compliance summary.
19. Please remove any reference to the luckstone mix from the biofilter detail. The county now
requires that the biofilter mix meets the approved state standard.
20. Please provide 1 f freeboard of the 100 -year storm in the biofilter facility.
21. The post - development drainage area does not appear to be accurate.
22. The planting plan for the biofilter should be amended. All required plantings should be provided
in the bed area. Based on the bed area of the facility, there should be close to 83 trees /shrubs
while maintaining a tree to shrub ratio between 2:1 and 3:1. Please adjust the "R -ARA" typo in
the lower right corner of the planting detail for the biofilter.
23. The minimum pipe size out of the facility is 15 ". [DM]
24. A bond amount will be computed by the County when the plans have been approved.
25. Please submit signed copy of the Storcnwater Maintenance Agreement and $17 fee to the County.
26. Additional comments may be forthcoming on the next submittal due to the required changes.
C. Erosion and Sediment Control Plan IWPO- 2008 - 000331
27. Please remove the "Silt Trap to Biofilter Conversion detail ". The detail shown in the Stormwater
management sheet is acceptable and another detail does not need to be included in the ESC plan.
28. Please provide a soil stockpile area.
29. Please show the outlet to the sediment trap to scale.
30. How is site runoff flowing out of the sediment trap to pass the paved pedestrian path? A method
to pass the pedestrian path should be accounted for in the ESC plan.
31. In the construction sequence, please move the biofilter conversion step to the end of the sequence
and note the conversion is only authorized by the County Water Protection Inspector.
32. Please do not show tree protection fencing within the dripline of trees. On the northern side of the
property, it may be best to put the fencing south of the paved pathway. Please note that ARB
requirement for tree protection fencing is 5ft from the dripline of a protected tree. Please
coordinate ESC with ARB tree conversation plans.
33. Please move the construction entrance into the watershed of the sediment trap and provide a
diversion on the northside of the CE direction water into the trap.
34. Please replace the silt fence on the western portion of the property with a diversion direction water
into the sediment trap.
35. A bond amount will be computed by the County when the plans have been approved.
36. Additional comments may be forthcoming on the next submittal due to the required changes.
0,F A1, 1
t
ifcrte
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Memorandum
To: Ammy George, Tinunons Group
From: Lisa Glass, Principal Planner
Division: Zoning and Current Development
Date: June 19, 2008
Subject: SDP 08 -56: Wickham Pond, Phase I1, Block 2: Final Site Plan
June 4, 2008 Revised Plan
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be granted tentative approval from the Current
Development Planner when the following items have been satisfactorily addressed.
The Site Plan comments below are from the Current Development Planner only. Please continue to work
with each reviewer for all Tentative Approvals.
The May 2, 2008 Planner comments have mostly been addressed, except the four below. Please address
these four concerns and send a plan to Bill Fritz. Final review of these items will allow the Current
Development Planner to grant tentative approval.
Comment 7: Please confirm that underground parking garage will have a hard
surface (paved/concrete /hard surface pavers), please add a note to the plan.
Comment 11: How many of the parallel spaces are "off- site" on block 1? Refer to the Timmons letter
submitted June 4, 2008, "Clarification of Changes: Wickham Pond ph 2 blocks 1 & 2 "; Item 1 discusses
parallel parking on block 1, to be used in the parking calculation for block 2.
Please check the parking space count to see if any spaces for block 2 are on block l; Add a note on the
parking schedule to clarify where the parallel parking for block 2 is located (if off -site, say so; if on -site,
note not needed).
Comment 13: the lighting note states full cut off and not more that .5 fc at PL or street.... okay. However,
by section 4.17 we need either a photometric plan or a statement that no lights >3000 lumens to be
installed.
Comment 15: Engineering will want to look at the size for the holding tank for sump /grinder pump to
remove drainage from the underground garage.
As well as providing vehicular access to the pump for maintenance.
Please discuss with Engineering reviewer.
I will not be available to answer questions, but since we discussed them today I hope you have no
problem adding three notes and working with Engineering for the last item on my list. Tentative
approvals must be obtained from all reviewers prior to final plan approval. Good Luck.
OF'Ik- ,
ai. RQm e
COUNTY OF U BEMARLE
Department of Community Development
441 McIntire Road, Room 227
Charlottesville, Virginia 22942 -4596
Comment 11: How many of the parallel spaces are "off- site" on block 1 ? Refer to the Timmons letter
submitted June 4, 2008, "Clarification of Changes: Wickham Pond ph 2 blocks I 2 "; Item I discusses
parallel parking on block 1, to be used in the parking calculation for block 2.
Please check the parking space count to see if any spaces for block 2 are on block 1; Add a note on the
v parking schedule to clarify where the parallel parking for block 2 is located (if off-site, say so; if on -site,4 ;-S- note not needed).
J\
L.I'mment 13: the lightingpote stat_ 11 cut off d not more that .5 fc at PL or street.... okay. However,
by section 4.17 we need either a photometric p or statement that no lights >3000 lumens to be
installed. - --- --
Phone (434) 296 -5832 Fax (434) 972 -4126
Meinoraadum
ptt Li'Y114 05 —16
To: Ammy George, Timmons Group 0(p
From: Lisa Glass, Principal Planner Ult'_dV &
Division: Zoning and Current Development
NtV1urlL' P l
Date: June 19, 2008
Subject: SDP 08 -56: Wickham Pond, Phase I1, Block 2: Final Site Plan
June 4, 2008 Revised Plan
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be granted tentative approval from the Current
Development Planner when the following items have been satisfactorily addressed.
The Site Plan comments below are from the Current Development Planner only. Please continue to work
with each reviewer for all Tentative Approvals.
The May 2, 2008 Planner continents have mostly been addressed, except the four below. Please address
these four concerns and send a plan to Bill Fritz. Final review of these items will allow the Current
Development Planner to grant tentative approval.
comment 7: Please confirm that underground parking garage will have a hard
surface (pave& surface pavers); please add a note to the plan.
Comment 15: Engineering will want to look at the size for the holding tank for sump/grinder pump tot1 ? remove drainage from the underground garage.
As well as providing vehicular access to the pump for maintenance.
Please discuss with Engineering reviewer.
I will not be available to answer questions, but since we discussed them today I hope you have no
problem adding three notes and working with Engineering for the last item on my list. Tentative
approvals must be obtained from all reviewers prior to final plan approval. Good Luck.
Q i5 it a K V I tl Sly LeC9 i ; } (j M t 4V
CAW I
Application #: L SDP200800056 Short Review Comments
Project Name:# Pond (Phase II -Block 2) -Final
Date Completed: 04/23/2008
Reviewer: Brent Nelson
Final 7- Residential 7- Administrative J
ARB
Review Status: Approved
Reviews Comments: ! ARB 07 -58, Wickham Pond II, Block 2 was approved on 8 -30 -07 (see posted approval). Subsequent
additions or revisions to the site plan that were not reviewed by the ARB (or conflict with the approved
plan) will require review /approval from ARB staff. Applicant should provide drawings clearly denotingallsuchchanges.
i Some issues identified:
The dumpster enclosure shown adjacent to the north elevation of Building B is not part of the ARB
approval and would not be approved by staff due to its proximity to the EC.
Approved hedgerow plantings, adjacent to Route 240, are not labeled.
Date Completed
Reviewer:
Approved street trees on the east side of Wickham Place and the south side of Wickham Way are not
labeled on the landscape plan. The installation of these trees is required prior to the completion of
Phase II - Block 2.
06/11/2008
Brent Nelson 1:7:3
Review Status: Approved
Reviews Comments: 'ARB 07 -58, Wickham Pond II, Block 2 was approved on 8- 30 -07. Subsequent additions or revisions
to the site plan that were not reviewed by the ARB (or conflict with the approved plan) will require
review /approval from ARB staff. Applicant should provide drawings clearly denoting all such changes.
Date Completed: 10/09/2008
Reviewer: Brent Nelson ARB
Review Status: Requested Changes
Reviews Comments: ,Sheet 12 Landscape Plan: plantings on the east side of Wickham Place Road need to be identified. i
They were approved as Quercuc Phellos 'Hightower'.
Sheet 12 Landscape Plan: plantings on the south side of Wickham Way need to be identified. They
were approved as Tilia Cordata 'Greenspire'.
Sheet 12 Landscape Plan: Hedgerow landscaping needs species identified. In the approved plan this
iwas a proposed hedgerow with the proposed species identifi
Date Completed: 06/16/2008
Reviewer: Jay Schlothauer Inspections
Review Status: No Objection
Reviews Comments: Based on plans revised May 8, 2008.
I
No comments or conditions.
Page: 1.00 County of Albemarle Printed On: Friday, October 10, 2008
A 1"13
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Wickham Pond Phase 2 Block 2 [SDP200800056, WP0200800033]
Plan preparer: The Timmons Group fax 295 -8317
Owner or rep.: Weather Hill Development, LLC fax 296 -2560
Plan received date: 25 March 2008
04 June 2008 (Revl)
Date of comments: 9 May 2008
21 July 2008 (Rev1)
Reviewer: Phil Custer
Jonathan Sharp (Revl) [phone: 566 -2578]
The site, SWM, and ESC plans for Wickham Pond Phase 2 Block 2 have been reviewed. The plans cannot
be approved as submitted and will require the following changes.
The proposed site plan is incomplete. The underground parking structure has not been designed (only a
layout has been provided). Proposed grading and structure information (walls, columns, elevations) must
be provided for the underground parking structure in order to verify that the plans meet all applicable
Zoning Ordinances.
A. Final Site Plan
3. Sight distance does not appear to be shown to the VDOT standard for entrances onto the roadway.
One hundred feet of sight distance is required for all internal intersections and not entrances onto
VDOT ROW.
Rev]: Adequate sight distances should be provided on Wickham Way.
4. Please show the necessary walls and pillars from the structural plans for the garage on sheet S -1.
The garage configuration and layout must be approved by the Zoning department in order to waive
the 100ft internal sight distance requirement specified in our ordinance.
Rev]: The plans still do not show whether or not all parking and travelway ordinances are met,
as the elevations of the garage and die footprint of the underground parking structure are not
shown. Only the travelway widths and parking dimensions appear to meet the ordinances. One
hundred foot sight distances and grade restrictions will need to be maintained unless a waiver is
granted from the Zoning Administrator. Please show the footprint for the design of the
underground parking garage, including the location of walls, columns, footers, etc. as these
will affect sight distances. All proposed grading on site is required, including grading for the
underground parking structure. [18- 32.6.6b, h6J
5. Please provide traffic control devices on the site. There appears to be several conflict points in the
garage and surrounding drive aisle that may need signage.
Rev]: comments not addressed. Traffic control design for all parking areas must be provided
Albemarle County Community Development
Engineering Review Comments
Page 2 of 4
prior to final site plan approval.
6. The dumpster and loading space configurations are not currently acceptable to engineering review.
The dump trucks and vehicles using the loading spaces will not be permitted to back out into the
roadway. The loading spaces also cannot block the dumpsters. [18- 32.72]
Rev]: I am unsure as to how underground trash collection will work. Will there not be a
dumpster? Underground parking garages tend to have very low ceilings and garbage trucks
would not be able to pick the dumpsters up. [18- 32.7.2]
7. Please provide greater detail with regards to grading throughout the site, specifically of the garage,
courtyard, and access aisles from the roadway to the garage. Entrances cannot exceed 4% for the
first 40' from the intersected street. Across the garage there appears to be a vertical drop of l Oft.
Rev]: comments not addressed Proposed grading is required All proposed grading for
travelways and parking areas must meet zoning ordinances. [18- 32.6.6b]
8. Please provide more detail in reference to the "stairs to elevator" specified on sheet S -1.
Rev]: All proposed grading should be shown. Any drops of 4' or greater require safety railing.DMJ
9. Please provide more information regarding the drainage system around the buildings, in the plaza,
and around the parking structure. Will the buildings have roofdrains taking runoff to the biofilter
or is there an underground drainage system taking water around the parking structure? How is
infiltrated water from the courtyard reaching the biofilter? Please also show the trenchdrains.
Rev]: The plans indicate that Post DA 4 and 6 are piped to structure 163, but no pipes or drains
have been provided
10. Please provide a section detail for the replacement of the paved pedestrian path.
Rev]: comments not addressed
13. Additional comments may be forthcoming on the next submittal due to the required changes.
a. (Revl) Engineering recommends redesigning the concrete area between buildings C
and D, as the grade is shown at 10 %. Is there a reason why the elevation at building
C is at 654? What is the crest elevation of Wickham Place adjacent to building C?
The elevation at building C could be lowered to provide a more suitable grade
between buildings C and D.
b. Engineering recommends directing drainage away from the proposed "stairs to
underground parking garage."
B. Stormwater Management Plan
14. The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been approved.
Rev]: The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been
approved
16. Please submit a modified simple spreadsheet for DA 1.
Albemarle County Community Development
Engineering Review Comments
Page 3 of 4
Rev]: Please provide adequate Water Quality Calculations for the entire site (calculations have
only been provided for the area draining toward Three Notched Road). During the rezoning,
was it the intent to provide additional water quality for Wickham Pond Phase ]I block 2? If so,
adequate water quality measures should be provided per the rezoning. Otherwise, water quality
is provided per payment of a pro rata share to the Lickinghole Basin.
18. Please provide a detention compliance summary.
Rev]: Detention computations are required. If detention is provided offsite, please provide
calculations verifying that the offsite facilities are adequately providing detention for the
proposed site.
24. A bond amount will be computed by the County when the plans have been approved.
Rev]: A bond amount will be computed by the County when the plans have been approved
25. Please submit signed copy of the Stormwater Maintenance Agreement and $17 fee to the County.
Rev]: Please provide easements for the use of the offsite SWM facilities.
26. Additional comments may be forthcoming on the next submittal due to the required changes.
C. Erosion and Sediment Control Plan
28. Please provide a soil stockpile area.
Rev]: The stockpile area is shown in a location of cut (for the underground parking structure).
Where will all the excess cut be stockpiled? There does not appear to be enough room offite asshown.
29. Please show the outlet to the sediment trap to scale.
Rev]: comments not addressed
30. How is site runoff flowing out of the sediment trap to pass the paved pedestrian path? A method
to pass the pedestrian path should be accounted for in the ESC plan.
Rev]: comments not addressed Adequate downstream channels should be provided from the
outlet of the sediment trap while the sediment trap is in place. At a minimum, an adequate
channel should be provided to the existing ditch below.
Albemarle Community Development
Engineering Review Comments
Page 4 of 4
35. A bond amount will be computed by the County when the plans have been approved.
Rev]: A bond antount will be computed by t/te County when the plans have been approved
36. Additional comments may be forthcoming on the next submittal due to the required changes.
a. (Revl) Outlet protection in Phase I of the ESC plans is shown outside the limits of
disturbance.
b. (Revl) Please show a Construction Entrance (CE) and limits of disturbance on
phase II of the ESC plans.
c. (Revl) The plans show proposed grading and improvements for Wickham Pond
Phase II Block 1 as existing. The proposed ESC plans may not work if construction
begins prior to the completion of Block 1.
d. (Revl) The proposed sediment basin is very close in proximity to the construction of
the proposed underground parking structure. The plans may need to revised to
avoid ESC measures in the way of construction or grading.
e. (Revl) As the proposed buildings and structures are very close to the proposed
Wickham Place and Wickham Way and encompass the majority of the back half of
the site, construction access and coordination may be required in the right -of -way. If
Block 1 is constructed prior to Block 2, cordination may be required to divert traffic
through Wickham Pond Phase 1 during the construction of Block 2.
f. (Revl) Please provide adequate channel calculations for the outfall following
structure 403 and for the pipe systems from stuctures 127 and 163 to the pond in
phase 1. [MS -191
Alen_
Awl
rRGIN
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Wickham Pond Phase 2 Block 2 [SDP200800056, WP0200800033]
Plan preparer: The Timmons Group fax 295 -8317
Owner or rep.: Weather Hill Development, LLC fax 296 -2560
Plan received date: 25 March 2008
04 June 2008 (Revl)
Date of comments: 9 May 2008
21 July 2008 (Revl)
Reviewer: Phil Custer
Jonathan Sharp (Revl) [phone: 566 -2578]
The site, SWM, and ESC plans for Wickham Pond Phase 2 Block 2 have been reviewed. The plans cannot
be approved as submitted and will require the following changes.
The proposed site plan is incomplete. The underground parking structure has not been designed (only a
layout has been provided). Proposed grading and structure information (walls, columns, elevations) must
be provided for the underground parking structure in order to verify that the plans meet all applicable
Zoning Ordinances.
A. Final Site Plan
1. Please provide, a benclamt on the plan with a set elevation. A benchmark is refel to but is not
near the project area and must he shown on the plan. [1.)141]
Rev]: Cominews addressed.
I Please specify a VDur standard entrance for each site access paint onto the roadway.
Revl: c-on €niew addressed,
3. Sight distance does not appear to be shown to the VDOT standard for entrances onto the roadway.
One hundred feet of sight distance is required for all internal intersections and not entrances onto
VDOT ROW.
Rev]: Adequate sight distances should be provided on Wickham Way.
4. Please show the necessary walls and pillars from the structural plans for the garage on sheet S -1.
The garage configuration and layout must be approved by the Zoning department in order to waive
the 100ft internal sight distance requirement specified in our ordinance.
Rev]: The plans still do not show whether or not all parking and travelway ordinances are met,
as the elevations of the garage and the footprint of the underground parking structure are not
shown. Only the travelway widths and parking dimensions appear to meet the ordinances. One
hundred foot sight distances and grade restrictions will need to be maintained unless a waiver is
granted from the Zoning Administrator. Please show the footprint for the design of the
underground parking garage, including the location of walls, columns, footers, etc. as these
will affect sight distances. All proposed grading on site is required, including grading for the
underground parking structure. [18- 32.6.6b, h6]
5. Please provide traffic control devices on the site. There appears to be several conflict points in the
garage and surrounding drive aisle that may need signage.
Rev]: comments not addressed. Traffic control design for all parking areas must be provided
Albemarle County Community Development
Engineering Review Comments
Page 2 of 4
prior to final site plan approval.
6. The dumpster and loading space configurations are not currently acceptable to engineering review.
The dump trucks and vehicles using the loading spaces will not be permitted to back out into the
roadway. The loading spaces also cannot block the dumpsters. [ 18- 32.7.2]
Rev]: I am unsure as to how underground trash collection will work. Will there not be a
dumpster? Underground parking garages tend to have very low ceilings and garbage trucks
would not be able to pick the dumpsters up. [18- 32.7.21
7. Please provide greater detail with regards to grading throughout the site, specifically of the garage,
courtyard, and access aisles from the roadway to the garage. Entrances cannot exceed 4% for the
first 40' from the intersected street. Across the garage there appears to be a vertical drop of 1Oft.
Rev]: comments not addressed. Proposed grading is required. All proposed grading for
travelways and parking areas must meet zoning ordinances. [18- 32.6.6b]
8. Please provide more detail in reference to the "stairs to elevator" specified on sheet S -1.
Rev]: All proposed grading should be shown. Any drops of 4' or greater require safety railing.
DMI
9. Please provide more information regarding the drainage system around the buildings, in the plaza,
and around the parking structure. Will the buildings have roofdrains taking runoff to the biofilter
or is there an underground drainage system taking water around the parking structure? How is
infiltrated water from the courtyard reaching the biofilter? Please also show the trenchdrains.
Rev]: The plans indicate that Post DA 4 and 6 are piped to structure 163, but no pipes or drains
have been provided. D X 1 fy. ?0-
10. Please provide a s ' n Mail for the replacement of the paved pedestrian path.
Rev]: cons s not addressed.
I l . Please do not provide an entrance frorn the VD07 ROW , for the biofilter maintenance path. The
access roast he 'liven from another entrance on site.
Rev/: comments addressed.
12. On all Slopes steeper than 3:'1, please specify alow- maintenance groundcover. [I)N- 1
Rev]: co mntcrrts addressed,
13. Additional comments may be forthcoming on the next submittal due to the required changes.
a. (Revl) Engineering recommends redesigning the concrete area between buildings C
and D, as the grade is shown at 10 %. Is there a reason why the elevation at building
C is at 654? What is the crest elevation of Wickham Place adjacent to building C?
The elevation at building C could be lowered to provide a more suitable grade
between buildings C and D.
b. Engineering recommends directing drainage away from the proposed "stairs to
underground parking garage."
B. Stormwater Management Plan
14. The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been approved.
Rev]: The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been
approved.
15. The hydrolooic ch aracteri sties of Post - Development Drainage area I are not rea%onable, i do not
see how the tithe of concentration increases f oni 16 minutes to 19 lnirrutcs. 1 believe a post -
development time of concentration between 5 and 10 tnintrtes would be touch more. reasonable.
Please provide a breakdown of the C coefficient for the DA 1. It is likely that grassed area over
the courtyard will be highly compacted and a co fficient of :around 0.6. rather than 0-3—should be
used.
Revl: c:c inments addressecl.
16. Please submit a modified simple spreadsheet for DA 1.
Albemarle County Community Development
Engineering Review Comments
Page 3 of 4
Rev]: ease provide adequate Water Quality Calculations for the entire site (calculations have
only een provided for the area draining toward Three Notched Road). During the rezoning,W it the intent to provide additional water quality for Wickham Pond Phase II block 2? If so,
dequate water quality measures should be provided per the rezoning. Otherwise, water qualityisprovidedperpaymentofaproratasharetotheLiekingholeBasin.
17. The project area data seems to be incorrect in 'Fable 12.
Revs: comments addre.i -see,
18. Please provide a detention compliance summary.
Rev]: Detention computations are required. If detention is provided offsite, please provide
calculations verifying that the offsite facilities are adequately providing detention for theproposedsite.
19. Plk <ase remove any reference; to the lucksi.ont mix from the biofilter detail. ibe; c•otlnty jjowrequiresthatthebiofiltermixineetstheapprovedstatestandard.
Revl ::,°<emments addressed.
20. Please provide 1 ft freeboard of the 100 -yeas , torrn in the biofilter facility.
Revll: c:oinrnews addressed
21. The post devek>pjrtent drainage area does not appear to be accurate.
Revl: coninwntsudclresscxi.
22. The planting plan for the bicafilter should be atnendt d. All required PIN ntings sl ould be providedinthebedarea. Based on the bed area of the facility, there should be close to 83 trees /shrubs
while maintaining a. tree to shrub ratio between 2:1 and 11. Please: adjust the "R- ;112A" typo inthelower601tcornerOftheplantingdetailforthebisafilter.
Re t l: comnienisaddress'c:d
23. The minimum pipe size one (-)t'tile 1a.cility is iS' [
Reel: t onmienis a( °
24. A bond amount will be computed by the County when the plans have been approved.
Rev-1: A bond amount will be computed by the County when the plans have been approved.25. Please submit signed copy of the Stormwater Maintenance Agreement and $17 fee to the County.Revl: Please provide easements for the use of the offsite S WMfacilities.
26. Additional comments may be forthcoming on the next submittal due to the required changes.
C. Erosion and Sediment Control Plan
27, Please renlove the "Silt. Trap to Biofilter Conversion de tail ". The detail show ill the Stormwater
managentent sheet is acceptable and another detail doers not need tO he included in the ESC pluln.Ret c oninie talc addressed
28. Please provide a soil stockpile area.
Rev]: The stockpile area is shown in a location of cut (for the underground parking structure).Where will all the excess cut be stockpiled? There does not appear to be enough room onsite asshown. - -\ w Ot^ -"1. or
29. Please show the outlet to t e sediment trap to scale.
Rev]: comments not addressed.
30. How is site runoff flowing out of the sediment trap to pass the paved pedestrian path? A method
to pass the pedestrian path should be accounted for in the ESC plan.
Rev]: comments not addressed. Adequate downstream channels should be provided from theoutletofthesedimenttrapwhilethesedimenttrapisinplace. At a minimum, an adequatechannelshouldbeprovidedtotheexistingditchbelow.
31. to the construction seytience-, please l"Ove the biofilter conversion stela to the end of the sequenceandnotetheconversionisojilyauthorizedbythe. County Water Protection Inspector.Re4: coninients raddresst,d,
Albemarle County Community Development
Engineering Review Comments
Page 4 of 4
32. Please do not show tree protection fencing within the dripline of trees. On the northern side ot'the
property, it may be best to put the fencing ,outh (if the paved pathway. Please note that ARB
requirement for tree protection fencing is 5ft frorn the dripline of .1 protected tree. Please
coordinate ESC with ARB tree conver4ation plans.
Rtwl: commoils addressed.
33. Please move the construction entrance into the watershed of the sediment trap and provide a
diversion on the nordiside of the (".E direction water into the trap,
Rev I: comineras addressed.
34. Please replace the silt fence on the western portion of the property with a diversion direction water
into the sediment trap,
Ret comments uddressed.
35. A bond amount will be computed by the County when the plans have been approved.
Rev]: A bond amount will be computed by the County when the plans have been approved.
36. Additional comments may be forthcoming on the next submittal due to the required changes.
a. (Revl) Outlet protection in Phase I of the ESC plans is shown outside the limits of
disturbance.
b. (Revl) Please show a Construction Entrance (CE) and limits of disturbance on
phase 11 of the ESC plans.
c. (Revl) The plans show proposed grading and improvements for Wickham Pond
Phase 11 Block 1 as existing. The proposed ESC plans may not work if construction
begins prior to the completion of Block 1.
d. (Revl) The proposed sediment basin is very close in proximity to the construction of
the proposed underground parking structure. The plans may need to revised to
avoid ESC measures in the way of construction or grading.
e. (Revl) As the proposed buildings and structures are very close to the proposed
Wickham Place and Wickham Way and encompass the majority of the back half of
the site, construction access and coordination may be required in the right-of-way. If
Block I is constructed prior to Block 2, cordination may be required to divert traffic
through Wickham Pond Phase I during the construction of Block 2.
f. (Revl) Please provide adequate channel calculations for the outfall following
structure 403 and for the pipe systems from stuctures 127 and 163 to the pond in
phase I. [MS-19]
Y IJ
C,1.Y /1-
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottes Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Wickham Pond Phase'—? Block 2
Plan preparer: The Timmons Group
Owner or rep.: Charlotte B. Dammann
Plan received date: 25 March 2008
SDP200800056, W1
U-1 June 2008 (Rer1)
14 August 2008 (Rev2)
Date of comments: 9 May 2008
21 Juh 2008 (Rev])
22 September (Rev2)
Reviewer: Phil Custer
Jonathan Sharp (Reel)
Phil Custer (Rev2)
The site, SWM, and ESC plans for Wickham Pond Phase 2 Block 2 have been reviewed. The plans cannot
be approved as submitted and will require the following changes.
A. Final Site Plan
4. Please show the necessary walls and pillars from the structural plans for the garage on sheet S -1.
The garage configuration and layout must be approved by the Zoning department in order to waive
the l 00ft internal sight distance requirement specified in our ordinance.
Rev]: The plans .dill do not Shod' whether or not all parking and travehra'v OrdinanceS (11'e met, (IS
the elevations of the garage and lhe, fc/olprint of the underground parkitW structure are not Shown.
Onh the traveliva widths and parking dimensions appear to sleet the ordinances. One hunched
foot sight distances and grade restrictions will heed to he maintained Unless a waiver is granted
from the ZoningAdminisiralor. Please show the fbolprini the design ref the underground
parking garage, including the location ofwalls, cohlinns,.fboters. etc. as these will affect sight
distances. A11 propertied grading on site is required, includinggrading for the Iindergroiind
parking structure. [18- 32.6.6h, h6]
Rev2: Please remove the note on .sheet 3 referencing the garage layout being subject to change.
Replace these three sentences with a note stating "Any deviation front this site plan will require
an amendment to be approved by the county. " Please also inchide this note on sheet 3. Many
of the parking spaces are not I Sft in length due to the diameter of the columns. Engineering
Albemarre County Community Development
Engineering Review Continents
Page 2 of 5
review (foes not support a waiver of this requirement.
5. Please provide traffic control devices on the site. There appears to be several conflict points in the
garage and surrounding drive aisle that may need signage.
Rev!: conlnlents not cidclressed. Traffic control design for clll p(Irking urecis must he provided
Prior In final site plan approl'c11.
Rev2: Please provide signs spec•if} the advisory speed inside the garage is 5ntph. This is a
condition of the waiver of the sight distance requirement in the parking garage.6. The dumpster and loading space configurations are not currently acceptable to engineering review.
The dump trucks and vehicles using the loading spaces will not be permitted to back out into the
roadway. The loading spaces also cannot block the dumpsters. [ 18- 32.7.2]
Rer1: 1 am unsure as to hou underw trash collection ~rill work. Will there not he (i
dumpster" Underground parking garages tend to have VerV loll' c•eilin,s and garbage trucks
would not he able to pick the dllmpsters 111). [18-32 . 7 . 2]
Rev2: The ordinance specifies that the loading spaces must have a clearance height of 14.Sft.
It is clear that the garage does not have this height. [18- 4.12.181
The county would like more ittforntattion regarding the waste disposal plan for this site. The
areas for trash collection appear too small considering the residential and contnterc•ial units on
site. Please also address the county's concern that the trash truck may he ton tallfor the
garage. Please provide sections estimating the height required from the lowest bean in the
garage to the finished floors and the courtyard.
7. Please provide greater detail with regards to grading throughout the site, specifically of the garage,
courtyard, and access aisles from the roadway to the garage. Entrances cannot exceed 4% for the
first 40" from the intersected street. Across the garage there appears to be a vertical drop of 1 Oft.
Rev 1: comments not addressed. Proposed grueling is required. All proposed grading for
h'al'e lx'al's and parking areas "'list ineet zonnlg ordinances. [IN
Rev2. Travelway grades cannot exceed 10'% measured at any location on the travelway. The
county will not require the full landing requirement of 4(ft lit 4 % Only 20ft at 4% will he
needed at each entrance. The eastern travelway also appears to conflict with Building B. Allgradechangesshouldhaveareasonableverticalcurve.
8. Please provide more detail in reference to the "stairs to elevator specified on sheet S -1.
Rev]: All proposed grading should be shown. AnV drops o0 ' or greater require sakti railing.D I]
Rev2: Show the grading around the tra velwatys into the garage with relation to the surrounding
grades in the grass. It appears that walls are needed in both entrances. Please provide walldetailswiththesafetyrailingasrequired.
9. Please provide more information regarding the drainage system around the buildings, in the plaza,
and around the parking structure. Will the buildings have roofdrains taking runoff to the biotilter
or is there an underground drainage system taking water around the parking structure? How is
infiltrated water from the courtyard reaching the biotilter? Please also show the trenchdrains.
Rerl: The plans indicate that Post DA 4 and 6 [ire piped tl) sirllc•tllre 163, hilt no pipes or drainshavebeenprovided.
Rev2: Please provide more detail regarding the parking garage drainage system and grinder
pump. This system will be subject to the approval of the county engineer.
10. Please provide a section detail for the replacement of the paved pedestrian path.
Rev]: comments not addressed.
Rev2: The applicant bus provided a detail far sidewalks. The sidewalk detail should include the
strength requirement of 3000psi at 28 days. A detail for the replaced pedestrian path (alongRoute240thatisdisrupted61' the TSD) is still needed
Albemar'rtCounty Community Development
Engineering Review Continents
Page 3 of 5
13. Additional comments may be forthcoming on the nest submittal due to the required changes.
a. (Rev I) Engineering recommends redesigning the concrete area between buildings C and
D, as the grade is shown at 10 %. Is there a reason why the elevation at building C is at
654? What is the crest elevation of Wickham Place adjacent to building C? The elevation
at building C could be lowered to provide a more suitable grade between buildings C and
D.
Rev. 2) Water is directed towards Building D. Please amend the grading.
B. Stormwater Management Plan
14. The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been approved.
Revd.- The Lickinghole SIVAI basin pro -rater ft e will be computed once the site plan has been
approved.
Rev2: The Lickinghole SWM basin pro -rata fee will be computed once the site plan has been
approver.
18. Please provide a detention compliance sununary.
Reel: Detention computations are required. Ifdetenlion is provided olfsite, please provide
calelrlcrtiotts verifi that the offsite k'ilities Cue adegtrately providing detention fur the proposed
site.
Rev2: Comment not addressed. Please subfnit calculations and all otter exhibits showing
detention compliance. This plan has a separate file and should be exclusive of other files. The
calculations should reflect the latest proposed conditions.
AlbemaMrCounty Community Development
Engineering Review Continents
Page 4 of 5
24. A bond amount will be computed by the County when the plans have been approved.
Rev]: A bond uniount will be computed by the C'ountl when the plans have been approved.
Rev2: A bond amount will be computed by the County when the plans have been approved.
25. Please submit signed copy of the Stormwater Maintenance Agreement and $17 fee to the County.
Rev l: Please provide easements fur the use ofthe offsite SWAT facilities.
Rev2: Comment has not been addressed. The Block 2 site plan cannot be approved until a plat
is approved showing the stormwater management easement for the pond and all necessary
drainage easements.
C. Erosion and Sediment Control Plan
28. Please provide a soil stockpile area.
Rev]: The stockpile area is shown in a location of cut (for the underground parking structure).
Where will ul1 the excess cut he stockpiled.' There does not appear to he enough 1.00171 onSite us
shown.
Rev2: To the note in the construction sequence, please add that the offsite location needs to
have an approver/ ESC plan and the ESC inspector needs to be notified Please update the
Offsite Areas" section of the narrative to include all of t {cis information.
30. How is site runoff flowing out of the sediment trap to pass the paved pedestrian path? A method
to pass the pedestrian path should be accounted for in the ESC plan.
Rev l: coinlnents not addressed. Adequate dotirnstreanr channels should he provided the
outlet of the .sediment trap while the sediment true is in place. At a nrininnrnr, ern adequate channel
should he provided to the existing ditch below.
Rev2: Please specify a diameter to the slope drain. The slope drain should go cooler the trail so
users of the trail do not have an obstacle to avoid
Albemarle County Community Development
Engineering Review Comments
Page 5 of 5
35. A bond amount will be computed by the County when the plans have been approved.
Rcvl: A bond antounl will he computed by the C'ouniti when 1he plans have been approved.
Rev2: A bond amount will be computed by the County when the plans have been approved
36. Additional comments may be forthcoming on the nest submittal due to the required changes.
a. (Rev I) Outlet protection in Phase I of the ESC plans is shown outside the limits of
disturbance.
Rev2) The temporary slope drain should be included in the limits of disturbance. The
slope drain should be placed underneath the paved pedestrian path so as not to disturb
use of the path.
d. (Rev] ) The proposed sediment basin is very close in proximity to the construction of the
proposed underground parking structure. The plans may need to revised to avoid ESC
measures in the way of construction or grading.
Rev2) Comment has not been addressed The edge of the sediment trap (elevation 538)
is located 10ft from the inside wall of the garage. Considering the thickness of the wall
section and the depth of the foundation in relation to the elevation of the trap grading,
the sediment will be an obstacle during the construction of the garage and should be
modified
RevI ) Please provide adequate channel calculations for the outfall following structure
403 and for the pipe systems from stuctures 127 and 163 to the pond in phase 1. [MS -l9]
Rev2) Comment has not been addressed A drainage area ntap .supporting the pipe
calculations should be submitted with this MS -19 analysis. Also, no channel
calculations the ditch west of structure 401 were submitted
Page 1 of 2
Philip Custer
From: Ammy George [Ammy.George @timmons.com]
Sent: Wednesday, September 17, 2008 11:06 AM
To: Bill Fritz
Cc: Philip Custer; Frank Pohl
Subject: FW: SDP08 -56 Wickham ph2 block 2
Good morning Bill, Phil Custer brought it to my attention that I did not include a response letter to Lisa Glass's
outstanding comments to Wickham Pond Phase 2 Block 2. We addressed her comments in the plan set that wasdeliveredtotheCountyonAugust20, 2008.
Bill, here are out responses to the comments from Lisa. If you did not receive a copy of the revised plan, inAugust, let me know how many copies you will need and I will get them over to you. `r,m1 J
i We have added a note about the flooring for the garage on Sheet 3. 'r06 \- Qa .
2. A clarification of the number of parallel spaces for Block 2 has been dded to Sheet 5.
3- The lighting note has been updated to clarify that if lighting is added in the future, it shall not exceed
3,000 lumens. (Sheet 5)
4. The grinder pump and location will be designed by the structural engineer at a later date.
If you have any questions or comments, please feel free to call me.
Ammy George, CLA c-
Tinnnons Group
Your v 1s1,,rr Our,
919 2nd St., S.E.
Charlottesville, VA 22902
434.327.1684 (Direct)
434.566.3411 (Cell)
434.295.8317 (Fax)
Please consider the environment before printing this e -mail
From: Lisa K. Glass [mai Ito: lglass2 @albemarle.org]
Sent: Thursday, June 19, 2008 2:41 PM
To: Ammy George
Subject: SDP08 -56 Wickham ph2 block 2
Ammy,
Lets discuss thes items so it is clear for the next planner to give you approval!
I am about out of this office!)
Thank you for your letter of June 2 and plan dated June 4.
you have addressed most of the planning /zoning comments.
I have a few remaining questions:
1) comment 7: Please confirm that underground parking garage will have a hard surface (paved /concrete /hardsurfacepavers);
add a note;
2) comment 11: How may of the parallel spaces are "Off- site" on block 1 ?;
add a note on the parking schedule after parallel;
3) comment 13: the lighting not you added says full cut off; and not more that .5 fact at PL or street ... okay
9/17/2008
Page 2 of 2
add a note or provide a plan;
I either need a photometric plan or a statement that no lights >3000 lumens to be installed'
so not the building entry, garage entry or street lights ?) t/
does this make sense?
4) comment 15: Who sizes the holding tank for sump /grinder pump to remove drainage from the underground
rage?V> ngineering will want to look at this.
well as providing vehicular access to the pump for maintenance.
want to be sure you understand these comments before I put these notes in the file.
If we can talk later today or Tuesday morning.
Lisa
296 -5832 x3432
9/17/2008
t
L r
County of Albemarle
Department of Community Development
Memorandum
To: Ammy George- Timmons Group
Charlotte Dammann- Barnes - Crozet LLC
Frank Pohl- Weatherhill Development
From: Elizabeth Marotta, Senior Planner
Division: Zcyiing & Current Development
Date: October 3, 2008
Subject: SDP 200800056 Wickham Pond Phase 11 Block 2
The Planner for the Zoning & Current Development Division of the Albemarle County Department of
Community Development has reviewed the latest final site plan revisions for the above reference project,dated 08- 05 -08, and will approve the site plan referenced above when the following items have been
satisfactorily addressed. The following continents are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review. [Each comment
is preceded by the applicable reference to the Albemarle County Code.]
L [Sec. 32.5.6 j, 11 It appears that some, but not all, existing utility and drainage easements are
shown on the existing conditions sheet. Please show and label all existing utility and drainage
easements on Sheet 2.
2. [32.5.6a] While zoning is provided on Sheet 5, it is difficult to find as it provided under the
category of "Tax Map Nos." Please provide the category header of "Zoning" for the zoning
information on Sheet 5.
3. [32.5.6b] Please explicitly provide the maximum amount of impervious cover on the site.
4. [32.5.6b] Please clarify parking schedule by noting that the 12,800 sf is the net floor area.
5. [32.5.6n] Please delineate on- street parking spaces.
6. [32.5.6p] Sheet 3 calls out the tot lot, community garden, and landscape bed areas. Please also
provide this information on the landscape plan sheet. And, please clarify where the perennial bed
detail is intended to be applied.
7. [32.5.611][32.7.7.11 You must provide a note on the plan that specifies the equipment to be
provided in the tot lot.
Please contact Elizabeth Marotta at the Department of Community Development 296 -5832 x3432 if you
have any questions or need additional information.