Loading...
HomeMy WebLinkAboutSDP200800065 Calculations 2008-08-01D-qffiic Analysis Northridge Development Albemarle County, Virginia Prepared for: University of Virginia Health Services Foundation January 2oo8 Revised August 2oo8 Kimley -Horn and Associates, Inc, 2008 Traffic Analysis for Northridge Development Albemarle County, Virginia Prepared for: University of Virginia Health Services Foundation Prepared by: Kimley -Horn and Associates, Inc. Suite 1050 222 Central Park Avenue Virginia Beach, Virginia 23462 P: 757.213.8600 F: 757.213.8601 117008000 January 25, 2008 Revised August 11, 2008 Table of Contents i.o EXECUTIVE SUMMARY ................ ............................... t 2.o INTRODUCTION .......................... ............................... 3 3.0 PROJECT BACKGROUND ............. ............................... 5 3.1 STUDYAREA .......................................................................... ..............................5 3.2 EXISTING LAND USE .............................................................. ..............................5 3.3 EXISTING CONDmoNS ........................................................... ..............................5 3.4 EXISTING TRAFFIC ............................................................... ............................... 6 4.0 PARKING GENERATION .............. ............................... 8 4.1 EXISTING NORTHRIDGE BUILDING PARKING OCCUPANCY ......... ............................... 8 4.2 PROPOSED NORTHRIDGE DEVELOPMENT PARKING GENERATION .............................. 9 4.3 EXISTING SIm MAINTENANCE FACILITY PARKING OCCUPANCY ............................... 11 4.4 EXISTING MOSER RADIATION THERAPY CENTER PARKING OCCUPANCY ................... 12 4.5 KIRTLEY PROPERTY PARKING GENERATION ............................. .............................13 5.o TRAFFIC GENERATION ................ .............................15 5 .1 PROPOSED DEVELOPMENT TRIP GENERATION ......................... ............................... 15 5 .2 ADDITIONAL DEVELOPMENT TRIP GENERATION ....................... .............................16 6.o TRAFFIC DISTRIBUTION .............. .............................17 7. o SITE ACCESS AND TRAFFIC ASSIGNMENT ................. 9 8.o PROJECTED TRAFFIC VOLUMES .............................. 20 8.1 HISTORIC TRAFFIC GROWTH ............................................... ............................... 20 8.2 TOTAL TRAFFIC ................................................................. ............................... 20 9 . o TRAFFIC ANALYSIS ................... ............................... 25 9.1 IVY ROAD /SERVICE ENTRANCE ............................................... .............................26 9.2 IVY ROAD / NORTHRIDGE MAIN ENTRANCE ............................. ............................... 27 9.3 IVY ROAD / MOSER ENTRANCE ............................................. ............................... 30 i-o.o CONCLUSIONS AND RECOMMENDATIONS .............31 APPENDIX....................................... ............................... 34 Nordwidge Development i . o Executive Summary August 11, 2008 The Northridge Development is proposed to be located on Ivy Road adjacent to the existing Northridge building in Albemarle County, Virginia. Figure I illustrates the site location. The proposed development is planned to include a new, 62,000 square foot (sf) building consisting of a 54,000 sf long term acute care (LTAC) facility (40 adult beds and 10 pediatric beds) and 8,000 sf of radiology support services. In the vicinity of the proposed development (located on the Kirtley property), a small office building and a warehouse have been acquired by the University of Virginia (UVA) and will be maintained with similar uses by the UVA Health Services Foundation. Parking to support the proposed development cannot be provided solely on the existing Northridge property. In order to provide sufficient parking for existing Northridge patients and future LTAC /radiology patients, the following are recommended: Modify the Northridge and Sieg parking lots to provide additional parking to acconumodate demand from the proposed Northridge development I Provide an interparcel connection between the Northridge and Sieg parking lots such that employees can choose to park at either lot Although it is not necessary to assign employees to one particular parking site given the interparcel connection, consider assigning 71 employees (existing Northridge or future LTAC /radiology) to the Sieg lot to provide more convenient parking for patients Consider allowing up to 12 LTAC /radiology employees to park in the surplus spaces on the existing Kirtley property near the warehouse building to reduce the number of employees that must park on the Sieg property K Pursue a waiver for the additional parking spaces being required by the County at the Moser Radiation Therapy Center such that no additional spaces need to be provided exclusively for that facility Periodically monitor actual parking conditions and adjust staff parking operations accordingly The number of new trips generated by the site is considerably low and will minimally increase the volume of traffic on Ivy Road and at study area intersections. To mitigate potential operational issues and provide for acceptable levels of service throughout the study area, the following are recommended: lvy Road/Serviee Entrance a Maintain existing laneage and traffic control Page 1 Northridge Development August 11, 2008 Restripe existing pavement markings (existing markings are faded and difficult to discern) Ivy Road/Northridge Main Entrance Maintain existing laneage Restripe existing pavement markings (existing markings are faded and difficult to discern) Consider modifying current pavement markings in center lane (two -way left -turn lane) by striping an exclusive eastbound left -turn lane Install a traffic signal to facilitate southbound movements from the Northridge Main Entrance Ivy Road/Moser Entrance Maintain existing laneage and traffic control Page 2 Northridge Development 2.0 Introduction August 11, 2008 The Northridge Development is proposed to be located on Ivy Road adjacent to the existing Northridge building in Albemarle County, Virginia. In general, the site is bounded by a Volvo dealership to the west, a Fleet Operations building to the east, Ivy Road to the south, and the CSX Railroad to the north. As shown in Figure 1, Ivy Road runs in an east/west direction and connects to the U.S. Route 29/250 Bypass to the east of the site. The proposed development is planned to include an approximately 62,000 square foot (sf) building to contain the following: Long term acute care facility - 54,000 sf (40 adult beds and 10 pediatric beds) Radiology support services -8,000 sf The anticipated construction and occupancy timeline for the proposed building is approximately two years -2010. The proposed building is planned to occupy an undeveloped portion of the existing Northridge property, as well as part of the existing Kirtley property, which was previously occupied by TJMF Distribution Center and the Lee Tennis Products office building. Both the warehouse and the office building have been acquired by UVA and will be maintained with similar uses by the UVA Health Services Foundation. Kimley -Horn and Associates, Inc. (KHA) has been retained to perform a traffic impact analysis for the proposed development. This report has been prepared for submittal to Albemarle County to evaluate existing conditions as well as future traffic conditions that include the proposed project. Page 3 0 40ofn North Flardon r 2006 Mar<)' st m-006 NAVTEC Kimley-Horn and Associates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES. INC Syr, Farmington 5 CW Ednam Forest 8R r 2006 Mar<)' st m-006 NAVTEC Kimley-Horn and Associates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES. INC Northridge Development 3.0 Project Background 3.1 Study Area The study area for this analysis includes the following roadways and intersections: Roadways Ivy Road (U.S. Route 250) Intersections August 11, 2008 Ivy Road/Moser Entrance (existing Sieg Maintenance Facility and Moser Radiation Clinic) Ivy Road/Northridge Main Entrance (existing Northridge building) Ivy Road/Service Entrance (former TJMF Distribution Center and Lee Tennis Products) 3.2 Existing Land Use Land use and development in the study area include medical, office, commercial, and industrial uses. In the vicinity of the proposed development, there is a medical office building, a warehouse, a small office building, and a Volvo dealership. 3.3 Existing Conditions Ivy Road (U.S. Route 250) is the primary thoroughfare within the study area. U.S. Route 250 runs parallel to Interstate 64 between Richmond and Staunton, from which point it continues northwest into West Virginia, eventually connecting to Interstate 79. Regionally, Ivy Road provides access to the U.S. Route 29/250 Bypass and to the University of Virginia. Within the study area, Ivy Road is a three -lane roadway with a two -way left -turn lane (TWLTL). Several signalized intersections are located along Ivy Road, as well as numerous unsignalized driveways. The posted speed limit on Ivy Road is 45 miles per hour. Traffic counts estimated by the Virginia Department of Transportation (VDOT) indicate that in 2007, Ivy Road was carrying approximately 14,000 vehicles per day (vpd) in the vicinity of the proposed development. Traffic counts were conducted by Kinley -Hom and Associates, Inc. in November 2006 on Ivy Road, and these counts indicated that the average weekday daily traffic (ADT) volume was approximately 17,800 vpd. Existing roadway laneage for study area roadways and intersections is illustrated in Figure 2. Page 5 Northridge Development 3.4 Existing Traffic August 11, 2008 AM and PM peak hour weekday turning movement counts were performed by Peggy Malone and Associates, Inc. at the following study intersections: Ivy Road/Moser Entrance — August 6, 2008 Ivy Road/Northridge Main Entrance — November 15, 2006 Ivy Road/Service Entrance — November 15, 2006 The recent turning movement count at the Ivy Road/Moser Entrance intersection was conducted at the request of the County to provide additional data for this updated report. In comparing the peak hour volumes counted in November 2006 to the volumes at the adjacent Moser Entrance intersection counted in August 2008, it was determined that the late 2006 volumes along Ivy Road are higher than those counted in 2008. The through volumes at the Ivy Road/Moser Entrance intersection were increased to balance with the late 2006 volumes and provide a conservative base for analysis. Peak hour turning movement volumes at study intersections are shown in Figure 2. It should be noted that a new 12 -hour turning movement count was conducted at the Ivy Road/Northridge Main Entrance intersection on July 22, 2008 in order to evaluate warrants for traffic signalization. While this count included the AM and PM peak hours, the data from late 2006 were utilized for all peak hour analyses in this study in order to maintain consistency. In addition to turning movement counts, an ADT volume count was conducted on Ivy Road on November 14 and 15, 2006. This count indicated an ADT volume of 17,800 vpd. Page 6 Existing (Late 2006) FIGUREM" Northridge Development Peak Hour Kimley -Horn Albemarle County, Virginia Turning Movement Counts 2andAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND WROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAMON BY KINI EY -HORN AND ASSOCIATES, INC. SHAM BE WITHOUT LIABB.HY TO KRALEY -HORN AND ASSOCIATES, INC North Not to Scale UCf6 C W c cc c cc ca c W CD W UC 2-1 L coO N N O Z co t2 N f7 I N 26 (3) (W,_ 115 (8)Ilk 12 (0) 4 — 399 (944) y 4 404 (890)4 — 516 (916) 0) 7 1) 16 —1 0) 4 Ivy Road 464)979 —o 494)1028 10 609)1046 —0 Legend OUnsignalaed Intersection 4 Laneage XX (XX) - AM (PM) Peak Hour Volume Existing (Late 2006) FIGUREM" Northridge Development Peak Hour Kimley -Horn Albemarle County, Virginia Turning Movement Counts 2andAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND WROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAMON BY KINI EY -HORN AND ASSOCIATES, INC. SHAM BE WITHOUT LIABB.HY TO KRALEY -HORN AND ASSOCIATES, INC Northridge Development 4.0 Parking Generation August 11, 2008 No new parking is planned to be provided exclusively for the proposed Northridge development. The parking lot at the existing Northridge building will be modified to accommodate the main entrance and drop -off for the proposed Northridge development. Likewise, the existing parking lot adjacent to the office building will be modified to accommodate a drop -off for patient transfer vehicles. Parking generation potential for the existing and proposed land uses was calculated using parking generation rates published in Parking Generation (Institute of Transportation Engineers [ITE], 3' Edition, 2004) to determine if the existing parking areas will be adequate to support the addition of the proposed Northridge development. Parking demand generated by ITE was compared to actual parking occupancy counts for the existing Kirtley, Northridge, Sieg, and Moser properties. Existing parking inventory and hourly occupancy data previously were collected at the on Wednesday, December 5, 2007. Because this was a snowy day, the County requested that parking data be collected on two additional standard business days. Kimley -Horn collected hourly parking occupancy data on Wednesday, July 16, 2008 from 10:00 AM to 6:00 PM and on Thursday, July 17, 2008from 8:00 AM to 4:00 PM. For each hour of the day, the higher of the two parking counts was used. 4.1 Existing Northridge Building Parking Occupancy ITE Code 720 (Medical- Dental Office Building) was used to approximate the parking generation potential of the existing 58,770 sf Northridge building. In addition, Kimley -Horn verified existing parking inventory and collected actual occupancy data in July 2008. Staff and visitor parking were counted separately; however, they are combined for analysis purposes. The actual occupancy counts were compared to parking demand generated by ITE, and the actual occupancy data were found to be higher at all hours. The actual occupancy counts were therefore used for existing parking demand. Table 1 below summarizes the parking demand at the Northridge building by the hour and indicates the number of remaining (unoccupied) parking spaces. Any facility that is at least 90% occupied is considered "full" by industry standards to account for circulation, turnover, and access. The number of available spaces has accordingly been reduced to account for 90% occupancy rather than 100 % in order to maintain some surplus for circulation and turnover. A total of 253 parking spaces (88 staff and 165 visitor) are currently provided at the Northridge site. Page 8 Notthtidge Development August 11, 2008 With the proposed modifications, 269 total parking spaces will be provided in the future. The unoccupied and available parking spaces determined below are based on a supply of 269 spaces. Table 1— Hourly Parking Demand at Existing Northridge Building HourBeginning 8:00 AM ParkingDemand 106 Unoccupied 163 Actual Parking Spaces 137 9:00 AM 196 73 47 10:00 AM 210 59 33 11:00 AM 223 46 20 12:00 PM 199 70 44 1:00 PAR 186 83 57 2:00 PAR 225 44 18 3:00 PAR 197 72 46 4:00 PAR 189 80 54 5:00 PAR 85 184 158 6:00 PAR 16 253 227 Table f indicates that only 18 parking spaces are available during the peak demand period (2:00 PM to 3:00 PM). 4.2 Proposed Northridge Development Parking Generation Parking Generation does not provide specific rates for Long Term Acute Care (LTAC) facilities or for Radiology Support Services as proposed for the development. Based on conversations with the architect, equivalent land uses were determined that would represent similar travel patterns for the proposed uses. 117E Code 620 (Nursing Home) was used for the LTAC due to low peak hour and daily parking /traffic generation observed at existing LTAC facilities. To provide a worst case scenario, parking demand was generated based on gross floor area. Parking generation for the LTAC based on gross floor area (54,000 sf) results in a demand significantly higher than if generated based on beds (50 beds). Even considering the projected number of 50 employees, parking demand is still highest when calculated using the gross floor area. ITE Code 720 Medical- Dental Office Building) was used to generate parking demand for the 8,000 sf Radiology Support Services. Table 2 below summarizes the parking generation potential of the proposed Northridge development by the hour. Page 9 Northridge Development August 11, 2008 Table 2— Hourly Parldng Generation Potential of Proposed Northridge Development Hour Beginning 8:00 AM LTAC Parking Demand 31 Radiology Demand 14 Demand 45 9:00 AM 35 24 59 10:00 AM 33 29 62 11:00 AM 34 29 63 12:00 PM 34 25 59 1:00 PM 35 23 58 2:00 PM 57 25 82 3:00 PM 57 28 85 4:00 PM 31 26 57 5:00 PM 14 21 35 6:00 PM 13 10 23 Table 2 indicates a total parking demand of 85 vehicles during the peak parking period (3:00 PM to 4:00 PM). Because the peak parking period occurs close to the peak period at the existing Northridge facility, the parking demand was compared to available spaces at the existing facility to determine whether additional parking spaces will be required. Table 3 summarizes the total parking demand and availability. Table 3— Hourly Parldng Space Allocation Hour Beginning 8:00 AM NorthridgeExisting Parking Demand 106 Existing Parking 9i 137 Proposed Development 45 Spaces 92 9:00 AM 196 47 59 12 10:00 AM 210 33 62 29 11:00 AM 223 20 63 43 12:00 PM 199 44 59 15 1:00 PM 186 57 58 1 2:00 PM 225 18 82 64 3:00 PM 197 46 85 39 4:00 PM 189 54 57 3 5:00 PM 85 158 35 123 6:00 PM 1 16 227 23 204 As indicated in Table 3, there is not sufficient parking supply at the existing Northridge building to accommodate the parking demand from the proposed Northridge development during the operating hours from 9:00 AM to 5:00 PM. In order to accommodate the additional parking demand and maintain a 10% surplus to account for circulation and turnover, an additional 64 parking spaces are needed to accommodate parking demand for the existing and proposed Northridge buildings. Page 10 Nortluidge Development 4.3 Fxlsting Sieg Maintenance Facility Parking Occupancy August 11, 2008 In order to meet the anticipated parking demand, the UVA Health Services Foundation has indicated that they will commit to relocating some employees to the adjacent Sieg maintenance facility parking area. hi order to determine the potential for future Northridge employee parking at the Sieg maintenance facility, K.imley -Horn also collected parking occupancy data at the site in July 2008. The actual occupancy counts were compared to parking demand generated by ITE Code 150 (Warehousing) for the existing 22,610 sf building, and the actual occupancy data were found to be higher at all hours. The actual occupancy counts were therefore used for existing parking demand. Table 3 below summarizes the parking demand at the Sieg maintenance facility by the hour and indicates the number of remaining (unoccupied) parking spaces as well as the actual number of spaces available considering 90% occupancy as "full." A total of 64 parking spaces are currently provided at the Sieg maintenance facility. With the proposed modifications to the site, 87 total parking spaces will be provided in the future. The unoccupied and available parking spaces determined below are based on a supply of 87 spaces. Table 3— Hourly Parldng Demand at Existing Sieg Maintenance Facility 8:00 AM Parking Demand 18 Unoccupied Parkingspaces 69 Actual Parking Spaces 90 61 9:00 AM 17 70 62 10:00 AM 19 68 60 11:00 AM 17 70 62 12:00 PM 21 66 58 1:00 PM 18 69 61 2:00 PM 17 70 62 3:00 PM 23 64 56 4:00 PM 16 71 63 5:00 PM 14 73 65 6:00 PM 14 73 65 Based on the existing occupancy data, Table 3 indicates that at least 56 parking spaces are available during all hours of the day. While the number of available spaces is eight spaces less than the calculated requirement of 64 additional parking spaces for the proposed facility, it is anticipated that that the parking supply at both the Northridge and Sieg sites will be enough to meet the parking demand of the existing Northridge building, the proposed Northridge development, and the Sieg maintenance facility because of the very conservative parking analyses that have been performed. Page 11 Northridge Development August 11, 2008 Parking analyses were conducted to represent a worst case scenario. In all cases, parking demand was determined using the independent variable that generated the highest peak demand or from actual occupancy counts which indicated a higher demand than calculated. In addition, the parking analyses considered conditions in which a 90% occupancy condition was considered full." It is anticipated that all employees, patients, and visitors can be accommodated while maintaining at least a 10% surplus at the Northridge site. The 64 additional parking spaces can be accommodated at the Sieg site if the 10% surplus is consumed at that location; however, a higher level of occupancy can be achieved there since it will provide parking only for employees of the facilities. Because employee parkers who are assigned to a specific parking facility will typically park in the same facility every day, they are not deterred by the need to circulate to find an available parking spot. It is also anticipated that this analysis has overstated the potential parking demand for the facilities. Actual parking conditions should be monitored periodically and adjustments should be made accordingly. An interparcel connection will be provided between the existing Northridge and Sieg sites that will allow employees to enter one site and circulate to find a parking space at either site without needing to access Ivy Road. Because of this connection, it is not necessary to assign employees to one particular parking site. However, if the UVA Health Services Foundation chooses to assign employees to specific parking areas, it is suggested that a parking rate of 0.9 vehicles per employee (ITE Code 620) be utilized. For example, the 64 parking spaces needed on the Sieg site to accommodate Northridge and LTAC parkers would result in the need for 71 employees to be assigned to the Sieg site. The Foundation may choose to reassign either existing Northridge employees, future LTAC employees, or a combination of the two because parking will be shared between the two facilities. 4.4 Existing Moser Radiation Therapy Center Parking Occupancy The County has recently indicated that, based on code, an additional 14 parking spaces need to be constructed at the Moser Radiation Therapy Center to accommodate a planned building addition. In order to evaluate parking conditions at the existing site, Kimley -Horn also collected parking occupancy data at the site in July 2008. The actual occupancy counts were compared to parking demand generated by ITE Code 720 (Medical- Dental Office Building) for the existing 7,173 sf building, and the actual occupancy data were found to be significantly lower at all hours. Table 4 below summarizes the parking demand at the Moser Radiation Therapy Center by the hour and indicates the number of remaining (unoccupied) parking spaces as well as the actual Page 12 Northridge Development August 11, 2008 number of spaces available considering 90% occupancy as "full." The unoccupied and available parking spaces determined below are based on the existing supply of 22 total spaces at the Moser Radiation Therapy Center. Table 4— Hourly Parldng Demand at Existing Moser Radiation Therapy Center HourBeginning 8:00 AM Parking Demand 5 Unoccupied Parking Spaces 17 Actual Parking Spaces 90 15 9:00 AM 7 15 13 10:00 AM 11 11 9 11:00 AM 10 12 10 12:00 PM 10 12 10 1:00 PM 10 12 10 2:00 PM 11 11 9 3:00 PM 10 12 10 4:00 PM 8 14 1 12 5:00 PM 4 18 16 6:00 PM 1 21 19 Based on the existing occupancy data, Table 4 indicates that at least nine parking spaces are available during all hours of the day. The UVA Health System has indicated that the proposed addition to the Moser Radiation Therapy Center will add four additional staff members and a maximum of four additional patients. Assuming that one parking space will be needed for each additional staff member and patient, it is anticipated that the existing parking lot at the Moser Radiation Therapy Center can accommodate any additional traffic associated with the expansion. It is therefore recommended that a waiver be pursued for the additional parking spaces being required by the County for this facility. 4.5 Kirtley Property Parking Generation It is anticipated that some parking spaces will be available on the existing Kirtley property near the warehouse building. While it is not recommended that any of the parking spaces on the existing Kirtley property be used for LTAC or Northridge employee parking, this parking has been evaluated to ensure that a sufficient supply is provided for the office and warehousing uses on the site. Existing parking occupancy data could not be collected at the existing office and warehouse buildings on the Kirtley property as they are both currently vacant. However, parking generation potential was determined based on ITE rates. ITE Code 710 (General Office) was used to generate parking demand for the 4,300 sf office building. ITE Code 150 (Warehousing) was used to generate parking demand for the 23,000 sf warehouse building. Page 13 Northridge Development August 11, 2008 Table 5 below summarizes the hourly parking generation potential of these facilities. A total of 62 parking spaces (21 office and 41 warehouse) are currently provided on the Kirtley property. However, the County has indicated that 17 of the existing parking spaces which are provided on a steep grade will not be accepted. With the proposed modifications to the site and the removal of the sub - standard spaces, 34 total parking spaces (10 office and 24 warehouse) will be provided in the future. The unoccupied and available parking spaces determined above are based on a supply of 34 spaces. Table 5— Rourly Parldng Generation Potential of Existing Kirtley Property iourBeginning. it Office Parking Demand Warehouse Parking Demand Total Parking Demand Unoccupied Parking Spaces Actual Parking Spaces Available (90 %) MERITITI ) , : , i is , Table 5 indicates that at least 12 parking spaces will be available on the Kirtley property, even during peak times. The 1JVA Health Services Foundation may choose to allow a select number of LTAC employees to park near the Kirtley warehouse to reduce the number of employees that must park on the Sieg property. Page 14 Northridge Development 5.o Traffic Generation August 11, 2008 Traffic generation potential for the proposed development was determined using traffic generation rates published in Trip Generation (Institute of Transportation Engineers [ITE], 7t " Edition, 2003). 5.1 Proposed Development Trip Generation Table 6 summarizes the estimated traffic generation potential for the proposed development under the future build -out (2010) scenario. Trip Generation does not provide specific rates for Long Term Acute Care (LTAC) facilities or for Radiology Support Services as proposed for the development. Based on conversations with the architect, equivalent land uses were determined that would represent similar travel patterns for the proposed uses. ITE Code 620 (Nursing Home) was used for the LTAC due to low peak hour and daily traffic generation observed at existing LTAC facilities. ITE Code 720 (Medical- Dental Office Building) was used to approximate the trip generation potential of the Radiology Support Services. Table 6— Proposed Development Trip Generation —Full Build -out Table 6 indicates the proposed development having the potential to generate a total of 618 new daily trips, 41 of those occurring in the AM peak hour and 53 occurring in the PM peak hour. In the vicinity of the proposed development (located on the Kirtley property), a small office building and a warehouse have been acquired by UVA and will be maintained with similar uses by the UVA Health Services Foundation. Because these buildings were occupied by their former tenants at the time of the data collection (November 2006), trips associated with these uses are included in the existing traffic counts and will not be generated as new site trips. Page 15 ivote: A alrectlonal aistnbution of 69% entering and 31% exiting was assumed based on AM Peak Hour of the Generator data using "beds" as an independent variable. Northridge Development August 11, 2008 5. Additional Development Trip Generation Based on continents received from Albemarle County staff, it was determined that the proposed addition to the Moser Radiation Therapy Center should be considered in this analysis. Any additional redevelopment or smaller development that might take place in the vicinity of the site will be accounted for in the annual growth rate used to generate the background traffic volumes. A plan to construct a 3,591 sf addition to the existing 7,173 sf Moser Radiation Therapy Center is currently being reviewed by Albemarle County. This proposed addition is anticipated to be constricted prior to the full build -out of the Northridge development. Table 7 summarizes the proposed new trips that may be generated in the vicinity of the Northridge development. Table 7— Additional Development Trip Generation The UVA Health System has indicated that the proposed addition to the Moser Radiation Therapy Center will add four additional staff members and a maximum of four additional patients. In order to provide a worst case scenario, trips were generated based on gross floor area. It should be noted, however, that the estimated daily trips are higher than what seems reasonable given the anticipated staff and patient load. The equations for ITE Code 720 would normally be used because the R value is greater than 0.75; however, because of the small size of the addition, this resulted in negative trips. Page 16 Norduidge Development 6.o Traffic Distribution August 11, 2008 The directional distribution and assignment of trips generated by a development is typically based on a review of existing roadway volumes, an understanding of travel patterns within the study area, and from assumptions of anticipated shifts in travel patterns due to the construction of the development. In the case of the proposed development, directional distribution was determined from the existing Northridge building, a similar land use. The following distribution applies to the 2010 development condition: 85% to /from the east on Ivy Road 15% to /from the west on Ivy Road Site traffic distribution is illustrated in Figure 3. Page 17 C mF1 Northridge Development FIGURE Kimley -Horn Albemarle County, Virginia Trip Distribution 3andAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIIEY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIABEY -HORN AND ASSOCIATES, INC North Not to Scale 8 cn3 c w c v c M b W c w aTrn H U L O M N Z e o o o R_1 60%20% 15%5%f—5%(5%)55% 85% 15% — 0 15% 1 75 %) 10 Ivy Road 5 %) 0 Legend OUnsignal¢ed Intersection XX (XX)Inbound (Outbound) Trips C m F1 Northridge Development FIGURE Kimley -Horn Albemarle County, Virginia Trip Distribution 3andAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIIEY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIABEY -HORN AND ASSOCIATES, INC Northridge Development August 11, 2005 7.0 Site Access and Traffic Assignment Ivy Road (U.S. Route 250) will be the primary corridor providing access to the proposed development. The main entrance to the proposed building will be located on the east side of the building at the parking (ground) level. As a result, all visitors and patients will utilize the Northridge Main Entrance, which will also continue to serve the existing Northridge building. As described in Chapter 4.0, staff from the existing Northridge building and/or the proposed development will be required to park near the Sieg maintenance facility in the future. Given the anticipated parking arrangement, it is expected that some proposed Northridge traffic will utilize the existing Moser Entrance to access the improved Sieg parking lot. However, because a traffic signal is proposed at the Northridge Main Entrance, it is anticipated that a significant portion of the vehicles parking at Sieg will utilize the interparcel connection and exit via the signalized entrance. It is therefore assumed that a small portion of proposed Northridge traffic will utilize the unsignalized Moser Entrance for outbound trips and that a slightly large portion will utilize this entrance for inbound trips. All other proposed Northridge traffic will utilize the Northridge Main Entrance. An ambulance /transfer vehicle drop -off will be provided on the west side of the proposed building. Due to the elevation change over the two adjacent properties, this entrance will provide direct access to the second floor Long Term Acute Care (LTAC) facility. The existing Service Entrance will therefore provide access to a very small portion of proposed LTAC traffic and will continue to provide access to the existing warehouse and two -story office buildings. It is assumed that approximately 5% of LTAC traffic will utilize the Service Entrance. Page 19 Northridge Develolmumt August 11, 2008 8.o Projected 'Traffic Volumes 8..1 Historic Traffic Groff historic traffic grov,41x is the increase in traffic volumes due to usage increases and non - specific growth throughout an area. One method of determining reasonable growth rates for an area is to research past traffic counts for a roadway or intersection. The following are traffic counts from the VDOT count program: Ivy Road r 2007 14,000 vehicles per day (vpd) 2006 - 14,000 vpd 2005 -15,000 vpd 2004 -14,000 vpd 2003 -13,000 vpd c 2002 -14,000 vpd 2001 -12,000 vpd Based on the VDOT data, a conservatively high background growth rate of 5.5% was used in this study. hi addition to applying growth rates to both Jefferson Avenue and Bland Boulevard, future traffic volumes anticipated from the Moser Radiation Therapy Center addition were also included in the future analysis. Any other redevelopment or smaller development in the site's vicinity is assumed to be accounted for by the background growth factor. 8.2 Future Background Traffic To obtain total 2010 background traffic volumes, existing (November 2006) traffic volumes were incrementally increased using the aforementioned background growth rate. Existing turning movement volumes were increased by 17.4 percent to reflect future background traffic growth for three years (to 2010). In addition to the historic growth rate, the anticipated trip generation potential for the proposed Moser Radiation Therapy Center addition was included in the calculation of background traffic volumes. Figure 4 illustrates the projected traffic volumes for the no build scenario with the addition of traffic associated with the Loser Radiation Therapy Center. Page 20 r: =F1 Northridge Development 2010 No Build FIGURE Kimley -Horn Albemarle County, Virginia Peak Hour Traffic Volumes 4andAssociates, Inc. IS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLENT FOR WHICH IT WAS PREPARED. REUSE OF AND WROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIMBEY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT 1-I4,BILIIY TO KINI EY -HORN AND ASSOCIATES, INC. North Not to Scale UCN U C W CC C W WU p it N O 0 Z NNf7 1 126 I y N 3) I 469 ( 1-- 115 (8)18 (3) 4 (1111)4 475 (1047)606 (1 076) 7 1) 16 1) 5 I Ivy Road 546) 1151 —581)1208 715)1228 — Legend OUnsignalized Intersection 4 Laneage XX (XX) -AM (PM) Peak Hour Volume r: =F1 Northridge Development 2010 No Build FIGURE Kimley -Horn Albemarle County, Virginia Peak Hour Traffic Volumes 4andAssociates, Inc. IS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLENT FOR WHICH IT WAS PREPARED. REUSE OF AND WROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIMBEY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT 1-I4,BILIIY TO KINI EY -HORN AND ASSOCIATES, INC. Northridge Development 8.3 Future Total Traffic August 11, 2008 Given the anticipated parking arrangement, it is expected that some existing Northridge staff will be required to park near the Sieg maintenance facility in the future. The proposed Sieg parking lot represents 25% of the total parking spaces on the Sieg and Northridge sites. However, it is also anticipated that with the proposed signal at the Northridge Main Entrance, a significant portion of the traffic parking at Sieg will utilize the interparcel connection and exit via the signalized entrance. To account for these behaviors, it was assumed that 10% of the total southbound left -turn traffic from the Northridge and Sieg sites would utilize the unsignalized Moser Entrance while all other traffic would utilize the Northridge Main Entrance, which is proposed to be signalized. This reassignment of existing traffic was applied to the 2010 background traffic volumes. Traffic associated with the proposed development was then added to develop 2010 total (build -out) traffic volumes. The following figures illustrate future turning movement volumes: Figure 5 -2010 AM peak hour Figure 6 -2010 PM peak hour Page 22 mF1 Northridge Development Future (2010) AM Peak FIGURE Kimley -Horn Albemarle County, Virginia Hour Traffic Volumes 5andAssociates, Inc. u wa. N M, 1n wNCt VM ANU DESJUNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CUNT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTION BY KIAREY -HORN AND ASSOCIATES, INC SHALL BE WITHOUT LIABILMY TO KI4EY -HORN AND ASSOCIATES, INC North Not to Scale O C W U UcCU C W c LU N M it O O n Z N <N I ( N 26 (1) [27] 469 M 115 (18) [133]18 (6) [24] 2) [471]4 475 (2) [477]4— 606 (19) [625] 7] (0) 7 21] (5) 16 _ $5] (0) 5 /Ivy Road 1156] (5) 1151 — i 1209)(1) 1208 —1 1236](8) 1228 —0 Legend 0 - Unsignalized Intersection XX (XX) [XX] - Background (Site) [Total] Peak Hour Volumes m F1 Northridge Development Future (2010) AM Peak FIGURE Kimley -Horn Albemarle County, Virginia Hour Traffic Volumes 5andAssociates, Inc. u wa. N M, 1n wNCt VM ANU DESJUNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CUNT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTION BY KIAREY -HORN AND ASSOCIATES, INC SHALL BE WITHOUT LIABILMY TO KI4EY -HORN AND ASSOCIATES, INC Northridge Development Future (2010) PM Peak FIGURE Kimley -Horn Albemarle County, Virginia Hour Traffic Volumes sandAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED REUSE OF AND IMPROPER RELL4NCE ON THE DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIMUY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMIXY -HORN AND ASSOCIATES, INC. North Not to Scale 3 w mU C C_ N 2 CU ct6 C w W N N 0 2 Cn Z N r.In N Ea tl Ez c0 fn N l 3 (1) [41 IL_ 8 ( [ j 1 3 ( [ I 1111 (5) [11161 4 1047 (3) [1050] s'1— 1076 (12) [1088] 0] (0) 0 _J1 [4] (3) 1 7] (0) 1 —1 Ivy Road 549] (3) 546 — [583] (2) 581 730] (26) 704 —0 LZend 0 - Unsignalized Intersection XX (XX) [XX] -Background (Sfte) [Total] Peak Hour Volumes Northridge Development Future (2010) PM Peak FIGURE Kimley -Horn Albemarle County, Virginia Hour Traffic Volumes sandAssociates, Inc. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED REUSE OF AND IMPROPER RELL4NCE ON THE DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KIMUY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMIXY -HORN AND ASSOCIATES, INC. Northridge Development y.o Traffic Analysis August 11, 2008 Capacity analyses for the unsignalized intersections in the AM and PM peak hours (Appendix) were performed for the following scenarios: Existing 2010 no build (background) 2010 build -out with the proposed development Analyses were completed to determine the operating characteristics of study area intersections and roadways using Synchro Professional 6.0, which uses methodologies contained in the 2000 Highway Capacity Manual (HCM) [TRB Special Report 209, 2000]. Intersection turning movement counts were used with information about the number of lanes and traffic control to determine existing and future levels of service. Level of service (LOS) describes traffic conditions —the amount of traffic congestion —at an intersection or on a roadway. LOS ranges from A to F —A indicating a condition of little or no congestion and F a condition with severe congestion, unstable traffic flow, and stop- and -go conditions. For intersections, LOS is based on the average delay experienced by all traffic using the intersection during the busiest peak) 15- minute period. LOS A through D are generally considered acceptable. Each of the aforementioned scenarios was analyzed during the weekday AM and PM peak hours. The results are presented in the following summaries, and supporting calculations are presented in the Appendix. Page 25 Northridge Development 9.1 Ivy Road /Service Entrance This unsignalized intersection currently provides the following laneage: August 11, 2008 Ivy Road (eastbound) —one exclusive through lane and one exclusive left -turn lane Ivy Road (westbound) --one exclusive through lane and one exclusive right -turn lane Service Entrance (southbound) ---one exclusive left -turn lane and one exclusive right -turnlane Under existing conditions, the southbound (site driveway) left -turn movement operates at LOS C and D during the AM and PM peak hours, respectively. With the increment of background traffic growth and traffic associated with the proposed development, this movement is anticipated to worsen to LOS D during the AM peak hour and maintain LOS D during the PM peak hour. Operations on Ivy Road, including the eastbound left -turn movement into the site, will be negligibly impacted by the development. Table 8 indicates levels of service and delays for the intersection under existing (2006), 2010 no build, and 2010 build -out conditions. No improvements are recommended at this intersection. Detailed level of service calculations are provided in the Appendix. Page 26 Table 8 —Ivy Road /Service Entrance Intersection Unsignalized LOS Northridge Development August 11, 2008 9 Ivy Road /Northridge Main Entrance This mliisignalized intersection currently provides the following laneage: a Ivy Road (eastbound.) —one exclusive through lane and one exclusive left -turn lane K Ivy Road (westbound) —one exclusive through lane and one exclusive right -turn lane Northridge Main Entrance (southbound) —one exclusive left -turn lane and one exclusive right -turn lane Under existing conditions, the southbound (site driveway) left -turn movement operates at LOS D and F during the AM and PM peak hours, respectively. With the increment of background traffic growth and traffic associated with the proposed development, this movement is expected to worsen to LOS E during the AM peak hour. Under the same conditions, delay is anticipated to increase significantly during the PM peak hour such that the movement continues to operate at LOS F. Table 9 indicates levels of service and delays for the intersection under existing (2006), 2010 no build, and 2010 build -out conditions. Table 9-1-try Road/Northridge fain Entrance Intersection Unsignalized LOS Under future traffic conditions, operations on Ivy Road will not change appreciably. Levels of service for all movements except for the southbound (site driveway) left -turn movement will not change under future traffic conditions. To improve operations for the southbound (site driveway) approach would require that a traffic signal be installed. A 12 -hour turning movement count was conducted at this intersection on July 22, 2008, and traffic signal warrant analyses were performed at this location referencing the Manual on Uniform Traffic Control Devices (MUTCD) 2003 Edition to evaluate the need for traffic signalization under existing (2008) conditions. According to the MUTCD, a traffic control signal should not be installed unless one or more of the signal wan - ants in the MUTCD are met. However, "the satisfaction of a traffic signal warrant Page 27 Northridge Development August 11, 2008 or warrants shall not in itself require the installation of a traffic control signal." The three main warrants are as follows: Warrant 1 (Eight -Hour Vehicular Volume )—is satisfied if ONE of the following conditions exists for any eight hours of a day: o Condition A (Minimum Vehicular Volume) — volumes do not meet or exceed the necessary thresholds for this warrant during any hours of the day. For the warrant to be met, volume thresholds must be at or above thresholds for eight hours. NOT MET o Condition B (Interruption of Continuous Traffic)-- volumes meet or exceed the necessary thresholds for this warrant during eight hours of the day. For the warrant to be met, volume thresholds must be at or above thresholds for eight hours. MET o Combination of Condition A and B (Combination of Condition A and B)— volumes do not meet or exceed the necessary combination of thresholds for this warrant during any hours of the day. For the warrant to be met, volume thresholds must be at or above thresholds for eight hours. NOT MET Warrant 2 (Four -Hour Vehicular Volume)— volumes meet or exceed the necessary thresholds for this warrant during seven hours of the day. For the warrant to be met, volume thresholds must be at or above thresholds for four hours. MET Warrant 3 (Peak Hour Volume} — volumes meet or exceed the necessary thresholds for this warrant during one hour of the day. For the warrant to be met, volume thresholds must be at or above thresholds for one hour. MET Based on existing turning movement volumes, analyses indicated that the intersection of Ivy Road and the Northridge Main Entrance currently warrants a traffic signal. These warrants are based on mainline and side street traffic volumes, number of travel lanes (one per approach), and mainline travel speed (45 mph). As is common practice, right -turn volumes were excluded from the side street volumes because an exclusive right -turn lane is provided. Detailed warrant analyses are included in the Appendix. Table 10 summarizes signalized level of service at this intersection for future scenarios. Table 10—Ivy Road/Northridge Main Entrance Intersection Signalized LOS Page 28 Northridge Development August 11, 2008 To provide acceptable LOS at this intersection as indicated in Table 10, the following are recommended: Maintain existing laneage Install a traffic signal to facilitate southbound movements from the Northridge Main Entrance Figure 7 shows recommended laneage and traffic control at this intersection. Detailed level of service calculations are provided in the Appendix. Page 29 Northridge Development 9.3 Ivy Road /Moser Entrance This unsignalized intersection currently provides the following laneage: August 11, 2008 Ivy Road (eastbound) —one exclusive through lane and one exclusive left -turn lane Ivy Road (westbound) —one exclusive through lane and one exclusive right -turn lane Moser Entrance (southbound) ---one shared left- and right -turn lane Under existing conditions, the southbound (site driveway) left -turn movement operates at LOS C during the AM peak hour and at LOS B during the PM peak hour. With the increment of background traffic growth and traffic associated with the proposed development, this movement is anticipated to worsen to LOS D during the AM and PM peak hours. The eastbound left -turn movement on Ivy Road will be negligibly impacted by the development and is anticipated to operate at LOS A and B during the AM and PM peak hours, respectively. Table 11 indicates levels of service and delays for the intersection under existing (2006), 2010 no build, and 2010 build -out conditions. Table 11 —Ivy Road/Moser Entrance Intersection Unsignalized LOS It is anticipated that the majority of vehicles parking at the Sieg/Moser site will avoid excessive delays by utilizing the interparcel connection to exit from the proposed traffic signal at the Northridge Main Entrance. No improvements are recommended at this intersection. Detailed level of service calculations are provided in the Appendix. Page 30 Northridge Development lo.o Conclusions and Recommendations August 11, 2008 Parking to support the proposed development cannot be provided solely on the existing Northridge property. In order to provide sufficient parking for existing Northridge patients and future LTAC /radiology patients, the following are recommended: Modify the Northridge and Sieg parking lots to provide additional parking to accommodate demand from the proposed Northridge development Provide an interparcel connection between the Northridge and Sieg parking lots such that employees can choose to park at either lot Although it is not necessary to assign employees to one particular parking site given the interparcel connection, consider assigning 71 employees (existing Northridge or future LTAC /radiology) to the Sieg lot to provide more convenient parking for patients Consider allowing up to 12 LTAC /radiology employees to park in the surplus spaces on the existing Kirtley property near the warehouse building to reduce the number of employees that must park on the Sieg property Pursue a waiver for the additional parking spaces being required by the County at the Moser Radiation Therapy Center such that no additional spaces need to be provided exclusively for that facility Periodically monitor actual parking conditions and adjust staff parking operations accordingly The number of new trips generated by the site is considerably low and will minimally increase traffic volumes on Ivy Road and at study area intersections. Recommended improvements will mitigate development traffic impacts. To maintain acceptable traffic operations at study intersections, the following are recommended as illustrated in Figure 7: Ivy Road/Service Entrance Maintain existing laneage and traffic control Restripe existing pavement markings (existing markings are faded and difficult to discern) Ivy Road/Northridge Main Entrance Maintain existing laneage Restripe existing pavement markings (existing markings are faded and difficult to discern) Consider modifying current pavement markings in center lane (two -way left -turn lane) by striping an exclusive eastbound left -turn lane Page 31 Northridge Development August 11, 2008 Install a traffic signal to facilitate southbound movements from the Northridge Main Entrance Ivy Road/Moser Entrance Maintain existing laneage and traffic control Page 32 C mF1 Northridge Development Recommended FIGURE IQmley -Horn Albemarle County, Virginia Roadway Laneage 7andAssociates, Inc. IRE DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KI I EY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KADEY -HORN AND ASSOCIATES, INC North Not to Scale ns UC W C cc U CU CU W C Z N n Z 5 Of Ivy Road Legend Signalized Intersection OUnsignalized Intersection 4— Existing Laneage C m F1 Northridge Development Recommended FIGURE IQmley -Horn Albemarle County, Virginia Roadway Laneage 7andAssociates, Inc. IRE DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTTON BY KI I EY -HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KADEY -HORN AND ASSOCIATES, INC Northridge Development Appendix August 11, 2008 Page 34 Existing Traffic Counts Peggy Malone & Associates, Inc. 888) 247 -8602 Entrance to Lee Tennis Products File Name : West Entrance & Ivy AM Site Code : 00003396 Start Date :11/15/2006 Page No : 1 r: enak Prir*dwL vat,l 08:00 AM 1 0 1 0 2 8 88 0 0 96 0 0 0 0 0 0 212 3 0 215 313 08:15 AM 1 0 1 0 2 6 118 0 0 124 0 0 0 0 0 0 212 0 0 212 338 08:30 AM 1 0 1 0 2 5 128 0 0 133 0 0 0 0 0 0 199 1 0 200 335 08:45 AM 0 0 0 0 0 6 90 0 0 96 0 0 0 0 0 0 244 1 0 245 341 head TOW 3 0 4 0 7 40 743 0 0 783 0 0 0 0 0 0 173 14 0 1727 2,517 Approh % 42.9 0.0 57.1 0.0 5.1 94.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 99.2 0.8 0.0 ToW % 0.1 0.0 0.2 0.0 0.3 1.6 29.5 0.0 0.0 31.1 0.0 0.0 0.0 0.0 0.0 0.0 68.1 0.6 0.0 68.6 West Erltrwm to property Ivy Rd. Westbound Northbound Ivy Rd. fAutum Rijht Tlmt tae Pads Rigtd Thm Ivy Rd. Pods T RW Tde LA Southbound TOW RW Thm Left Weelbound 0 0 0 Northbound 0 299 PukFador 0 303 Eastbound High 1d. SOrt99ma RW Thm Ld Pads 1 0 Right I Zhu Leh Dada 1W W&I 1U.Let Pads 7W Right I The I I.aW I Peels Ta41 Tohl ftdar 1.0 1 1.01 1.0 0 1.0 1A 1 1.0 1 1.0 1 1.01 1.0 1 1.01 1.01 1.0 1 1.0 07:00 AM 0 0 0 0 0 0 52 0 0 52 0 0 0 0 0 0 131 0 0 131 183 07:15 AM 0 0 0 0 0 3 74 0 0 77 0 0 0 0 0 0 160 5 0 165 242 0730 AM 0 0 1 0 1 7 98 0 0 105 0 0 0 0 0 0 256 0 0 256 362 07:45 AM 0 0 0 0 0 5 95 0 0 100 0 0 0 0 0 0 299 4 0 303 403 Total 0 0 1 0 1 15 319 0 0 334 0 0 0 0 0 0 846 9 0 855 1190 08:00 AM 1 0 1 0 2 8 88 0 0 96 0 0 0 0 0 0 212 3 0 215 313 08:15 AM 1 0 1 0 2 6 118 0 0 124 0 0 0 0 0 0 212 0 0 212 338 08:30 AM 1 0 1 0 2 5 128 0 0 133 0 0 0 0 0 0 199 1 0 200 335 08:45 AM 0 0 0 0 0 6 90 0 0 96 0 0 0 0 0 0 244 1 0 245 341 head TOW 3 0 4 0 7 40 743 0 0 783 0 0 0 0 0 0 173 14 0 1727 2,517 Approh % 42.9 0.0 57.1 0.0 5.1 94.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 99.2 0.8 0.0 ToW % 0.1 0.0 0.2 0.0 0.3 1.6 29.5 0.0 0.0 31.1 0.0 0.0 0.0 0.0 0.0 0.0 68.1 0.6 0.0 68.6 r ifVwrF= W.W AIR w w West Entrance to property Southbound Ivy Rd. Westbound Northbound Ivy Rd. Eastbound fAutum Rijht Tlmt tae Pads Rigtd Thm Loft Pods T RW Tde LA Pads TOW RW Thm Left Pads 0 0 r ifVwrF= W.W AIR w w AIR -rWC1 Ox 0 0 hteneWw 07:30 AM 0 986 0.0 0.0 0.0 Volun 2 0 3 0 5 Peroad 40.0 0.0 60.0 0.0 0 30307:45 0 0 0 0 01Vd=C 0 0 0 0 0 0 299 PukFador 0 303 High 1d.08:00 AM Volama 1 0 1 0 2 Peak Fedor 0.625 26 399 0 0 425 6.1 93.9 0.0 0.0 5 95 0 0 100 08:15 AM 6 118 0 0 124 0.857 0 0 0 0 0 0 979 7 0 986 0.0 0.0 0.0 0.0 0.0 99.3 0.7 0.0 0 0 0 0 0 0 299 4 0 303 6:45:00 AM 07:45 AM 0 0 0 0 0 0 299 4 0 303 0.814 ha. Total 1416 403 0.878 Peggy Malone & Associates, Inc. 888) 247 -8602 Entrance to Lee Tennis Products File Name : West Entrance & Ivy PM Site Code : 00003396 Start Date : 11/15/2006 Page No : 1 West Enbwwe t0 Prr Southbound 8hat7See aw 1 11ne 1 LeR_ I P46 RW I M- I UftI PWSI I PW I Um I r W I 7t-I 1A 1 lO& 04:15 PM 3 0 2 0 5 2 164 0 0 166 0 0 0 0 0 0 115 0 0 115 286 04:30 FM 0 0 2 0 2 3 213 0 0 216 0 0 0 0 0 0 126 0 0 126 344 04:45 FM 1 0 5 0 6 2 208 0 0 210 0 0 0 0 0 0 105 0 0 105 321 Total 4 0 14 0 18 11 781 0 0 792 0 0 0 0 0 0 487 0 0 487 1297 05:00 PM 4 0 9 0 13 1 230 0 0 231 0 0 0 0 0 0 122 0 0 122 366 05:15 FM 0 0 5 0 5 0 239 0 0 239 0 0 0 0 0 0 130 0 0 130 374 05:30 FM 2 0 3 0 5 1 2 234 0 0 236 0 0 0 0 0 0 121 0 0 121 362 05:45 PM 0 0 0 0 0 0 241 0 0 241_ _0 0 0 0 0 0 91 0 0 91 332 Gmnd Total 10 0 31 0 41 14 172 5 0 0 1739 0 0 0 0 0 0 951 0 0 951 2731 Apprch % 24.4 0.0 75.6 0.0 0.8 99.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100. 0.0 0.0 Total % 0.4 0.0 1.1 0.0 1.5 0.5 63.2 0.0 0.0 63.7 0.0 0.0 0.0 0.0 0.0 0.0 34.8 0.0 0.0 34.8 IntamX tiom 05:00 PM 0 947 0.3 99.7 vol m 6 0 17 0 23 Peroead 26.1 0.0 73.9 0.0 005:15 0 0 5 0 5' Volomo 0 0 0.982 Peak Factor 0.892 High Int.05:00 PM Volume 4 0 9 0 13 Peak Factor 0.442 3 944 0 0 947 0.3 99.7 0.0 0.0 0.0 0 239 0 0 239 05:45 PM PM 0 130 0 241 0 0 241 0 130 0 0 0.982 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 3:45:00 PM 0 130 0 0 0 0 0 0 0 0 464 0 0 464 0.0 1000.0.0 0.0 0 130 0 0 130 05:15 PM 0 130 0 0 130 0.892 1434 374 0.959 Peggy Malone & Associates, Inc. 888) 247 -8602 Entrance to Northridge Health Services File Name : East Entrance & Ivy AM Site Code : 00003395 Start Date : 11/15/2006 Page No : 1 n"M u,e a inr eL 1 - V®hidm East entrarl0e to prgmty Ivy Rd. I Ivy nu. goutltbowd Wadbound Nort1ft" Eastbound Suctum 1 RW I U. I U1 p.& I U- [ a8 Pdt =' Risk n. LaR Pedt " RW ifiw I eB Peda TOW V IAM Java 07:15 AM 1 0 4 0 5 5 71 0 0 76 0 0 0 0 0 0 167 1 0 168 249 07 :30 AM 1 0 4 0 5 19 101 0 0 120 0 0 0 0 0 0 268 1 0 269 394 07:45 AM 0 0 3 0 3 27 92 0 0 119 0 0 0 0 0 0 306 6 0 312 434 Total 3 0 16 0 19 59 316 0 0 375 0 0 0 0 0 0 877 9 0 886 1280 08:00 AM 2 0 7 0 9 30 84 0 0 114 0 0 0 0 0 0 226 2 0 228 351 08:15 AM 1 0 8 0 9 39 127 0 0 166 0 0 0 0 0 0 228 7 0 235 410 08:30 AM 1 0 2 0 3 22 122 0 0 144 0 0 0 0 0 0 195 1 0 196 343 08:45 AM 3 0 13 0 16 28 90 0 0 118 0 0 0 0 0 0 224 9 0 233 367 Total 7 0 30 0 37 119 423 0 0 542 0 0 0 0 0 0 873 19 0 892 1471 Gcwd Total 10 0 46 0 56 178 739 0 0 917 0 0 0 0 0 0 170 28 0 1778 2751 Appm& %17.9 0.0 82.1 0.0 19.4 80.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 98.4 1.6 0.0 Total %0.4 0.0 1.7 0.0 10 6.5 26.9 0.0 0.0 33.3 0.0 0.0 0.0 0.0 0.0 0.0 63.6 1.0 0.0 64.6 Intersection 07:30 AM 0 5191 22.2 77.8 VOloaw 4 0 22 0 26 Pat oat 15.4 0.0 84.6 0.0 007:45 0 0 3 0 3 Vohmw 6 0 0.782 Pads Factor 0.837 G& Ent.08:00 AM WIN=2 0 7 0 9 Peak Factor 0.722 115 404 0 0 5191 22.2 77.8 0.0 0.0 0.0 27 92 0 0 119 08:15 AM AM 0 312 39 127 0 0 166 0 306 6 0 0.782 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 6:45:00 AM 0 312 0 0 0 0 4 0 0 0 102 16 0 104418 0.0 98.5 1.5 0.0 0 306 6 0 312 07:45 AM 0 306 6 0 312 0.837 1589 434 0.915 Peggy Malone & Associates, Inc. 888) 247 -8602 Entrance to Northridge Health Services File Name : East Entrance & Ivy PM Site Code : 00003395 Start Date :11/15/2006 Page No : 1 Grp UM Prb*ML 1 _ Vahlnlee R.A7.1 Rightt I Thm I 1wR I tads I T Ram 11uu Uft Fads Rigla 7wn Las Fads xan< o.00 R rnm Las Fads 2 0 Fawn 1 1.01 1.01 1.01 1.0 0.250 17o 1.0 1.0 1 - .0 - 1 1.0 1 1.01 1.01 1.01 TOW 1.0 1 lA 1.0 1.0 Tod1 04:00 FM 8 0 18 0 26 13 186 0 0 199 0 0 0 0 0 0 136 1 0 137 362 04:15 PM 2 0 25 0 27 5 179 0 0 184 0 0 0 0 0 0 123 2 0 125 336 04:30 FM 6 0 27 0 33 1 214 0 0 215 0 0 0 0 0 0 121 0 0 121 369 04:45 PM 4 0 28 0 32 3 209 0 0 212 0 0 0 1 1 0 109 0 0 109 354 ToW 20 0 98 0 118 22 788 0 0 810 0 0 0 1 1 0 489 3 0 492 1421 05:00 FM 2 0 41 0 43 2 227 0 0 229 0 0 0 0 0 0 136 0 0 136 408 05:15 FM 1 0 19 0 20 2 240 0 0 242 0 0 0 0 0 0 128 1 0 129 391 05:30 FM 2 0 14 0 16 4 219 0 0 223 0 0 0 0 0 0 122 0 0 122 361 05:45 PM 4 0 7 0 I1 8 233 0_0 241 0 0 0 0 0 0 82 1 0 83 335 Grand Total 29 0 179 0 208 38 170 0 0 1745 0 0 0 1 1 0 957 5 0 962 2916 Appmh % 13.9 0.0 86.1 0.0 2.2 97.8 0.0 0.0 0.0 0.0 0.0 1000. 0.0 99.5 015 0.0 Total % 1.0 0.0 6.1 0.0 7.1 1.3 58.5 0.0 0.0 59.8 0.0 0.0 0.0 0.0 0.0 0.0 32.8 0.2 0.0 33.0 b9ameo ion East entrance to property Ivy Rd. 898 Ivy Rd. Volume Southbound Westbound Northbound Eastbound 18ac176m Right I 7tw I Lab I Fads Right n- LaR Pads R Thm Ls@ Fads Right ltan Lsft Fads Wxan< o.00 Pb1 m oges tae . 0 0 T b9ameo ion 04:30 PM 0 898 0.9 99.1 Volume 13 0 115 0 128 Peacad 10.2 0.0 89.8 0.0 0 05:00 2 240 0 0 242 Volume 2 0 41 0 43 Peak Factor 0.250 ITio hs.05:00 PM Volume 2 0 41 0 43 Peak Factor 0.744 8 890 0 0 898 0.9 99.1 0.0 0.0 2 227 0 0 229 05 :15 PM 0 0 0 2 240 0 0 242 0 0 0 1 0.928 0 0 0 1 1 0.0 0.0 0.0 100 0 136 0 0 13600000 04:45 FM 0 0 13600011 0.250 0 494 1 0 495 0.0 99.8 0.2 0.0 0 136 0 0 136 05:00 PM 0 136 0 0 136 0.910 TOW 1522 408 0.933 Peggy Malone and Associates 904- 992 -8072 0 File Name Moser Radiation Driveway & Ivy Rd AM Site Code 00003005 Start Date 8/5/2008 Page No 1 rSm,ms PriMaf_ Vnhlr" 08:00 AM Moser Radiation Driveway 0 0 ivy Rd 1 0 93 0 0 93 0 0 Ivy Rd 0 0 0 230 Southbound 0 232 Westbound 8:I0SAM 0 Northbound 0 0 Eastbound 2 116 SartToie Rig1u TMo VO Peb 0 Right Tiw Le8 Pads Toni Right 71w IeR Pods TW Right n.Leo Peels Tw Tool I--I.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1A 0 1.0 1.0 1.0 1.0 0 1.0 1.0 I.0 1.0 1 107 07:00 AM 3 0 2 0 5 1 29 0 0 29 0 0 0 0 0 0 84 0 0 84 118 07:ISAM 0 0 2 0 2 2 62 0 0 64 0 0 0 0 0 0 145 0 0 145 211 07:30 AM I 0 1 0 2 0 74 0 0 74 0 0 0 0 0 0 193 1 0 194 270 07:45 AM1 56.3 0 2 0 3 1 9 136 0 0 145 1 0 0 0 0 0 1 0 229 t 0 230 378 Total 5 0 7 0 12 12 300 0 0 312 0 0 0 0 0 0 651 2 0 633 977 08:00 AM 1 0 0 0 1 0 93 0 0 93 0 0 0 0 0 0 230 2 0 232 326 8:I 0SAM 0 0 0 0 0 2 116 0 0 118 0 0 0 0 0 0 230 0 0 230 348 08:30 AM 1 0 0 0 1 1 119 0 0 120 0 0 0 0 0 0 19$0 0 195 316 08.45 AM 0 0 2 0 2 1 107 0 0 108 0 0 0 0 0 0'198 0 0 198 308 Total 2 0 2 0 4 4 435 0 0 439 0 0 0 0 01 0 853 2 0 855 1298 16 751 0 1508 2275 Apprch %43.8 0.0 56.3 0.0 I 21979 Q0 0.0 I 0.0 0.0 0.0 0.0 0.0 99.7 03 0.0 Total %0.3 0.0 0.4 0.0 0.7 0.7 32.3 0.0 0.0 33.0 0.0 0.0 0.0 0.0 0.0 i 0.0I 66.1 0.2 0.0 66.3 rac swoT riven Intersection Moser Radiation Driveway Southbound Ivy Rd Westbound Northbound Ivy Rd Eastbound Stan Tiie Right 1 TMu 1.e0 Peels ToW Right Thre [.e0 Peels ToW Right Thro I.e1l Peels T M. Len rac swoT riven Intersection viw :+a WAS AM un :.:va Volume 3 0 2 0 5 12 464 0 0 476 0 0 0 0 Percent 60.0 0.0 40.0 0.0 2.5 97.5 0.0 0.0 0.0 0.0 0.0 0.0 WAS 1 0 2 0 3 9 136 0 0 145 0 0 0 0 Volume Peale Factor Fright lot.07:45 AM 07:45 AM 6:45:00 AM Volume 1 0 2 0 3 9 136 0 0 145 0 0 0 0 Peak Factor 0.417 0.821 oi.i iPeel 0 0 884 3 0 887 1368 0.0 99.7 03 0.0 0 0 229 1 0 230 378 0.905 08:00 AM 0 0 230 2 0 232 0.956 Peggy Malone and Assn 904 -992 -8072 File Name Site Code Start Date Page No dates Moser Radiation Driveway & Ivy Rd PM 00003005 8/5/2008 1 TIM I RI& I Thm I Lett I Polo I TaN I Ri1a I Thru I L-R I Pedt I Total TM I L a I Pads I W& 04:13 PM 0 0 2 0 2 0 166 0 0 166 0 0 0 0 0 0 130 0 0 130 29804:30 PM 1 0 3 0 4 0 186 0 O 186 0 0 0 0 0 0 128 0 0 128 31804:15 PM 0 0 l 0 1 0 201 0 0 201 0 0 0 0 0 0 120 0 0 120 322Taal106071173000731000000498004981236 05:00 PM 0 0 0 0 0 0 222 0 0 222 0 0 0 0 0 0 132 0 0 132 35405:1 S PM 0 0 0 0 0 0 250 0 0 250 0 0 0 0 0 0 113 0 0 113 36305:30 PM 1 0 0 0 1 0 243 0 0 243 0 0 0 0 0 0 110 0 0 110 35405:45 PM 0 0 0 0 0 0 228 0 0 228 0 0 0 0 0 0•87 0 0 87 315Totalt0001094300943000000442004421386 hood Total 2 0 6 0 8 I l 1673 0 0 1674 0 0 0 0 0 0 940 0 0 940 2622 Appech %25.0 0.0 75.0 0.0 0.1 99.9 0.0 0.0 I OA 0.0 0.0 0.0 0.0 100,0.0 0,0 Total%0.1 0.0 0.2 0,0 I0.3 0.0 63.8 0.0 0.0 63.8 0.0 0.0 0.0 00 00 0.0 3S.9 0.0 0.0 35.9 Intersection Moser Radiation Driveway Ivy Rd Ivy RdSouthboundWestboundNorthboundEastbound Start Thm Right Tl-a Leo I Pelt T 41 Rlatt Theo Loll Pedt I ='Right TMo Loo Po&Ri81a Then L-6 Padt 1 0 1 Pak Hour Pean04:00 PM to 05:45 PM • Peak I of I 0 916 ToW Total ToW Intersection 04:45 PM Volans 1 0 1 0 2 0 916 0 0 916 0 0 0 0 0 0 475 0 0 475 1393 Petcant 0.0 0.0 $0.0 0.0 0.0 100 0 0.0 0.0 OA 0.0 0.0 0.0 t00 OA OA 0.0 0515 0. Volume 0 0 0 0 0 0 250 0 0 250 0 0 0 0 0 0 113 0 0 Ili 363 Pak Factor Hio lot.04:45 PM 05:15 pm 3:45:00 PM 0590 PM 0.959 Volume 0 0 1 0 1 0 250 0 0 250 0 0 0 0 0 0 132 0 0 132PakFactor0.500 0.916 0,900 Peggy Malone & Associates, Inc. 888) 247 -8602 File Name : Northridge Medical and Ivy Rd. Site Code : 00003158 Start Date : 7/22/2008 Page No : 1 Ml to Prir &A- va"rJx 07:00 AM Northridge Medical Center Southbound 0 Ivy Rd. Westbound 0 4 Northbound 38 0 Ivy Rd. Eastbound 45 0 sun ram ftw Tura to h& j AN'Tool RWK TMu tie Pads Tool lu&Thrn Les Pak Am. 7oW i6&T8n Leg Peds Tou! im Total Awsw 0 0 1 1.01 0 1.01 1.01 1 1.0 187 1.0 0 l.0 IA 3 1-01 ITI 1.0 1 1 0 0 0630 AM 0 0 0 0 0 06AS AM 0 0 2 0 2 1 1 7 26 0 0 31 0 0 27 38 0 0 0 0 0 Q 0 0 0 0 0 0 105 0 0 132 0 0 105 132 132 172 Total 0 0 2 0 2 8 57 0 0 65 0 0 0 0 0 0 237 0 0 237 304 07:00 AM 1 0 3 0 4 7 38 0 0 45 0 0 0 0 0 0 99 0 0 99 148 07:15 AM 0 0 2 0 2 13 60 0 0 73 0 0 0 0 0 0 184 3 0 187 262 07:30 AM 0 0 3 0 3 22 75 0 0 97 0 0 0 0 0 0 208 4 0 212 312 07:45 AM 0 0 5 0 5 43 85 0 0 128 0 0 0 0 0 0 252 7 0 259 392 Total 1 0 13 0 14 85 258 0 0 343 f 0 0 0 0 0 0 743 14 0 7S7 1114 08:00 AM 0 0 0 4 4 32 101 0 0 133 0 0 0 0 0 0 240 6 0 246 383 08:15 AM 1 0 10 0 11 40 72 0 0 112 0 0 0 0 0 0 229 9 0 238 361 08:30 AM 0 0 8 0 8 17 82 0 0 99 0 0 0 0 0 0 236 10 0 246 353 08:45 AM 0 0 12 0 12 24 99 0 0 123 0 0 0 0 0 0 219 9 0 228 363 Total 1 0 30 4 35 113 354 0 0 467 1 0 0 0 0 0 0 924 34 0 958 1460 09:00 AM 1 0 15 1 17 25 91 0 0 L16 0 0 0 0 0 0 166 2 0 168 301 09:15 AM 4 0 17 0 21 32 89 0 0 121 0 0 0 0 0 0 179 1 0 180 322 09:30 AM 3 0 21 0 24 20 76 0 0 96 0 0 0 0 0 0 162 3 0 165 285 09:45 AM 5 0 17 0 22 26 93 0 0 119 0 0 0 0 0 0 173 2 0 175 316 TOUT 13 0 70 1 84 103 349 0 0 452 0 0 0 0 0 0 680 8 0 688 1224 10:00 AM 3 0 20 0 23 19 93 0 0 112 0 0 0 0 0 0 112 0 0 112 247 10:15 AM 1 0 24 0 25 21 95 0 0 116 0 0 0 0 0 0 Ito 5 0 1 15 256 10:30 AM 2 0 26 0 28 19 83 0 0 102 0 0 0 0 0 0 116 4 0 120 250 10:45 AM 3 0 16 0 19 15 102 0 0 117 0 0 0 0 0 0 125 6 0 131 267 Toni 9 0 86 0 95 74 373 0 0 4471 0 0 0 0 0 0 463 15 0 478 1020 11:00 AM 1 0 18 0 19 16 0 0 112 0 0 0 0 0 0 131 0 0 131 262 11:15 AM 0 0 21 0 21 18 109 0 0 127 0 0 0 0 0 0 133 2 0 135 283 1130 AM 3 0 19 0 22 9 97 0 0 106 0 0 0 0 0 0 105 3 0 log 236 11:45 AM 3 0 17 0 20 9 126 0 0 135 0 0 0 0 0 0 111 1 0 112 267 Total 7 0 75 0 82 52 428 0 0 480 0 0 0 0 0 0 480 6 0 486 1048 12.00 PM 2 0 29 0 31 10 131 0 0 141 0 0 0 0 0 0 106 0 0 tO6 278 12:15 PM 3 0 17 0 20 9 143 0 0 152 0 0 0 0 0 0 111 0 0 111 283 1230 PM 1 0 16 0 17 16 126 0 0 142 0 0 0 0 0 0 124 1 0 125 284 12:45 PM 0 0 10 0 10 13 108 0 0 121 0 0 0 0 0 0 143 1 0 144 275 Total 6 0 72 0 78 48 SM 0 0 556 0 0 0 0 0 0 484 2 0 486 1120 01:00 PM 2 0 14 0 16 17 116 0 0 133 0 0 0 0 0 0 99 0 0 99 248 01:15 PM 2 0 12 0 14 21 125 0 0 146 0 0 0 0 0 0 106 6 0 112 272 0130 PM 3 0 10 0 13 l9 121 0 0 140 0 0 0 0 0 0 120 0 0 120 273 01:45 PM 0 0 16 0 16 16 toll 0 0 124 0 0 0 0 0 0 103 1 0 104 244 Tout 7 0 52 0 59 73 470 0 0 543 0 0 6 0 0 0 428 7 0 435 037 02100 PM 0 0 20 0 20 15 107 0 0 122 0 0 0 0 0 0 104 2 0 106 248 02:15 PM 7 0 16 0 23 16 115 0 0 131 0 0 0 0 0 0 ill 2 0 114 268 0230 PM 5 0 16 0 21 8 121 0 0 129 0 0 0 0 0 0 132 1 0 133 283 02:45 PM 1 0 14 0 15 16 140 0 0 156 0 0 0 0 0 0 102 3 0 105 276 Tout 13 0 66 0 79 55 483 0 0 538 o o o o 0 0 450 8 0 458 1075 03:OOPM 2 0 12 0 14 17 113 0 0 130 0 0 0 0 0 0 105 4 0 t09 2S3 03:15 PM 4 0 21 0 25 9 151 0 0 160 0 0 0 0 0 0 114 1 0 115 300 0330 PM 4 0 26 0 30 14 178 0 0 192 0 0 0 0 0 0 93 2 0 95 317 03:45 PM 3 0 Is 0 21 IS 181 0 0 196 0 0 0 0 0 0 111 1 0 112 329 Total 13 0 77 0 90 55 623 0 0 678 0 0 0 0 0 0 423 8 0 431 1199 04:00 PM 2 0 20 0 22 3 186 0 0 189 0 0 0 0 0 0 107 1 0 log 319 0415 PM 1 0 16 0 17 3 161 0 0 164 0 0 0 0 0 0 Il3 1 0 114 295 04:30 PM 5 0 17 0 22 4 160 0 0 164 0 0 0 0 0 0 113 0 0 113 299 04A5 PM 4 0 20 1 2S 4 222 0 0 226 0 0 0 0 0 0 120 0 0 120 371 Total 12 0 73 1 86 14 729 0 6 743 0 0 0 0 0 0 453 2 0 455 1284 050 PM 4 0 29 0 33 0 244 0 0 244 0 0 0 0 0 0 toy 1 0 106 383 05:15 PM 2 0 10 0 12 3 253 0 0 256 0 0 0 0 0 0 113 0 0 113 381 05:30 PM 3 0 10 0 13 1 258 0 0 259 0 0 0 0 0 0 106 0 0 106 378 05:45 PM 0 0 7 0 7 5 212 0 0 217 0 0 0 0 0 0 too 0 0 loo 324 Total 9 0 S6 0 65 9 967 0 0 976 0 0 00 0 0 424 1 0 425 1466 06:00 PM 2 0 l0 0 12 1 200 0 0 201 0 0 0 0 0 0 104 0 0 104 317 06:15 PM 0 0 0 0 0 0 197 0 0 197 0 0 0 0 0 0 119 0 0 119 316 Oand Total 93 0 682 6 781 690 5996 0 0 6686 0 0 0 0 0 0 6412 105 0 6517 13984 Appro6 %11.9 0.0 87.3 0.8 10.3 89.7 0.0 O.o 0.0 0.0 0.0 0.0 0.0 98.4 1.6 0.0 Total %0.7 0.0 4.9 OA S.6 4.9 42.9 0.0 0.0 47.8 0.0 0.0 0.0 0.0 0.0 0.0 45.9 0.8 0.0 46.6 Peggy Malone 8t Associates, Inc. 888) 247 -8602 File Name : Northridge Medical and Ivy Rd. Site Code : 00003158 Start Date : 7/22/2008 Page No :2 RkhI TkuI Left Pak 0 0 957 Southbound 0 989 Westbound 0.0 %.8 3.2 Northbound S41A Tlms Right I Tlaw I La! I Pak Tool Right n-Leg Pak Tow Right Tlw Leo Pods Pak Hour From W.30 AM t0 W.45 1 OF I 7 0 259 0.955 Inuasection WAS AM Volume 1 0 23 4 28 132 340 0 0 472 0 0 0 0 Percent 3.6 0.0 82.1 143 28.0 72.0 0.0 0.0 0.0 0.0 0.0 0.0 07.45 0 0 5 0 5 43 85 0 0 128 0 0 0 0 Volume Peak Factor M$b Int.08:15 AM 08:00 AM 6:15:00 AM Volume 1 0 10 0 11 32 101 0 0 133 0 0 0 0 Peak Factor 0.636 0487 Peak Hour From 10.00 AM to 01:45 PM - Peck 1 of I Imteneotion 12:00 PM Volume 6 0 72 0 78 48 508 0 0 556 0 0 0 0 Petocnt 7.7 0.0 92.3 0.0 8.6 91A 0.0 0.0 0.0 0.0 0.0 0.0 1230 1 0 16 0 17 16 126 0 0 142 0 0 0 0 Volume Peak Factor High Int.12:00 PM 12:15 PM Volume 2 0 29 0 31 9 143 0 0 152 0 0 0 0 Peak Factor 0.629 0.914 Peak Hour From 02:00 PM to 06:15 PM • Peak 1 of 1 lotersecticn 04.45 PM Volume 13 0 69 1 83 8 977 0 0 985 0 0 0 0 Per mt 15.7 0.0 83.1 1.2 0.8 991 0.0 0.0 0.0 0.0 0.0 0.0 05.00 4 0 29 0 33 0 244 0 0 244 0 0 0 0 Volume Peak Factor High la 05.:00 PM 05:30 PM Vokume 4 0 29 0 33 1 258 0 0 259 0 0 0 0 Peak Factor 0.629 0.951 RkhI TkuI Left Pak 0 0 957 32 0 989 1489 0.0 %.8 3.2 0.0 0 0 252 7 0 259 392 0.950 WAS AM 0 -0 252 7 0 259 0.955 0 0 484 2 0 486 1120 0.0 "A 0.4 0.0 0 0 124 1 0 125 284 0.986 12AS PM 0 0 143 1 0 144 0.844 0 0 444 1 0 445 1513 0.0 99.8 0.2 0.0 0 0 105 1 0 106 383 0.988 04.45 PM 0 0 120 0 0 120 0.927 Malone 8 Associates Inc. WEEKLY SUMMARY Page:1 Starting:11/14/2006 Site Reference: 869700000000 File: D1113001.prn Site ID:869700000000 City: Loc: Ivy Rd. s/o Ednam Dr.County: Direction: NORTH TIME MON TUE WED THU FRI SAT SUN WK TOT WK AVG 14 15 Lane 1 am pm am pm am pm am pm am pm am pm am pm am pm am pm 00:15 5 151 3 143 8 294 4 147 00:30 3 154 2 169 5 323 2 161 00:45 5 140 4 123 9 263 4 131 01:00 4 136 2 140 6 276 3 138 01:15 3 123 6 124 9 247 4 123 01:30 3 123 0 113 3 236 1 118 01:45 5 145 1 119 6 264 3 132 02:00 1 142 3 117 4 259 2 129 02:15 1 116 4 110 5 226 2 113 02:30 3 121 1 151 4 272 2 136 02:45 1 165 3 151 4 316 2 158 03:00 4 138 3 121 7 259 3 129 03:15 0 151 2 132 2 283 1 141 03:30 2 142 2 159 4 301 2 150 03:45 5 144 1 149 6 293 3 146 04:00 4 151 7 167 it 318 5 159 04:15 2 175 4 167 6 342 3 171 04:30 1 140 6 151 7 291 3 145 04:45 4 161 4 163 8 324 4 162 05:00 8 137 11 160 19 297 9 148 05:15 11 142 17 185 28 327 14 163 05:30 20 158 28 164 48 322 24 161 05:45 36 139 37 144 73 283 36 141 06:00 44 105 53 108 97 213 48 106 06:15 59 116 48 120 107 236 53 118 06:30 82 134 94 107 176 241 88 120 06:45 108 100 112 105 220 205 110 102 07:00 123 67 129 109 252 176 126 88 07:15 137 69 145 62 282 131 141 65 07:30 213 62 183 62 396 124 198 62 07:45 287 66 261 45 548 111 274 55 06:00 293 42 323 41 616 83 308 41 08:15 244 31 246 31 490 62 245 31 08:30 230 39 246 43 478 82 239 41 08:45 234 29 210 41 444 70 222 35 09:00 253 35 252 51 505 86 252 43 09:15 215 23 189 23 404 46 202 23 09:30 187 45 197 45 384 90 192 45 09:45 147 26 203 26 350 52 175 26 10:00 152 27 143 27 295 54 147 27 10:15 136 13 152 37 288 50 144 25 10:30 169 17 148 13 317 30 158 15 10:45 145 15 137 19 282 34 141 17 11:00 136 15 138 22 274 37 137 18 11:15 124 14 124 10 248 24 124 12 11:30 151 8 166 8 317 16 158 8 11:45 140 10 139 11 279 21 139 10 12:00 141 8 151 10 292 18 146 9 TOTALS 0 8691 8840 0 0 0 0 17531 8747 AM Times 7 :45 7 :45 7:45 7:45 AM Peaks 1054 1078 2132 1066 PM Times 16:00 16:45 16:00 16:00 PM Peaks 627 672 1275 637 Site Reference: 868800000000 Site ID: 868800000000 Loc: Ivy Rd. s/o Ednam Dr. Direction: SOUTH TIME MON TUE WK AVG 14 Lane 1 am pm am pm 00:15 12 129 00:30 9 136 00:45 10 144 01:00 7 136 01:15 5 152 01:30 6 161 01:45 3 158 02:00 4 136 02:15 2 170 02:30 2 168 02:45 4 150 03:00 3 148 03:15 7 133 03:30 2 185 03:45 2 202 04:00 0 199 04:15 1 197 04:30 1 210 04:45 5 217 05:00 0 215 05:15 2 236 05:30 5 256 05:45 2 276 06:00 9 226 06:15 23 202 06:30 22 202 06:45 31 165 07 :00 44 160 07:15 74 126 07 :30 99 123 07:45 138 119 08:00 147 75 08:15 126 95 08:30 149 120 08:45 160 85 09:00 144 92 09:15 123 86 09:30 116 81 09:45 128 63 10:00 119 59 10:15 109 44 10:30 116 78 10:45 117 30 11:00 116 19 11:15 103 28 11:30 145 24 11:45 133 14 12:00 125 14 TOTALS 0 9154 AM Times 457 8:00 AM Peaks 15 582 PM Times 400 17:15 PM Peaks 18 994 Malone & Associates Inc. WEEKLY SUMMARY Starting:11/14/2006 File: D1113002.prn City: County: Page: 1 WED THU FRI SAT SUN WK TOT WK AVG 15 am pm am pm am pm am pm am pm am pm am pm 12 133 24 262 12 131 6 146 15 282 7 141 9 132 19 276 9 138 3 161 10 297 5 148 2 133 7 285 3 142 3 135 9 296 4 148 6 152 9 310 4 155 1 159 5 295 2 147 6 151 8 321 4 160 3 172 5 340 2 170 9 149 13 299 6 149 3 150 6 298 3 149 1 155 8 288 4 144 1 150 3 335 1 167 1 174 3 376 1 188 2 203 2 402 1 201 2 190 3 387 1 193 0 195 1 405 0 202 4 226 9 443 4 221 1 209 1 424 0 212 6 247 8 483 4 241 7 248 12 504 6 252 1 237 3 513 1 256 5 231 14 457 7 228 15 198 38 400 19 200 18 179 40 381 20 190 41 171 72 336 36 168 59 150 103 310 51 155 72 143 146 269 73 134 81 125 180 248 90 124 132 110 270 229 135 114 129 103 276 178 138 89 122 92 248 187 124 93 173 94 322 214 161 107 148 98 308 163 154 91 132 117 276 209 138 104 132 88 255 174 127 87 113 74 229 155 114 77 92 57 220 120 110 60 162 51 281 110 140 55 97 36 206 80 103 40 108 53 224 131 112 65 109 42 226 72 113 36 110 26 226 45 113 22 122 16 225 44 112 22 134 18 279 42 139 21 132 20 265 34 132 17 127 12 252 26 126 13 8965 0 0 0 0 18119 9038 8:30 8:30 8:30 585 1161 580 17:15 17:15 17 :15 963 1957 977 Existing Parking Occupancy Counts M , and Associates, Inc. Recorded by: Katrina Mader Date: Wednesday, July 16, 2008 Parking Area Total No. of Spaces 10: 00 AM 11: 00 AM 12: 00 PM 1: 00 PM 2: 00 PM 3: 00 PM 4: 00 PM 5: 00 PM 6: 00 PM Staff 88 81 83 81 80 80 75 68 44 9 Northridge Health Services Center Visitors and 165 109 140 118 106 145 122 121 41 7 Patients Kirtiey Office Building (BOB) -21 0 0 0 0 0 0 0 0 0vacant Kirtiey Warehouse - vacant 41 0 0 0 0 0 0 0 0 0 Sieg Warehouse 64 19 17 21 18 17 23 14 14 14 Moser Building 22 11 10 10 10 11 7 8 4 1 Total 401 220 250 230 214 253 227 211 103 31 Northridge Development Occupancy Counts K:\ Project \TPTO\ 117008000- Northridge_ TIA_Update \3 Project Data \3 -03 Field Work \Data Collection\ Parking _Occupancy_ July_ 16_ 2008.xis pp it F' 1 Kin> fey M M and Associates, Inc. Recorded by: Katrina Mader Date: Thursday, July 17, 2008 Parking Area Total No. of 8: 00 AM 9: 00 AM 10: 00 AM 11: 00 AM 12: 00 PM 1: 00 PM 2: 00 PM 3: 00 PM 4: 00 PM Spaces Staff 88 37 70 71 77 73 72 64 57 55 Northridge Health Services Center Visitors and 165 69 126 139 139 117 109 112 117 95 Patients Kirdey Office Building (BOB) -21 0 0 0 0 0 0 0 0 0 vacant Kirtley Warehouse - vacant 41 0 0 0 0 0 0 0 0 0 Sieg Warehouse 64 18 17 19 17 16 16 16 17 16 Moser Building 22 5 7 8 6 6 10 9 10 8 Total 401 129 220 237 239 212 207 201 201 174 Northridge Development Occupancy Counts K:\ Project \TPTO\ 117008000- Northridge_ TIA_Update \3 Project Data \3 -03 Field Work \Data Collection\ Parking _Occupancy_ July_ 16_ 2008.x1s Signal Warrant Analysis Ivy Road /Northridge Main Entrance Northrid Development _ TRAFFIC SIGNAL VOLUME WARRANT ANALYSIS INTERSECTION NAME: Iv RosdlNorMKidge Main Entrance f COUNT DATE: t Jul 2 8 ! INTERSECTION CONDITION: MAJOR STREET: Road t # OF APPROACH LANES: I MINOR STREET: Nordtridg Male Entrance # OF APPROACH LANES: # 1_ ISOLATED COMMUNITY WITH POPULATION LESS THAN 10, 000 (Y OR N): N 85TH PERCENTILE SPEED GREATER THAN 40 MPH ON MAJOR STREET (Y OR N): _ Y WARRANT 1 — Eight- Hour Vehicular Volume Warrant Condition A : Minimum Vehicular Volume Condition B : Interruption of Continuous Traffic Combination : Combination of Condition A and Condition B WARRANT 2 — Four -Hour Vehicular Volume Warrant WARRANT 3 — Peak Hour Warrant MAJOR ST BOTH APPROACHES MINOR ST HIGHEST APPROACH WARRANT 1, Condition A WARRANT 1 Condition B WARRANT 1, Combination Warrant WARRANT 2 WARRANT 3 MAJOR STREET MINOR STREET BOTH MET MAJOR STREET MINOR STREET BOTH MET CONDITION A CONDITION B MAJOR STREET MINOR STREET BOTH MET MAJOR STREET MINOR STREET BOTH MET THRESHOLD VALUES No 350 105 525 53 400 120 800 60 05: 00 AM TO 07: 00 AM 07: 00 AM TO 08: 00 AM 1, 015 13 Y Y Y Y 08: 00 AM TO 08: 00 AM 1, 312 30 Y Y Y Y 09: 00 AM TO 10: 00 AM 1, 037 70 Y Y Y Y Y Y Y Y Y 10 AM TO 11: 00 AM 851 as Y Y Y Y Y Y Y Y Y 11: 00 AM TO 12: 00 PM 914 75 Y Y Y Y Y Y Y Y Y 1200 PM TO 01: 00 PM 994 72 Y Y Y Y Y Y Y Y Y 01: 00 PM . TO 02: 00 PM 905 52 Y Y Y Y 02: 00 PM TO 03: 00 PM 941 Be Y Y Y Y Y Y Y Y Y 03: 00 PM TO 04: 00 PM 1, 054 77 Y Y Y Y Y Y Y Y Y Y 04: 00 PM TO 05: 00 PM 1, 184 73 Y Y Y Y Y Y Y Y Y 05: 00 PM TO 05 PM 1, 392 56 Y Y Y Y Y Y 06: 00 PM TO 07: 00 PM 07: 00 PM TO 08: 00 PM 08: 00 PM TO 09: 00 PM 09: 00 PM TO 10: 00 PM 11699 670 0 8 0 7 7 1 8 HOURS NEEDED NOT SATISFIED 8 HOURS NEEDED SATISFIED 8 HOURS OF BOTH COND. A AND COND. B NEEDED NOT SATISFIED 4 HRS NEEDED SATISFIED 1 HR NEEDED SATISFIED WARRANT 1 — Eight- Hour Vehicular Volume Warrant Condition A : Minimum Vehicular Volume Condition B : Interruption of Continuous Traffic Combination : Combination of Condition A and Condition B WARRANT 2 — Four -Hour Vehicular Volume Warrant WARRANT 3 — Peak Hour Warrant Traffic Analysis Ivy Road /Service Entrance HCM Unsignalized Intersection Capacity Analysis Existing AM 3: Ivy Road & Service Entrance Northridge Developmen 4- 4.1 \ 10. 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations I r F Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)7 979 399 26 3 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)8 1064 434 28 3 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 462 1513 434 vC1, stage 1 conf vol 434 vC2, stage 2 conf vol 1079 vCu, unblocked vol 462 1513 434 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 98 100 cM capacity (veh /h)1099 185 622 Direction, Lane #EB 1 EB 2 WS 1 WB 2 SB 1 SB 2 Volume Total 8 1064 434 28 3 2 Volume Left 8 0 0 0 3 0 Volume Right 0 0 0 28 0 2 cSH 1099 1700 1700 1700 185 622 Volume to Capacity 0.01 0.63 0.26 0.02 0.02 0.00 Queue Length 95th (ft)1 0 0 0 1 0 Control Delay (s)8.3 0.0 0.0 0.0 24.8 10.8 Lane LOS A C B Approach Delay (s)0.1 0.0 19.2 Approach LOS C Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 61.5%ICU Level of Service B Analysis Period (min)15 Timing Plan: Existing AM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis Existing PM 3: Ivy Road & Service Entrance Northridge Development Timing Plan: Existing PM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations wt I f Sign Control Free Free Stop Grade 0%0%0% Volume (veh/h)0 464 944 3 17 6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)0 504 1026 3 18 7 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1029 1530 1026 vC1, stage 1 conf vol 1026 vC2, stage 2 conf vol 504 vCu, unblocked vol 1029 1530 1026 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %100 90 98 cM capacity (veh/h)675 189 285 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 0 504 1026 3 18 7 Volume Left 0 0 0 0 18 0 Volume Right 0 0 0 3 0 7 cSH 1700 1700 1700 1700 189 285 Volume to Capacity 0.00 0.30 0.60 0.00 0.10 0.02 Queue Length 95th (ft)0 0 0 0 8 2 Control Delay (s)0.0 0.0 0.0 0.0 26.1 17.9 Lane LOS D C Approach Delay (s)0.0 0.0 24.0 Approach LOS C Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 59.7%ICU Level of Service B Analysis Period (min)15 Timing Plan: Existing PM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis AM Background Unsignalized 3: Ivy Road & Service Entrance Northridge Development 1#4 -1.11. Movement EBL EBT WBT WBR SBL SBR Lane Configurations I r F Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)7 1151 469 26 3 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)8 1251 510 28 3 2 Pedestrians Lane Width (ft) Walking Speed (f /s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 538 1776 510 vC1, stage 1 conf vol 510 vC2, stage 2 conf vol 1266 vCu, unblocked vol 538 1776 510 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 98 100 cM capacity (veh /h)1030 149 564 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SIB 1 SB 2 Volume Total 8 1251 510 28 3 2 Volume Left 8 0 0 0 3 0 Volume Right 0 0 0 28 0 2 cSH 1030 1700 1700 1700 149 564 Volume to Capacity 0.01 0.74 0.30 0.02 0.02 0.00 Queue Length 95th (ft)1 0 0 0 2 0 Control Delay (s)8.5 0.0 0.0 0.0 29.7 11.4 Lane LOS A D B Approach Delay (s)0.1 0.0 22.4 Approach LOS C Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 70.6%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 No -Build AM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Background Unsignalized 3: Ivy road & Service Entrance Northridge Development 4.,4 /40. Movement EBL EBT WBT WBR SBL SBR Lane Configurations f If i Sign Control Free Free Stop Grade 0%0%0% Volume (veh/h)0 546 1111 3 17 6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)0 593 1208 3 18 7 Pedestrians Lane Width (ft) Walking Speed (ftts) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1211 1801 1208 vC1, stage 1 conf vol 1208 vC2, stage 2 conf vol 593 vCu, unblocked vol 1211 1801 1208 IC, single (s)4,1 6.4 6.2 IC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %100 88 97 cM capacity (veh/h)576 153 223 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 0 593 1208 3 18 7 Volume Left 0 0 0 0 18 0 Volume Right 0 0 0 3 0 7 cSH 1700 1700 1700 1700 153 223 Volume to Capacity 0.00 0.35 0.71 0.00 0.12 0.03 Queue Length 95th (ft)0 0 0 0 10 2 Control Delay (s)0.0 0.0 0.0 0.0 31.7 21.6 Lane LOS D C Approach Delay (s)0.0 0.0 29.1 Approach LOS D lintersec*m Summary Average Delay 0.4 Intersection Capacity Utilization 68.5%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 No -Build PM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis AM Build Unsignalized 3: Ivy Road & Service Entrance Northridge Development Timing Plan: 2010 Build AM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 A 4, r—k'4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations I F ir Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)7 1156 471 27 4 2 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)8 1257 512 29 4 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 541 1784 512 vC1, stage 1 conf vol 512 vC2, stage 2 conf vol 1272 vCu, unblocked vol 541 1784 512 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 97 100 cM capacity (veh /h)1027 148 562 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SIB 1 SIB 2 _ Volume Total 8 1257 512 29 4 2 Volume Left 8 0 0 0 4 0 Volume Right 0 0 0 29 0 2 cSH 1027 1700 1700 1700 148 562 Volume to Capacity 0.01 0.74 0.30 0.02 0.03 0.00 Queue Length 95th (ft)1 0 0 0 2 0 Control Delay (s)8.5 0.0 0.0 0.0 30.0 11.4 Lane LOS A D B Approach Delay (s)0.1 0.0 23.8 Approach LOS C Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 70.8%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 Build AM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Build Unsignalized 3: Ivy Road & Service Entrance Northridge Development Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations N r F Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)0 549 1116 4 19 6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)0 597 1213 4 21 7 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1217 1810 1213 vC1, stage 1 conf vol 1213 vC2, stage 2 conf vol 597 vCu, unblocked vol 1217 1810 1213 tC, single (s)4.1 6.4 6.2 IC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %100 86 97 cM capacity (veh/h)573 152 222 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 0 597 1213 4 21 7 Volume Left 0 0 0 0 21 0 Volume Right 0 0 0 4 0 7 cSH 1700 1700 1700 1700 152 222 Volume to Capacity 0.00 0.35 0.71 0.00 0.14 0.03 Queue Length 95th (ft)0 0 0 0 11 2 Control Delay (s)0.0 0.0 0.0 0.0 32.4 21.7 Lane LOS D C Approach Delay (s)0.0 0.0 29.8 Approach LOS D Jntersection Summary Average Delay 0.4 Intersection Capacity Utilization 68.7%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Traffic Analysis Ivy Road /Northridge Main Entrance HCM Unsignalized Intersection Capacity Analysis Existing AM 6: Ivy Road & Northridge Main Entrance Northridge Development Timing Plan: Existing AM Peak Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 A A,.1.r/ Movement EBL EBT WBT WBR SBL SBR . Lane Configurations r i Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)16 1028 404 115 22 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)17 1117 439 125 24 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 564 1591 439 vC1, stage 1 conf vol 439 vC2, stage 2 conf vol 1152 vCu, unblocked vol 564 1591 439 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %98 86 99 cM capacity (veh /h)1007 170 618 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SIB 1 SB 2 Volume Total 17 1117 439 125 24 4 Volume Left 17 0 0 0 24 0 Volume Right 0 0 0 125 0 4 cSH 1007 1700 1700 1700 170 618 Volume to Capacity 0.02 0.66 0.26 0.07 0.14 0.01 Queue Length 95th (ft)1 0 0 0 12 1 Control Delay (s)8.6 0.0 0.0 0.0 29.6 10.9 Lane LOS A D B Approach Delay (s)0.1 0.0 26.7 Approach LOS D Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 64.1%ICU Level of Service C Analysis Period (min)15 Timing Plan: Existing AM Peak Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis Existing PM 6: Ivy Road & Northridge Main Entrance Northridge Development Timing Plan: Existing PM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Vi r ff Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)1 494 890 8 115 13 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)1 537 967 9 125 14 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 976 1507 967 vC1, stage 1 conf vol 967 vC2, stage 2 conf vol 539 vCu, unblocked vol 976 1507 967 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %100 36 95 cM capacity (veh/h)707 196 308 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 1 537 967 9 125 14 Volume Left 1 0 0 0 125 0 Volume Right 0 0 0 9 0 14 cSH 707 1700 1700 1700 196 308 Volume to Capacity 0.00 0.32 0.57 0.01 0.64 0.05 Queue Length 95th (ft)0 0 0 0 93 4 Control Delay (s)10.1 0.0 0.0 0.0 51.2 17.2 Lane LOS B F C Approach Delay (s)0.0 0.0 47.7 Approach LOS E Intersection Summary Average Delay 4.0 Intersection Capacity Utilization 59.9%ICU Level of Service B Analysis Period (min)15 Timing Plan: Existing PM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis AM Background Unsignalized 6: Ivy Road & Northridge Main Entrance Northridge Development Timing Plan: 2010 No -Build AM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 4 .1 4/A 10. Movement EBL EBT WBT WBR SBL SBR Lane Configurations I r rr Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)16 1208 475 115 22 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)17 1313 516 125 24 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 641 1864 516 vC1, stage 1 conf vol 516 vC2, stage 2 conf vol 1348 vCu, unblocked vol 641 1864 516 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %98 82 99 cM capacity (veh /h)943 136 559 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 17 1313 516 125 24 4 Volume Left 17 0 0 0 24 0 Volume Right 0 0 0 125 0 4 cS H 943 1700 1700 1700 136 559 Volume to Capacity 0.02 0.77 0.30 0.07 0.18 0.01 Queue Length 95th (ft)1 0 0 0 15 1 Control Delay (s)8.9 0.0 0.0 0.0 37.0 11.5 Lane LOS A E B Approach Delay (s)0.1 0.0 33.1 Approach LOS D Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 73.6%ICU Level of Service D Analysis Period (min)15 Timing Plan: 2010 No -Build AM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Background Unsignalized 6: Ivy Road & Northridge Main Entrance Northridge Development lr. "_ k \%. 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations Vi r ir Sign Control Free Free Stop Grade 0%0%0% Volume (veh/h)1 581 1047 8 115 13 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)1 632 1138 9 125 14 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1147 1772 1138 vC1, stage 1 conf vol 1138 vC2, stage 2 conf vol 634 vCu, unblocked vol 1147 1772 1138 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %100 22 94 cM capacity (veh/h)609 160 245 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 1 632 1138 9 125 14 Volume Left 1 0 0 0 125 0 Volume Right 0 0 0 9 0 14 cSH 609 1700 1700 1700 160 245 Volume to Capacity 0.00 0.37 0.67 0.01 0.78 0.06 Queue Length 95th (ft)0 0 0 0 125 5 Control Delay (s)10.9 0.0 0.0 0.0 80.2 20.6 Lane LOS B F C Approach Delay (s)0.0 0.0 74.1 Approach LOS F Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 68.1%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 No -Build PM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 Lanes, Volumes, Timings AM Background Signalized 6: Ivy Road & Northridge Main Entrance Northridge De v e lopment l -. - t ` 1 Gif ii ih Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated- Coordinated Maximum v/ c Ratio: 0. 80 Intersection Signal Delay: 8. 9 Intersection LOS: A Intersection Capacity Utilization 73. 6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: Ivy Road & Northridge Main Entrance e2 e4 v6 HCM Signalized Intersection Capacity Analysis AM Background Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development t L 1 Movement -E` BL' Lane Configurations Lane Configurations r V ! Total Lost Time (s)4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Mi. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt Lane Util, Factor 1. 00 1. 00 0. 850 1. 00 0. 850 Flt Protected 0. 950 1. 00 1. 00 1. 00 0. 950 1. 00 Said. Flow (prot)1770 1863 1863 1583 1770 1583 Fit Permitted 0. 431 1770 1863 18630. 950 1770 Said. Flaw (perm)803 1863 1863 1583 1770 1583 Said. Flow (RTOR)Said. Flow (perm)859 1863125 15834 Headway Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Volume (vph)16 1208 475 115 22 4 Adj. Flow (vph)17 1313 516 125 24 4 Lane Group Flow (vph)17 1313 516 125 24 4 Turn Type Perm 17 1313Perm 98custom Protected Phases Turn Type2644 Permitted Phases 2 2 6644 Total Split (s)45. 0 45. 0 45. 0 45. 0 15. 0 15. 0 Act Effct Green (s)53. 1 53. 1 53. 1 53. 1 8. 3 8. 3 Actuated g/ C Ratio 0. 88 0. 88 0. 88 0. 88 0. 14 0. 14 v/ c Ratio 0. 02 0. 80 0. 31 0. 09 0. 10 0. 02 Control Delay 2. 3 12. 0 2. 6 0. 8 23. 0 15. 2 Queue Delay 0. 0 0. 0 0. 0 0. 0 0. 0 0. 0 Total Delay 2. 3 12. 0 2. 6 0. 8 23. 0 15. 2 LOS A B A A C B Approach Delay 0. 02 11. 9 2. 2 0. 06 21. 9 Approach LOS 0. 03 B A 0. 08 C 0. 00 Gif ii ih Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated- Coordinated Maximum v/ c Ratio: 0. 80 Intersection Signal Delay: 8. 9 Intersection LOS: A Intersection Capacity Utilization 73. 6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: Ivy Road & Northridge Main Entrance e2 e4 v6 HCM Signalized Intersection Capacity Analysis AM Background Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development t L 1 Movement - E` BL'E81` . .-.- 111_1,11- _ - 1._11 1._.. .....- Lane Configurations r V !r Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Total Lost time (s)4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util, Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1. 00 1. 00 1. 00 0. 85 1. 00 0. 85 Flt Protected 0. 95 1. 00 1. 00 1. 00 0. 95 1. 00 Said. Flow (prot)1770 1863 1863 1583 1770 1583 Fit Permitted 0. 46 1. 00 1. 00 1. 00 0. 95 1. 00 Said. Flow (perm)859 1863 1863 1583 1770 1583 Volume (vph)16 1208 475 115 22 4 Peak -hour factor, PHF 0. 92 0. 92 0. 92 0. 92 0. 92 0. 92 Adj. Flow (vph)17 1313 516 125 24 4 RTOR Reduction (vph)0 0 0 27 0 4 Lane Group Flow (vph)17 1313 516 98 24 0 Turn Type Perm Perm custom Protected Phases 2 6 4 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)45. 1 45. 1 45. 1 45. 1 2. 9 2. 9 Effective Green, g (s)47. 1 47. 1 47. 1 47. 1 4. 9 4. 9 Actuated g/ C Ratio 0. 79 0. 79 0. 79 0. 79 0. 08 0. 08 Clearance Time (s)6. 0 6. 0 6. 0 6. 0 6. 0 6. 0 Vehicle Extension (s)3. 0 3. 0 3. 0 3. 0 3. 0 3. 0 Lane Grp Cap (vph)674 1462 1462 1243 145 129 v/ s Ratio Prot c0. 70 0. 28 c0. 01 0. 00 v/ s Ratio Perm 0. 02 0. 06 v/ c Ratio 0. 03 0. 90 0. 35 0. 08 0. 17 0. 00 Uniform Delay, dl 1. 4 4. 7 1. 9 1. 5 25. 6 25. 3 Progression Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Incremental Delay, d2 0. 1 9. 1 0. 7 0. 1 0. 5 0. 0 Delay (s)1. 5 13. 8 2. 6 1. 6 26. 2 25. 3 Level of Service A B A A C C Approach Delay (s)13. 6 2. 4 26. 1 Approach LOS B A C Inteitedroii'. tartmery HCM Average Control Delay 10. 2 HCM Level of Service B HCM Volume to Capacity ratio 0. 83 Actuated Cycle Length (s)60. 0 Sum of lost time (s) 8. 0 Intersection Capacity Utilization 73. 6%ICU Level of Service D Analysis Period (min)15 c Critical Lane Group Timing Plan: 2010 No- Build AM Synchro 6 Report Timing Plan: 2010 No- Build AM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Kimley -Horn and Associates, Inc. Page 2 Lanes, Volumes, Timings PM Background Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development J -- ~ ` ` r aC, sam _1t E . . .- ' "RSBL Stiff .. -. ._... - 1. "1, - --, . .. . _ . Lane Configurations INBT WSR" MSBL ,. - I I If Total Lost Time (s)4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Fri 4. 0 Lane Util. Factor 1. 00 0. 850 1. 00 0. 850 Fit Protected 0. 950 Frt 1. 00 1. 00 0. 950 0. 85 Satd. Flow (prat)1770 1863 1863 1583 1770 1583 Fft Permitted 0. 078 Satd. Flow (prot)1770 18630. 950 1583 Satd. Flow (perm)145 1863 1863 1583 1770 1583 Satd. Flow (RTOR) 1. 00 Satd. Flow (perm)2409 186314 Headway Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Volume (vph)1 581 1047 8 115 13 Adj. Flow (vph)1 632 1138 9 125 14 Lane Group Flow (vph)1 632 1138 9 125 14 Turn Type Perm Lane Group Flow (vph)1Perm 1138custom Protected Phases 2 2 6 4 4 Permitted Phases 2 2644 Total Split (s)55. 0 55. 0 55. 0 55. 0 20. 0 20. 0 Act Effct Green (s)58. 0 58. 0 58. 0 58. 0 12. 2 12. 2 Actuated g/ C Ratio 0. 77 077 0. 77 0. 77 0. 16 0. 16 v/ c Ratio 0. 01 0. 44 0. 79 0. 01 0. 43 0. 05 Control Delay 4. 0 5. 5 13. 5 2. 1 32. 3 13. 1 Queue Delay 0. 0 0. 0 0. 0 0. 0 0. 0 0. 0 Total Delay 4. 0 5. 5 13. 5 2. 1 32. 3 13. 1 LOS A A B A C B Approach Delay 5. 5 13. 4 30. 3 Approach LOS A B C Inter_' 116i t Cyde Length: 75 Actuated Cycle Length: 75 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated - Coordinated Maximum v/ c Ratio: 0. 79 Intersection Signal Delay: 12. 0 Intersection LOS: B Intersection Capacity Utilization 68. 1% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 6: Ivy Road & Northridge Main Entrance 02 s4 e6 HCM Signalized Intersection Capacity Analysis PM Background Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development l 4 L J EBL'EBT INBT WSR" MSBL ,. - Lane Lane Configurations If I i Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Total Lost time (s)4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1. 00 1. 00 1. 00 0. 85 1. 00 0. 85 Flt Protected 0. 95 1. 00 1. 00 1. 00 0. 95 1. 00 Satd. Flow (prot)1770 1863 1863 1583 1770 1583 Flt Permitted 0. 13 1. 00 1. 00 1. 00 0. 95 1. 00 Satd. Flow (perm)240 1863 1863 1583 1770 1583 Volume (vph)1 581 1047 8 115 13 Peak -hour factor, PHF 0. 92 0. 92 0. 92 0. 92 0. 92 0. 92 Adj. Flow (vph)1 632 1138 9 125 14 RTOR Reduction (vph)0 0 0 2 0 12 Lane Group Flow (vph)1 632 1138 7 125 2 Turn Type Perm Perm custom Protected Phases 2 6 4 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)54. 0 54. 0 54. 0 54. 0 9. 0 9. 0 Effective Green, g (s)56. 0 56. 0 56. 0 56. 0 11. 0 11. 0 Actuated g/ C Ratio 0. 75 0. 75 0. 75 0. 75 0. 15 0. 15 Clearance Time (s)6. 0 6. 0 6. 0 6. 0 6. 0 6. 0 Vehicle Extension (s)3. 0 3. 0 3. 0 3. 0 3. 0 3. 0 Lane Grp Cap (vph)179 1391 1391 1182 260 232 v/ s Ratio Prot 0. 34 c0. 61 c0. 07 0. 00 v/ s Ratio Perm 0. 00 0. 00 v/ c Ratio 0. 01 0. 45 0. 82 0. 01 0. 48 0. 01 Uniform Delay, d1 2. 4 3. 6 6. 2 2. 4 29. 4 27. 3 Progression Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Incremental Delay, d2 0. 1 1. 1 5. 5 0. 0 1. 4 0. 0 Delay (s)2. 5 4. 7 11. 6 2. 4 30. 8 27. 4 Level of Service A A B A C C Approach Delay (s)4. 7 11. 6 30. 4 Approach LOS A B C Pflt TSfEOIi• 3` Uf11fl'1 ®N .. .__..__ ..,.M,,.R _,....a....,,.»...- ... „ a,...,m mr,....,..., HCM Average Control Delay 10. 7 HCM Level of Service B HCM Volume to Capacity ratio 0. 76 Actuated Cycle Length (s)75. 0 Sum of lost time (s) 8. 0 Intersection Capacity Utilization 68. 1%ICU Level of Service C Analysis Per od (min)15 c Critical Lane Group Timing Plan: 2010 No- Build PM Synchro 6 Report Timing Plan: 2010 No- Build PM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 Kimley -Hom and Associates, Inc. Page 2 HCM Unsignalized Intersection Capacity Analysis AM Build Unsignalized6: Ivy Road & Northridge Main Entrance Northridge Development A - 01 . *- k '141.. 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations Vi F F Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)21 1209 477 133 29 5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)23 1314 518 145 32 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 663 1878 518 vC1, stage 1 conf vol 518 vC2, stage 2 conf vol 1360 vCu, unblocked vol 663 1878 518 IC, single (s)4.1 6.4 6.2 IC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %98 76 gg cM capacity (veh/h)926 134 557 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 23 1314 518 145 32 5 Volume Left 23 0 0 0 32 0 Volume Right 0 0 0 145 0 5 cSH 926 1700 1700 1700 134 557 Volume to Capacity 0.02 0.77 0.30 0.09 0.24 0.01 Queue Length 95th (ft)2 0 0 0 22 1 Control Delay (s)9.0 0.0 0.0 0.0 40.0 11.5 Lane LOS A E B Approach Delay (s)0.2 0.0 35.8 Approach LOS E Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 73.6%ICU Level of Service D Analysis Period (min)15 Timing Plan: 2010 Build AM Synchro 6 ReportKirnley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Build Unsignalized 6: Ivy Road & Northridge Main Entrance Northridge Development A w— A., Movement EBL EBT WBT WBR SBL SBR Lane Configurations F F Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)4 583 1050 19 128 16 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)4 634 1141 21 139 17 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1162 1784 1141 vC1, stage 1 conf vol 1141 vC2, stage 2 conf vol 642 vCu, unblocked vol 1162 1784 1141 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 12 93 cM capacity (veh /h)601 158 244 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total 4 634 1141 21 139 17 Volume Left 4 0 0 0 139 0 Volume Right 0 0 0 21 0 17 cSH 601 1700 1700 1700 158 244 Volume to Capacity 0.01 0.37 0.67 0.01 0.88 0.07 Queue Length 95th (ft)1 0 0 0 153 6 Control Delay (s)11.0 0.0 0.0 0.0 99.2 20.9 Lane LOS B F C Approach Delay (s)0.1 0.0 90.5 Approach LOS F Intersection Summary Average Delay 7.3 Intersection Capacity Utilization 69.0%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 Lanes, Volumes, Timings AM Build Signalized6: jyy Road & Northridge Main Entrance Northridge Development Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated- Coordinated Maximum v/ c Ratio: 0. 80 Intersection Signal Delay: 9. 1 Intersection LOS: A Intersection Capacity Utilization 73. 6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: Ivy Road & Northridge Main Entrance 2 #"" ® 4 Timing Plan: 2010 Build AM Kimley -Horn and Associates, Inc. HCM Signalized Intersection Capacity Analysis AM Build Signalized 6: Iw Road & Northridge Main Entrance Northridge Devel Movement _ _..._.. €BL __ "F: BT ' W § t_ W3Tt`"'§ - eL' - Ok . Lane Con`, igurations I f 1)r Ideal Flow (vphpl)1900 Lane Configurations 1900 1900 i" Total Lost time (s)4. 0 Total Lost Time (s)4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1. 00 0. 85 1. 00 0. 850 Flt Protected 0. 850 Fit Protected 0. 950 1. 00 0. 95 1. 00 0. 950 1770 Satd. Flow (prot)1770 1863 1883 1583 1770 1583 Flt Permitted 0. 430 1. 00 0. 95 1. 00 0, 950 855 Satd. Flow (perm)801 1863 1863 1583 1770 1583 Satd. Flow (RTOR) 477 133 29 145 Peak -hour factor, PHF 5 Headway Factor 1100 1. 00 1. 00 1. 00 1. 00 1. 00 Volume (vph)21 1209 477 133 29 5 Ad). Flow (vph)23 1314 518 145 32 5 Lane Group Flow (vph)23 1314 518 145 32 5 Turn Type Perm Perm custom Perm custom Protected Phases B 2 6 4 4 4 Permitted Phases 2 8 4 6 4 4 Total Split (s)45. 0 45. 0 45. 0 45. 0 15. 0 15. 0 Act Effct Green (s)52. 9 52. 9 52. 9 52. 9 8. 5 8. 5 Actuated g/ C Ratio 0. 88 0. 88 0. 88 0. 88 0. 14 0. 14 v/ c Ratio 0. 03 0. 80 0. 32 0, 10 0. 13 0. 02 Control Delay 2. 4 12. 4 2. 7 0. 8 23. 2 14. 4 Queue Delay 0. 0 0. 0 0. 0 0. 0 0. 0 0. 0 Total Delay 2. 4 12. 4 2. 7 0. 8 23. 2 14. 4 LOS A B A A C B Approach Delay 0. 36 12. 2 2. 3 0. 00 22. 0 1. 5 Approach LOS 2. 0 B A 25. 1 C 1. 00CycleLength: 60 Actuated Cycle Length: 60 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated- Coordinated Maximum v/ c Ratio: 0. 80 Intersection Signal Delay: 9. 1 Intersection LOS: A Intersection Capacity Utilization 73. 6% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 6: Ivy Road & Northridge Main Entrance 2 #"" ® 4 Timing Plan: 2010 Build AM Kimley -Horn and Associates, Inc. HCM Signalized Intersection Capacity Analysis AM Build Signalized 6: Iw Road & Northridge Main Entrance Northridge Devel Movement _ _..._.. €BL __ " F: BT ' W § t_ W3Tt`"'§ - eL' - Ok . Lane Con`, igurations I f 1)r Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Total Lost time (s) 4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1. 00 1. 00 1. 00 0. 85 1. 00 0. 85 Flt Protected 0. 95 1. 00 1. 00 1. 00 0. 95 1. 00 Sstd. Flow (prof)1770 1863 1863 1583 1770 1563 Fit Permitted 0. 46 1. 00 1. 00 1. 00 0. 95 1. 00 Satd. Flow (perm)855 1863 1863 1583 1770 1 583 Volume (vph)21 1209 477 133 29 5 Peak -hour factor, PHF 0. 92 0. 92 0. 92 0. 92 0. 92 0. 92 Adj. Flow (vph)23 1314 518 145 32 5 RTOR Reduction (vph)0 0 0 32 0 5 Lane Group Flow (vph)23 1314 518 113 32 0 Turn Type Perm Perm custom Protected Phases 2 B 4 4 Permitted Phases 2 8 4 4 Actuated Green, G (s)44. 9 44. 9 44. 9 44. 9 3. 1 3. 1 Effective Green, g (s)46. 9 46. 9 46. 9 46. 9 5. 1 5. 1 Actuated g/ C Ratio 0. 78 0. 78 0. 78 0. 78 0. 08 0. 08 Clearance Time (a)6. 0 6. 0 6. 0 6. 0 6. 0 6. 0 Vehicle Extension (s)3. 0 3. 0 3. 0 3. 0 3. 0 3. 0 Lane Grp Cap (vph)668 1456 1456 1237 150 135 v/ s Ratio Prot c0. 71 0. 28 c0. 02 0. 00 v/ s Ratio Perm 0. 03 0. 07 v/ c Ratio 0. 03 0. 90 0. 36 0. 09 0. 21 0. 00 Uniform Delay, d1 1. 5 4. 9 2. 0 1. 5 25. 6 25. 1 Progression Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Incremental Delay, d2 0. 1 9. 4 0. 7 0. 1 0. 7 0. 0 Delay (s)1. 6 14. 3 2. 7 1. 7 26. 3 25. 1 Level of Service A B A A C C Approach Delay (s)14. 1 2. 4 26. 1 Approach LOS B A C fntereedion' vumma r ._ _........_._..... HCM Average Control Delay 10. 5 HCM Level of Service B HCM Volume to Capacity ratio 0. 83 Actuated Cycle Length (s)60. 0 Sum of lost time (s) 8. 0 Intersection Capacity Utilization 73. 6%ICU Level of Service D Analysis Period (min)15 c Critical Lane Group Synchro 6 Report Timing Plan: 2010 Build AM Synchro 6 ReportPage1Kimley -Horn and Associates, Inc. Page 2 Lanes, Volumes, Timings PM Build Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development k ` r l. eneGroup " ESL ''BT" W T IN R SBR Lane Configurations T r I r Total Lost Time (s) 4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1900 Total Lost time (s) 0. 850 4. 0 0. 850 Fft Protected 0. 950 4. 0 4. 0 Lane Util. Factor 0. 950 1. 00 Bald. Flow (prot) 1770 1863 1863 1583 1770 1583 FR Permitted 0. 078 1. 00 0. 85 1. 00 0. 950 Fit Protected Satd. Flow (perm) 145 1863 1863 1583 1770 1583 Satd. Flow (RTOR) 1770 1863 21 1583 17 Headway Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Volume (vph) 4 583 1050 19 128 16 Adj. Flow (vph) 4 634 1141 21 139 17 Lane Group Flow (vph) 4 634 1141 21 139 17 Turn Type Perm 0. 92 0. 92 Perm 0. 92 custom Protected Phases 2 6 21 4 4 Permitted Phases 2 0 0 6 4 4 Total Split (s) 55. 0 55. 0 55. 0 55. 0 20. 0 20. 0 Act Effct Green (s) 57. 6 57. 6 57. 6 57. 6 12. 6 12. 6 Actuated g/ C Ratio 0. 77 077 0. 77 0. 77 0. 17 0. 17 v/ c Ratio 0. 04 0. 44 0. 80 0. 02 0. 47 0. 06 Control Delay 4. 8 5. 7 14. 0 1. 8 32. 7 12. 3 Queue Delay 0. 0 0. 0 0. 0 0. 0 0. 0 0. 0 Total Delay 4. 8 5. 7 14. 0 1. 8 32. 7 12. 3 LOS A A B A C B Approach Delay 5. 7 13. 8 6. 0 30. 5 6. 0 Approach LOS A B 3. 0 C 3. 0 3. 0 3. 0 3. 0 Lane Grp Cap (vph)171 Cycle Length: 75 1381 1174 269 241 v/ s Ratio Prot Actuated Cycle Length: 75 0. 34 c0. 61 c0. 08 0. 00 Offset: 0 (0 %), Referenced to phase 2: EBTL and 6: WBT, Start of Green Control Type: Actuated - Coordinated 0. 01 Maximum v/ c Ratio: 0. 80 v/ c Ratio 0. 02 0. 46 0. 83 0. 01 Intersection Signal Delay: 12. 5 0. 01 Uniform Delay, d1 Intersection LOS: B Intersection Capacity Utilization 69. 0% 2. 5 ICU Level of Service C Analysis Period (min) 15 Progression Factor 1. 00 1. 00 1. 00 1. 00 S its and Phases: 6: Iv Road & Northridge Main Entrance e2 e 4 e6 HCM Signalized Intersection Capacity Analysis PM Build Signalized 6: Ivy Road & Northridge Main Entrance Northridge Development 1 k ti 1 11 EBL-EBT WBT WBR SBL 38R Lane Lane Configurations 1 T t If jr Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Total Lost time (s) 4. 0 4. 0 4. 0 4. 0 4. 0 4. 0 Lane Util. Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Frt 1. 00 1. 00 1. 00 0. 85 1. 00 0. 85 Fit Protected 0. 95 1. 00 1. 00 1. 00 0.95 1. 00 Said. Flow (prot)1770 1863 1863 1583 1770 1583 Fit Permitted 0. 12 1. 00 1. 00 1. 00 0. 95 1. 00 Satd. Flow (perm)230 1863 1863 1583 1770 1583 Volume (vph)4 583 1050 19 128 16 Peak -hour factor, PHF 0. 92 0. 92 0. 92 0. 92 0. 92 0. 92 Adj. Flow (vph)4 634 1141 21 139 17 RTOR Reduction (vph)0 0 0 5 0 14 Lane Group Flow (vph)4 634 1141 16 139 3 Turn Type Perm Perm custom Protected Phases 2 6 4 4 Permitted Phases 2 6 4 4 Actuated Green, G (s)53. 6 53. 6 53. 6 53. 6 9. 4 9. 4 Effective Green, g (s)55. 6 55. 6 55. 6 55. 6 11. 4 11. 4 Actuated g/ C Ratio 0. 74 0. 74 0. 74 0. 74 0. 15 0. 15 Clearance Time (s)6. 0 6. 0 6. 0 6. 0 6. 0 6. 0 Vehicle Extension (s)3. 0 3. 0 3. 0 3. 0 3. 0 3. 0 Lane Grp Cap (vph)171 1381 1381 1174 269 241 v/ s Ratio Prot 0. 34 c0. 61 c0. 08 0. 00 v/ s Ratio Perm 0. 02 0. 01 v/ c Ratio 0. 02 0. 46 0. 83 0. 01 0. 52 0. 01 Uniform Delay, d1 2. 6 3. 8 6. 5 2. 5 29. 3 27. 0 Progression Factor 1. 00 1. 00 1. 00 1. 00 1. 00 1. 00 Incremental Delay, d2 0. 3 1. 1 5. 8 0. 0 1. 7 0. 0 Delay (s)2. 8 4. 9 12. 2 2. 6 30. 9 27. 0 Level of Service A A B A C C Approach Delay (s)4. 9 12. 1 30. 5 Approach LOS A B C Int on many HCM Average Control Delay 11. 2 HCM Level of Service B HCM Volume to Capacity ratio 0. 77 Actuated Cycle Length (s)75. 0 Sum of lost time (s) 8. 0 Intersection Capacity Utilization 69. 0%ICU Level of Service C Analysis Period (min)15 c Critical Lane Group Timing Plan: 2010 Build PM Synchro 6 Report Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Kimley- Hom and Associates, Inc. Page 2 Traffic Analysis Ivy Road /Moser Entrance HCM Unsignalized Intersection Capacity Analysis Existing AM 7: Ivy Road & Moser Entrance Northridge Development Movement EBL EBT WBT WBR SBL SBR Lane Configurations I 11 Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)4 1046 516 12 2 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)4 1137 561 13 2 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 574 1707 561 vC1, stage 1 conf vol 561 vC2, stage 2 conf vol 1146 vCu, unblocked vol 574 1707 561 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %100 99 99 cM capacity (veh /h)999 164 527 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 4 1137 561 13 7 Volume Left 4 0 0 0 2 Volume Right 0 0 0 13 4 cSH 999 1700 1700 1700 303 Volume to Capacity 0.00 0.67 0.33 0.01 0.02 Queue Length 95th (ft)0 0 0 0 2 Control Delay (s)8.6 0.0 0.0 0.0 17.1 Lane LOS A C Approach Delay (s)0.0 0.0 17.1 Approach LOS C Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 65.1%ICU Level of Service C Analysis Period (min)15 Timing Plan: Existing AM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis Existing PM 7° Ivy Road & Moser Entrance Northridge Development Movement EBL EBT WBT WBR SBL SBR Lane Configurations Vi r Y Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)0 608 0 916 1 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)0 661 0 996 1 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right tum flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 996 661 0 vC1, stage 1 conf vol 0 vC2, stage 2 conf vol 661 vCu, unblocked vol 996 661 0 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %100 100 100 cM capacity (veh /h)695 342 1085 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 0 661 0 996 2 Volume Left 0 0 0 0 1 Volume Right 0 0 0 996 1 cSH 1700 1700 1700 1700 520 Volume to Capacity 0.00 0.39 0.00 0.59 0.00 Queue Length 95th (ft)0 0 0 0 0 Control Delay (s)0.0 0.0 0.0 0.0 12.0 Lane LOS B Approach Delay (s)0.0 0.0 12.0 Approach LOS B Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 60.1%ICU Level of Service B Analysis Period (min)15 Timing Plan: Existing PM Peak Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis AM Background Unsignalized 7: Ivy Road & Moser Entrance Northridge Developm Movement EBL EBT WBT WBR SBL SBR Lane Configurations I r Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)5 1228 606 18 4 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)5 1335 659 20 4 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 678 2004 659 vC1, stage 1 conf vol 659 vC2, stage 2 conf vol 1346 vCu, unblocked vol 678 2004 659 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 97 99 cM capacity (veh /h)914 130 464 Direction, Lane #EB 1 EB 2 W B 1 W B 2 SB 1 Volume Total 5 1335 659 20 8 Volume Left 5 0 0 0 4 Volume Right 0 0 0 20 3 cSH 914 1700 1700 1700 188 Volume to Capacity 0.01 0.79 0.39 0.01 0.04 Queue Length 95th (ft)0 0 0 0 3 Control Delay (s)9.0 0.0 0.0 0.0 24.9 Lane LOS A C Approach Delay (s)0.0 0.0 24.9 Approach LOS C Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 74.6%ICU Level of Service D Analysis Period (min)15 Timing Plan: 2010 No -Build AM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Background Unsignalized 7: Ivy Road & Moser Entrance Northridge Development 4- 4 \ 40 W Movement EBL EBT WBT WBR SBL SBR Lane Configurations If Y Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)1 715 1076 3 9 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)1 777 1170 3 10 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1173 1949 1170 vC1, stage 1 conf vol 1170 vC2, stage 2 conf vol 779 vCu, unblocked vol 1173 1949 1170 IC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %100 93 99 cM capacity (veh /h)596 144 235 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 1 777 1170 3 13 Volume Left 1 0 0 0 10 Volume Right 0 0 0 3 3 cSH 596 1700 1700 1700 160 Volume to Capacity 0.00 0.46 0.69 0.00 0.08 Queue Length 95th (ft)0 0 0 0 7 Control Delay (s)11.1 0.0 0.0 0.0 29.6 Lane LOS B D Approach Delay (s)0.0 0.0 29.6 Approach LOS D Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 66.6%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 No -Build PM Synchro 6 Report Kimley -Hom and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis AM Build Unsignalized 7: Ivy Road & Moser Entrance Northridge Development A --I,. ~ A, • Movement EBL EBT WBT WBR SBL SBR Lane Configurations I II Sign Control Free Free Stop Grade 0%0%0% Volume (veh /h)5 1236 625 24 5 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)5 1343 679 26 5 4 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 705 2034 679 vC1, stage 1 conf vol 679 vC2, stage 2 conf vol 1354 vCu, unblocked vol 705 2034 679 tC, single (s)4.1 6.4 6.2 tC, 2 stage (s)5.4 tF (s)2.2 3.5 3.3 p0 queue free %99 96 gg cM capacity (veh /h)893 128 451 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 5 1343 679 26 10 Volume Left 5 0 0 0 5 Volume Right 0 0 0 26 4 cSH 893 1700 1700 1700 188 Volume to Capacity 0.01 0.79 0.40 0.02 0.05 Queue Length 95th (ft)0 0 0 0 4 Control Delay (s)9.1 0.0 0.0 0.0 25.2 Lane LOS A D Approach Delay (s)0.0 0.0 25.2 Approach LOS D Intersection Summary Average Delay 0.1 Intersection Capacity Utilization 75.1%ICU Level of Service D Analysis Period (min)15 Timing Plan: 2010 Build AM Synchro 6 ReportKimley -Horn and Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis PM Build Unsignalized 7: Ivy road & Moser Entrance Northridge Development Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations r Sign Control Free Free Stop Grade 0%0%0% Volume (vehlh)1 730 1088 7 23 5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph)1 793 1183 8 25 5 Pedestrians Lane Width (ft) Walking Speed (ftts) Percent Blockage Right turn flare (veh) Median type TW LTL Median storage veh)0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1190 1978 1183 vC 1, stage 1 conf vol 1183 vC2, stage 2 conf vol 796 vCu, unblocked vol 1190 1978 1183 tC, single (s)4.1 6.4 6.2 IC, 2 stage (s)5.4 IF (s)2.2 3.5 3.3 p0 queue free %100 82 98 cN capacity (veh/h)587 141 231 Direction, Lane #EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total 1 793 1183 8 30 Volume Left 1 0 0 0 25 Volume Right 0 0 0 8 5 cSH 587 1700 1700 1700 152 Volume to Capacity 0.00 0.47 0.70 0.00 0.20 Queue Length 95th (ft)0 0 0 0 18 Control Delay (s)11.1 0.0 0.0 0.0 34.6 Lane LOS B D Approach Delay (s)0.0 0.0 34.6 Approach LOS D Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 67.3%ICU Level of Service C Analysis Period (min)15 Timing Plan: 2010 Build PM Synchro 6 Report Kimley -Horn and Associates, Inc. Page 1 Kimley -Horn JIM and Associates, Inc. Memorandum To: Charles Hurt UVA Dept. of Space and Real Estate Management Gary Lowe UVA Health Services Foundation From: Emily Lintner, E.I.T. Carl Tewksbury, P.E. Kimley -Horn and Associates, Inc. Date: August 26, 2008 Subject: Northridge Development Parking Generation Comparison Kimley -Horn and Associates, Inc. submitted a revised traffic impact analysis and parking needs assessment for the proposed Northridge development on August 11, 2008. This report outlined the methodology used to evaluate existing parking conditions at the existing Northridge building and Sieg maintenance facility, the parking generation potential of the proposed Northridge development, and the allocation of future parking spaces to each. Based on existing parking occupancy data, it was determined that the peak parking demand period at the existing Northridge building occurs from 2:00 PM to 3:00 PM with 225 spaces occupied. Based on a proposed total supply of 269 parking spaces and accounting for the industry standard of 90% occupancy, the 225 occupied parking spaces leave a total of 18 parking spaces available during the peak demand period. Parking demand for the proposed Northridge development was generated to provide a comparison to the available parking spaces at the existing Northridge site. The radiology component of the proposed building has a demand of 25 parking spaces during the 2:00 PM to 3:00 PM period. The parking demand for the long term acute care (LTAC) facility was generated based on the gross floor area and calculated to be 57 parking spaces during the same period for a total of demand of 82 parking spaces. Because only 18 parking spaces are available at the existing Northridge building, this leaves a deficit of 64 parking spaces. In order to provide adequate parking, it is proposed that some existing or future Northridge/LTAC employees will park at the existing Sieg maintenance facility. TEL 757 213 8600 FAX 757 213 8601 E Suite 1050 222 Central Park Avenue Virginia Beach, Virginia 23462 Kimley-Hom Parking Generation Comparison, August 26, 2008, Page 2 of 2andAssogale,s, Inc. The peak parking demand at the existing Sieg maintenance facility was 23 occupied parking spaces during the 3:00 PM to 4:00 PM period. Based on a proposed total supply of 87 parking spaces and accounting for 90% occupancy, 56 parking spaces are available at Sieg to park others (Northridge) during the peak period. Although more parking spaces are available during other periods of the day (including the 2:00 PM to 3:00 PM period), the peak parking period at Sieg was used for comparison purposes since the proposed employee parking will generally be all -day parking. The 56 parking spaces available at Sieg are eight spaces less than what is needed to accommodate all of the proposed parking demand given the conservative estimates. Because of the negligible calculated deficit of eight parking spaces, Kimley -Horn further evaluated the potential parking demand of the proposed Northridge development. For the radiology component, only one independent variable gross floor area) is available for calculations, so 25 parking spaces are required for this component as indicated above. For the LTAC facility, however, three independent variables are available for calculation —gross floor area, employees, and beds. Generating the parking demand based on the gross floor area of 50,000 square feet results in the highest parking demand. In order to provide a conservative analysis, this high estimate of 57 parking spaces was used in the study for a total of 82 parking spaces. By comparison, generating the parking demand for the LTAC based on the 50 anticipated employees results in a peak parking demand of 45 parking spaces for the LTAC, or a total of 70 parking spaces for the proposed Northridge development. Based on the 18 available parking spaces at the existing Northridge building, this results in a deficit of 52 parking spaces. Compared to the 56 available parking spaces at the Sieg maintenance facility, a surplus of four parking spaces will be available. If the parking demand for the LTAC is generated based on the 50 proposed beds at the facility, only 20 parking spaces are required during the peak for a total of 45 parking spaces. Given the 18 available parking spaces at the existing Northridge building, this results in a deficit of 27 parking spaces. Because 56 parking spaces are available at the Sieg maintenance facility, a surplus of 29 parking spaces will be available. Given the information available, it is anticipated that the Northridge and Sieg sites may range from having a deficit of eight parking spaces to a surplus of 29 parking spaces during the peak parking period while still maintaining a 10% surplus to account for turnover and circulation. It is our opinion that this range suggests there is adequate parking available if the Sieg maintenance facility is used.