Loading...
HomeMy WebLinkAboutSUB201500183 Checklist - Project Closeout (Administrative) 2016-04-06 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please com' •to this form within 30 days of final action,place in folder and forward to CDA FOR QC and st +s .1) I. CDA will forward to the Imaging Center for digital clos out. (1 SD '/SUB # a S _ 1 u'/ PROJE ^TITLE r � G(wi'. 5 / � Irl) Fu► ► -I F n E OF LEAD REVIEWER -eAre-- FINAL ACTIO ' DATE: y-e_41 ,_i Cou View— Application, Page 2 Data Entered 1 t2risiPMILTIFIIIP,Ground Water Assessment, or other documents placed in"Docs&Pics" IHardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" I next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. imissimorismadmiemiiims 1p-i ppliignature copy) cationScan ❑ Saved location ence Nomillegropuillommimmus plicant espondence(to/from, memos/emails) Scan D Saved location Complete f printed Review Comments Scan 0 Saved location ,, roved (signed, pp p1a�Iat or s amped"Approved"with planner/Engineer name) Scan Saved location C V .Rxs`tga) grafiriviewsietitefriffflififfiffifftWOTITIMEr ma - - - - - - - Letter) 'Ground Water Assessments 0 Scan Saved location ,-s a(' c 5 Numftlimiliiikation tudies) • n be darjewidaseilmii n ave oca ion f + 1 Additional Information on this project: 1