HomeMy WebLinkAboutSDP200800059 Review Comments 2008-05-02Application#: SDP200800059 _ •-Short Review CommilIn1ts
Project Name: Oliva And Sons Major Major Amendment
Date Completed` 05/02/2008
Reviewer: Andrew Slack E911
Review Status: No Objection
Reviews Comments: NO OBJECTION.
Date Completed: 05/01/2008
Reviewer: Margaret Maliszewski ARB
Review Status: Requested Changes
Reviews Comments: This site falls within the Avon Street Extended Entrance Corridor. Consequently, ARB review/approval
are required prior to final plan approval. ARB applications, checklists, schedules and guidelines are
available on line at www.albemarle.org.
Page: 1.00 County of Albemarle Printed On: Tuesday, May 06, 2008
Page 1 of 1
Philip Custer
From: Philip Custer
Sent: Friday, May 02, 2008 5:14 PM
To: Megan Yaniglos
Subject: Oliva and Sons
Attachments: E1_pmj_PBC_08-00059 Oliva and Sons.doc
Megan,
Attached to this email are my comments for the major amendment to the Oliva and Sons site plan. The comments
included in the memo are final site plan comments. Also, I'm not sure we were looking at the true approved site
plan for the existing building because from what I remember of the plan, the parking and building were reversed
than what exists on site now. Do you think there could be a more recent plan? It doesn't make too much of a
difference to engineering review because the existing part of the site seems to be in compliance with the current
ordiance anyway. Below, I have listed some questions that are probably more related to planning that may affect
future engineering review.
If you have any questions, please let me know.
Thanks,
Phil
Additional questions...
The setback line is shown on the current site plan more as an easement (the applicant refers to a deedbook and
page number) that was created when the original site plan was approved. The applicant states in plan that some
land was given by the site owners for the ROW of Southern Parkway. Do they keep the original setback line or
should it be taken from the current property line?
As you know, I visited the site last week and while I was there I noticed that there was a large dumpster on site.
In my comment letter I recommended that they provide one. I think if they process this site plan without the trash
compactor and it remains atter approval, it will be in a zoning violation. Could we require that the applicant
provide a dwnpster of some sort during the site plan process so we can avoid having to process a zoning
violation?
The parking calculations state that only three employees work at the warehouse at a time. While I was there,
there were three cars in addition to mine in the lot. How can we verify that 3 parking spaces are required? Also,
the building seems to be used more as a workshop than warehouse. I'm not sure what that does to the parking
talcs.
5/5/2008
Page 1 of 1
Megan Yaniglos
From: Philip Custer
Sent: Friday, May 02, 2008 5:14 PM
To: Megan Yaniglos
Subject: Oliva and Sons
Attachments: E1_pmj_PBC_08-00059 Oliva and Sons.doc cou
\(lljr - 11
Megan,
Attached to this email are my comments for the major amendment to the Oliva ind Sons site plan. "The comments
included in the memo are final site plan comments. Also, I'm not sure we were looking at the true approved site
plan for the existing building because from what I remember of the plan, the pa ing and building were reversed
than what exists on site now. Do you think there could be a more recent plan7V It doesn't make too much of a
difference to engineering review because the existing part of the site seems to be in compliance with the current
ordiance anyway. Below, i have listed some questions that are probably more related to planning that may affect
future engineering review.
If you have any questions, please let me know.
Thanks,
Phil
Additional questions...
The setback line is shown on the current site plan more as an easement (the applicant refers to a deedbook and
page number) that was created when the original site plan was approved. The applicant states in plan that some
land was given by the site owners for the ROW of Southern Parkway. Do they keep the original setback line or
should it be taken from the current property line? M „ M..j I .,�..�
As you know, i visited the site last week and while i was there I noticed that there was a large dumpster on site.
In my comment letter I recommended that they provide one. I think if they process this site plan without the trash
compactor and it remains after approval, it will be in a zoning violation. Could we require that the applicant
provide a dumpster of some sort duringtilesite plan process so we can avoid having to process a zoning
violation? hv�►,rt
The parking calculations state that only three employees work at the warehouse at a time. While I was there,
there were three cars in addition to mine in the lot. How can we verify that 3 parking spaces are required? Also,
the building seems to be used �m/�ore as a workshop than warehouse. I'm not sure what that does to the parking
calcs. no 4 Rp1�'l; 16 C.(GS
5/5/2008
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: SDP -2008-00059, Oliva and Son Major site plan amendment
Plan preparer: Mr. Tim Miller, PE (fax 434.979.1681)
Owner or rep.: Richard A Oliva and Sons (fax unknown)
Date received: 7 April 2008 (plan dated 3 April 2008)
Date of Comment: 2 May 2008
Engineer: Phil Custer
The major site plan amendment for the Olivia and Sons has been reviewed. Because the application is a
major amendment to an existing site plan, the following comments are final site plan comments.
A. SDP -2008-00059
1. A WPO plan for this property will need to be approved before the site plan can be. No
information regarding the water protection plan for the proposed addition has been provided.
Detention appears to be provided for the industrial park through the use of a facility adjacent to the
FedEx facility. However, the building addition will increase the discharge from the site into the
downstream system. The applicant must either perform an analysis of the downstream storm
sewer network, or provide onsite detention. Stormwater quality will also need to be considered in
the WPO plan.
2. Please show all existing utility lines on the plan.
3. Sight distance needs to be shown from the parking lot entrance onto Five Springs Road. It appears
it may be necessary to adjust the grading on site to obtain adequate sight distance looking to the
north. A vertical profile of the sight line may be required.
4. It appears a dumpster or trash compactor is needed for the site. Please provide one on the plan.
5. Please specify a low maintenance, nongrassy groundcover for all new proposed slopes greater than
3:1.
Please contact me at (434)296-5832 ext. 3072 should you have any questions.
File: EI_pmj_PBC_08-00059 Olive and Sons
�FRGIN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
May 6, 2008
Mr. Justin Shimp
172 South Pantops Drive
Charlottesville, Virginia 22911
RE: SDP -2008 -059 -Oliva and Sons- Major Site Plan Amendment
Mr. Shimp
The Site Review Connnittee has reviewed the development proposal referenced above. Preliminary
comments for the following divisions of the Department of Community Development and other agencies,
as applicable, are attached:
Albemarle County Division of Zoning & Current Development (Engineer)
Albemarle County Division of Zoning & Current Development (Planner)
Albemarle County Division of Planning (E911)
Albemarle County Division of Zoning Inspections
Albemarle County Division of Plamling (Architectural Review Board)
Albemarle County Department of Fire Rescue
Albemarle County Service Authority
Virginia Department of Transportation
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that
could affect approval of the proposed project.
Please make the revisions that have been identified as necessary for preliminary approval by the Site
Review Committee. If you choose not to snake the requested revisions, please submit in writing
justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 1 1" x 17"
copy to the Department of Community Development including responses to each of the attached
comments of the Site Review Committee by May 20th, 2008. Failure to submit this information by this
date will result in suspension of the review schedule. Review will resume when revisions are submitted
along with a reinstatement fee of $65.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely,
Megan Yaniglos
Senior Planner
Zoning & Current Development
�S�op Al,
"A
`a
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: SDP -2008-00059, Oliva and Son Major site plan amendment
Plan preparer: Mr. Tim Miller, PE (fax 434.979.168 1)
Owner or rep.: Richard A Oliva and Sons (fax unknown)
Date received: 7 April 2008 (plan dated 3 April 2008)
Date of Comment: 2 May 2008
Engineer: Phil Custer
The major site plan amendment for the Olivia and Sons has been reviewed. Because the application is a
major amendment to an existing site plan, the following comments are final site plan comments.
A. SDP -2008-00059
1. A WPO plan for this property will need to be approved before the site plan can be. No
information regarding the water protection plan for the proposed addition has been provided.
Detention appears to be provided for the industrial park through the use of a facility adjacent to the
FedEx facility. However, the building addition will increase the discharge from the site into the
downstream system. The applicant must either perform an analysis of the downstream storm
sewer network, or provide onsite detention. Stormwater quality will also need to be considered in
the WPO plan.
2. Please show all existing utility lines on the plan.
3. Sight distance needs to be shown from the parking lot entrance onto Five Springs Road. It appears
it may be necessary to adjust the grading on site to obtain adequate sight distance looking to the
north. A vertical profile of the sight line may be required.
4. It appears a dumpster or trash compactor is needed for the site. Please provide one on the plan.
5. Please specify a low maintenance, nongrassy groundcover for all new proposed slopes greater than
3:1.
Please contact me at (434)296-5832 ext. 3072 should you have any questions.
Filc: E I _pmj_PBC_08-00059 Olive and Sons
COLI: Cr
d'i 1 �fL
County of Albemarle
Department of Community Development
Memorandum
To: Justin Shimp (jshimp(-2dddrva.com)
From: Megan Yaniglos- Planner
Division: Zoning & Current Development
Date: May 6, 2008
Revised: May 14, 2008
Subject: SDP -2008-059- Oliva and Sons- Major Amendment
The Planner for the Zoning & Current Development Division of the Albemarle County
Department Community Development will recommend approve the plan referred to above when
the following items have been satisfactorily addressed. (The following comments are those that
have been identified at this time. Additional comments or conditions may be added or eliminated
based on further review.) [Each comment is preceded by the applicable reference to the
Albemarle County Code.]
L [32.5.6(p); 32.7.9] Provide a landscape plan in conformance with section 32.7.9.
2. [32.5.6(a)] The building setback must be from the current ROW line. The original site
plan stated that the building setback is 50 feet from the right-of-way. Show the right-of-
way for Southern Parkway, and revise plan to meet this requirement.
3. 14.12.13 (e)J Each site plan that depicts a commercial or industrial building of four
thousand (4000) gross square feet or more shall provide a dumpster pad that does
not impede any required parking or loading spaces, nor any pedestrian or vehicular
circulation aisles.
Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext.
3004 for further information.
Application #:
SDP200800059 :�Short Review Com '.1.nts
Project Name Oliva And Sons --Major Major Amendment
Date Completed:
05/02/2008
Reviewer:
Andrew Slack E911
Review Status:
No Objection
Reviews Comments:
NO OBJECTION.
Date Completed:
05/01/2008
Reviewer:
Margaret Maliszewski ARB
Review Status:
Requested Changes
Reviews Comments:
This site falls within the Avon Street Extended Entrance Corridor. Consequently, ARB review/approval!
are required prior to final plan approval. ARB applications, checklists, schedules and guidelines are
available on line at www.albemarle.org.
Page: 1.00 County of Albemarle Printed On: Tuesday, May 06, 2008
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
ViiginiaDOT org
(David S. Ekern, P.E.
COMMISSIONER
May 7, 2008
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments May 8, 2008 site review meeting
Dear Mr. Brooks:
Below are VDOT's comments on the Site Plans for the May 8, 2008 Site Review Committee
Meeting:
SDP -2008-00059 Olinva and sons -Major (MelZan YanijZlos)
• No comments
SDP -2008-00060 First Church of the Nazarene —Preliminary (Summer Frederick
• VDOT has previously reviewed the configuration and location of the turn land and
entrance and it does appear to be in accordance with past meetings and comments from
VDOT.
• The construction of VDOT project 0022-002-104 will begin May 12`h, 2008. This plan
needs to, and appears to be, designed to the changes by the intersection project. Final
plans should show the proposed intersection project and how the proposed turn lane and
entrance will tie in to that project. VDOT has provided the developer the survey data and
that needs to be shown on the final plan.
SDP -2008-00061 Easrlysville Business Park -Final (Summer Frederick)
• The sag vertical curve at station 21+44 needs to have a minimum k value of 17.
• Outlet protection at A l should be class II rip rap
SDP -2008-00064 Georgetown/Hydraulic Professional Offices -Preliminary (Lisa Glass)
• Previous comments have been made for ZMA-2006-00014 that still need to be addressed
and are:
tooYEARS OP
TRANSPORTATION FXULILENCE
1 9 1 6 2 0 4
• This plan must be coordinated with the VDOT project for Georgetown Road. The project
manager has been forwarded a copy of this plan. The applicants engineer should contact
VDOT for coordination.
• It is very undesirable to have the entrance in the functional area of the intersection,
however, a previous meeting with the engineer and the county determined that this is the
best solution at this site for Hydraulic Road. The only other option is to access the site
from Georgetown Road.
• The plan needs to show the intersection of 656 and 743 and show details of turn
movements, lane widths, storage lengths, etc. All projected and existing traffic needs to
be shown on the plan.
• Sight lines need to be shown for the entrance to the site and also for the existing
intersection at 656/743.
• Vehicles heading northbound on Hydraulic trying to turn left into the site is a dangerous
situation and needs to be addressed with the site plan.
• Proposed traffic needs to be shown on the site plan to determine is a Chapter 527 study
needs to be done.
SDP -2008-00065 Moser Radiation Therapy Ctr-Ma_ior (Gerald Gatobu)
• LTACH access management plan should be completed prior to any site plan approvals.
SDP -2008-00066 Hunters Way Site Plan Amendment-Ma.ior (Lisa K Glass)
• The plan needs to include calculations for outlet velocity on YDI and outlet protection
details. Also include ditch calculations.
SUB -2008-00102 Handley Farm Estates(10-19) lots -Final (Megan Yani$!los)
• No comments.
Please request the applicants provide a written description of revisions with re -submissions. If you
have any questions or comments, please contact me prior to sharing these comments with the
applicants.
Sincerely,
Joel DeNunzio, P.E.
Residency Program Manager
VDOT Charlottesville Residency
434-293-0011
cc Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand,
Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick
Lawrence, and John Giometti
�IRGINti�
County of Albemarle
Department of Community Development
Memorandum
To: Justin Shimp 6shim p@ddrva.com)
From: Megan Yaniglos- Planner
Division: Zoning & Current Development
Date: May 6, 2008
Subject: SDP -2008-059- Oliva and Sons- Major Amendment
The Planner for the Zoning & Current Development Division of the Albemarle County
Department Community Development will recommend approve the plan referred to above when
the following items have been satisfactorily addressed. (The following comments are those that
have been identified at this time. Additional comments or conditions may be added or eliminated
based on further review.) [Each comment is preceded by the applicable reference to the
Albemarle County Code.]
1. [32.5.6(p); 32.7.9] Provide a landscape plan in conformance with section 32.7.9.
2. [32.5.6(a)] The building setback must be from the current ROW line. The original site
plan stated that the building setback is 50 feet from the right-of-way. Show the right-of-
way for Southern Parkway, and revise plan to meet this requirement.
Please contact Megan Yaniglos at the Department of Community Development 296-5832 ext.
3004 for further information.
Thomas Jefferson Soil and Water Conservation District May 14, 2008
2134 Berkmar Dr
Charlottesville, VA 22901
975-0224
TO: Megan Yaniglos
Planning Department
RE: Soils Report and Comments for:
Oliva & Sons
USDA united States Natural
�— Department of Resources
® Agriculture Conservation
Service
Prepared by: Thomas Jefferson Soil & Water
Conservation District
434-975-0224
Soils Report
SOILS REPORT FOR: Oliva & Sons
Soil Survey Area: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map Unit: 13D Catoctin very stony silt loam, 15 to 25 percent slopes
Description Category: Virginia FOTG
Catoctin is a moderately steep to steep, moderately deep, well drained soil. Typically the surface layer is silt loam
about 5 inches thick. The surface layer has a moderately low content of organic matter. The slowest permeability
is moderately rapid. It has a low available water capacity and a low shrink swell potential. This soil is not
flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land capability
classification is 7s. The Virginia soil management group is JJ. This soil is not hydric.
Map Unit: 21 C Culpeper fine sandy loam, 7 to 15 percent slopes
Description Category: Virginia FOTG
Culpeper is a strongly sloping to moderately steep, deep, well drained soil. Typically the surface layer is fine
sandy loam about 8 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderate. It has a moderate available water capacity and a moderate shrink swell potential. This
soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 3e. The Virginia soil management group is X. This soil is not hydric.
Map Unit: 22C3 Culpeper clay loam, 7 to 15 percent slopes, severely eroded
Description Category: Virginia FOTG
Culpeper is a strongly sloping to moderately steep, deep, well drained soil. Typically the surface layer is clay
loam about 8 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderate. It has a moderate available water capacity and a moderate shrink swell potential. This
soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 4e. The Virginia soil management group is X. This soil is not hydric.
Map Unit: 39C Hazel loam, 7 to 15 percent slopes
Description Category: Virginia FOTG
Hazel is a strongly sloping to moderately steep, moderately deep, excessively drained soil. Typically the surface
layer is loam about 10 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderately rapid. It has a low available water capacity and a low shrink swell potential. This soil
is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 3e. The Virginia soil management group is JJ. This soil is not hydric.
Map Unit: 39D Hazel loam, 15 to 25 percent slopes
Description Category: Virginia FOTG
Hazel is a moderately steep to steep, moderately deep, excessively drained soil. Typically the surface layer is
loam about 10 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderately rapid. It has a low available water capacity and a low shrink swell potential. This soil
Thomas Jefferson SWCD 1 5/15/08
is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 4e. The Virginia soil management group is JJ. This soil is not hydric.
Map Unit: 77 Riverview-Chewacla complex
Description Category: Virginia FOTG
Riverview is a nearly level to gently sloping, very deep, well drained soil. Typically the surface layer is loam
about 12 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderate. It has a high available water capacity and a low shrink swell potential. This soil is
occasionally flooded and is not ponded. The top of the seasonal high water table is at 48 inches. The land
capability classification is 2w. The Virginia soil management group is G. This soil is not hydric.
Chewacla is a nearly level to gently sloping, very deep, somewhat poorly drained soil. Typically the surface layer
is silt loam about 8 inches thick. The surface layer has a moderate content of organic matter. The slowest
permeability is moderate. It has a high available water capacity and a low shrink swell potential. This soil is
occasionally flooded and is not ponded. The top of the seasonal high water table is at 12 inches. The land
capability classification is 3w. The Virginia soil management group is I. This soil is not hydric.
Small Commercial Buildings - Dominant Condition
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol
Soil Name
Rating
13D
Catoctin very stony silt
Very limited
loam, 15 to 25 percent
slopes
21C
Culpeper fine sandy loam,
Very limited
7 to 15 percent slopes
220
Culpeper clay loam, 7 to
Very limited
15 percent slopes, severely
eroded
39C
Hazel loam, 7 to 15
Very limited
percent slopes
39D
Hazel loam, 15 to 25
Very limited
percent slopes
77
Riverview-Chewacla
Very limited
complex
Mapunit Hydric Rating
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name
13D Catoctin very stony silt
loam, 15 to 25 percent
slopes
21C Culpeper fine sandy loam,
Rating
Not hydric
Not hydric
Phomas Jetterson SWCD 2 5/15/08
7 to 15 percent slopes
Survey Status: Published
22C3 Culpeper clay loam, 7 to
Not hydric
15 percent slopes, severely
Distribution Date: 10/21/2002
eroded
Map
39C Hazel loam, 7 to 15
Not hydric
percent slopes
13D Catoctin very stony silt
39D Hazel loam, 15 to 25
Not hydric
percent slopes
slopes
77 Riverview-Chewacla
Partially hydric
complex
7 to 15 percent slopes
Soil Shrink -Swell - Dominant Soil
Top Depth : 0
Bottom Depth: 0
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name
Rating
13D Catoctin very stony silt
1.5
loam, 15 to 25 percent
slopes
21 C Culpeper fine sandy loam,
1.5
7 to 15 percent slopes
22C3 Culpeper clay loam, 7 to
1.5
15 percent slopes, severely
eroded
39C Hazel loam, 7 to 15
1.5
percent slopes
39D Hazel loam, 15 to 25
1.5
percent slopes
77 Riverview-Chewacla
1.5
complex
Corrosion Concrete - Dominant Condition
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name
Rating
13D Catoctin very stony silt
Moderate
loam, 15 to 25 percent
slopes
21C Culpeper fine sandy loam,
Moderate
7 to 15 percent slopes
22C3 Culpeper clay loam, 7 to
Moderate
15 percent slopes, severely
eroded
39C Hazel loam, 7 to 15
High
Phomas Jetterson SWCD 3 5/15/08
percent slopes
39D Hazel loam, 15 to 25 High
percent slopes
77 Riverview-Chewacla Moderate
complex
Corrosion Steel - Dominant C ion Al
Soil Survey:Al' m ounty,,V rgin r.
Survey Status: Pu d
Correlation Date: 12/ /1981"
Distribution Date: 10/21/2002
Map
Symbol Soil Name (�'t�ating
13D Catoctin very stony silt 4�-High
loam, 15 to 25 percent
slopes
21C Culpeper fine sandy loam, Moderate
7 to 15 percent slopes
220 Culpeper clay loam, 7 to Moderate
15 percent slopes, severely
eroded
39C Hazel loam, 7 to 15 Low
percent slopes
39D Hazel loam, 15 to 25 Low
percent slopes
77 Riverview-Chewacla Low
complex
Phomas Jetterson SWCD 4 5/15/08
Page 1 of 1
Philip Custer
From:
Philip Custer
Sent:
Tuesday, June 10, 2008 5:15 PM
To:
'Justin Shimp'
Cc:
Megan Yaniglos
Subject:
Oliva and Sons Site and SWM plans
Attachments: E1 swm PBC 08-00063 Oliva and Sons.docI E2_pmj_PBC_08-00059 Oliva and Sons.doc
Good afternoon,
Attached are the comment letters for the SWM and site plans for the Oliva and Sons parcel. Please contact me
should you have any questions.
Thanks,
Phil
296-5832 x3072
6/10/2008
Page 1 of 1
Philip Custer
From: Philip Custer
Sent: Tuesday, August 12, 2008 9:14 AM
To: 'Justin Shimp'
Subject: Engineering Review for Oliva and Sons Site and SWM plan
Attachments: E2 swm PBC 08-00063 Oliva and Sons.doc; E3_pmj_PBC_08-00059 Oliva and Sons.doc
Good afternoon,
Attached are the engineering reivew letters for the WPO and site plan amendment for the addition to the Oliva
and Sons building. Engineering review can recommend approval to the plans after the two remaining comments
are addressed, the WPO bond is posted, and the SWM facility maintenance agreement has been recorded.
The WPO bond for this site has been computed to be $1,853.23.
Please resubmit the 4 copies of the plan (no calculations are needed). It appears that only two sheets of the 6 -
page set are being amended. If you wish to slip the modified sheets into the sets already here, you may. Please
let me know and I will arrange for the plans to be at the front desk. Please contact me if you have any questions.
Thanks,
Phil
296-5832 x3072
8/12/2008
1 "
1 IRGIN��
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Project: SDP -2008-00059, Oliva and Son Major Site Plan Amendment
Plan preparer: Mr. Tim Miller, PE (fax 434.979.168 1)
Owner or rep.: Richard A Oliva and Sons (fax unknown)
Date received: (Rev. 1) 28 May 2008
7 April 2008 (plan dated 3 April 2008)
Date of Comment: (Rev. 1) 10 June 2008
2 May 2008
Engineer: Phil Custer
The major site plan amendment for the Olivia and Sons has been reviewed. Because the application is a
major amendment to an existing site plan, the following comments are final site plan comments.
A. SDP -2008-00059
1. A WPO plan for this property will need to be approved before the site plan can be. No
information regarding the water protection plan for the proposed addition has been provided.
Detention appears to be provided for the industrial park through the use of a facility adjacent to the
FedEx facility. However, the building addition will increase the discharge from the site into the
downstream system. The applicant must either perforin an analysis of the downstream storm
sewer network, or provide onsite detention. Stormwater duality will also need to be considered in
the WPO plan.
(Rev. 1) A WPO plan has been received for water quality measures but not for erosion and
sediment control. The applicant claims that land disturbances will be under 10,000sf and will
not require an ESC plan. Comments regarding the WPO plan will appear in a separate letter.
2. Please show all existing utility lines on the plan.
(Rev. 1) Comment not addressed. I do not see where the underground electric line is located.
3. Sight distance needs to be shown from the parking lot entrance onto Five Springs Road. It appears
it may be necessary to adjust the grading on site to obtain adequate sight distance looking to the
north. A vertical profile of the sight line may be required.
(Rev. 1) The required sight distance for this entrance is 10 x the speed limit of the road, not
Mgft. After a closer inspection, it does not appear that adequate sight distance is present at this
entrance. But since no improvements will be made to the existing entrance and parking areas,
correcting the sight distance issue will not be required with this plan. fDMI
4. It appears a dumpster or trash compactor is needed for the site. Please provide one on the plan.
(Rev. 1) The dumpster pad must be placed so that water does not run through, but away from,
the pad. The proposed location would also limit the available sight distance for the entrance as
well. f 18-4.12.19. b/
. Pt
iitciSx,
County of Albemarle
Department of Community Development
Memorandum
To:
Justin Shimp (jshimpC)ddrva.com)
From:
Megan Yaniglos- Planner
Division:
Zoning & Current Development
Date:
May 6, 2008
Revised: May 14, 2008
Revision l: June 17, 2008
Subject:
SDP -2008-059- Oliva and Sons- Major Amendment
The Planner for the Zoning & Current Development Division of the Albemarle County
Department Community Development will recommend approve the plan referred to above when
the following items have been satisfactorily addressed. (The following comments are those that
have been identified at this time. Additional continents or conditions may be added or eliminated
based on further review.) [Each continent is preceded by the applicable reference to the
Albemarle County Code.]
1. [32.5.6(p); 32.7.9] Provide a landscape plan in conformance with section 32.7.9.
Rev 1: Provide screening for the dumpster per the requirements stated in 32.7.9.8
Please contact Megan Yaniglos at the Department of Community Development 296-5532 ext.
3004 for further information.
Phone(434)296-5832
Project:
Plan preparer:
Owner or rep.:
Date received:
Date of Comment:
Engineer:
0,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Fax(434)972-4126
SDP -2008-00059, Oliva and Son Major Site Plan Amendment
Mr. Tim Miller, PE (fax 434.979.168 1)
Richard A Oliva and Sons (fax unknown)
(Rev. 2) 6 August 2008 (plan signed S August 2008)
(Rev. 1) 28 AMY 2008
7 April 2008 (plan dated 3 April 2008)
(Rev. 2) 12 August 2008
(Rev. 1) 10 June 2008
2 May 2008
Phil Custer
The major site plan amendment for the Olivia and Sons has been reviewed. Because the application is a
major amendment to an existing site plan, the following comments are final site plan comments.
A. SDP -2008-00059
4. It appears a dumpster or trash compactor is needed for the site. Please provide one on the plan.
(Rev. 1) The dumpster pad must be placed so that water does not run through, but awa'v front, the
Pad. The proposed location would also lnnit the availahle .Sight distance for the entrance as tit'ell.
[18-4.12.19.b]
(Rev. 2) Comment has not been addressed. The ordinance requires 8ft of the concrete pad in
front of the dumpst. -.r . CG -6 curb is not designed to withstand "Tv, loads of a garbage truck.
Page t of 2
Megan Yaniglos
From: Gary Whelan [gwhelan@serviceauthority.org]
Sent: Tuesday, August 12, 2008 11 A 6 AM
To: 'Justin Shimp'; Megan Yaniglos
Subject: RE: Oliva + Son
Megan,
The ACSA approves Oliva & Son.
,.Gary
From: Justin Shimp [mailto:jshimp@ddrva.com]
Sent: Tuesday, August 12, 2008 9:28 AM
To: 'Megan Yaniglos'; 'Gary Whelan'
Subject: RE: Oliva + Son
Gary/ Merla€ ,
There .a€e nD now plumbing nxtures proposed for the Oliva .and Son site. we aro prop{,,,,(,ig io , ,am'nin th,, . €JI!calt
inkier as it oxict
Let €ted, know if you'll need anythirjr:f else for this. Mega.l, cJid you k with ARB? I sty° �t .;tUff to th, G .I Wf01.;
ba k to verify that we aic,, unit of view of the EC and I didn't hear back I rrssufee that mpans =,(, further �s
required?
thanks,
From: Megan Yaniglos [mailto:myaniglos@albemarle.org]
Sent: Wednesday, August 06, 2008 10:34 AM
To: Justin Shimp
Subject: RE: Oliva + Son
Justin:
The only other comment I have is from ACSA and it is attached.
Thanks.
megan yaniglos, ASLA
senior planner
Albemarle County Communith Development Department
Division of Zoning and Current Development
401 !McIntire Road, North Wing
Charlottesville, Virginia 22902
ph: 434.296.5832 x. 3004
fax: 434.07'.4035
8/19/2008
Application #: SDP200800059 — 'Short Review Com.. ent$
Project Name:�Oliva And Sons - Major - Major Amendment
Date Completed:
09/11/2008
Reviewer:
Amy Pflaum Engineer Z&CD
Review Status:
No Objection
Reviews Comments:
�Dumpster Pad has been corrected on site plan mylars. Mylars signed by engineering 9/11/08.
Date Completed:
05/02/2008
Reviewer:
Andrew Slack E911
Review Status:
No Objection
Reviews Comments:
INO OBJECTION.
Date Completed:
06/20/2008
Reviewer:
Margaret Maliszewski ARB
Review Status:
No Objection
Reviews Comments:
!Based on a site visit and additional information provided by the applicant (the addition will not exceed
the height of the existing building), the proposed addition is not expected to be visible from the EC.
Consequently, ARB- review will not be required. -
Date Completed:
05/01/2008
Reviewer:
Margaret Maliszewski ARB
Review Status:
Requested Changes
Reviews Comments:
This site falls within the Avon Street Extended Entrance Corridor. Consequently, ARB review/approval:
are required prior to final plan approval. ARB applications, checklists, schedules and guidelines are
available on line at www.albemarle.org. -
Date Completed:
08/12/2008
Reviewer:
Philip Custer Engineer Z&CD
Review Status:
Requested Changes
Reviews Comments:
;Two minor comments to be addressed. SWM needs to be posted. SWM facility maintenance
'agreement and fee recorded.
Page: 1.00 County of Albemarle Printed On: Thursday, September 11, 2008