HomeMy WebLinkAboutSDP200800065 Review Comments 2008-05-05Application #: SDP200800065 — ! Short Review Co Project Name:, Moser Radiation Therapy Ctr - Major - Major Amendment Date Completed: 05/02/2008 Reviewer: Andrew Slack E911 Review Status: No Objection Reviews Comments: NO OBJECTION. Date Completed: 04/25/2008 Reviewer: Joan McDowell Planning Review Status: Pending Reviews Comments: A com rehenive lancompliance application will be required to be approved b the PlanningPPPPPqPPY Commission prior to approval of the site Ian. Access interconnections between the other UVA health sites to allow one main entrance (signaled) at Northridge is recommended. Date Completed: 05/05/2008 Reviewer: Jay Schlothauer Inspections Review Status: No Objection Reviews Comments: iState -owned property no local building official jurisdiction. Date Completed: 05/01/2008 Reviewer: Margaret Maliszewski ARB Review Status: Requested Changes Reviews Comments: This project is scheduled for ARB review on June 2, 2008. Comments will be provided after that meeting. Date Completed: Reviewer: Philip Custer Engineer Z &CD Review Status: Pending Reviews Comments: SRC Meeting 5/8/08 Page: 1.00 County of Albemarle Printed On: Tuesday, May 06, 2008 of AI , IRGtNP County of Albemarle Department of Community Development Memorandum To: Ammy George From: Gerald Gatobu, Senior Planner Division: Zoning and Current Development Date: May 5, 2008 Subject: SDP2008 -00065 Moser Radiation Therapy Ctr - Major Amendment The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site plan referred to above once the following comments have been addressed: Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] V32.5.6] Please indicate on the site plan the maximum number of employees for the proposed use. 32.5.6] Indicate the maximum amount of paved parking and vehicular circulation eas.(Landscape plan is required) 3. [21.7.2] No portion of any structure, excluding signs, shall be located closer than fifty (50) feet to any residential or rural areas district. No off - street parking or loading space shall be located closer an twenty (20) feet to any residential or rural areas district. 4. [32.5.6] Please show the owner, zoning, tax map and parcel number and present use of adjacent 0 parcels. Parcel 60E2 -1 is adjacent to the North and is zoned RA. Rx tok - 4.12.13.e] Please show a dumpster location that does not im ede any required parking or loading spaces or any pedestrian or vehicular circulation isles. pkk AcmAw , 6. [32.5.6]Provide on the site plan a description of all variances, zoning proffers, bonus factors or special use permits applicable to this site. ? ZMA- CtAA(47tW> --5Wu 4 Ire o1n pk'In 4.12.5(A)] Parking areas on same lot as primary use; exception. All parking spaces shall be ra" established on the same lot with the primary use, to which it is appurtenant, except as authorized by WI/ Of [section 4.12.8].therefore, [section 4.12.8.e] An instrument assuring the continuation of off -site shared parking needs to be submitted. The instrument shall be in a form that is suitable for rY recording, shall be subject to review and approval as to form and substance by the county attorney, StUI ? and shall be recorded in the office of the clerk of the circuit court of the county before the site plan or site plan waiver is approved. As the parking requirements for the use or structure change, subsequent instruments may be submitted, reviewed, approved and recorded that rescind or modify 4.12.13.c] Loading spaces shall be provided in addition to and exclusive of any parking requirement on the basis of(1) space for the first eight thousand (8,000) square feet of office space 9. If Outdoor lighting is proposed: Provide a Lighting/Photometric Plan A) Make sure light fixture locations do not conflict with utilities and landscaping. B) All light fixtures with 3000 or more lumens must be full cut off. C) Provide cut sheets for each lighting fixture on a separate sheet of the site plan. (Catalog numbers on the cut sheets must match those on the luminaire schedule). v K Show /clearly delineate the property lines on the lighting plan. t loss factor LLF/Maintenance Factor must be 1. Add the standard lighting note to the lighting plan. sLxef CZ 10. Landscaping Plan k/ eC [32.7.9.4.b] Existing trees or wooded areas may be preserved in lieu of planting new materials v in order to satisfy landscaping and screening requirements, subject to the agent's approval. In such case, the landscape plan shall indicate the trees to be saved; limits of clearing; location and type of protective fencing; grade changes requiring tree wells or walls; and trenching or tunneling proposed beyond the limits of clearing. In addition, the applicant shall sign a conservation checklist approved by the agent to insure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, such checklist shall conform to specifications contained in the Virginia Erosion and Sediment Control Handbook, pages III -393 through III -413, and as hereafter amended. The conservation plan checklist must be shown on the site plan and must be signed. tB) [32.7.9.9.b.I] 10% tree canopy is required for the site. Provide tree canopy calculations. Show existing tree canopy, and delineate new /proposed trees. V116 [32.7.9.6] Indicate additional street trees and indicate the amount required and the amount provided. v6) [32.7.9.7.b]Interior landscaping calculations need to be shown. An area equal to 5% of paved parking and circulation areas shall be landscaped with trees and shrubs. L/E) [32.7.9.7.b] Interior landscaping shall include I large or medium shade tree per 10 parking spaces if 5 spaces or more. Show existing interior landscaping, and then show the additional interior landscaping required because of the addition. Indicate how the additional interior landscaping will be met. Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. 2 I T 1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 DATE: May 6, 2008 Ainmy George 919 2 "`' Street S.E. Charlottesville, VA, 22902. RE: SDP - 2008 -00065 Moser Radiation Therapy Ctr - Major. Dear Sir /Madam, The Site Review Committee has reviewed the development proposal referenced above. Preliminary continents for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Division of Planning (Principle Planner ARB) Albemarle County Division of Planning (Principle Planner Rural Area) Albemarle County Division of Inspections (Building Official) Virginia Department of Transportation (VDOT). Albemarle County Service Authority (ACSA). Albemarle County Fire and Rescue. Albemarle County Geographic and Data Services (GDS) Conmlents reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Conmlittee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by Monday May 19th 2008. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Gerald Gatobu, Senior PlannerCountyofAlbemarle Department of Community DevelopmentCurrentDevelopment401McIntireRoad Charlottesville, VA 22902_4596Phone: (434)296_5832 Ext 3385Fax: (434)972.4126 County of Albemarle Department of Community Development Memorandum To: Ammy George From: Gerald Gatobu, Senior Planner Division: Zoning and Current Development Date: May 5, 2008 Subject: SDP2008 -00065 Moser Radiation Therapy Ctr - Major Amendment The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the final site plan referred to above once the following comments have been addressed: Each comment is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] 1. [32.5.6] Please indicate on the site plan the maximum number of employees for the proposed use. 2. [32.5.61 Indicate the maximum amount of paved parking and vehicular circulation areas. (Landscape plan is required) 3. [21.7?] No portion of any structure, excluding signs, shall be located closer than fifty (50) feet to any residential or rural areas district. No off- street parking or loading space shall be located closer than twenty (20) feet to any residential or rural areas district. 4. [32.5.6] Please show the owner, zoning, tax map and parcel number and present use of adjacent parcels. Parcel 60E2 -1 is adjacent to the North and is zoned RA. 5. [4.12.13.eI Please show a dumpster location that does not impede any required parking or loading spaces or any pedestrian or vehicular circulation isles. 6. [32.5.6]Provide on the site plan a description of all variances, zoning proffers, bonus factors or special use permits applicable to this site. 7. [4.12.5(A)] Parkin g areas on same lot as primary use; exception. All parking spaces shall be established on the same lot with the primary use, to which it is appurtenant, except as authorized by section 4.12.8 ].therefore, [section 4.12.8.e] An instrument assuring the continuation of off -site shared parking needs to be submitted. The instrument shall be in a form that is suitable for recording, shall be subject to review and approval as to form and substance by the county attorney, and shall be recorded in the office of the clerk of the circuit court of the county before the site plan or site plan waiver is approved. As the parking requirements for the use or structure change, subsequent instruments may be submitted, reviewed, approved and recorded that rescind or modify the prior instrument. 8. [4.12.13.c] Loading spaces shall be provided in addition to and exclusive of any parking requirement on the basis of( I ) space for the first eight thousand (8,000) square feet of office space If Outdoor lighting is proposed: Provide a Lighting/Photometric Plan A) Make sure light fixture locations do not conflict with utilities and landscaping. B) All light fixtures with 3000 or more lumens must be full cut off. C) Provide cut sheets for each lighting fixture on a separate sheet of the site plan. (Catalog numbers on the cut sheets must match those on the luminaire schedule). D) Show /clearly delineate the property lines on the lighting plan. E) Light loss factor LLF /Maintenance Factor must be 1. F) Add the standard lighting note to the lighting plan. 10. Landscaping Plan A) [32.7.9.4.b] Existing trees or wooded areas may be preserved in lieu of planting new materials in order to satisfy landscaping and screening requirements, subject to the agent's approval. In such case, the landscape plan shall indicate the trees to be saved; limits of clearing; location and type of protective fencing; grade changes requiring tree wells or walls; and trenching or tunneling proposed beyond the limits of clearing. In addition, the applicant shall sign a conservation checklist approved by the agent to insure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, such checklist shall conform to specifications contained in the Virginia Erosion and Sediment Control Handbook, pages III -393 through III -413, and as hereafter amended. The conservation plan checklist must be shown on the site plan and must be signed. B) [32.7.9.9.b.11 10% tree canopy is required for the site. Provide tree canopy calculations. Show existing tree canopy, and delineate new /proposed trees. C) [32.7.9.6] Indicate additional street trees and indicate the amount required and the amount provided. D) [32.7.9.7.b]Interior landscaping calculations need to be shown. An area equal to 5% of paved parking and circulation areas shall be landscaped with trees and shrubs. E) [32.7.9.7.b] Interior landscaping shall include l large or medium shade tree per 10 parking spaces if 5 spaces or more. Show existing interior landscaping, and then show the additional interior landscaping required because of the addition. Indicate how the additional interior landscaping will be met. Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 338.5 for further information. COUNTY OF ALBENTARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP - 2008 - 00065, Moser Radiation Major site plan amendment Plan preparer: Mr. Samuel Saunders, PE (fax 434.295.8317) Owner or rep.: Rector and Visitors of the University of Virginia (fax unknown) Date received: 15 April 2008 Date of Comment: 5 May 2008 Engineer: Phil Custer The major site plan amendment for the Moser Radiation building has been reviewed. Because the application is a major amendment to an existing site plan, the following comments are final site plan comments. WPO plan comments will be forthcoming. A. SDP - 2008 - 00065 I . The Moser Radiation expansion project should be included in the parking and traffic impact study that is currently being revised for the Sieg Maintenance, Northridge, and LTACH sites. 2. Please show the existing dumpster and loading space on the site plan. 3. Please provide an approval letter from VEPCO showing permission for the applicant to place a biofilter in its easement. 4. Please provide drainage profiles for the existing system and the proposed improvements. This site plan will replace the existing approved plan and most include drainage profiles. 5. Please specify a low maintenance, nongrassy groundcover for all new proposed slopes greater than 3:1. File: GI_Cmj_PBC_08 -00065 Moser Radiation Amendment Application #. SDP200800065 Shoff Review Comments Project Narne: Moser Radiation Therapy Ctr - Major Date Crarruleted. 05102 2008 Andrew Slack Rev; &:. Status No Objection Rei evv5 Co ^;n c r is. NO OBJECTION. E911 Major Arrendment Date Cowp etc,d: U- , 125/lOf)8 Joan McDowell Planning Re,.ew Statics: Pending Rev Co;linenfs A comprehensive plan compliance application -will be required to be approved by the Planning Commission prior to approval of the site plan. Access interconnections between the other UVA health sites to allow one train entrance t,si at Northridge is recommended. Date Cotlipl•etezd: 05 05:2008 Rev!errflr' Jay Schlothauer Inspections Re.lew Straws: No Objection Re:v,e," Corno State -owned property: no local building official jurisdiction. Date Cn„ Ipieted 05:01,2008 Re: Margaret Maliszewski ARB Re Status Requested Changes Revieros Convnents: This project is scheduled for ARB review on June 2. 2008. Comments will be provided after that meeting. Date Completed. Re: eLVer Philip Custer Engineer Z &CD R&r:ew Stzitus: Pending Re!e•.ws Cor!: - en "s SRC Meeting 5:8,03 County (;f Albernarle ''r,tt 6 on. Tuesday, iv!ay 06, 2000, Service Auth4rity TO: Gerald Gatobu FROM: Gary Whelan, Civil Engineer DATE: May 6, 2008 RE: Site Plan Technical Review for: Moser Radiation Therapy Center -Major SDP200800065 TM 59 -23C The below checked items apply to this site. X 1.This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2.An 12 inch water line is located on site. X 3.Fire flow from, nearest public hydrant, located 90' distant from this site plan, is 1,654 Gpm + at 20 psi residual. X 4.A 8 inch sewer line is located on site. 5.An Industrial Waste Ordinance survey form must be completed. X 6.No improvements or obstructions shall be placed within existing or future easements. 7.and plans are currently under review. 8.and plans have been received and approved. X 9.No plans are required. 10.Final and plans are required for our review and approval prior to granting tentative approval. 11.Final site plan may /may not be signed. 12.RWSA approval for water and /or sewer connections. 13.City of Charlottesville approval for sewer. Comments: Provide plumbing fixture count to size the water meter. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands l; Application #: WP0200800039 Short Review Comr -Jnts Project Name: Moser Radiation Thrpy Ctr(2nd Vault Addt) Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed: 07/31/2008 Reviewer. Max Greene Engineer Z &CD Review Status: Requested Changes Reviews Comments: This plan has been reviewed and a redlined copy of the plans is available at the front desk for pick -up. Date Completed: 07/31/2008 Reviewer: Max Greene Engineer Z &CD Review Status: Pending Reviews Comments: This plan has been reviewed and a redlined copy of the plans is available at the front desk for pick -up. Date Completed: 10/01/2008 Reviewer: Max Greene Engineer Z &CD Review Status: Pending Reviews Comments: WPO plan can be approved after planning and zoning requirements are adequately addressed. Stormwater Maintenance Agreement is required prior to final approval. Date Completed: 10/01/2008 Reviewer: Max Greene Engineer Z &CD Review Status: Pending Reviews Comments: WPO plan can be approved after planning and zoning requirements are adequately addressed. Stormwater Maintenance Agreement is required prior to final approval. Date Completed: 05/28/2008 Reviewer: Philip Custer Engineer Z &CD Review Status: Requested Changes Reviews Comments: Page: 1.00 County of Albemarle Printed On Wednesday, October 01, 2008 llF AL o k l 9 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SDP- 2008 - 00065, Moser Radiation Major site plan amendment Plan preparer: Mr. Samuel Saunders, PE (fax 434.295.8317) Owner or rep.: Rector and Visitors of the University of Virginia (fax unknown) Date received: (Rev. 1) 23 May 2008 15 April 2008 Date of Comment: (Rev. 1) 23 June 2008 5 May 2008 Engineer: Phil Custer The major site plan amendment for the Moser Radiation building has been reviewed. WPO plan comments will be forthcoming. A. SDP - 2008 -00065 1. The Moser Radiation expansion project should be included in the parking and traffic impact study that is currently being revised for the Sieg Maintenance, Northridge, and LTACH sites. Rev. 1) The latest studying provided by Knnley>, Horn Associates did anat) impacts to the existing entrance onto Route 250. Please provide an approval letter from VEPCO showing permission for the applicant to place a biofilter in its easement. Rev. 1) Comment not addressed. Please specify a low maintenance, nongrassy groundcover for all new proposed slopes greater than 3:1. Rev. 1) The groundcover needs to be called out on the site plan. A general note in the vicinity of 2:1 slopes stating that slopes steeper than 2:1 must be planted with a low - maintenance, non - grassed groundcover. Cjt :II,IIF.r., J IRGI ti1P / County of Albemarle Department of Community Development Memorandum To: Ammy George From: Gerald Gatobu, Senior Planner Division: Zoning and Current Development Date: September 24, 2008 Subject: SDP2008 -00065 Moser Radiation Therapy Center - Major Amendment The County of Albemarle Division of Zoning and Current Development will grant or recommend approval of the major amendment referred to above once the following comments have been addressed: [Each continent is preceded by the applicable reference, which is to the Subdivision /Zoning Ordinances unless otherwise specified.] 1. [21.7.2] No portion of any structure, excluding signs, shall be located closer than fifty (50) feet to any residential or rural areas district. No off - street parking or loading space shall be located closer than twenty (20) feet to any residential or rural areas district. The 20 foot undisturbed buffer should stay as is. [Make sure the 20 foot buffer is not disturbed anv further] this includes activities during construction. There currently parking within the 20' buffer. See comment #3 for more details. 2. [32.5.6]Provide on the site plan a description of all variances, zoning proffers, bonus factors or special use permits applicable to this site. All conditions of the latest zoning map amendment [ZMA 1990000261 should be scanned onto the site plan. 3. Minimum setback lines, the minimum setbacks for the Commercial Cl zoning district shown in the site data table are incomplete. Include the adjacent to residential districts requirement, and buffer zone requirements for commercial uses adjacent to residential and rural area districts. Refer to the Albemarle County Zoning Ordinance section 21.7 minimum yard requirements [Commercial Districts generally] for the complete setbacks. [Correct the setbacks on the site plan]. 4. [4.12.5(A)]Parking areas on same lot as primary use; exception. All parking spaces shall be established on the same lot with the primary use, to which it is appurtenant, except as authorized by [section 4.12.8].therefore, [section 4.12.8.e] An instrument assuring the continuation of off -site shared parking needs to be submitted. The instrument shall be in a form that is suitable for recording, shall be subject to review and approval as to forin and substance by the county attorney, and shall be recorded in the office of the clerk of the circuit court of the county before the site plan or site plan waiver is approved. As the parking requirements for the use or structure change, subsequent instruments may be submitted, reviewed, approved and recorded that rescind or modify the prior instrument. Parking study will address this? The site data notes indicate that 13 spaces necessitated by this expansion will be provided on the Sieg property. Based on our Last conversation with Mr. Hurt, he indicated that the latest traffic study conducted established that based on the use; there was enough /sufficient parking on this site. Please confirm and add a note to the site plan. A copy of the parking study will have to be submitted with this plan for our files. Please contact Gerald Gatobu at the Division of Zoning and Current Development at 296 -5832 ext. 3385 for further information. F AL Ir9 C Ell COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 18, 2008 Timmons Group c/o Ammy George 919 2nd St SE Charlottesville VA 22902 RE: ARB- 2008 -93: Moser Radiation Therapy Addition (Tax Map 59, Parcel 23C) Dear Ms. George: I have reviewed your recent submittals, which consisted of the following site plan sheets: C1 -C2 and C4 with revision date of 10- 13 -08; C3, C5 -C6 with revision date of 8- 19 -08; C7 with revision date of 9- 05 -08, L1 with revision date of 10- 22 -08; and L2 dated 15 April 2008. These drawings, together with the exterior elevations sheet dated 9/17/08 and the color rendering, undated, resolve the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. Approval received from the Albemarle County Architectural Review Board is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to use the materials as indicated on the site plan, attachments, and samples submitted. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. If you have any questions regarding this action, please feel free to contact me Sinc erely, vl" Margaret Maliszewski Principal Planner cc: ARB File Gerald Gatobu