The Site Review Committee has reviewed the development proposal referenced above.
Preliminary comments for the following divisions of the Department of Community Development
and other agencies, as applicable, are attached:
Albemarle County Division of Zoning & Current Development (Engineer)
Albemarle County Division of Zoning & Current Development (Planner)
Albemarle County Division of Planning (E911)
Albemarle County Division of Planning (Architectural Review Board)
Albemarle County Division of Planning (Historic Preservation)
Albemarle County Division of Planning (Water Protection)
Albemarle County Department of Fire Rescue
Albemarle County Service Authority
Virginia Department of Health
Virginia Department of Transportation
Comments reflect information available at the time the development proposal was reviewed,
and should not be considered final. However, the Site Review Committee has attempted to
identify all issues that could affect approval of the proposed project.
Please make the revisions that have been identified as necessary for preliminary approval by
the Site Review Committee. If you choose not to make the requested revisions, please submit
in writing justification for not incorporating such revisions. Submit eight (8) full size copies and
one (1) 11" x 17" copy to the Department of Community Development including responses to
each of the attached comments of the Site Review Committee by May 19, 2008. Failure to
submit this information by this date will result in suspension of the review schedule. Review will
resume when revisions are submitted along with a reinstatement fee of $65.
Please contact me at your earliest convenience if you have questions or require additional
information.
Sincerely,
Summer Frederick
Senior Planner
Zoning & Current Development
Application #:SDP200800060 Short Review ComL3nts
Project Name: 1st Church of the Nazarene - Prel 1Preliminary - Non - residential
Date Completed:05/02/2008
Reviewer:Andrew Slack E911
Review Status:No Objection
Reviews Comments: ENO OBJECTION.
Date Completed:
Reviewer:Josh Rubinstein Water Resources Manager
Review Status:Pending
Reviews Comments: i For the SDP application to be considered complete, the applicant needs to pay the $400 Tier III
Groundwater Assessment Fee by 1 May. Fee paid 4/23/08
Date Completed:05/05/2008
Reviewer:Jay Schlothauer Inspections
Review Status:Requested Changes
Reviews Comments: ;Based on plans dated March 2008.
Provide an accessible route from the two barrier -free parking spaces on the north side of the site to a
building entrance.
IDue to the size of the building ( >12,000 sq. ft.), it must be provided with a fire sprinkler system. Show
the provisions for this system on the site plan.
Date Completed:04/24/2008
Reviewer:Max Greene Engineer Z &CD
Review Status:Requested Changes
Reviews Comments: 'I SRC 5/8/08
Submittal is blurry and hard to read.
Plan appears to show some kind of retaining wall between the entrance road and parking area, but
can not be deciphered. Please clarify proposal or move the road to allow for a gentle slope.
Travelways between parking areas will need to be redesigned to 10% slopes or less.
VDOT may require road improvements on Ste. Rte. 22.
Health department approval required for drainfield locations.
Date Completed:05/01/2008
Reviewer:Margaret Maliszewski ARB
Review Status:Requested Changes
Reviews Comments: 'This site falls within the Entrance Corridor. Consequently, ARB review and approval are required prior I
to final plan approval. Applications, checklists, guidelines and schedules are available on line at
www.albemarle.org.
Date Completed:05/07/2008
Reviewer:Scott Clark Planning
Review Status:Requested Changes
Page: 1.00 County of Albemarle Printed On: Wednesday, May 07, 2008
Reviews Comments: http: / /www.albemarle.org /upl ' mages /Forms Center) Departments /Board_of Supervisors /Form" - tion_Letters /20071212actions.pdf
1 have reviewed this site plan -- ;ompliance with the conditions of approval for SP 2007 - 00034, a.-.. ,roved by the Board of Supervisors on Dec. 12,
2007. See Attachment 2 of the document linked above for the full text of the conditions
Condition 1: The requirements for scale appear to have been met.
Condition 1(a): The entrance is obscured on the plan. Please revise the plan so that the required right turn lane is visible.
Conditino 1(b): The dumpster area and grading nearby do not seem to meet the requirement for a 20 -foot undisturbed buffer in Section 21.7. This
requirement should be met, or a possible waiver under 21.7.3 should be discussed.
Condition 1(c): The parking limit is met.
Condition 4 requires that "a lighting plan reasonably limiting the amount of adverse light pollutionshall be submitted to the Zoning Administrator for
approval as a condition of preliminary site plan approval." This site plan should not be signed before such a plan is approved.
Condition 7 requires that the building be built to the general design shown at the Dec. 12, 2007 Board meeting, subject to modification by the
Architectural Review Board.
Page: 2.00 County of Albemarle Printed On: Wednesday, May 07, 2008
41J„JJ,,1
Service Auth‘rit
TO: Summer Frederick
FROM: Gary Whelan, Civil Engineer
DATE: May 6, 2008
RE: Site Plan Technical Review for: Church of the Nazarene - Preliminary
SDP200800060
TM 79 -10
The below checked items apply to this site.
X 1. This site plan is not within the Authority's jurisdictional area for:
X A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
X 2. An 16 inch water line is located on site.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
4. A inch sewer line is located approximately distant.
5. An Industrial Waste Ordinance survey form must be completed.
X 6. No improvements or obstructions shall be placed within existing or future
easements.
7.and plans are currently under review.
8.and plans have been received and approved.
X 9. No plans are required.
10. Final and plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
13. City of Charlottesville approval for sewer.
Comments: 16" butterfly valve is labeled as a water meter. Provide a profile of the
existing and proposed grade over the 16" water line.
The site plan does not show or incorrectly shows:
meter locations water line size
waterline locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434977 -4511 • Fax (434)979-0698
www.serviceauthoriy.org
011th/sAftic
4.1
County of Albemarle
Department of Community Development
Memorandum
To:Pastor Bill Willis
From:Summer Frederick, Senior Planner
Division:Zoning & Current Development
Date:May 5, 2008
Subject:SDP2008 -60 1st Church of the Nazarene - Preliminary
The Planner /Engineer for the Zoning & Current Development Division of the Albemarle
County Department Community Development will recommend approve the plan referred
to above when the following items have been satisfactorily addressed. (The following
comments are those that have been identified at this time. Additional comments or
conditions may be added or eliminated based on further review.) [Each comment is
preceded by the applicable reference to the Albemarle County Code.]
1. [Sec. 18- 32.5.6(a)] Please provide a north point arrow and source of
topography.
2. [Sec. 18- 32.5.6(b)] Please provide maximum number of employees and
maximum height of structures.
3. [Sec. 18- 32.5.6(1)] Please show location of existing and /or proposed utility
easements.
4. [Sec. 18- 32.5.6(n)] Please provide dimensions of all proposed improvements,
including: maximum footprint and height of buildings and other structures;
walkways; fences; walls; trash containers; outdoor lighting; landscaped areas
and open space; recreational areas; parking spaces; loading and service areas.
This comment may be best addressed by providing additional sheets for
various areas of required information.
Please contact Summer Frederick at the Department of Community Development 296-
5832 ext. 3565 for further information.
1
pfi>t- L
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
ViiginiaDOT.org
David S. Ekern, P.E.
COMMISSIONER
May 7, 2008
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments May 8, 2008 site review meeting
Dear Mr. Brooks:
Below are VDOT's comments on the Site Plans for the May 8, 2008 Site Review Committee
Meeting:
SDP 2008 - 00059 Olinva and sons - Major (Megan Yaniglos)
No comments
SDP 2008 - 00060 First Church of the Nazarene — Preliminary (Summer Frederick)
VDOT has previously reviewed the configuration and location of the turn land and
entrance and it does appear to be in accordance with past meetings and comments from
VDOT.
The construction of VDOT project 0022 - 002 -104 will begin May 12` 2008. This plan
needs to, and appears to be, designed to the changes by the intersection project. Final
plans should show the proposed intersection project and how the proposed turn lane and
entrance will tie in to that project. VDOT has provided the developer the survey data and
that needs to be shown on the final plan.
SDP - 2008 - 00061 Easrlysville Business Park - Final (Summer Frederick)
The sag vertical curve at station 21 +44 needs to have a minimum k value of 17.
Outlet protection at A 1 should be class II rip rap
SDP - 2008 - 00064 Georgetown/Hydraulic Professional Offices Preliminary (Lisa Glass)
Previous comments have been made for ZMA -2006- 00014 that still need to he addressed
and are:
OYEASS0OOE
TRANSPORTATION EXCELLENCE
6 2 0 0
This plan must be coordinated with the VDOT project for Georgetown Road. The project
manager has been forwarded a copy of this plan. The applicants engineer should contact
VDOT for coordination.
It is very undesirable to have the entrance in the functional area of the intersection,
however, a previous meeting with the engineer and the county determined that this is the
best solution at this site for Hydraulic Road. The only other option is to access the site
from Georgetown Road.
The plan needs to show the intersection of 656 and 743 and show details of turn
movements, lane widths, storage lengths, etc. All projected and existing traffic needs to
be shown on the plan.
Sight lines need to be shown for the entrance to the site and also for the existing
intersection at 656/743.
Vehicles heading northbound on Hydraulic trying to turn left into the site is a dangerous
situation and needs to he addressed with the site plan.
Proposed traffic needs to be shown on the site plan to determine is a Chapter 527 study
needs to be done.
SDP- 2008 -00065 Moser Radiation Therapy Ctr -Major (Gerald Gatobu)
LTACH access management plan should be completed prior to any site plan approvals.
SDP - 2008 -00066 Hunters Way Site Plan Amendment -Major (Lisa K Glass)
The plan needs to include calculations for outlet velocity on YD I and outlet protection
details. Also include ditch calculations.
SUB -2008- 00102 Handley Farm Estates(10 -19) lots -Final (Megan Yaniglos)
No comments.
Please request the applicants provide a written description of revisions with re- submissions. If you
have any questions or comments, please contact me prior to sharing these comments with the
applicants.
Sincerely,
Joel DeNunzio, P.E.
Residency Program Manager
VDOT Charlottesville Residency
434 -293 -0011
cc Bill Fritz, David Benish, Juan Wade, Elaine Echols, Joan McDowell, Judith Wiegand,
Margaret Maliszewski, David Pennock, Francis McCall, Jon Sharp, Summer Frederick, Patrick
Lawrence, and John Giometti
Thomas Jefferson Soil and Water Conservation District May 14, 2008
2134 Berkmar Dr
Charlottesville, VA 22901
975-0224
TO:Summer Frederick
Planning Department
RE:Soils Report and Comments for:
1 Church of the Nazarene
A
i ,-*/I A V .....,ItQt
l
cm
4
E; ,
q _ M
o
5 v 11 U
a
N1119m J /1 N
li
0
co ,
N
n 4 ---- 14:
P ,51D
1
e F O .itCJ
AIv
cn w q N O
N
rn ni
1 4,-' 0'
v fl N
I 10 I io w
Q
s- AtA
N W
p0 cry x :.w
w IIIMIPi5IIUritv
o
N=
CO
Q t rn. R I n
fl .,,,0 C°
f:1"-I '''''''' '713) iii° \a
al
1<r'—N ,I n NI
S 0 Q,W Y,W ..S
1 v
O
1 i cli
I
l (co
r
lhl
y ,J I Y
V f
VtiX 1S t ,I
y)
t• ,,..j tt, I I
i ,,
T 0
8 , flPf,1
J Y N lv Cl s A
co
n ;2773 /, )ft„, aI7vkf ,\,,,' - r t
Q 0,SAC'Nm:r 1 ,
sc
fix,, ^,„
USDA United States Dural Prepared by: Tho Jefferson Soil & Water
Department of Resources Conservation District
Agriculture Conservation 434 - 975 -0224
Service
Soils Report
SOILS REPORT FOR: 1 Church of Nazarene
Soil Survey Area: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map Unit: 23C Davidson clay loam, 7 to 15 percent slopes
Description Category: Virginia FOTG
Davidson is a strongly sloping to moderately steep, very deep, well drained soil. Typically the surface layer is
clay loam about 4 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderate. It has a moderate available water capacity and a low shrink swell potential. This soil is
not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 6e. The Virginia soil management group is N. This soil is not hydric.
Map Unit: 51B Manteo channery silt loam, 2 to 7 percent slopes
Description Category: Virginia FOTG
Manteo is a gently sloping to moderately sloping, shallow, somewhat excessively drained soil. Typically the
surface layer is channery silt loam about 6 inches thick. The surface layer has a moderately low content of organic
matter. The slowest permeability is moderately rapid. It has a very low available water capacity and a low shrink
swell potential. This soil is not flooded and is not ponded. The seasonal high water table is at a depth of more
than 6 feet. The land capability classification is 4e. The Virginia soil management group is JJ. This soil is not
hydric.
Map Unit: 51D Manteo channery silt loam, 15 to 25 percent slopes
Description Category: Virginia FOTG
Manteo is a moderately steep to steep, shallow, somewhat excessively drained soil. Typically the surface layer is
channery silt loam about 6 inches thick. The surface layer has a moderately low content of organic matter. The
slowest permeability is moderately rapid. It has a very low available water capacity and a low shrink swell
potential. This soil is not flooded and is not ponded. The seasonal high water table is at a depth of more than 6
feet. The land capability classification is 7e. The Virginia soil management group is JJ. This soil is not hydric.
Map Unit: 71C Rabun clay loam, 7 to 15 percent slopes
Description Category: Virginia FOTG
Rabun is a strongly sloping to moderately steep, very deep, well drained soil. Typically the surface layer is clay
loam about 6 inches thick. The surface layer has a moderately low content of organic matter. The slowest
permeability is moderate. It has a moderate available water capacity and a low shrink swell potential. This soil is
not flooded and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land
capability classification is 6e. The Virginia soil management group is N. This soil is not hydric.
Map Unit: 71D Rabun clay loam, 15 to 25 percent slopes
Description Category: Virginia FOTG
Rabun is a moderately steep to steep, very deep, well drained soil. Typically the surface layer is clay loam about
6 inches thick. The surface layer has a moderately low content of organic matter. The slowest permeability is
moderate. It has a moderate available water capacity and a low shrink swell potential. This soil is not flooded
Thomas Jefferson SWCD 1 5/15/08
and is not ponded. The seasonal high water table is at a depth of more than 6 feet. The land capability
classification is 6e. The Virginia soil management group is N. This soil is not hydric.
Small Commercial Buildings - Dominant Condition
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name Rating
23C Davidson clay loam, 7 to Very limited
15 percent slopes
51B Manteo channery silt Very limited
loam, 2 to 7 percent slopes
51D Manteo channery silt Very limited
loam, 15 to 25 percent
slopes
71C Rabun clay loam, 7 to 15 Very limited
percent slopes
71D Rabun clay loam, 15 to 25 Very limited
percent slopes
Septic Tank Absorption Fields - Dominant Condition
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name Rating
23C Davidson clay loam, 7 to Somewhat limited
15 percent slopes
51B Manteo channery silt Very limited
loam, 2 to 7 percent slopes
51D Manteo channery silt Very limited
loam, 15 to 25 percent
slopes
71C Rabun clay loam, 7 to 15 Somewhat limited
percent slopes
7I D Rabun clay loam, 15 to 25 Very limited
percent slopes
Mapunit Hydric Rating
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name Rating
Thomas Jetterson SWCD 2 5/15/08
23C Davidson clay loam, 7 to Not hydric
15 percent slopes
51B Manteo channery silt Not hydric
loam, 2 to 7 percent slopes
51D Manteo channery silt Not hydric
loam, 15 to 25 percent
slopes
71C Rabun clay loam, 7 to 15 Not hydric
percent slopes
71D Rabun clay loam, 15 to 25 Not hydric
percent slopes
Soil Shrink - Swell - Dominant Soil
Top Depth : 0
Bottom Depth : 0
Soil Survey: Albemarle County, Virginia
Survey Status: Published
Correlation Date: 12/01/1981
Distribution Date: 10/21/2002
Map
Symbol Soil Name Rating
23C Davidson clay loam, 7 to 1.5
15 percent slopes
51B Manteo channery silt 1.5
loam, 2 to 7 percent slopes
51 D Manteo channery silt 1.5
loam, 15 to 25 percent
slopes
71C Rabun clay loam, 7 to 15 1.5
percent slopes
71D Rabun clay loam, 15 to 25 1.5
percent slopes
Thomas Jefferson SWCD 3 5/15/08